{"canonical":"https://sealedbidder.com/opportunities/w911kb25r0026industryday","key":"W911KB25R0026INDUSTRYDAY","url":"https://sealedbidder.com/opportunities/w911kb25r0026industryday","title":"Port of Nome Modification Phase 1A, Nome, Alaska","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","notice_type":"s","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-01-16T23:00:00Z","first_posted":"2024-12-20","last_posted":"2025-02-11","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W2SN ENDIST ALASKA","naics":"237990","psc":"F006","set_aside":null,"place_state":"AK","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"02180","place_county_name":"Nome Census Area","place_city":"0254920","place_city_name":"Nome","winner":null,"award_amount":null,"publications":[{"notice_id":"eb0fa968d02e4a81beec0ade84c7f136","title":"Port of Nome Modification Phase 1A, Nome, Alaska","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","notice_type":"s","base_type":"r","posted":"2024-12-20","posted_at":null,"due_at":"2025-01-16T23:00:00Z","due_date":"2025-01-16","cancelled":null,"archived":null,"archive_date":"2025-01-31","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/eb0fa968d02e4a81beec0ade84c7f136/view","enriched":false,"history":[]},{"notice_id":"da987c0ca102409e9b598278faba006c","title":"Port of Nome Modification Phase 1A, Nome, Alaska","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","notice_type":"s","base_type":"s","posted":"2025-01-07","posted_at":"2025-01-07T20:41:24.695Z","due_at":"2025-01-16T23:00:00Z","due_date":"2025-01-16","cancelled":false,"archived":true,"archive_date":"2025-01-31","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/da987c0ca102409e9b598278faba006c/view","enriched":true,"history":[{"index":9,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T17:46:02.505Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"bd92defb57624840882dc04868c2a618","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","parent_opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"},{"index":6,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-24T19:45:05.134Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"84259a6979374eb9924b52b90dcaf8f6","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","parent_opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"},{"index":4,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-07T20:41:24.695Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"modify","opportunity_id":"da987c0ca102409e9b598278faba006c","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","parent_opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"},{"index":3,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-11-23T00:22:21.415Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"096a4d024092467bb463f58a80ac67cb","solicitation_number":"W911KB25R0026_Sources_Sought","parent_opportunity_id":"712514c39a764b5baa4f5c376b279d43","related_opportunity_id":"f29596d9f22c4abcb840a1a21f406a91"},{"index":2,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-21T01:08:47.237Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"}]},{"notice_id":"84259a6979374eb9924b52b90dcaf8f6","title":"Port of Nome Modification Phase 1A, Nome, Alaska","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","notice_type":"s","base_type":"s","posted":"2025-01-24","posted_at":"2025-01-24T19:45:05.134Z","due_at":"2025-01-16T23:00:00Z","due_date":"2025-01-16","cancelled":false,"archived":true,"archive_date":"2025-01-31","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/84259a6979374eb9924b52b90dcaf8f6/view","enriched":true,"history":[{"index":9,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T17:46:02.505Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"bd92defb57624840882dc04868c2a618","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","parent_opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"},{"index":6,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-24T19:45:05.134Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"84259a6979374eb9924b52b90dcaf8f6","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","parent_opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"},{"index":4,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-07T20:41:24.695Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"modify","opportunity_id":"da987c0ca102409e9b598278faba006c","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","parent_opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"},{"index":3,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-11-23T00:22:21.415Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"096a4d024092467bb463f58a80ac67cb","solicitation_number":"W911KB25R0026_Sources_Sought","parent_opportunity_id":"712514c39a764b5baa4f5c376b279d43","related_opportunity_id":"f29596d9f22c4abcb840a1a21f406a91"},{"index":2,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-21T01:08:47.237Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"}]},{"notice_id":"bd92defb57624840882dc04868c2a618","title":"Port of Nome Modification Phase 1A, Nome, Alaska","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","notice_type":"s","base_type":"s","posted":"2025-02-11","posted_at":"2025-02-11T17:46:02.505Z","due_at":"2025-01-16T23:00:00Z","due_date":"2025-01-16","cancelled":false,"archived":true,"archive_date":"2025-09-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/bd92defb57624840882dc04868c2a618/view","enriched":true,"history":[{"index":9,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T17:46:02.505Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"bd92defb57624840882dc04868c2a618","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","parent_opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"},{"index":6,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-24T19:45:05.134Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"84259a6979374eb9924b52b90dcaf8f6","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","parent_opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"},{"index":4,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-07T20:41:24.695Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"modify","opportunity_id":"da987c0ca102409e9b598278faba006c","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","parent_opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"},{"index":3,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-11-23T00:22:21.415Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"096a4d024092467bb463f58a80ac67cb","solicitation_number":"W911KB25R0026_Sources_Sought","parent_opportunity_id":"712514c39a764b5baa4f5c376b279d43","related_opportunity_id":"f29596d9f22c4abcb840a1a21f406a91"},{"index":2,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-21T01:08:47.237Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"}]}],"latest_notice_id":"bd92defb57624840882dc04868c2a618","first_type":"s","notices":[{"dates":{"posted":"2024-12-20","response_deadline":{"raw":"2025-01-16T14:00:00-09:00","utc":"2025-01-16T23:00:00Z","date":"2025-01-16","time":"14:00:00","utc_offset_seconds":-32400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/eb0fa968d02e4a81beec0ade84c7f136/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Port of Nome Modification Phase 1A, Nome, Alaska","agency":{"office":{"code":"W911KB","name":"W2SN ENDIST ALASKA"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"99506-0898","city":"ANCHORAGE","state":"AK","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-01-31","archive_type":"auto15"},"contacts":[{"name":"Tammy Davis","role":"primary","email":"tammy.davis@usace.army.mil"},{"name":"Michelle Mandel","role":"secondary","email":"MICHELLE.R.MANDEL@USACE.ARMY.MIL"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"eb0fa968d02e4a81beec0ade84c7f136","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"52850b63ce7da0e8e2916bf388a258c2c9ce23a9ab13bd6c2fc1d2a2681a8387","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY TO ANNOUNCE AN INDUSTRY DAY FOR PORT OF NOME MODIFICATION PHASE 1A AS FOLLOWS: U.S. Army Corps of Engineers, Alaska District will conduct an Industry Day to improve the industry's understanding of USACE's Port of Nome Modification Phase 1A Design Bid Build, Construction Project. The Phase 1A requirements include a 1,200-foot causeway extension consisting of a layered aggregate and rock embankment protected by 18-ton armor stone. The causeway extension incorporates a 30-foot wide road surface and includes a 600-foot long OpenCell™ sheet pile dock. This project includes removal of the 250-foot long Spur Breakwater and existing 22-ton armor stone and B rock underlayer at the nose of the causeway. Construction of the armor protection includes excavation of seabed material which will be placed upland or in a nearby nearshore placement zone to the east of the harbor at the Port on Nome in Nome, Alaska. The Alaksa District will answer questions on the Phase 1A project and gain an understanding of how the contractor community can support this project. The goals of this industry day are to: 1) Familiarize the industry with the Phase 1A requirements at Nome, Alaska. 2) Receive feedback from industry. The Industry Day presentation will be held on Thursday, January 16, 2024, from 10:00 – 11:00 AM (Alaska Standard Time) at the Old St. Joe’s Hall located at 407 Bering St., Nome, AK 99762. One-on-One consultation with the Government will follow the presentation with contractors in attendance that wish to participate in these discussions. Items conversed will NOT BE made public. Limited time slots exist from 12:00-15:00 - sign up will be provided at the site. It is anticipated that a draft solicitation will be released prior to the industry day. Each participant is required to submit the following information in advance of the industry day: (1) First and Last name. (2) Company Submit the required information to Tammy.Davis@usace.army.mil and michelle.r.mandel@usace.army.mil by January 14, 2025, 14:00 Alaska Time. Attendance at the Industry Day is voluntary and is not required to participate in the proposed acquisition. Contractors are required to secure their own lodging and transportation to this event. PORT OF NOME MODIFICATION PHASE 1A REQUIREMENT: REQUIREMENT: Phase 1A – West Causeway Extension Construction of approximately 1,200 linear feet, quarry stone, causeway. The causeway extension cross sections will be like the existing West causeway. The causeway extension will consist of 18-ton A1 rock, 3600 lbs. B1 rock, 180 lbs. C1 rock, 12.25 Ton A2 rock, 2450 lbs. B2 rock, 130 lbs. C2 rock, filter material, and E and F fill. Rocks and material placement equipment will need to be capable of accurate placement to -35 feet MLLW. Mechanical dredge equipment will need to be capable of fine and coarse grain sediment removal, including cobbles and boulders, to depths of -35 feet MLLW. Construction of 600 linear feet of driven sheet pile docks. New High Mast Lighting concrete foundations. Existing Stub Breakwater removal. Construction contract award anticipated for 4Q FY25. Feedback from the Industry Day participants on the following areas is requested: Feedback on construction schedule and sequencing. Feedback on site access and traffic control. Feedback on unionized labor agreement.","origin":"extract"},"notice_type":{"code":"s","label":"Special Notice"},"schema_version":1,"solicitation_number":"W911KB25R0026_INDUSTRY_DAY","place_of_performance":{"zip":"99762","city":{"name":"Nome"},"state":{"code":"AK"},"country":{"code":"USA"}},"product_service_code":"F006"},{"dates":{"posted":"2025-01-07","posted_at":"2025-01-07T20:41:24.695Z","created_at":"2025-01-07T19:29:54.500Z","modified_at":"2025-10-01T04:00:10.590Z","response_deadline":{"raw":"2025-01-16T14:00:00-09:00","utc":"2025-01-16T23:00:00Z","date":"2025-01-16","time":"14:00:00","timezone":"America/Anchorage","utc_offset_seconds":-32400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/da987c0ca102409e9b598278faba006c/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Port of Nome Modification Phase 1A, Nome, Alaska","agency":{"office":{"code":"W911KB","name":"W2SN ENDIST ALASKA"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"99506-0898","city":"ANCHORAGE","state":"AK","country":"USA"},"organization_id":"100513801","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-01-31","archive_type":"auto15"},"history":[{"index":9,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T17:46:02.505Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"bd92defb57624840882dc04868c2a618","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","parent_opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"},{"index":6,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-24T19:45:05.134Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"84259a6979374eb9924b52b90dcaf8f6","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","parent_opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"},{"index":4,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-07T20:41:24.695Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"modify","opportunity_id":"da987c0ca102409e9b598278faba006c","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","parent_opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"},{"index":3,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-11-23T00:22:21.415Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"096a4d024092467bb463f58a80ac67cb","solicitation_number":"W911KB25R0026_Sources_Sought","parent_opportunity_id":"712514c39a764b5baa4f5c376b279d43","related_opportunity_id":"f29596d9f22c4abcb840a1a21f406a91"},{"index":2,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-21T01:08:47.237Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"}],"contacts":[{"name":"Tammy Davis","role":"primary","email":"tammy.davis@usace.army.mil"},{"name":"Michelle Mandel","role":"secondary","email":"MICHELLE.R.MANDEL@USACE.ARMY.MIL"}],"base_type":{"code":"s","label":"Special Notice"},"notice_id":"da987c0ca102409e9b598278faba006c","lineage_id":"eb0fa968d02e4a81beec0ade84c7f136","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-26T03:44:41.021003979Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"5441c172ccbd827f30895a6a3f48c265a18176767bb79d31ec4acf025488ab2e","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-26T03:44:41.021003979Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY TO ANNOUNCE AN INDUSTRY DAY FOR PORT OF NOME MODIFICATION PHASE 1A&nbsp; AS FOLLOWS:</p>\n\n<p><br />\nU.S. Army Corps of Engineers, Alaska District will conduct an Industry Day to improve the industry&#39;s understanding of USACE&#39;s Port of Nome Modification Phase 1A Design Bid Build, Construction Project. The Phase 1A requirements include a 1,200-foot causeway extension consisting of a layered aggregate and rock embankment protected by 18-ton armor stone. The causeway extension incorporates a 30-foot wide road surface and includes a 600-foot long OpenCell&trade; sheet pile dock.&nbsp; This project includes removal of the 250-foot long Spur Breakwater and existing 22-ton armor stone and B rock underlayer at the nose of the causeway.&nbsp; Construction of the armor protection includes excavation of seabed material which will be placed upland or in a nearby nearshore placement zone to the east of the harbor at the Port on Nome in Nome, Alaska. The Alaksa District will answer questions on the Phase 1A project and gain an understanding of how the contractor community can support this project.</p>\n\n<p><br />\nThe goals of this industry day are to:</p>\n\n<p><br />\n1) Familiarize the industry with the Phase 1A requirements at Nome, Alaska.</p>\n\n<p>2) Receive feedback from industry.</p>\n\n<p><br />\nThe Industry Day presentation will be held on Thursday, January 16, 2024, from 10:00 &ndash; 11:00 AM (Alaska Standard Time) at the Old St. Joe&rsquo;s Hall located at 407 Bering St., Nome, AK 99762.&nbsp;</p>\n\n<p></p>\n\n<p><strong>Or you may attend virtually through Microsoft Teams:</strong></p>\n\n<p><strong>Join the meeting now </strong></p>\n\n<p><strong>Meeting ID: 993 315 232 541 </strong></p>\n\n<p><strong>Passcode: Cc9e76cJ </strong></p>\n\n<p><strong>Dial in by phone </strong></p>\n\n<p><strong>+1 503-207-9433,,608302610# United States, Beaverton </strong></p>\n\n<p><strong>Find a local number </strong></p>\n\n<p><strong>Phone conference ID: 608 302 610# </strong></p>\n\n<p><strong>For organizers: Meeting options | Reset dial-in PIN</strong></p>\n\n<p></p>\n\n<p>One-on-One consultation with the Government will follow the presentation with contractors in attendance that wish to participate in these discussions. Items conversed will NOT BE made public. Limited time slots exist from 12:00-15:00 - sign up will be provided at the site.</p>\n\n<p>It is anticipated that a draft solicitation will be released prior to the industry day.</p>\n\n<p><br />\nEach participant is required to submit the following information &nbsp;in advance of the industry day:</p>\n\n<p><br />\n(1) First and Last name.<br />\n(2) Company</p>\n\n<p>Submit the required information to Tammy.Davis@usace.army.mil,&nbsp; <strong>pamela.iverson@usace.army.mil</strong> and michelle.r.mandel@usace.army.mil by January 14, 2025, 14:00 Alaska Time.</p>\n\n<p><br />\nAttendance at the Industry Day is voluntary and is not required to participate in the proposed acquisition. Contractors are required to secure their own lodging and transportation to this event.</p>\n\n<p>PORT OF NOME MODIFICATION PHASE 1A REQUIREMENT:&nbsp;</p>\n\n<p>REQUIREMENT:</p>\n\n<p>Phase 1A &ndash; West Causeway Extension</p>\n\n<ul>\n\t<li>Construction of approximately 1,200 linear feet, quarry stone, causeway. The causeway extension cross sections will be like the existing West causeway. The causeway extension will consist of 18-ton A1 rock, 3600 lbs. B1 rock, 180 lbs. C1 rock, 12.25 Ton A2 rock, 2450 lbs. B2 rock, 130 lbs. C2 rock, filter material, and E and F fill. Rocks and material placement equipment will need to be capable of accurate placement to&nbsp;-35 feet MLLW. Mechanical dredge equipment will need to be capable of fine and coarse grain sediment removal, including cobbles and boulders, to depths of -35 feet MLLW.</li>\n\t<li>Construction of 600 linear feet of driven sheet pile docks.</li>\n\t<li>New High Mast Lighting concrete foundations.</li>\n\t<li>Existing Stub Breakwater removal.</li>\n\t<li>Construction contract award anticipated for 4Q FY25.</li>\n</ul>\n\n<p></p>\n\n<p>Feedback from the Industry Day participants on the following areas is</p>\n\n<p>requested:</p>\n\n<p></p>\n\n<ul>\n\t<li>Feedback on construction schedule and sequencing.</li>\n\t<li>Feedback on site access and traffic control.</li>\n\t<li>Feedback on unionized labor agreement.</li>\n</ul>\n\n<p></p>","text":"THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY TO ANNOUNCE AN INDUSTRY DAY FOR PORT OF NOME MODIFICATION PHASE 1A AS FOLLOWS:\n\nU.S. Army Corps of Engineers, Alaska District will conduct an Industry Day to improve the industry's understanding of USACE's Port of Nome Modification Phase 1A Design Bid Build, Construction Project. The Phase 1A requirements include a 1,200-foot causeway extension consisting of a layered aggregate and rock embankment protected by 18-ton armor stone. The causeway extension incorporates a 30-foot wide road surface and includes a 600-foot long OpenCell™ sheet pile dock. This project includes removal of the 250-foot long Spur Breakwater and existing 22-ton armor stone and B rock underlayer at the nose of the causeway. Construction of the armor protection includes excavation of seabed material which will be placed upland or in a nearby nearshore placement zone to the east of the harbor at the Port on Nome in Nome, Alaska. The Alaksa District will answer questions on the Phase 1A project and gain an understanding of how the contractor community can support this project.\n\nThe goals of this industry day are to:\n\n1) Familiarize the industry with the Phase 1A requirements at Nome, Alaska.\n\n2) Receive feedback from industry.\n\nThe Industry Day presentation will be held on Thursday, January 16, 2024, from 10:00 – 11:00 AM (Alaska Standard Time) at the Old St. Joe’s Hall located at 407 Bering St., Nome, AK 99762.\n\nOr you may attend virtually through Microsoft Teams:\n\nJoin the meeting now\n\nMeeting ID: 993 315 232 541\n\nPasscode: Cc9e76cJ\n\nDial in by phone\n\n+1 503-207-9433,,608302610# United States, Beaverton\n\nFind a local number\n\nPhone conference ID: 608 302 610#\n\nFor organizers: Meeting options | Reset dial-in PIN\n\nOne-on-One consultation with the Government will follow the presentation with contractors in attendance that wish to participate in these discussions. Items conversed will NOT BE made public. Limited time slots exist from 12:00-15:00 - sign up will be provided at the site.\n\nIt is anticipated that a draft solicitation will be released prior to the industry day.\n\nEach participant is required to submit the following information in advance of the industry day:\n\n(1) First and Last name.\n\n(2) Company\n\nSubmit the required information to Tammy.Davis@usace.army.mil, pamela.iverson@usace.army.mil and michelle.r.mandel@usace.army.mil by January 14, 2025, 14:00 Alaska Time.\n\nAttendance at the Industry Day is voluntary and is not required to participate in the proposed acquisition. Contractors are required to secure their own lodging and transportation to this event.\n\nPORT OF NOME MODIFICATION PHASE 1A REQUIREMENT:\n\nREQUIREMENT:\n\nPhase 1A – West Causeway Extension\n\n• Construction of approximately 1,200 linear feet, quarry stone, causeway. The causeway extension cross sections will be like the existing West causeway. The causeway extension will consist of 18-ton A1 rock, 3600 lbs. B1 rock, 180 lbs. C1 rock, 12.25 Ton A2 rock, 2450 lbs. B2 rock, 130 lbs. C2 rock, filter material, and E and F fill. Rocks and material placement equipment will need to be capable of accurate placement to -35 feet MLLW. Mechanical dredge equipment will need to be capable of fine and coarse grain sediment removal, including cobbles and boulders, to depths of -35 feet MLLW.\n\n• Construction of 600 linear feet of driven sheet pile docks.\n\n• New High Mast Lighting concrete foundations.\n\n• Existing Stub Breakwater removal.\n\n• Construction contract award anticipated for 4Q FY25.\n\nFeedback from the Industry Day participants on the following areas is\n\nrequested:\n\n• Feedback on construction schedule and sequencing.\n\n• Feedback on site access and traffic control.\n\n• Feedback on unionized labor agreement.","origin":"detail"},"notice_type":{"code":"s","label":"Special Notice"},"schema_version":1,"solicitation_number":"W911KB25R0026_INDUSTRY_DAY","place_of_performance":{"zip":"99762","city":{"code":"54920","name":"Nome"},"state":{"code":"AK","name":"Alaska"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"F006"},{"dates":{"posted":"2025-01-24","posted_at":"2025-01-24T19:45:05.134Z","created_at":"2025-01-24T19:22:28.533Z","modified_at":"2025-10-01T04:00:10.590Z","response_deadline":{"raw":"2025-01-16T14:00:00-09:00","utc":"2025-01-16T23:00:00Z","date":"2025-01-16","time":"14:00:00","timezone":"America/Anchorage","utc_offset_seconds":-32400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/84259a6979374eb9924b52b90dcaf8f6/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Port of Nome Modification Phase 1A, Nome, Alaska","agency":{"office":{"code":"W911KB","name":"W2SN ENDIST ALASKA"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"99506-0898","city":"ANCHORAGE","state":"AK","country":"USA"},"organization_id":"100513801","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-01-31","archive_type":"auto15"},"history":[{"index":9,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T17:46:02.505Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"bd92defb57624840882dc04868c2a618","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","parent_opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"},{"index":6,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-24T19:45:05.134Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"84259a6979374eb9924b52b90dcaf8f6","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","parent_opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"},{"index":4,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-07T20:41:24.695Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"modify","opportunity_id":"da987c0ca102409e9b598278faba006c","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","parent_opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"},{"index":3,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-11-23T00:22:21.415Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"096a4d024092467bb463f58a80ac67cb","solicitation_number":"W911KB25R0026_Sources_Sought","parent_opportunity_id":"712514c39a764b5baa4f5c376b279d43","related_opportunity_id":"f29596d9f22c4abcb840a1a21f406a91"},{"index":2,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-21T01:08:47.237Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"}],"contacts":[{"name":"Tammy Davis","role":"primary","email":"tammy.davis@usace.army.mil"},{"name":"Michelle Mandel","role":"secondary","email":"MICHELLE.R.MANDEL@USACE.ARMY.MIL"}],"base_type":{"code":"s","label":"Special Notice"},"notice_id":"84259a6979374eb9924b52b90dcaf8f6","lineage_id":"eb0fa968d02e4a81beec0ade84c7f136","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-24T09:23:21.505650138Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"af5fe4d152722cdd4529a0835ea42155d46ae9e48799008b958f325ff56d18b8","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-24T09:23:21.505650138Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY TO ANNOUNCE AN INDUSTRY DAY FOR PORT OF NOME MODIFICATION PHASE 1A&nbsp; AS FOLLOWS:</p>\n\n<p><br />\nU.S. Army Corps of Engineers, Alaska District will conduct an Industry Day to improve the industry&#39;s understanding of USACE&#39;s Port of Nome Modification Phase 1A Design Bid Build, Construction Project. The Phase 1A requirements include a 1,200-foot causeway extension consisting of a layered aggregate and rock embankment protected by 18-ton armor stone. The causeway extension incorporates a 30-foot wide road surface and includes a 600-foot long OpenCell&trade; sheet pile dock.&nbsp; This project includes removal of the 250-foot long Spur Breakwater and existing 22-ton armor stone and B rock underlayer at the nose of the causeway.&nbsp; Construction of the armor protection includes excavation of seabed material which will be placed upland or in a nearby nearshore placement zone to the east of the harbor at the Port on Nome in Nome, Alaska. The Alaksa District will answer questions on the Phase 1A project and gain an understanding of how the contractor community can support this project.</p>\n\n<p><br />\nThe goals of this industry day are to:</p>\n\n<p><br />\n1) Familiarize the industry with the Phase 1A requirements at Nome, Alaska.</p>\n\n<p>2) Receive feedback from industry.</p>\n\n<p><br />\nThe Industry Day presentation will be held on Thursday, January 16, 2024, from 10:00 &ndash; 11:00 AM (Alaska Standard Time) at the Old St. Joe&rsquo;s Hall located at 407 Bering St., Nome, AK 99762.&nbsp;</p>\n\n<p></p>\n\n<p><strong>Or you may attend virtually through Microsoft Teams:</strong></p>\n\n<p><strong>Join the meeting now </strong></p>\n\n<p><strong>Meeting ID: 993 315 232 541 </strong></p>\n\n<p><strong>Passcode: Cc9e76cJ </strong></p>\n\n<p><strong>Dial in by phone </strong></p>\n\n<p><strong>+1 503-207-9433,,608302610# United States, Beaverton </strong></p>\n\n<p><strong>Find a local number </strong></p>\n\n<p><strong>Phone conference ID: 608 302 610# </strong></p>\n\n<p><strong>For organizers: Meeting options | Reset dial-in PIN</strong></p>\n\n<p></p>\n\n<p>One-on-One consultation with the Government will follow the presentation with contractors in attendance that wish to participate in these discussions. Items conversed will NOT BE made public. Limited time slots exist from 12:00-15:00 - sign up will be provided at the site.</p>\n\n<p>It is anticipated that a draft solicitation will be released prior to the industry day.</p>\n\n<p><br />\nEach participant is required to submit the following information &nbsp;in advance of the industry day:</p>\n\n<p><br />\n(1) First and Last name.<br />\n(2) Company</p>\n\n<p>Submit the required information to Tammy.Davis@usace.army.mil,&nbsp; <strong>pamela.iverson@usace.army.mil</strong> and michelle.r.mandel@usace.army.mil by January 14, 2025, 14:00 Alaska Time.</p>\n\n<p><br />\nAttendance at the Industry Day is voluntary and is not required to participate in the proposed acquisition. Contractors are required to secure their own lodging and transportation to this event.</p>\n\n<p>PORT OF NOME MODIFICATION PHASE 1A REQUIREMENT:&nbsp;</p>\n\n<p>REQUIREMENT:</p>\n\n<p>Phase 1A &ndash; West Causeway Extension</p>\n\n<ul>\n\t<li>Construction of approximately 1,200 linear feet, quarry stone, causeway. The causeway extension cross sections will be like the existing West causeway. The causeway extension will consist of 18-ton A1 rock, 3600 lbs. B1 rock, 180 lbs. C1 rock, 12.25 Ton A2 rock, 2450 lbs. B2 rock, 130 lbs. C2 rock, filter material, and E and F fill. Rocks and material placement equipment will need to be capable of accurate placement to&nbsp;-35 feet MLLW. Mechanical dredge equipment will need to be capable of fine and coarse grain sediment removal, including cobbles and boulders, to depths of -35 feet MLLW.</li>\n\t<li>Construction of 600 linear feet of driven sheet pile docks.</li>\n\t<li>New High Mast Lighting concrete foundations.</li>\n\t<li>Existing Stub Breakwater removal.</li>\n\t<li>Construction contract award anticipated for 4Q FY25.</li>\n</ul>\n\n<p></p>\n\n<p>Feedback from the Industry Day participants on the following areas is</p>\n\n<p>requested:</p>\n\n<p></p>\n\n<ul>\n\t<li>Feedback on construction schedule and sequencing.</li>\n\t<li>Feedback on site access and traffic control.</li>\n\t<li>Feedback on unionized labor agreement.</li>\n</ul>\n\n<p></p>","text":"THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY TO ANNOUNCE AN INDUSTRY DAY FOR PORT OF NOME MODIFICATION PHASE 1A AS FOLLOWS:\n\nU.S. Army Corps of Engineers, Alaska District will conduct an Industry Day to improve the industry's understanding of USACE's Port of Nome Modification Phase 1A Design Bid Build, Construction Project. The Phase 1A requirements include a 1,200-foot causeway extension consisting of a layered aggregate and rock embankment protected by 18-ton armor stone. The causeway extension incorporates a 30-foot wide road surface and includes a 600-foot long OpenCell™ sheet pile dock. This project includes removal of the 250-foot long Spur Breakwater and existing 22-ton armor stone and B rock underlayer at the nose of the causeway. Construction of the armor protection includes excavation of seabed material which will be placed upland or in a nearby nearshore placement zone to the east of the harbor at the Port on Nome in Nome, Alaska. The Alaksa District will answer questions on the Phase 1A project and gain an understanding of how the contractor community can support this project.\n\nThe goals of this industry day are to:\n\n1) Familiarize the industry with the Phase 1A requirements at Nome, Alaska.\n\n2) Receive feedback from industry.\n\nThe Industry Day presentation will be held on Thursday, January 16, 2024, from 10:00 – 11:00 AM (Alaska Standard Time) at the Old St. Joe’s Hall located at 407 Bering St., Nome, AK 99762.\n\nOr you may attend virtually through Microsoft Teams:\n\nJoin the meeting now\n\nMeeting ID: 993 315 232 541\n\nPasscode: Cc9e76cJ\n\nDial in by phone\n\n+1 503-207-9433,,608302610# United States, Beaverton\n\nFind a local number\n\nPhone conference ID: 608 302 610#\n\nFor organizers: Meeting options | Reset dial-in PIN\n\nOne-on-One consultation with the Government will follow the presentation with contractors in attendance that wish to participate in these discussions. Items conversed will NOT BE made public. Limited time slots exist from 12:00-15:00 - sign up will be provided at the site.\n\nIt is anticipated that a draft solicitation will be released prior to the industry day.\n\nEach participant is required to submit the following information in advance of the industry day:\n\n(1) First and Last name.\n\n(2) Company\n\nSubmit the required information to Tammy.Davis@usace.army.mil, pamela.iverson@usace.army.mil and michelle.r.mandel@usace.army.mil by January 14, 2025, 14:00 Alaska Time.\n\nAttendance at the Industry Day is voluntary and is not required to participate in the proposed acquisition. Contractors are required to secure their own lodging and transportation to this event.\n\nPORT OF NOME MODIFICATION PHASE 1A REQUIREMENT:\n\nREQUIREMENT:\n\nPhase 1A – West Causeway Extension\n\n• Construction of approximately 1,200 linear feet, quarry stone, causeway. The causeway extension cross sections will be like the existing West causeway. The causeway extension will consist of 18-ton A1 rock, 3600 lbs. B1 rock, 180 lbs. C1 rock, 12.25 Ton A2 rock, 2450 lbs. B2 rock, 130 lbs. C2 rock, filter material, and E and F fill. Rocks and material placement equipment will need to be capable of accurate placement to -35 feet MLLW. Mechanical dredge equipment will need to be capable of fine and coarse grain sediment removal, including cobbles and boulders, to depths of -35 feet MLLW.\n\n• Construction of 600 linear feet of driven sheet pile docks.\n\n• New High Mast Lighting concrete foundations.\n\n• Existing Stub Breakwater removal.\n\n• Construction contract award anticipated for 4Q FY25.\n\nFeedback from the Industry Day participants on the following areas is\n\nrequested:\n\n• Feedback on construction schedule and sequencing.\n\n• Feedback on site access and traffic control.\n\n• Feedback on unionized labor agreement.","origin":"detail"},"notice_type":{"code":"s","label":"Special Notice"},"schema_version":1,"solicitation_number":"W911KB25R0026_INDUSTRY_DAY","place_of_performance":{"zip":"99762","city":{"code":"54920","name":"Nome"},"state":{"code":"AK","name":"Alaska"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"F006"},{"dates":{"posted":"2025-02-11","posted_at":"2025-02-11T17:46:02.505Z","created_at":"2025-02-11T17:46:02.505Z","modified_at":"2025-10-01T04:00:10.590Z","response_deadline":{"raw":"2025-01-16T14:00:00-09:00","utc":"2025-01-16T23:00:00Z","date":"2025-01-16","time":"14:00:00","timezone":"America/Anchorage","utc_offset_seconds":-32400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/bd92defb57624840882dc04868c2a618/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Port of Nome Modification Phase 1A, Nome, Alaska","agency":{"office":{"code":"W911KB","name":"W2SN ENDIST ALASKA"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"99506-0898","city":"ANCHORAGE","state":"AK","country":"USA"},"organization_id":"100513801","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-09-30","archive_type":"auto_custom"},"history":[{"index":9,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T17:46:02.505Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"bd92defb57624840882dc04868c2a618","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","parent_opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"},{"index":6,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-24T19:45:05.134Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"84259a6979374eb9924b52b90dcaf8f6","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","parent_opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"},{"index":4,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-07T20:41:24.695Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"modify","opportunity_id":"da987c0ca102409e9b598278faba006c","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","parent_opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"},{"index":3,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-11-23T00:22:21.415Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"096a4d024092467bb463f58a80ac67cb","solicitation_number":"W911KB25R0026_Sources_Sought","parent_opportunity_id":"712514c39a764b5baa4f5c376b279d43","related_opportunity_id":"f29596d9f22c4abcb840a1a21f406a91"},{"index":2,"title":"Port of Nome Modification Phase 1A, Nome, Alaska","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-21T01:08:47.237Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"eb0fa968d02e4a81beec0ade84c7f136","solicitation_number":"W911KB25R0026_INDUSTRY_DAY","related_opportunity_id":"096a4d024092467bb463f58a80ac67cb"}],"contacts":[{"name":"Tammy Davis","role":"primary","email":"tammy.davis@usace.army.mil"},{"name":"Michelle Mandel","role":"secondary","email":"MICHELLE.R.MANDEL@USACE.ARMY.MIL"}],"base_type":{"code":"s","label":"Special Notice"},"notice_id":"bd92defb57624840882dc04868c2a618","lineage_id":"eb0fa968d02e4a81beec0ade84c7f136","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-23T00:23:15.775097379Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"dd93ff4213cabe346731bb056444e4bee68c4fc6a79df92067d2585fc3327e99","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-23T00:23:15.775097379Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY TO ANNOUNCE AN INDUSTRY DAY FOR PORT OF NOME MODIFICATION PHASE 1A&nbsp; AS FOLLOWS:</p>\n\n<p><br />\nU.S. Army Corps of Engineers, Alaska District will conduct an Industry Day to improve the industry&#39;s understanding of USACE&#39;s Port of Nome Modification Phase 1A Design Bid Build, Construction Project. The Phase 1A requirements include a 1,200-foot causeway extension consisting of a layered aggregate and rock embankment protected by 18-ton armor stone. The causeway extension incorporates a 30-foot wide road surface and includes a 600-foot long OpenCell&trade; sheet pile dock.&nbsp; This project includes removal of the 250-foot long Spur Breakwater and existing 22-ton armor stone and B rock underlayer at the nose of the causeway.&nbsp; Construction of the armor protection includes excavation of seabed material which will be placed upland or in a nearby nearshore placement zone to the east of the harbor at the Port on Nome in Nome, Alaska. The Alaksa District will answer questions on the Phase 1A project and gain an understanding of how the contractor community can support this project.</p>\n\n<p><br />\nThe goals of this industry day are to:</p>\n\n<p><br />\n1) Familiarize the industry with the Phase 1A requirements at Nome, Alaska.</p>\n\n<p>2) Receive feedback from industry.</p>\n\n<p><br />\nThe Industry Day presentation will be held on Thursday, January 16, 2024, from 10:00 &ndash; 11:00 AM (Alaska Standard Time) at the Old St. Joe&rsquo;s Hall located at 407 Bering St., Nome, AK 99762.&nbsp;</p>\n\n<p></p>\n\n<p><strong>Or you may attend virtually through Microsoft Teams:</strong></p>\n\n<p><strong>Join the meeting now </strong></p>\n\n<p><strong>Meeting ID: 993 315 232 541 </strong></p>\n\n<p><strong>Passcode: Cc9e76cJ </strong></p>\n\n<p><strong>Dial in by phone </strong></p>\n\n<p><strong>+1 503-207-9433,,608302610# United States, Beaverton </strong></p>\n\n<p><strong>Find a local number </strong></p>\n\n<p><strong>Phone conference ID: 608 302 610# </strong></p>\n\n<p><strong>For organizers: Meeting options | Reset dial-in PIN</strong></p>\n\n<p></p>\n\n<p>One-on-One consultation with the Government will follow the presentation with contractors in attendance that wish to participate in these discussions. Items conversed will NOT BE made public. Limited time slots exist from 12:00-15:00 - sign up will be provided at the site.</p>\n\n<p>It is anticipated that a draft solicitation will be released prior to the industry day.</p>\n\n<p><br />\nEach participant is required to submit the following information &nbsp;in advance of the industry day:</p>\n\n<p><br />\n(1) First and Last name.<br />\n(2) Company</p>\n\n<p>Submit the required information to Tammy.Davis@usace.army.mil,&nbsp; <strong>pamela.iverson@usace.army.mil</strong> and michelle.r.mandel@usace.army.mil by January 14, 2025, 14:00 Alaska Time.</p>\n\n<p><br />\nAttendance at the Industry Day is voluntary and is not required to participate in the proposed acquisition. Contractors are required to secure their own lodging and transportation to this event.</p>\n\n<p>PORT OF NOME MODIFICATION PHASE 1A REQUIREMENT:&nbsp;</p>\n\n<p>REQUIREMENT:</p>\n\n<p>Phase 1A &ndash; West Causeway Extension</p>\n\n<ul>\n\t<li>Construction of approximately 1,200 linear feet, quarry stone, causeway. The causeway extension cross sections will be like the existing West causeway. The causeway extension will consist of 18-ton A1 rock, 3600 lbs. B1 rock, 180 lbs. C1 rock, 12.25 Ton A2 rock, 2450 lbs. B2 rock, 130 lbs. C2 rock, filter material, and E and F fill. Rocks and material placement equipment will need to be capable of accurate placement to&nbsp;-35 feet MLLW. Mechanical dredge equipment will need to be capable of fine and coarse grain sediment removal, including cobbles and boulders, to depths of -35 feet MLLW.</li>\n\t<li>Construction of 600 linear feet of driven sheet pile docks.</li>\n\t<li>New High Mast Lighting concrete foundations.</li>\n\t<li>Existing Stub Breakwater removal.</li>\n\t<li>Construction contract award anticipated for 4Q FY25.</li>\n</ul>\n\n<p></p>\n\n<p>Feedback from the Industry Day participants on the following areas is</p>\n\n<p>requested:</p>\n\n<p></p>\n\n<ul>\n\t<li>Feedback on construction schedule and sequencing.</li>\n\t<li>Feedback on site access and traffic control.</li>\n\t<li>Feedback on unionized labor agreement.</li>\n</ul>\n\n<p></p>","text":"THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY TO ANNOUNCE AN INDUSTRY DAY FOR PORT OF NOME MODIFICATION PHASE 1A AS FOLLOWS:\n\nU.S. Army Corps of Engineers, Alaska District will conduct an Industry Day to improve the industry's understanding of USACE's Port of Nome Modification Phase 1A Design Bid Build, Construction Project. The Phase 1A requirements include a 1,200-foot causeway extension consisting of a layered aggregate and rock embankment protected by 18-ton armor stone. The causeway extension incorporates a 30-foot wide road surface and includes a 600-foot long OpenCell™ sheet pile dock. This project includes removal of the 250-foot long Spur Breakwater and existing 22-ton armor stone and B rock underlayer at the nose of the causeway. Construction of the armor protection includes excavation of seabed material which will be placed upland or in a nearby nearshore placement zone to the east of the harbor at the Port on Nome in Nome, Alaska. The Alaksa District will answer questions on the Phase 1A project and gain an understanding of how the contractor community can support this project.\n\nThe goals of this industry day are to:\n\n1) Familiarize the industry with the Phase 1A requirements at Nome, Alaska.\n\n2) Receive feedback from industry.\n\nThe Industry Day presentation will be held on Thursday, January 16, 2024, from 10:00 – 11:00 AM (Alaska Standard Time) at the Old St. Joe’s Hall located at 407 Bering St., Nome, AK 99762.\n\nOr you may attend virtually through Microsoft Teams:\n\nJoin the meeting now\n\nMeeting ID: 993 315 232 541\n\nPasscode: Cc9e76cJ\n\nDial in by phone\n\n+1 503-207-9433,,608302610# United States, Beaverton\n\nFind a local number\n\nPhone conference ID: 608 302 610#\n\nFor organizers: Meeting options | Reset dial-in PIN\n\nOne-on-One consultation with the Government will follow the presentation with contractors in attendance that wish to participate in these discussions. Items conversed will NOT BE made public. Limited time slots exist from 12:00-15:00 - sign up will be provided at the site.\n\nIt is anticipated that a draft solicitation will be released prior to the industry day.\n\nEach participant is required to submit the following information in advance of the industry day:\n\n(1) First and Last name.\n\n(2) Company\n\nSubmit the required information to Tammy.Davis@usace.army.mil, pamela.iverson@usace.army.mil and michelle.r.mandel@usace.army.mil by January 14, 2025, 14:00 Alaska Time.\n\nAttendance at the Industry Day is voluntary and is not required to participate in the proposed acquisition. Contractors are required to secure their own lodging and transportation to this event.\n\nPORT OF NOME MODIFICATION PHASE 1A REQUIREMENT:\n\nREQUIREMENT:\n\nPhase 1A – West Causeway Extension\n\n• Construction of approximately 1,200 linear feet, quarry stone, causeway. The causeway extension cross sections will be like the existing West causeway. The causeway extension will consist of 18-ton A1 rock, 3600 lbs. B1 rock, 180 lbs. C1 rock, 12.25 Ton A2 rock, 2450 lbs. B2 rock, 130 lbs. C2 rock, filter material, and E and F fill. Rocks and material placement equipment will need to be capable of accurate placement to -35 feet MLLW. Mechanical dredge equipment will need to be capable of fine and coarse grain sediment removal, including cobbles and boulders, to depths of -35 feet MLLW.\n\n• Construction of 600 linear feet of driven sheet pile docks.\n\n• New High Mast Lighting concrete foundations.\n\n• Existing Stub Breakwater removal.\n\n• Construction contract award anticipated for 4Q FY25.\n\nFeedback from the Industry Day participants on the following areas is\n\nrequested:\n\n• Feedback on construction schedule and sequencing.\n\n• Feedback on site access and traffic control.\n\n• Feedback on unionized labor agreement.","origin":"detail"},"notice_type":{"code":"s","label":"Special Notice"},"schema_version":1,"solicitation_number":"W911KB25R0026_INDUSTRY_DAY","place_of_performance":{"zip":"99762","city":{"code":"54920","name":"Nome"},"state":{"code":"AK","name":"Alaska"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"F006"}],"due_at":"2025-01-16T23:00:00Z","due_date":"2025-01-16","closes_at":"2025-01-16T23:00:00Z","awardable":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W911KB","office_name":"W2SN ENDIST ALASKA","state":"AK","county":"02180","county_name":"Nome Census Area","city":"0254920","city_name":"Nome","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-23T01:25:14.149439Z","principal_notice_id":"bd92defb57624840882dc04868c2a618","description":{"text":"THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY TO ANNOUNCE AN INDUSTRY DAY FOR PORT OF NOME MODIFICATION PHASE 1A AS FOLLOWS:\n\nU.S. Army Corps of Engineers, Alaska District will conduct an Industry Day to improve the industry's understanding of USACE's Port of Nome Modification Phase 1A Design Bid Build, Construction Project. The Phase 1A requirements include a 1,200-foot causeway extension consisting of a layered aggregate and rock embankment protected by 18-ton armor stone. The causeway extension incorporates a 30-foot wide road surface and includes a 600-foot long OpenCell™ sheet pile dock. This project includes removal of the 250-foot long Spur Breakwater and existing 22-ton armor stone and B rock underlayer at the nose of the causeway. Construction of the armor protection includes excavation of seabed material which will be placed upland or in a nearby nearshore placement zone to the east of the harbor at the Port on Nome in Nome, Alaska. The Alaksa District will answer questions on the Phase 1A project and gain an understanding of how the contractor community can support this project.\n\nThe goals of this industry day are to:\n\n1) Familiarize the industry with the Phase 1A requirements at Nome, Alaska.\n\n2) Receive feedback from industry.\n\nThe Industry Day presentation will be held on Thursday, January 16, 2024, from 10:00 – 11:00 AM (Alaska Standard Time) at the Old St. Joe’s Hall located at 407 Bering St., Nome, AK 99762.\n\nOr you may attend virtually through Microsoft Teams:\n\nJoin the meeting now\n\nMeeting ID: 993 315 232 541\n\nPasscode: Cc9e76cJ\n\nDial in by phone\n\n+1 503-207-9433,,608302610# United States, Beaverton\n\nFind a local number\n\nPhone conference ID: 608 302 610#\n\nFor organizers: Meeting options | Reset dial-in PIN\n\nOne-on-One consultation with the Government will follow the presentation with contractors in attendance that wish to participate in these discussions. Items conversed will NOT BE made public. Limited time slots exist from 12:00-15:00 - sign up will be provided at the site.\n\nIt is anticipated that a draft solicitation will be released prior to the industry day.\n\nEach participant is required to submit the following information in advance of the industry day:\n\n(1) First and Last name.\n\n(2) Company\n\nSubmit the required information to Tammy.Davis@usace.army.mil, pamela.iverson@usace.army.mil and michelle.r.mandel@usace.army.mil by January 14, 2025, 14:00 Alaska Time.\n\nAttendance at the Industry Day is voluntary and is not required to participate in the proposed acquisition. Contractors are required to secure their own lodging and transportation to this event.\n\nPORT OF NOME MODIFICATION PHASE 1A REQUIREMENT:\n\nREQUIREMENT:\n\nPhase 1A – West Causeway Extension\n\n• Construction of approximately 1,200 linear feet, quarry stone, causeway. The causeway extension cross sections will be like the existing West causeway. The causeway extension will consist of 18-ton A1 rock, 3600 lbs. B1 rock, 180 lbs. C1 rock, 12.25 Ton A2 rock, 2450 lbs. B2 rock, 130 lbs. C2 rock, filter material, and E and F fill. Rocks and material placement equipment will need to be capable of accurate placement to -35 feet MLLW. Mechanical dredge equipment will need to be capable of fine and coarse grain sediment removal, including cobbles and boulders, to depths of -35 feet MLLW.\n\n• Construction of 600 linear feet of driven sheet pile docks.\n\n• New High Mast Lighting concrete foundations.\n\n• Existing Stub Breakwater removal.\n\n• Construction contract award anticipated for 4Q FY25.\n\nFeedback from the Industry Day participants on the following areas is\n\nrequested:\n\n• Feedback on construction schedule and sequencing.\n\n• Feedback on site access and traffic control.\n\n• Feedback on unionized labor agreement.","html":"<p>THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY TO ANNOUNCE AN INDUSTRY DAY FOR PORT OF NOME MODIFICATION PHASE 1A&nbsp; AS FOLLOWS:</p>\n\n<p><br />\nU.S. Army Corps of Engineers, Alaska District will conduct an Industry Day to improve the industry&#39;s understanding of USACE&#39;s Port of Nome Modification Phase 1A Design Bid Build, Construction Project. The Phase 1A requirements include a 1,200-foot causeway extension consisting of a layered aggregate and rock embankment protected by 18-ton armor stone. The causeway extension incorporates a 30-foot wide road surface and includes a 600-foot long OpenCell&trade; sheet pile dock.&nbsp; This project includes removal of the 250-foot long Spur Breakwater and existing 22-ton armor stone and B rock underlayer at the nose of the causeway.&nbsp; Construction of the armor protection includes excavation of seabed material which will be placed upland or in a nearby nearshore placement zone to the east of the harbor at the Port on Nome in Nome, Alaska. The Alaksa District will answer questions on the Phase 1A project and gain an understanding of how the contractor community can support this project.</p>\n\n<p><br />\nThe goals of this industry day are to:</p>\n\n<p><br />\n1) Familiarize the industry with the Phase 1A requirements at Nome, Alaska.</p>\n\n<p>2) Receive feedback from industry.</p>\n\n<p><br />\nThe Industry Day presentation will be held on Thursday, January 16, 2024, from 10:00 &ndash; 11:00 AM (Alaska Standard Time) at the Old St. Joe&rsquo;s Hall located at 407 Bering St., Nome, AK 99762.&nbsp;</p>\n\n<p></p>\n\n<p><strong>Or you may attend virtually through Microsoft Teams:</strong></p>\n\n<p><strong>Join the meeting now </strong></p>\n\n<p><strong>Meeting ID: 993 315 232 541 </strong></p>\n\n<p><strong>Passcode: Cc9e76cJ </strong></p>\n\n<p><strong>Dial in by phone </strong></p>\n\n<p><strong>+1 503-207-9433,,608302610# United States, Beaverton </strong></p>\n\n<p><strong>Find a local number </strong></p>\n\n<p><strong>Phone conference ID: 608 302 610# </strong></p>\n\n<p><strong>For organizers: Meeting options | Reset dial-in PIN</strong></p>\n\n<p></p>\n\n<p>One-on-One consultation with the Government will follow the presentation with contractors in attendance that wish to participate in these discussions. Items conversed will NOT BE made public. Limited time slots exist from 12:00-15:00 - sign up will be provided at the site.</p>\n\n<p>It is anticipated that a draft solicitation will be released prior to the industry day.</p>\n\n<p><br />\nEach participant is required to submit the following information &nbsp;in advance of the industry day:</p>\n\n<p><br />\n(1) First and Last name.<br />\n(2) Company</p>\n\n<p>Submit the required information to Tammy.Davis@usace.army.mil,&nbsp; <strong>pamela.iverson@usace.army.mil</strong> and michelle.r.mandel@usace.army.mil by January 14, 2025, 14:00 Alaska Time.</p>\n\n<p><br />\nAttendance at the Industry Day is voluntary and is not required to participate in the proposed acquisition. Contractors are required to secure their own lodging and transportation to this event.</p>\n\n<p>PORT OF NOME MODIFICATION PHASE 1A REQUIREMENT:&nbsp;</p>\n\n<p>REQUIREMENT:</p>\n\n<p>Phase 1A &ndash; West Causeway Extension</p>\n\n<ul>\n\t<li>Construction of approximately 1,200 linear feet, quarry stone, causeway. The causeway extension cross sections will be like the existing West causeway. The causeway extension will consist of 18-ton A1 rock, 3600 lbs. B1 rock, 180 lbs. C1 rock, 12.25 Ton A2 rock, 2450 lbs. B2 rock, 130 lbs. C2 rock, filter material, and E and F fill. Rocks and material placement equipment will need to be capable of accurate placement to&nbsp;-35 feet MLLW. Mechanical dredge equipment will need to be capable of fine and coarse grain sediment removal, including cobbles and boulders, to depths of -35 feet MLLW.</li>\n\t<li>Construction of 600 linear feet of driven sheet pile docks.</li>\n\t<li>New High Mast Lighting concrete foundations.</li>\n\t<li>Existing Stub Breakwater removal.</li>\n\t<li>Construction contract award anticipated for 4Q FY25.</li>\n</ul>\n\n<p></p>\n\n<p>Feedback from the Industry Day participants on the following areas is</p>\n\n<p>requested:</p>\n\n<p></p>\n\n<ul>\n\t<li>Feedback on construction schedule and sequencing.</li>\n\t<li>Feedback on site access and traffic control.</li>\n\t<li>Feedback on unionized labor agreement.</li>\n</ul>\n\n<p></p>","origin":"detail"},"contacts":[{"name":"Tammy Davis","role":"primary","email":"tammy.davis@usace.army.mil"},{"name":"Michelle Mandel","role":"secondary","email":"MICHELLE.R.MANDEL@USACE.ARMY.MIL"}],"place_of_performance":{"zip":"99762","city":{"code":"54920","name":"Nome"},"state":{"code":"AK","name":"Alaska"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"99506-0898","city":"ANCHORAGE","state":"AK","country":"USA"},"naics_codes":["237990"],"award":null,"attachments":[{"resource_id":"7b108d06200c4dacbb4d273afd8c353c","name":"PoNM_Phase 1A_IndustryDay_20250115.pdf","kind":"file","mime_type":".pdf","size_bytes":5744918,"posted_at":"2025-01-24T19:45:05.134Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7b108d06200c4dacbb4d273afd8c353c/download","mirrored":false},{"resource_id":"b24351610f5a40cbba7b905e36f006dc","name":"Industry Day Nome Virtual.pdf","kind":"file","mime_type":".pdf","size_bytes":336087,"posted_at":"2025-01-24T19:45:05.134Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b24351610f5a40cbba7b905e36f006dc/download","mirrored":false},{"resource_id":"d20abe8e0b26491fb3bd3cd1d732fd10","name":"Industry Day Nome In Person_20250116_Redacted.pdf","kind":"file","mime_type":".pdf","size_bytes":575632,"posted_at":"2025-01-24T19:45:05.134Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d20abe8e0b26491fb3bd3cd1d732fd10/download","mirrored":false}],"awards":[],"related":[{"key":"W911KB27RWP01","latest_notice_id":"3c237827a28d40e49a4b753e571f5751","title":"ACC003 Weapons Generation Complex and Northern Flightline","solicitation_number":"W911KB27RWP01","notice_type":"o","first_type":"o","first_posted":"2026-11-10","last_posted":"2026-11-23","notices":3,"due_at":"2026-11-30T23:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W911KB","office_name":"W2SN ENDIST ALASKA","naics":"236220","psc":"Y1EA","set_aside":null,"state":"AK","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"site","state_evidence":"RECAPITALIZATION FTR PROGRAM AT JOINT BASE ELMENDORF-RICHARDSON","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"W911KB27RWP14","latest_notice_id":"4ed9f51d010e4e1d9954edf46b48a87d","title":"Request for Information - Market Intelligence for WAK030, WAK032, and WAK033","solicitation_number":"W911KB27RWP14","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-12-03T23:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W911KB","office_name":"W2SN ENDIST ALASKA","naics":null,"psc":null,"set_aside":null,"state":"HI","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"W911KB27RWP02","latest_notice_id":"5e06b207e59d4411ab6b80978e9b444b","title":"ACC004 Flight Simulator","solicitation_number":"W911KB27RWP02","notice_type":"o","first_type":"s","first_posted":"2026-09-14","last_posted":"2026-11-24","notices":3,"due_at":"2026-12-09T23:00:00Z","due_date":"2026-12-09","closes_at":"2026-12-09T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W911KB","office_name":"W2SN ENDIST ALASKA","naics":"236220","psc":"Y1BG","set_aside":null,"state":"AK","county":"02050","county_name":"Bethel Census Area","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"W911KB25R0032","latest_notice_id":"36f58ccc19e04752854dc01f0af35015","title":"FTG247 Replace UPS at IDT1, Fort Greely, Alaska","solicitation_number":"W911KB25R0032","notice_type":"p","first_type":"r","first_posted":"2024-12-04","last_posted":"2025-04-03","notices":3,"due_at":"2026-12-13T00:00:00Z","due_date":"2026-12-12","closes_at":"2026-12-13T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W911KB","office_name":"W2SN ENDIST ALASKA","naics":"237130","psc":"Y1BF","set_aside":"SBA","state":"AK","county":"02240","county_name":"Southeast Fairbanks Census Area","city":"0226100","city_name":"Fort Greely","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Fort Greely","site_key":"fort-greely-ak","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T03:25:58.922164Z"},{"key":"W911KB27RA002","latest_notice_id":"61f054fab3bc46cabc42e244076aa4aa","title":"2027-2029 Maintenance Dredging, Anchorage Harbor, Alaska","solicitation_number":"W911KB27RA002","notice_type":"o","first_type":"r","first_posted":"2026-04-17","last_posted":"2026-11-24","notices":8,"due_at":"2026-12-14T23:00:00Z","due_date":"2026-12-14","closes_at":"2026-12-14T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W911KB","office_name":"W2SN ENDIST ALASKA","naics":"237990","psc":"Z1KF","set_aside":null,"state":"AK","county":"02020","county_name":"Anchorage Municipality","city":"0203000","city_name":"Anchorage","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"}],"similar_open":[{"key":"W911KB27RA002","latest_notice_id":"61f054fab3bc46cabc42e244076aa4aa","title":"2027-2029 Maintenance Dredging, Anchorage Harbor, Alaska","solicitation_number":"W911KB27RA002","notice_type":"o","first_type":"r","first_posted":"2026-04-17","last_posted":"2026-11-24","notices":8,"due_at":"2026-12-14T23:00:00Z","due_date":"2026-12-14","closes_at":"2026-12-14T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W911KB","office_name":"W2SN ENDIST ALASKA","naics":"237990","psc":"Z1KF","set_aside":null,"state":"AK","county":"02020","county_name":"Anchorage Municipality","city":"0203000","city_name":"Anchorage","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"W911KB27BA004","latest_notice_id":"b4f0352db0c84e299a293f5562672335","title":"Port of Nome Modification - Phase 2","solicitation_number":"W911KB27BA004","notice_type":"o","first_type":"r","first_posted":"2026-08-27","last_posted":"2026-11-17","notices":5,"due_at":"2026-12-17T23:00:00Z","due_date":"2026-12-17","closes_at":"2026-12-17T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W911KB","office_name":"W2SN ENDIST ALASKA","naics":"237990","psc":"Y1KF","set_aside":null,"state":"AK","county":"02180","county_name":"Nome Census Area","city":"0254920","city_name":"Nome","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"W911KB27BA005","latest_notice_id":"e6ad8e60c59649a58d6107c3061be558","title":"Lowell Creek Tunnel Repairs, Seward, Alaska","solicitation_number":"W911KB27BA005","notice_type":"o","first_type":"r","first_posted":"2026-06-11","last_posted":"2026-11-23","notices":8,"due_at":"2026-12-23T23:00:00Z","due_date":"2026-12-23","closes_at":"2026-12-23T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W911KB","office_name":"W2SN ENDIST ALASKA","naics":"237990","psc":"Z2LC","set_aside":null,"state":"AK","county":"02122","county_name":"Kenai Peninsula Borough","city":"0268560","city_name":"Seward","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"}],"similar_open_total":143,"indexable":false}