# Replace leaky roof and transformers, Osan AB (LCS, MATOC Work Plan only)

Canonical: https://sealedbidder.com/opportunities/w90vn625r0001

- Solicitation number: W90VN6-25-R-0001
- Notice type: Combined synopsis and solicitation
- Status: Closed. Deadline was December 26, 2024 at 11:00 PM EST
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: 0906 Aq Co Contracting Bat (W90VN6)
- NAICS: 236220 Commercial and Institutional Building Construction
- Product or service code: Z1AA Maintenance Of Office Buildings
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 236220)
- Place of performance: Osan AB, KOR
- Who can bid, by location: Outside the US. The work is outside the United States.
- First posted: November 26, 2024
- Last posted: November 26, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/7f24d6ca0dc346b4b5aedd0360d69547/view

## Reading this notice

- Kind of notice: Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 31 days from the day the solicitation was posted, November 26, 2024, to the deadline.

## Description

**GENERAL:** The work to be performed for completion of this Work Plan project shall be as described in general below. 1.1 The contractor shall provide all labor, tools, equipment, supplies, and any other resources necessary to accomplish the scope of work contained herein and as included in the drawings and specifications. 1.2 All work shall be completed IAW specifications and standards referenced in section 3 and drawings associated with this project. 1.3.

**Contract Type:** This project is an individual Work Plan Task Order under the Multiple Award Task Order Contract (MATOC) issued by the 411th CSB, Korea. The definition of Work Plan is a task order in which the Government provides 30% of the concept design for the contract, and the contractor is responsible for completing and submitting 100% of the design submittals. The contractor must submit the following proposal submittals for the technical evaluation performed by Government during RFP period:

## Open now in the same industry

191 open in NAICS 236220.

- FY27 NRM - VISN Base Modernize Nurse Call - 539-23-101 (36C25027B0009), due November 30, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/36c25027b0009
- FY27 NRM - VISN Base Install Roof Equipment Railings - 539-22-206 (36C25027B0008), due November 30, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/36c25027b0008
- N4008426R7500 DB RMAC FACILITY IMPROVEMENT AT NETDC, SAN ANTONIO, ZAMBALES, PHILIPPINES (N4008426R7500), due November 30, 2026 at 11:00 PM EST. https://sealedbidder.com/opportunities/n4008426r7500

## Publications

- November 26, 2024: Combined synopsis and solicitation, due December 26, 2024 at 11:00 PM EST. Notice 7f24d6ca0dc346b4b5aedd0360d69547. https://sam.gov/workspace/contract/opp/7f24d6ca0dc346b4b5aedd0360d69547/view

## Points of contact

- Chaeyong Yi, chaeyong.yi5.ln@army.mil, 7576018
- SFC Dong H. Kim, dong.h.kim49.mil@army.mil

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/w90vn625r0001.
