Demolish Abandoned Bldg#930, #942, #947 & #1012, Osan AB (MATOC Work Plan)
W90VN6-24-R-0017
Department of the Army, 0906 Aq Co Contracting Bat. Commercial and Institutional Building Construction.
Response deadline
July 5, 2024 at 12:00 AM EDT
Closed 874 days ago. Posted June 9, 2024. Scheduled to archive July 20, 2024.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2024
191 like it are open now in commercial and institutional building construction
- FY27 NRM - VISN Base Modernize Nurse Call - 539-23-101
Department of Veterans Affairs, 250-Network Contract Office 10
PresolicitationSDVOSBNAICS 236220Location not published36C25027B0009Due in 4 daysNov 30 - FY27 NRM - VISN Base Install Roof Equipment Railings - 539-22-206
Department of Veterans Affairs, 250-Network Contract Office 10
PresolicitationSDVOSBNAICS 236220Location not published36C25027B0008Due in 4 daysNov 30 - N4008426R7500 DB RMAC FACILITY IMPROVEMENT AT NETDC, SAN ANTONIO, ZAMBALES, PHILIPPINES
Department of the Navy, Navfacsyscom FAR East
SolicitationNAICS 236220Outside the USN4008426R7500Due in 5 daysDec 1
All 191 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 26 days from the day the solicitation was posted, June 9, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
GENERAL: The work to be performed for completion of this project shall be as described in general below. The contractor shall provide all labor, tools, equipment, supplies, and any other resources necessary to accomplish the scope of work contained herein and as included in the drawings and specifications. All work shall be completed IAW specifications and standards referenced in section 3 and drawings associated with this project.
Contract Type: This project is an individual Work Plan Task Order under the Multiple Award Task Order Contract (MATOC) issued by the 411th CSB, Korea. The task order proposal submission requirements are as below. Unless otherwise specified in the Task Order RFP, the Contractor shall provide the following in response to a task order RFP.
Price Proposal Offer Breakdown: The quantity of all materials and labors in the offer breakdown shall be prepared based on the contract drawing and manufacturer’s technical datasheet with materials coverage rates provided by manufacturer. Government provides 30% of concept design for the contract and contractor will accomplish and submit 100% design. Following design data and drawings shall be submitted pre-award (Technical Evaluation Purpose) and post-award (100% design submittal).
Required conceptual drawings for technical evaluation purpose (Pre-award proposal) Site plan/Removal/Demolition plan Profile and section detail drawings for reinforced retaining wall (B930 & B1012) Earth shoring plan Grading plan for B1012 Gravel parking lot plan for B930 Section for road widening for B930 Required final drawings after contract award (Post-award submittal) Site plan/Removal/Demolition plan Profile and section detail drawings for reinforced retaining wall (B930 & B1012) Earth shoring plan Grading plan for B1012 Gravel parking lot plan for B930 Section for road widening for B930 Details for concrete stairway, handrail for B1012 Details for storm drainage for B1012 Construction, contraction, expansion joint plans for retaining walls Final drawing package submittal including details and plans of each project areas shall be submitted within 30 days after pre-construction meeting.
Ownership of Construction Drawings: The Government shall take full ownership of the drawings submitted with the proposal and after contract award.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 9, 2024
Combined synopsis and solicitation
Due July 5, 2024 at 12:00 AM EDT. SAM.gov, notice ab2fdf7480194ae4929b5dbbe4b60ead