Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,695 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans

Combined synopsis and solicitation

Demolish Abandoned Bldg#930, #942, #947 & #1012, Osan AB (MATOC Work Plan)

W90VN6-24-R-0017

Department of the Army, 0906 Aq Co Contracting Bat. Commercial and Institutional Building Construction.

Response deadline

July 5, 2024 at 12:00 AM EDT

Closed 874 days ago. Posted June 9, 2024. Scheduled to archive July 20, 2024.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2024

191 like it are open now in commercial and institutional building construction

All 191 open in commercial and institutional building construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
Time to respond
Bidders had 26 days from the day the solicitation was posted, June 9, 2024, to the deadline.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

GENERAL: The work to be performed for completion of this project shall be as described in general below. The contractor shall provide all labor, tools, equipment, supplies, and any other resources necessary to accomplish the scope of work contained herein and as included in the drawings and specifications. All work shall be completed IAW specifications and standards referenced in section 3 and drawings associated with this project.

Contract Type: This project is an individual Work Plan Task Order under the Multiple Award Task Order Contract (MATOC) issued by the 411th CSB, Korea. The task order proposal submission requirements are as below. Unless otherwise specified in the Task Order RFP, the Contractor shall provide the following in response to a task order RFP.

Price Proposal Offer Breakdown: The quantity of all materials and labors in the offer breakdown shall be prepared based on the contract drawing and manufacturer’s technical datasheet with materials coverage rates provided by manufacturer. Government provides 30% of concept design for the contract and contractor will accomplish and submit 100% design. Following design data and drawings shall be submitted pre-award (Technical Evaluation Purpose) and post-award (100% design submittal).

Required conceptual drawings for technical evaluation purpose (Pre-award proposal) Site plan/Removal/Demolition plan Profile and section detail drawings for reinforced retaining wall (B930 & B1012) Earth shoring plan Grading plan for B1012 Gravel parking lot plan for B930 Section for road widening for B930 Required final drawings after contract award (Post-award submittal) Site plan/Removal/Demolition plan Profile and section detail drawings for reinforced retaining wall (B930 & B1012) Earth shoring plan Grading plan for B1012 Gravel parking lot plan for B930 Section for road widening for B930 Details for concrete stairway, handrail for B1012 Details for storm drainage for B1012 Construction, contraction, expansion joint plans for retaining walls Final drawing package submittal including details and plans of each project areas shall be submitted within 30 days after pre-construction meeting.

Ownership of Construction Drawings: The Government shall take full ownership of the drawings submitted with the proposal and after contract award.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 9, 2024

    Combined synopsis and solicitation

    Due July 5, 2024 at 12:00 AM EDT. SAM.gov, notice ab2fdf7480194ae4929b5dbbe4b60ead

Points of contact