Presolicitation, total small business set-aside, first published as sources sought
Synopsis for Overhaul of CH-47 Control Assembly, Quadrant
W58RGZ-26-B-0019
Department of the Army, W6QK ACC-RSA. Aircraft Manufacturing.
Response deadline
April 1, 2026 at 4:00 PM EDT
Closed 239 days ago. Posted March 17, 2026, first published March 3, 2026. Scheduled to archive April 16, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2026
59 like it are open now in aircraft manufacturing
- FIRE CONTROL RADAR (FCR)
Department of the Army, W6QK ACC-RSA
SolicitationNAICS 336411Redstone Arsenal, ALW58RGZ-26-R-0004Due in 4 daysNov 30 - Uncrewed Aircraft System Marketplace Commercial Solutions Opening
Department of the Army, W6QK ACC-RSA
SolicitationNAICS 336411Ship to Redstone Arsenal, ALW58RGZ26SC001Closes in 1566 daysMar 11, 2031 - GEAR,SPUR
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 336411Ship to the buyerSPE7LX27U0646Due in 2 daysNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 336411 (aircraft manufacturing), means no more than 1,500 employees, counted with affiliates. Open Small business opportunities
- What comes next
- No solicitation was published under this number after the sources sought of March 3, 2026. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
This is a 100% Small Business Set-Aside.
The Contractor shall furnish all services, facilities, labor, parts, materials, equipment, tools and data (other than Government Furnished Property), necessary to accomplish the inspection and overhaul of the following assets:
NOMENCLATURE: CH-47 Control Assembly, Quadrant
INPUT/OUTPUT NSN: 1680-01-549-4959
INPUT/OUTPUT P/N: 145ES010-8
ESTIMATED QUANTITY RANGE: Minimum 9 each – Maximum 54 each
(Maximum includes a Foreign Military Sales (FMS) Quantity of 9 each)
This requirement is to fulfill the government’s need for the overhaul of the Control Assembly, Quadrant, NSN 1680-01-549-4959. The proposed contractual action is a five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) overhaul contract. The Control Assembly, Quadrant is not a Critical Safety Item (CSI). The overhaul shall be accomplished in accordance with Government specifications. The overhaul requires the complete restoration of unserviceable assets to a like-new, fully serviceable, and air-worthy condition in accordance with the specifications outlined in the Depot Maintenance Work Requirement (DMWR) 1-1680-391, Revision date 7/21/2017, Change # 0. This effort is essential for the ongoing sustainment and operational readiness of the CH-47 fleet.
An RFP will be issued at a later date for this requirement. No reimbursement will be made for any costs associated with providing information in response to this announcement and any follow-up information requested. No basis for claim against the Government shall arise as a result of a response to this announcement or Government use of any information provided. All responsible sources may submit an offer which shall be considered by the agency. The closing date annotated is an estimated date dependent upon the date of the release of the solicitation; however, the solicitation will not open prior to the closing date stated on the synopsis. No telephone requests for the solicitation will be accepted.
Foreign firms are reminded that all request for solicitation must be processed through their respective embassies. All responsible sources may submit a proposal which shall be considered by the Agency. This requirement is currently unfunded. Award will be withheld pending receipt of sufficient funds.
Point of Contact is Cameron Maclin, cameron.a.maclin.civ@army.mil.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 3, 2026
Sources sought
Sources Sought for Overhaul of CH-47 Control Assembly, Quadrant
Due March 10, 2026 at 4:00 PM EDT. SAM.gov, notice e9ae7af39c774962bd39786a561032bc
2 revisions on SAM
- March 17, 2026: publish, presolicitation
- March 3, 2026: publish, sources sought
March 17, 2026
Presolicitation, originally sources sought
Due April 1, 2026 at 4:00 PM EDT. SAM.gov, notice 960fe77f53304d499e352d7c80b7472a
2 revisions on SAM
- March 17, 2026: publish, presolicitation
- March 3, 2026: publish, sources sought
Points of contact
- Cameron Maclincameron.a.maclin.civ@army.mil
- Charles R. Millercharles.r.miller254.civ@mail.mil