{"canonical":"https://sealedbidder.com/opportunities/w58rgz26b0005","key":"W58RGZ26B0005","url":"https://sealedbidder.com/opportunities/w58rgz26b0005","title":"Step One Technical Evaluation, Overhaul Elec Seq CTR unit","solicitation_number":"W58RGZ-26-B-0005","notice_type":"p","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-10-15T21:00:00Z","first_posted":"2025-09-16","last_posted":"2025-09-16","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W6QK ACC-RSA","naics":"335312","psc":"6110","set_aside":null,"place_state":null,"place_scope":"nationwide","site":null,"place_state_source":null,"place_evidence":"UTILIZED. REQUIRED DELIVERY SHALL BE FOB ORIGIN","place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"df440ff4d1a949b897a892e1021788b0","title":"Step One Technical Evaluation, Overhaul Elec Seq CTR unit","solicitation_number":"W58RGZ-26-B-0005","notice_type":"p","base_type":"p","posted":"2025-09-16","posted_at":"2025-09-16T13:30:54.641Z","due_at":"2025-10-15T21:00:00Z","due_date":"2025-10-15","cancelled":false,"archived":true,"archive_date":"2025-10-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/df440ff4d1a949b897a892e1021788b0/view","enriched":true,"history":[{"index":3,"title":"Step One Technical Evaluation, Overhaul Elec Seq CTR unit","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-16T13:30:54.641Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"df440ff4d1a949b897a892e1021788b0","solicitation_number":"W58RGZ-26-B-0005"}]}],"latest_notice_id":"df440ff4d1a949b897a892e1021788b0","first_type":"p","notices":[{"dates":{"posted":"2025-09-16","posted_at":"2025-09-16T13:30:54.641Z","created_at":"2025-09-16T13:05:22.456Z","modified_at":"2025-10-31T03:55:45.802Z","response_deadline":{"raw":"2025-10-15T17:00:00-04:00","utc":"2025-10-15T21:00:00Z","date":"2025-10-15","time":"17:00:00","timezone":"America/Chicago","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/df440ff4d1a949b897a892e1021788b0/view"},"naics":{"codes":["335312"],"primary":"335312"},"title":"Step One Technical Evaluation, Overhaul Elec Seq CTR unit","agency":{"office":{"code":"W58RGZ","name":"W6QK ACC-RSA"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"35898-0000","city":"REDSTONE ARSENAL","state":"AL","country":"USA"},"organization_id":"500045573","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-10-30","archive_type":"auto15"},"history":[{"index":3,"title":"Step One Technical Evaluation, Overhaul Elec Seq CTR unit","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-16T13:30:54.641Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"df440ff4d1a949b897a892e1021788b0","solicitation_number":"W58RGZ-26-B-0005"}],"contacts":[{"name":"Aysia Young","role":"primary","email":"aysia.l.young.civ@army.mil","phone":"5208519942"},{"name":"Edward A. Peterson","role":"secondary","email":"edward.a.peterson4.civ@army.mil","phone":"2563138529"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"df440ff4d1a949b897a892e1021788b0","lineage_id":"df440ff4d1a949b897a892e1021788b0","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-30T01:47:25.506557311Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"9aa8cdd0d7ec965379372a7d0c94f235f7124c39a86149ac382fa01f15749d0c","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-10-30T01:47:25.506557311Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><strong><u>STEP 1 Tech Evaluation&nbsp;</u></strong><u>Overhaul Elec Seq CTR unit (CAR)</u></p>\n\n<p><strong><u>W58RGZ-26-B-0005</u></strong></p>\n\n<p><strong><u>DATE:</u></strong><strong> </strong>16 SEPTEMBER</p>\n\n<p><strong><u>YEAR:</u></strong><strong> </strong>2025</p>\n\n<p><strong><u>CONTRACTING OFFICE ZIP CODE</u></strong>: 35898-5820</p>\n\n<p><strong><u>Product or Service Code: </u></strong>6110</p>\n\n<p><strong><u>Contracting Office Address: </u></strong></p>\n\n<p>U.S. Army Aviation and Missile Command (W58RGZ)</p>\n\n<p>ATTN: CCAM-ALB, Building 5303, Martin Road Redstone Arsenal, AL 35898-5280 (US)</p>\n\n<p><strong>SUBJECT:</strong> OVERHAUL OF THE ELECTRONIC SEQUENCING CONTROL UNIT for the (UH-60) Blackhawk TECHNICAL SUBMISSION (STEP-1)</p>\n\n<p></p>\n\n<p><strong>SOLICITATION NUMBER: </strong>W58RGZ-26-B-0005</p>\n\n<p>SET-ASIDE STATUS: N/A</p>\n\n<p><strong>RESPONSE DATE: 15 October 2025, 1700 hours, CST</strong>.</p>\n\n<p><strong><u>Contracting Officer:</u></strong><strong> </strong>Edward A. Peterson, email:edward.a.peterson4.civ@army.mil</p>\n\n<p><strong>DESCRIPTION: </strong>The contractor shall furnish all labor, facilities, parts, materials, equipment, tools and data (other than Government Furnished Property),necessary to accomplish the overhaul of the following assets:</p>\n\n<p>INPUT NSN: 6110-01-328-5258</p>\n\n<p>INPUT P/N: 2118806-2</p>\n\n<p>OUTPUT NSN: 6110-01-328-5258</p>\n\n<p>OUTPUT P/N: 2118806-2</p>\n\n<p>ESTIMATED QUANTITY RANGE: Minimum 53 each &ndash; Maximum 318 each,</p>\n\n<p>(FMS quantity- 53, US Quantity 265).</p>\n\n<p>The proposed contractual action will be a Five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) overhaul contract, with minimum/maximum quantities listed above. These items are commercial; FAR Part 12 will be utilized. Required delivery shall be FOB Origin. This procurement will be solicited as a Full and Open competitive requirement.</p>\n\n<ol>\n\t<li><strong>Step 1 of the solicitation </strong></li>\n</ol>\n\n<p>The U.S. Army Contracting Command &ndash; Redstone Arsenal (ACC-RSA) will issue an Invitation for Bid (IFB) for the overhaul of the ELEC SEQ CONTROL UNIT. All work shall be completed in accordance with the Statement of Work (SOW). The Government does not have a Depot Maintenance Work Requirement (DMWR) for the proposed solicitation.</p>\n\n<p>The IFB is being issued and Step-Two will be issued as a Full and Open Competitive action using the Two-Step Sealed Bidding Method in accordance with FAR Subpart 14.5. This notice constitutes the Step One Request for Technical Proposals in accordance with FAR 14.503-1. FAR 52.214-24 is incorporated by reference in this request. It is anticipated that a single Firm-fixed Price (FFP) type contract will be awarded to the responsive, responsible bidder.&nbsp; Only bids based upon technical proposals (Step-One) determined to be acceptable, either initially or as a result of discussions, will be considered further for award into Step-Two. Each bid in the second step must be based on the bidder&rsquo;s own technical proposal. Bidders shall submit bids that are acceptable without additional explanation or information. The Government may make a final determination regarding a technical proposal&rsquo;s acceptability solely based on the bid as submitted. The Government may proceed with Step-Two without requesting further information from any bidder. A notice of unacceptability will be forwarded to the Bidder upon completion of the technical proposal evaluation (Step-One) and final determination of unacceptability. <strong><u>This begins the start of step-one, technical submission.&nbsp; The technical information (step-one) will be submitted no later than October 15, 2025, 1700 hours CST.</u></strong></p>\n\n<p><strong><u>Technical proposals (Step-One) shall not include prices or pricing information. </u></strong></p>\n\n<p>Bidders shall ensure submission of fully complete bids, including all fill-in-the blanks. Any bidder submitting a bid agrees by submission that its bid and the prices contained therein will be valid for 120 days after receipt of bids.</p>\n\n<ol>\n\t<li><strong>Technical requirement</strong>:</li>\n</ol>\n\n<p>Technical acceptability for step-one will be determined by the bidder&rsquo;s response to the following questions.</p>\n\n<p>a. Has your company ever conducted a repair/overhaul or manufacture of the ELEC SEQ CONTROL UNIT for the UH-60? If not, has your company performed repair on the same, or like item in the past?</p>\n\n<p></p>\n\n<p>b. If yes, when, for how long, in what quantity, and what specific item? If it was under a military contract, what is the contract number?</p>\n\n<p></p>\n\n<p>c. Who was the Primary Contracting Officer? Provide the name, organization, and contact information.</p>\n\n<p></p>\n\n<p>d. Provide contact information for the Defense Contract Management Agency (DCMA) that served as your administrative contracting officer.</p>\n\n<p>e. Describe the following in the amount of detail necessary. If any portion of the overhaul program is outsourced, then the following requirements of line items E-K must be imposed on the outsourced vendor(s).</p>\n\n<p>&nbsp;&nbsp;Does your company have overhaul and replacement capability?</p>\n\n<p>&nbsp;Does your company have a documented quality plan/process?</p>\n\n<p>&nbsp;Please provide the following details regarding your company&rsquo;s quality plan.</p>\n\n<p>&nbsp;Calibration program</p>\n\n<p>&nbsp;Continuous improvement/self-audits program</p>\n\n<p>&nbsp;Non-conformance parts &amp; quality escapes</p>\n\n<p>&nbsp;Parts obsolescence</p>\n\n<p>&nbsp;Periodic training/certification/recertification program</p>\n\n<p>&nbsp;Certification/release of test stand/equipment for production</p>\n\n<p>&nbsp;Traceability of repair &amp; maintenance performed, records keeping program</p>\n\n<p>&nbsp;What are the required minimal qualification and specialized skills of an&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;</p>\n\n<p>&nbsp;electronic technician?</p>\n\n<p>&nbsp;Describe experience in depinning and pinning electrical connectors.</p>\n\n<p>&nbsp;Describe experience in replacing crimp type pins.</p>\n\n<p>&nbsp;Describe experience in circuit-board level repair, desolder and solder of &nbsp;</p>\n\n<p>&nbsp;electrical components.</p>\n\n<p>&nbsp;Describe experience in repairing and replacing electrical wires.</p>\n\n<p>&nbsp;Do you have electrical static discharge (ESD) prevention &nbsp;</p>\n\n<p>&nbsp;program/capability?</p>\n\n<p>&nbsp;Do you have paint removal capabilities?</p>\n\n<p>&nbsp;Do you have corrosion repair/prevention/application capability?</p>\n\n<p>&nbsp;Do you have painting and minor touch-up capability?</p>\n\n<p>&nbsp;Do you have repair capability for minor surface defects such as nicks, &nbsp;</p>\n\n<p>&nbsp;scratches on housing/enclosure?</p>\n\n<p>f. Do you have facilities, special tools and equipment as follows:</p>\n\n<p>Overhaul facility equipped with environmental controls of temperature, humidity, and adequate ventilation to vent hazardous fumes?</p>\n\n<p>Equipment, documentation, and procedure to fully support an IUID (Item Unique Identifier) program?</p>\n\n<p>Adequate workbenches with ESD control and access to standard shop tools?</p>\n\n<p>Availability of electronic test equipment necessary for troubleshooting of electrical circuit and performing milliohm electrical bond tests?</p>\n\n<p>If applicable, do you have the required equipment to install, verify, and update application software/firmware?</p>\n\n<p>Original Equipment Manufacturer (OEM) test stand/equipment, or certified equivalent for Acceptance Test Procedure (ATP)?</p>\n\n<p>*NOTE* For certified equivalent, be prepared to provide procedure and data&nbsp;&nbsp;&nbsp;&nbsp; establishing equivalency.</p>\n\n<p>g. Do you plan to outsource any or all portion of the repair/overhaul work?&nbsp; If yes, will you have any problem to flow-down/enforce Army requirements of line items E-K to the outsourced vendor(s)?</p>\n\n<ol>\n\t<li>Do you have a repair/overhaul plan for the subject end item or like end item?&nbsp; If not. are you willing to develop and submit the plan for evaluation?</li>\n\t<li>If yes, are you willing to submit a copy for evaluation? The plan must contain maintenance instructions and procedures covering the following major categories, and sample run sheet(s), in the following format, at a minimum:</li>\n</ol>\n\n<ul>\n\t<li>Receiving inspection instructions.</li>\n\t<li>Pre-test/Pre-shop analysis instructions.</li>\n\t<li>Disassembly instructions.</li>\n\t<li>Cleaning instructions.</li>\n\t<li>Overhaul Inspection Requirements (OIP).</li>\n\t<li>Repair and replacement instructions.</li>\n\t<li>Assembly instructions.</li>\n\t<li>Final Test instructions.</li>\n\t<li>Primer, paint, coating, and or corrosion protection instructions</li>\n\t<li>Packaging, marking and shipping instructions.</li>\n</ul>\n\n<p></p>\n\n<p>*NOTE* A routing document or shop traveler is NOT an acceptable substitution for an overhaul plan.</p>\n\n<p>h. Can your company acquire all necessary</p>\n\n<p>parts/components/subcomponents, tooling and materials to fully support an overhaul program?</p>\n\n<p></p>\n\n<p>i. If you have worked with Sikorsky, Cage CODE 78286 for the subject item, or one of its approved suppliers, provide a copy of a completed, showing item receipt, purchase order for the Original Equipment Manufacturer (OEM), or approved supplier, parts, or materials.</p>\n\n<p></p>\n\n<p>j. Do you possess any OEM data or drawings of this item, including Acceptance Test Procedure (ATP), Maintenance and Overhaul Procedures/Instructions, or Commercial Maintenance Manual (CMM)? Is it complete or partial?</p>\n\n<p>If yes to possession of complete or partial OEM Data or Drawings, how did your company acquire the rights to the data or drawings? Provide license or certificate for substantiation. Omission is not acceptable.</p>\n\n<p>k. Provide a copy of the purchase order, or other evidence that you have the rights to the data or drawings in your possession.</p>\n\n<p></p>\n\n<p><strong>k. Evaluation of Technical Proposals</strong></p>\n\n<p>The Government may make a final determination regarding a proposal&rsquo;s acceptability solely based on the proposal as submitted without requesting further information from any offeror. The Government will evaluate the technical proposal and bid samples submitted in response to Step 1 of the solicitation in accordance with (IAW) the evaluation approach indicated below. Overall, the submissions shall be categorized as:</p>\n\n<p><strong>Acceptable</strong>: Acceptable means the submitted technical proposal meets all the technical requirements in Section II, Technical Requirements, of the solicitation.</p>\n\n<p><strong>Unacceptable: </strong>Failure to provide a full and detailed response and the required substantiation documents to the line items E-K will render the submission unacceptable.</p>\n\n<p></p>\n\n<p>Bidders should submit proposals that are acceptable without additional explanation or information.</p>\n\n<p>The Government may make a final determination regarding a proposal&rsquo;s acceptability solely on the basis of the proposal as submitted; and may proceed with the second step without requesting further information from any bidder.&nbsp; However, the Government may request additional information from bidders of proposals that it considers reasonably susceptible of being made acceptable, and may discuss proposals with their bidders.</p>\n\n<p>A notice of unacceptability will be forwarded to the bidders upon completion of the proposal evaluation and final determination of unacceptability.</p>\n\n<p>Multiple technical proposals may be submitted by each offeror. No telephone request for the synopsis will be accepted. Request for the synopsis shall not be responded to. Your response to step-one, shall be electronically submitted to the Contract Specialist, Aysia Young in either Microsoft Word or Portable Document Format (PDF), via email aysia.l.young.civ@army.mil no later than 1700 p.m. Central Time on October 15, 2025 and reference the solicitation number in the subject line of the step-one.</p>\n\n<p>This requirement is currently unfunded. Award will be withheld pending receipt of sufficient funds. The closing date annotated is an estimated date and may be adjusted dependent upon the date of release of the synopsis; however, the synopsis will not close prior to the closing date stated above.</p>","text":"STEP 1 Tech Evaluation Overhaul Elec Seq CTR unit (CAR)\n\nW58RGZ-26-B-0005\n\nDATE: 16 SEPTEMBER\n\nYEAR: 2025\n\nCONTRACTING OFFICE ZIP CODE: 35898-5820\n\nProduct or Service Code: 6110\n\nContracting Office Address:\n\nU.S. Army Aviation and Missile Command (W58RGZ)\n\nATTN: CCAM-ALB, Building 5303, Martin Road Redstone Arsenal, AL 35898-5280 (US)\n\nSUBJECT: OVERHAUL OF THE ELECTRONIC SEQUENCING CONTROL UNIT for the (UH-60) Blackhawk TECHNICAL SUBMISSION (STEP-1)\n\nSOLICITATION NUMBER: W58RGZ-26-B-0005\n\nSET-ASIDE STATUS: N/A\n\nRESPONSE DATE: 15 October 2025, 1700 hours, CST.\n\nContracting Officer: Edward A. Peterson, email:edward.a.peterson4.civ@army.mil\n\nDESCRIPTION: The contractor shall furnish all labor, facilities, parts, materials, equipment, tools and data (other than Government Furnished Property),necessary to accomplish the overhaul of the following assets:\n\nINPUT NSN: 6110-01-328-5258\n\nINPUT P/N: 2118806-2\n\nOUTPUT NSN: 6110-01-328-5258\n\nOUTPUT P/N: 2118806-2\n\nESTIMATED QUANTITY RANGE: Minimum 53 each – Maximum 318 each,\n\n(FMS quantity- 53, US Quantity 265).\n\nThe proposed contractual action will be a Five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) overhaul contract, with minimum/maximum quantities listed above. These items are commercial; FAR Part 12 will be utilized. Required delivery shall be FOB Origin. This procurement will be solicited as a Full and Open competitive requirement.\n\n• Step 1 of the solicitation\n\nThe U.S. Army Contracting Command – Redstone Arsenal (ACC-RSA) will issue an Invitation for Bid (IFB) for the overhaul of the ELEC SEQ CONTROL UNIT. All work shall be completed in accordance with the Statement of Work (SOW). The Government does not have a Depot Maintenance Work Requirement (DMWR) for the proposed solicitation.\n\nThe IFB is being issued and Step-Two will be issued as a Full and Open Competitive action using the Two-Step Sealed Bidding Method in accordance with FAR Subpart 14.5. This notice constitutes the Step One Request for Technical Proposals in accordance with FAR 14.503-1. FAR 52.214-24 is incorporated by reference in this request. It is anticipated that a single Firm-fixed Price (FFP) type contract will be awarded to the responsive, responsible bidder. Only bids based upon technical proposals (Step-One) determined to be acceptable, either initially or as a result of discussions, will be considered further for award into Step-Two. Each bid in the second step must be based on the bidder’s own technical proposal. Bidders shall submit bids that are acceptable without additional explanation or information. The Government may make a final determination regarding a technical proposal’s acceptability solely based on the bid as submitted. The Government may proceed with Step-Two without requesting further information from any bidder. A notice of unacceptability will be forwarded to the Bidder upon completion of the technical proposal evaluation (Step-One) and final determination of unacceptability. This begins the start of step-one, technical submission. The technical information (step-one) will be submitted no later than October 15, 2025, 1700 hours CST.\n\nTechnical proposals (Step-One) shall not include prices or pricing information.\n\nBidders shall ensure submission of fully complete bids, including all fill-in-the blanks. Any bidder submitting a bid agrees by submission that its bid and the prices contained therein will be valid for 120 days after receipt of bids.\n\n• Technical requirement:\n\nTechnical acceptability for step-one will be determined by the bidder’s response to the following questions.\n\na. Has your company ever conducted a repair/overhaul or manufacture of the ELEC SEQ CONTROL UNIT for the UH-60? If not, has your company performed repair on the same, or like item in the past?\n\nb. If yes, when, for how long, in what quantity, and what specific item? If it was under a military contract, what is the contract number?\n\nc. Who was the Primary Contracting Officer? Provide the name, organization, and contact information.\n\nd. Provide contact information for the Defense Contract Management Agency (DCMA) that served as your administrative contracting officer.\n\ne. Describe the following in the amount of detail necessary. If any portion of the overhaul program is outsourced, then the following requirements of line items E-K must be imposed on the outsourced vendor(s).\n\nDoes your company have overhaul and replacement capability?\n\nDoes your company have a documented quality plan/process?\n\nPlease provide the following details regarding your company’s quality plan.\n\nCalibration program\n\nContinuous improvement/self-audits program\n\nNon-conformance parts & quality escapes\n\nParts obsolescence\n\nPeriodic training/certification/recertification program\n\nCertification/release of test stand/equipment for production\n\nTraceability of repair & maintenance performed, records keeping program\n\nWhat are the required minimal qualification and specialized skills of an\n\nelectronic technician?\n\nDescribe experience in depinning and pinning electrical connectors.\n\nDescribe experience in replacing crimp type pins.\n\nDescribe experience in circuit-board level repair, desolder and solder of\n\nelectrical components.\n\nDescribe experience in repairing and replacing electrical wires.\n\nDo you have electrical static discharge (ESD) prevention\n\nprogram/capability?\n\nDo you have paint removal capabilities?\n\nDo you have corrosion repair/prevention/application capability?\n\nDo you have painting and minor touch-up capability?\n\nDo you have repair capability for minor surface defects such as nicks,\n\nscratches on housing/enclosure?\n\nf. Do you have facilities, special tools and equipment as follows:\n\nOverhaul facility equipped with environmental controls of temperature, humidity, and adequate ventilation to vent hazardous fumes?\n\nEquipment, documentation, and procedure to fully support an IUID (Item Unique Identifier) program?\n\nAdequate workbenches with ESD control and access to standard shop tools?\n\nAvailability of electronic test equipment necessary for troubleshooting of electrical circuit and performing milliohm electrical bond tests?\n\nIf applicable, do you have the required equipment to install, verify, and update application software/firmware?\n\nOriginal Equipment Manufacturer (OEM) test stand/equipment, or certified equivalent for Acceptance Test Procedure (ATP)?\n\n*NOTE* For certified equivalent, be prepared to provide procedure and data establishing equivalency.\n\ng. Do you plan to outsource any or all portion of the repair/overhaul work? If yes, will you have any problem to flow-down/enforce Army requirements of line items E-K to the outsourced vendor(s)?\n\n• Do you have a repair/overhaul plan for the subject end item or like end item? If not. are you willing to develop and submit the plan for evaluation?\n\n• If yes, are you willing to submit a copy for evaluation? The plan must contain maintenance instructions and procedures covering the following major categories, and sample run sheet(s), in the following format, at a minimum:\n\n• Receiving inspection instructions.\n\n• Pre-test/Pre-shop analysis instructions.\n\n• Disassembly instructions.\n\n• Cleaning instructions.\n\n• Overhaul Inspection Requirements (OIP).\n\n• Repair and replacement instructions.\n\n• Assembly instructions.\n\n• Final Test instructions.\n\n• Primer, paint, coating, and or corrosion protection instructions\n\n• Packaging, marking and shipping instructions.\n\n*NOTE* A routing document or shop traveler is NOT an acceptable substitution for an overhaul plan.\n\nh. Can your company acquire all necessary\n\nparts/components/subcomponents, tooling and materials to fully support an overhaul program?\n\ni. If you have worked with Sikorsky, Cage CODE 78286 for the subject item, or one of its approved suppliers, provide a copy of a completed, showing item receipt, purchase order for the Original Equipment Manufacturer (OEM), or approved supplier, parts, or materials.\n\nj. Do you possess any OEM data or drawings of this item, including Acceptance Test Procedure (ATP), Maintenance and Overhaul Procedures/Instructions, or Commercial Maintenance Manual (CMM)? Is it complete or partial?\n\nIf yes to possession of complete or partial OEM Data or Drawings, how did your company acquire the rights to the data or drawings? Provide license or certificate for substantiation. Omission is not acceptable.\n\nk. Provide a copy of the purchase order, or other evidence that you have the rights to the data or drawings in your possession.\n\nk. Evaluation of Technical Proposals\n\nThe Government may make a final determination regarding a proposal’s acceptability solely based on the proposal as submitted without requesting further information from any offeror. The Government will evaluate the technical proposal and bid samples submitted in response to Step 1 of the solicitation in accordance with (IAW) the evaluation approach indicated below. Overall, the submissions shall be categorized as:\n\nAcceptable: Acceptable means the submitted technical proposal meets all the technical requirements in Section II, Technical Requirements, of the solicitation.\n\nUnacceptable: Failure to provide a full and detailed response and the required substantiation documents to the line items E-K will render the submission unacceptable.\n\nBidders should submit proposals that are acceptable without additional explanation or information.\n\nThe Government may make a final determination regarding a proposal’s acceptability solely on the basis of the proposal as submitted; and may proceed with the second step without requesting further information from any bidder. However, the Government may request additional information from bidders of proposals that it considers reasonably susceptible of being made acceptable, and may discuss proposals with their bidders.\n\nA notice of unacceptability will be forwarded to the bidders upon completion of the proposal evaluation and final determination of unacceptability.\n\nMultiple technical proposals may be submitted by each offeror. No telephone request for the synopsis will be accepted. Request for the synopsis shall not be responded to. Your response to step-one, shall be electronically submitted to the Contract Specialist, Aysia Young in either Microsoft Word or Portable Document Format (PDF), via email aysia.l.young.civ@army.mil no later than 1700 p.m. Central Time on October 15, 2025 and reference the solicitation number in the subject line of the step-one.\n\nThis requirement is currently unfunded. Award will be withheld pending receipt of sufficient funds. The closing date annotated is an estimated date and may be adjusted dependent upon the date of release of the synopsis; however, the synopsis will not close prior to the closing date stated above.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W58RGZ-26-B-0005","place_of_performance":{"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"6110"}],"due_at":"2025-10-15T21:00:00Z","due_date":"2025-10-15","closes_at":"2025-10-15T21:00:00Z","awardable":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W58RGZ","office_name":"W6QK ACC-RSA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","state_source":null,"state_evidence":"UTILIZED. REQUIRED DELIVERY SHALL BE FOB ORIGIN","site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-30T02:20:18.462851Z","principal_notice_id":"df440ff4d1a949b897a892e1021788b0","description":{"text":"STEP 1 Tech Evaluation Overhaul Elec Seq CTR unit (CAR)\n\nW58RGZ-26-B-0005\n\nDATE: 16 SEPTEMBER\n\nYEAR: 2025\n\nCONTRACTING OFFICE ZIP CODE: 35898-5820\n\nProduct or Service Code: 6110\n\nContracting Office Address:\n\nU.S. Army Aviation and Missile Command (W58RGZ)\n\nATTN: CCAM-ALB, Building 5303, Martin Road Redstone Arsenal, AL 35898-5280 (US)\n\nSUBJECT: OVERHAUL OF THE ELECTRONIC SEQUENCING CONTROL UNIT for the (UH-60) Blackhawk TECHNICAL SUBMISSION (STEP-1)\n\nSOLICITATION NUMBER: W58RGZ-26-B-0005\n\nSET-ASIDE STATUS: N/A\n\nRESPONSE DATE: 15 October 2025, 1700 hours, CST.\n\nContracting Officer: Edward A. Peterson, email:edward.a.peterson4.civ@army.mil\n\nDESCRIPTION: The contractor shall furnish all labor, facilities, parts, materials, equipment, tools and data (other than Government Furnished Property),necessary to accomplish the overhaul of the following assets:\n\nINPUT NSN: 6110-01-328-5258\n\nINPUT P/N: 2118806-2\n\nOUTPUT NSN: 6110-01-328-5258\n\nOUTPUT P/N: 2118806-2\n\nESTIMATED QUANTITY RANGE: Minimum 53 each – Maximum 318 each,\n\n(FMS quantity- 53, US Quantity 265).\n\nThe proposed contractual action will be a Five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) overhaul contract, with minimum/maximum quantities listed above. These items are commercial; FAR Part 12 will be utilized. Required delivery shall be FOB Origin. This procurement will be solicited as a Full and Open competitive requirement.\n\n• Step 1 of the solicitation\n\nThe U.S. Army Contracting Command – Redstone Arsenal (ACC-RSA) will issue an Invitation for Bid (IFB) for the overhaul of the ELEC SEQ CONTROL UNIT. All work shall be completed in accordance with the Statement of Work (SOW). The Government does not have a Depot Maintenance Work Requirement (DMWR) for the proposed solicitation.\n\nThe IFB is being issued and Step-Two will be issued as a Full and Open Competitive action using the Two-Step Sealed Bidding Method in accordance with FAR Subpart 14.5. This notice constitutes the Step One Request for Technical Proposals in accordance with FAR 14.503-1. FAR 52.214-24 is incorporated by reference in this request. It is anticipated that a single Firm-fixed Price (FFP) type contract will be awarded to the responsive, responsible bidder. Only bids based upon technical proposals (Step-One) determined to be acceptable, either initially or as a result of discussions, will be considered further for award into Step-Two. Each bid in the second step must be based on the bidder’s own technical proposal. Bidders shall submit bids that are acceptable without additional explanation or information. The Government may make a final determination regarding a technical proposal’s acceptability solely based on the bid as submitted. The Government may proceed with Step-Two without requesting further information from any bidder. A notice of unacceptability will be forwarded to the Bidder upon completion of the technical proposal evaluation (Step-One) and final determination of unacceptability. This begins the start of step-one, technical submission. The technical information (step-one) will be submitted no later than October 15, 2025, 1700 hours CST.\n\nTechnical proposals (Step-One) shall not include prices or pricing information.\n\nBidders shall ensure submission of fully complete bids, including all fill-in-the blanks. Any bidder submitting a bid agrees by submission that its bid and the prices contained therein will be valid for 120 days after receipt of bids.\n\n• Technical requirement:\n\nTechnical acceptability for step-one will be determined by the bidder’s response to the following questions.\n\na. Has your company ever conducted a repair/overhaul or manufacture of the ELEC SEQ CONTROL UNIT for the UH-60? If not, has your company performed repair on the same, or like item in the past?\n\nb. If yes, when, for how long, in what quantity, and what specific item? If it was under a military contract, what is the contract number?\n\nc. Who was the Primary Contracting Officer? Provide the name, organization, and contact information.\n\nd. Provide contact information for the Defense Contract Management Agency (DCMA) that served as your administrative contracting officer.\n\ne. Describe the following in the amount of detail necessary. If any portion of the overhaul program is outsourced, then the following requirements of line items E-K must be imposed on the outsourced vendor(s).\n\nDoes your company have overhaul and replacement capability?\n\nDoes your company have a documented quality plan/process?\n\nPlease provide the following details regarding your company’s quality plan.\n\nCalibration program\n\nContinuous improvement/self-audits program\n\nNon-conformance parts & quality escapes\n\nParts obsolescence\n\nPeriodic training/certification/recertification program\n\nCertification/release of test stand/equipment for production\n\nTraceability of repair & maintenance performed, records keeping program\n\nWhat are the required minimal qualification and specialized skills of an\n\nelectronic technician?\n\nDescribe experience in depinning and pinning electrical connectors.\n\nDescribe experience in replacing crimp type pins.\n\nDescribe experience in circuit-board level repair, desolder and solder of\n\nelectrical components.\n\nDescribe experience in repairing and replacing electrical wires.\n\nDo you have electrical static discharge (ESD) prevention\n\nprogram/capability?\n\nDo you have paint removal capabilities?\n\nDo you have corrosion repair/prevention/application capability?\n\nDo you have painting and minor touch-up capability?\n\nDo you have repair capability for minor surface defects such as nicks,\n\nscratches on housing/enclosure?\n\nf. Do you have facilities, special tools and equipment as follows:\n\nOverhaul facility equipped with environmental controls of temperature, humidity, and adequate ventilation to vent hazardous fumes?\n\nEquipment, documentation, and procedure to fully support an IUID (Item Unique Identifier) program?\n\nAdequate workbenches with ESD control and access to standard shop tools?\n\nAvailability of electronic test equipment necessary for troubleshooting of electrical circuit and performing milliohm electrical bond tests?\n\nIf applicable, do you have the required equipment to install, verify, and update application software/firmware?\n\nOriginal Equipment Manufacturer (OEM) test stand/equipment, or certified equivalent for Acceptance Test Procedure (ATP)?\n\n*NOTE* For certified equivalent, be prepared to provide procedure and data establishing equivalency.\n\ng. Do you plan to outsource any or all portion of the repair/overhaul work? If yes, will you have any problem to flow-down/enforce Army requirements of line items E-K to the outsourced vendor(s)?\n\n• Do you have a repair/overhaul plan for the subject end item or like end item? If not. are you willing to develop and submit the plan for evaluation?\n\n• If yes, are you willing to submit a copy for evaluation? The plan must contain maintenance instructions and procedures covering the following major categories, and sample run sheet(s), in the following format, at a minimum:\n\n• Receiving inspection instructions.\n\n• Pre-test/Pre-shop analysis instructions.\n\n• Disassembly instructions.\n\n• Cleaning instructions.\n\n• Overhaul Inspection Requirements (OIP).\n\n• Repair and replacement instructions.\n\n• Assembly instructions.\n\n• Final Test instructions.\n\n• Primer, paint, coating, and or corrosion protection instructions\n\n• Packaging, marking and shipping instructions.\n\n*NOTE* A routing document or shop traveler is NOT an acceptable substitution for an overhaul plan.\n\nh. Can your company acquire all necessary\n\nparts/components/subcomponents, tooling and materials to fully support an overhaul program?\n\ni. If you have worked with Sikorsky, Cage CODE 78286 for the subject item, or one of its approved suppliers, provide a copy of a completed, showing item receipt, purchase order for the Original Equipment Manufacturer (OEM), or approved supplier, parts, or materials.\n\nj. Do you possess any OEM data or drawings of this item, including Acceptance Test Procedure (ATP), Maintenance and Overhaul Procedures/Instructions, or Commercial Maintenance Manual (CMM)? Is it complete or partial?\n\nIf yes to possession of complete or partial OEM Data or Drawings, how did your company acquire the rights to the data or drawings? Provide license or certificate for substantiation. Omission is not acceptable.\n\nk. Provide a copy of the purchase order, or other evidence that you have the rights to the data or drawings in your possession.\n\nk. Evaluation of Technical Proposals\n\nThe Government may make a final determination regarding a proposal’s acceptability solely based on the proposal as submitted without requesting further information from any offeror. The Government will evaluate the technical proposal and bid samples submitted in response to Step 1 of the solicitation in accordance with (IAW) the evaluation approach indicated below. Overall, the submissions shall be categorized as:\n\nAcceptable: Acceptable means the submitted technical proposal meets all the technical requirements in Section II, Technical Requirements, of the solicitation.\n\nUnacceptable: Failure to provide a full and detailed response and the required substantiation documents to the line items E-K will render the submission unacceptable.\n\nBidders should submit proposals that are acceptable without additional explanation or information.\n\nThe Government may make a final determination regarding a proposal’s acceptability solely on the basis of the proposal as submitted; and may proceed with the second step without requesting further information from any bidder. However, the Government may request additional information from bidders of proposals that it considers reasonably susceptible of being made acceptable, and may discuss proposals with their bidders.\n\nA notice of unacceptability will be forwarded to the bidders upon completion of the proposal evaluation and final determination of unacceptability.\n\nMultiple technical proposals may be submitted by each offeror. No telephone request for the synopsis will be accepted. Request for the synopsis shall not be responded to. Your response to step-one, shall be electronically submitted to the Contract Specialist, Aysia Young in either Microsoft Word or Portable Document Format (PDF), via email aysia.l.young.civ@army.mil no later than 1700 p.m. Central Time on October 15, 2025 and reference the solicitation number in the subject line of the step-one.\n\nThis requirement is currently unfunded. Award will be withheld pending receipt of sufficient funds. The closing date annotated is an estimated date and may be adjusted dependent upon the date of release of the synopsis; however, the synopsis will not close prior to the closing date stated above.","html":"<p><strong><u>STEP 1 Tech Evaluation&nbsp;</u></strong><u>Overhaul Elec Seq CTR unit (CAR)</u></p>\n\n<p><strong><u>W58RGZ-26-B-0005</u></strong></p>\n\n<p><strong><u>DATE:</u></strong><strong> </strong>16 SEPTEMBER</p>\n\n<p><strong><u>YEAR:</u></strong><strong> </strong>2025</p>\n\n<p><strong><u>CONTRACTING OFFICE ZIP CODE</u></strong>: 35898-5820</p>\n\n<p><strong><u>Product or Service Code: </u></strong>6110</p>\n\n<p><strong><u>Contracting Office Address: </u></strong></p>\n\n<p>U.S. Army Aviation and Missile Command (W58RGZ)</p>\n\n<p>ATTN: CCAM-ALB, Building 5303, Martin Road Redstone Arsenal, AL 35898-5280 (US)</p>\n\n<p><strong>SUBJECT:</strong> OVERHAUL OF THE ELECTRONIC SEQUENCING CONTROL UNIT for the (UH-60) Blackhawk TECHNICAL SUBMISSION (STEP-1)</p>\n\n<p></p>\n\n<p><strong>SOLICITATION NUMBER: </strong>W58RGZ-26-B-0005</p>\n\n<p>SET-ASIDE STATUS: N/A</p>\n\n<p><strong>RESPONSE DATE: 15 October 2025, 1700 hours, CST</strong>.</p>\n\n<p><strong><u>Contracting Officer:</u></strong><strong> </strong>Edward A. Peterson, email:edward.a.peterson4.civ@army.mil</p>\n\n<p><strong>DESCRIPTION: </strong>The contractor shall furnish all labor, facilities, parts, materials, equipment, tools and data (other than Government Furnished Property),necessary to accomplish the overhaul of the following assets:</p>\n\n<p>INPUT NSN: 6110-01-328-5258</p>\n\n<p>INPUT P/N: 2118806-2</p>\n\n<p>OUTPUT NSN: 6110-01-328-5258</p>\n\n<p>OUTPUT P/N: 2118806-2</p>\n\n<p>ESTIMATED QUANTITY RANGE: Minimum 53 each &ndash; Maximum 318 each,</p>\n\n<p>(FMS quantity- 53, US Quantity 265).</p>\n\n<p>The proposed contractual action will be a Five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) overhaul contract, with minimum/maximum quantities listed above. These items are commercial; FAR Part 12 will be utilized. Required delivery shall be FOB Origin. This procurement will be solicited as a Full and Open competitive requirement.</p>\n\n<ol>\n\t<li><strong>Step 1 of the solicitation </strong></li>\n</ol>\n\n<p>The U.S. Army Contracting Command &ndash; Redstone Arsenal (ACC-RSA) will issue an Invitation for Bid (IFB) for the overhaul of the ELEC SEQ CONTROL UNIT. All work shall be completed in accordance with the Statement of Work (SOW). The Government does not have a Depot Maintenance Work Requirement (DMWR) for the proposed solicitation.</p>\n\n<p>The IFB is being issued and Step-Two will be issued as a Full and Open Competitive action using the Two-Step Sealed Bidding Method in accordance with FAR Subpart 14.5. This notice constitutes the Step One Request for Technical Proposals in accordance with FAR 14.503-1. FAR 52.214-24 is incorporated by reference in this request. It is anticipated that a single Firm-fixed Price (FFP) type contract will be awarded to the responsive, responsible bidder.&nbsp; Only bids based upon technical proposals (Step-One) determined to be acceptable, either initially or as a result of discussions, will be considered further for award into Step-Two. Each bid in the second step must be based on the bidder&rsquo;s own technical proposal. Bidders shall submit bids that are acceptable without additional explanation or information. The Government may make a final determination regarding a technical proposal&rsquo;s acceptability solely based on the bid as submitted. The Government may proceed with Step-Two without requesting further information from any bidder. A notice of unacceptability will be forwarded to the Bidder upon completion of the technical proposal evaluation (Step-One) and final determination of unacceptability. <strong><u>This begins the start of step-one, technical submission.&nbsp; The technical information (step-one) will be submitted no later than October 15, 2025, 1700 hours CST.</u></strong></p>\n\n<p><strong><u>Technical proposals (Step-One) shall not include prices or pricing information. </u></strong></p>\n\n<p>Bidders shall ensure submission of fully complete bids, including all fill-in-the blanks. Any bidder submitting a bid agrees by submission that its bid and the prices contained therein will be valid for 120 days after receipt of bids.</p>\n\n<ol>\n\t<li><strong>Technical requirement</strong>:</li>\n</ol>\n\n<p>Technical acceptability for step-one will be determined by the bidder&rsquo;s response to the following questions.</p>\n\n<p>a. Has your company ever conducted a repair/overhaul or manufacture of the ELEC SEQ CONTROL UNIT for the UH-60? If not, has your company performed repair on the same, or like item in the past?</p>\n\n<p></p>\n\n<p>b. If yes, when, for how long, in what quantity, and what specific item? If it was under a military contract, what is the contract number?</p>\n\n<p></p>\n\n<p>c. Who was the Primary Contracting Officer? Provide the name, organization, and contact information.</p>\n\n<p></p>\n\n<p>d. Provide contact information for the Defense Contract Management Agency (DCMA) that served as your administrative contracting officer.</p>\n\n<p>e. Describe the following in the amount of detail necessary. If any portion of the overhaul program is outsourced, then the following requirements of line items E-K must be imposed on the outsourced vendor(s).</p>\n\n<p>&nbsp;&nbsp;Does your company have overhaul and replacement capability?</p>\n\n<p>&nbsp;Does your company have a documented quality plan/process?</p>\n\n<p>&nbsp;Please provide the following details regarding your company&rsquo;s quality plan.</p>\n\n<p>&nbsp;Calibration program</p>\n\n<p>&nbsp;Continuous improvement/self-audits program</p>\n\n<p>&nbsp;Non-conformance parts &amp; quality escapes</p>\n\n<p>&nbsp;Parts obsolescence</p>\n\n<p>&nbsp;Periodic training/certification/recertification program</p>\n\n<p>&nbsp;Certification/release of test stand/equipment for production</p>\n\n<p>&nbsp;Traceability of repair &amp; maintenance performed, records keeping program</p>\n\n<p>&nbsp;What are the required minimal qualification and specialized skills of an&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;</p>\n\n<p>&nbsp;electronic technician?</p>\n\n<p>&nbsp;Describe experience in depinning and pinning electrical connectors.</p>\n\n<p>&nbsp;Describe experience in replacing crimp type pins.</p>\n\n<p>&nbsp;Describe experience in circuit-board level repair, desolder and solder of &nbsp;</p>\n\n<p>&nbsp;electrical components.</p>\n\n<p>&nbsp;Describe experience in repairing and replacing electrical wires.</p>\n\n<p>&nbsp;Do you have electrical static discharge (ESD) prevention &nbsp;</p>\n\n<p>&nbsp;program/capability?</p>\n\n<p>&nbsp;Do you have paint removal capabilities?</p>\n\n<p>&nbsp;Do you have corrosion repair/prevention/application capability?</p>\n\n<p>&nbsp;Do you have painting and minor touch-up capability?</p>\n\n<p>&nbsp;Do you have repair capability for minor surface defects such as nicks, &nbsp;</p>\n\n<p>&nbsp;scratches on housing/enclosure?</p>\n\n<p>f. Do you have facilities, special tools and equipment as follows:</p>\n\n<p>Overhaul facility equipped with environmental controls of temperature, humidity, and adequate ventilation to vent hazardous fumes?</p>\n\n<p>Equipment, documentation, and procedure to fully support an IUID (Item Unique Identifier) program?</p>\n\n<p>Adequate workbenches with ESD control and access to standard shop tools?</p>\n\n<p>Availability of electronic test equipment necessary for troubleshooting of electrical circuit and performing milliohm electrical bond tests?</p>\n\n<p>If applicable, do you have the required equipment to install, verify, and update application software/firmware?</p>\n\n<p>Original Equipment Manufacturer (OEM) test stand/equipment, or certified equivalent for Acceptance Test Procedure (ATP)?</p>\n\n<p>*NOTE* For certified equivalent, be prepared to provide procedure and data&nbsp;&nbsp;&nbsp;&nbsp; establishing equivalency.</p>\n\n<p>g. Do you plan to outsource any or all portion of the repair/overhaul work?&nbsp; If yes, will you have any problem to flow-down/enforce Army requirements of line items E-K to the outsourced vendor(s)?</p>\n\n<ol>\n\t<li>Do you have a repair/overhaul plan for the subject end item or like end item?&nbsp; If not. are you willing to develop and submit the plan for evaluation?</li>\n\t<li>If yes, are you willing to submit a copy for evaluation? The plan must contain maintenance instructions and procedures covering the following major categories, and sample run sheet(s), in the following format, at a minimum:</li>\n</ol>\n\n<ul>\n\t<li>Receiving inspection instructions.</li>\n\t<li>Pre-test/Pre-shop analysis instructions.</li>\n\t<li>Disassembly instructions.</li>\n\t<li>Cleaning instructions.</li>\n\t<li>Overhaul Inspection Requirements (OIP).</li>\n\t<li>Repair and replacement instructions.</li>\n\t<li>Assembly instructions.</li>\n\t<li>Final Test instructions.</li>\n\t<li>Primer, paint, coating, and or corrosion protection instructions</li>\n\t<li>Packaging, marking and shipping instructions.</li>\n</ul>\n\n<p></p>\n\n<p>*NOTE* A routing document or shop traveler is NOT an acceptable substitution for an overhaul plan.</p>\n\n<p>h. Can your company acquire all necessary</p>\n\n<p>parts/components/subcomponents, tooling and materials to fully support an overhaul program?</p>\n\n<p></p>\n\n<p>i. If you have worked with Sikorsky, Cage CODE 78286 for the subject item, or one of its approved suppliers, provide a copy of a completed, showing item receipt, purchase order for the Original Equipment Manufacturer (OEM), or approved supplier, parts, or materials.</p>\n\n<p></p>\n\n<p>j. Do you possess any OEM data or drawings of this item, including Acceptance Test Procedure (ATP), Maintenance and Overhaul Procedures/Instructions, or Commercial Maintenance Manual (CMM)? Is it complete or partial?</p>\n\n<p>If yes to possession of complete or partial OEM Data or Drawings, how did your company acquire the rights to the data or drawings? Provide license or certificate for substantiation. Omission is not acceptable.</p>\n\n<p>k. Provide a copy of the purchase order, or other evidence that you have the rights to the data or drawings in your possession.</p>\n\n<p></p>\n\n<p><strong>k. Evaluation of Technical Proposals</strong></p>\n\n<p>The Government may make a final determination regarding a proposal&rsquo;s acceptability solely based on the proposal as submitted without requesting further information from any offeror. The Government will evaluate the technical proposal and bid samples submitted in response to Step 1 of the solicitation in accordance with (IAW) the evaluation approach indicated below. Overall, the submissions shall be categorized as:</p>\n\n<p><strong>Acceptable</strong>: Acceptable means the submitted technical proposal meets all the technical requirements in Section II, Technical Requirements, of the solicitation.</p>\n\n<p><strong>Unacceptable: </strong>Failure to provide a full and detailed response and the required substantiation documents to the line items E-K will render the submission unacceptable.</p>\n\n<p></p>\n\n<p>Bidders should submit proposals that are acceptable without additional explanation or information.</p>\n\n<p>The Government may make a final determination regarding a proposal&rsquo;s acceptability solely on the basis of the proposal as submitted; and may proceed with the second step without requesting further information from any bidder.&nbsp; However, the Government may request additional information from bidders of proposals that it considers reasonably susceptible of being made acceptable, and may discuss proposals with their bidders.</p>\n\n<p>A notice of unacceptability will be forwarded to the bidders upon completion of the proposal evaluation and final determination of unacceptability.</p>\n\n<p>Multiple technical proposals may be submitted by each offeror. No telephone request for the synopsis will be accepted. Request for the synopsis shall not be responded to. Your response to step-one, shall be electronically submitted to the Contract Specialist, Aysia Young in either Microsoft Word or Portable Document Format (PDF), via email aysia.l.young.civ@army.mil no later than 1700 p.m. Central Time on October 15, 2025 and reference the solicitation number in the subject line of the step-one.</p>\n\n<p>This requirement is currently unfunded. Award will be withheld pending receipt of sufficient funds. The closing date annotated is an estimated date and may be adjusted dependent upon the date of release of the synopsis; however, the synopsis will not close prior to the closing date stated above.</p>","origin":"detail"},"contacts":[{"name":"Aysia Young","role":"primary","email":"aysia.l.young.civ@army.mil","phone":"5208519942"},{"name":"Edward A. Peterson","role":"secondary","email":"edward.a.peterson4.civ@army.mil","phone":"2563138529"}],"place_of_performance":{"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"35898-0000","city":"REDSTONE ARSENAL","state":"AL","country":"USA"},"naics_codes":["335312"],"award":null,"attachments":[],"awards":[],"related":[{"key":"W58RGZ26R00400001","latest_notice_id":"e1faa0368d7848e48481688cf8ca6af5","title":"UH-60 STAKING SET, BEARING","solicitation_number":"W58RGZ-26-R-0040_0001","notice_type":"o","first_type":"o","first_posted":"2026-10-01","last_posted":"2026-10-01","notices":1,"due_at":"2026-11-30T21:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W58RGZ","office_name":"W6QK ACC-RSA","naics":"334413","psc":"5980","set_aside":null,"state":"AL","county":"01089","county_name":"Madison County","city":"0163912","city_name":"Redstone Arsenal","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-02T04:16:43.273742Z"},{"key":"W58RGZ26B00120004","latest_notice_id":"4e703002132841afabc31acd496f3d51","title":"Overhaul of the UH-60 POWER TURBINE MODULE","solicitation_number":"W58RGZ-26-B-0012_0004","notice_type":"o","first_type":"o","first_posted":"2026-09-30","last_posted":"2026-09-30","notices":1,"due_at":"2026-11-30T21:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W58RGZ","office_name":"W6QK ACC-RSA","naics":"336412","psc":"2840","set_aside":null,"state":"AL","county":"01089","county_name":"Madison County","city":"0163912","city_name":"Redstone Arsenal","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-01T04:02:27.010479Z"},{"key":"W58RGZ26R0004","latest_notice_id":"342f3795cefb4401b44461935eac78d5","title":"FIRE CONTROL RADAR (FCR)","solicitation_number":"W58RGZ-26-R-0004","notice_type":"o","first_type":"r","first_posted":"2026-02-12","last_posted":"2026-09-10","notices":3,"due_at":"2026-11-30T23:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W58RGZ","office_name":"W6QK ACC-RSA","naics":"336411","psc":"R706","set_aside":null,"state":"AL","county":"01089","county_name":"Madison County","city":"0163912","city_name":"Redstone Arsenal","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T03:25:58.922164Z"},{"key":"W58RGZ25Q0016","latest_notice_id":"1382ddf28b4043f693446ab0ceba574b","title":"V250 AND TMS KIT","solicitation_number":"W58RGZ-25-Q-0016","notice_type":"o","first_type":"o","first_posted":"2025-11-17","last_posted":"2025-11-17","notices":1,"due_at":"2026-12-01T23:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W58RGZ","office_name":"W6QK ACC-RSA","naics":"336413","psc":"6695","set_aside":null,"state":"AL","county":"01089","county_name":"Madison County","city":"0163912","city_name":"Redstone Arsenal","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T03:25:58.922164Z"},{"key":"W58RGZ26B0024","latest_notice_id":"1f2b536ec2e743b681c266359bc078df","title":"Solicitation for Overhaul of the Hydraulic Valve","solicitation_number":"W58RGZ-26-B-0024","notice_type":"o","first_type":"r","first_posted":"2026-07-21","last_posted":"2026-09-24","notices":5,"due_at":"2026-12-02T20:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W58RGZ","office_name":"W6QK ACC-RSA","naics":"332911","psc":"4810","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 4810)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"removed_at":null,"updated_at":"2026-10-02T05:14:27.609400Z"}],"similar_open":[{"key":"N0010427QLA15","latest_notice_id":"88f3499f27dd4a528d6394868184e847","title":"MOTOR,ALTERNATING C","solicitation_number":"N0010427QLA15","notice_type":"o","first_type":"o","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":1,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00104","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT MECH","naics":"335312","psc":"6105","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"COST TO GOVERNMENT. \"ALL FREIGHT IS FOB ORIGIN","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"SPRMM127QKA05","latest_notice_id":"23b626d7085a4009a009662995634514","title":"CONDITIONER,POWER L","solicitation_number":"SPRMM127QKA05","notice_type":"o","first_type":"o","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":1,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRMM1","office_name":"SPRMM1 DLA MECHANICSBURG","naics":"335312","psc":"6110","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6110)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"SPRMM126QGG06","latest_notice_id":"8ec60ebc9ca54725900405ed64fa088e","title":"CONTROLLER","solicitation_number":"SPRMM126QGG06","notice_type":"o","first_type":"o","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRMM1","office_name":"SPRMM1 DLA MECHANICSBURG","naics":"335312","psc":"6110","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6110)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"}],"similar_open_total":70,"indexable":false}