{"canonical":"https://sealedbidder.com/opportunities/w58rgz25b0018","key":"W58RGZ25B0018","url":"https://sealedbidder.com/opportunities/w58rgz25b0018","title":"Amendment 001 W58RGZ-25-B-0018 (Technical Evaluation) Step 1","solicitation_number":"W58RGZ25B0018","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-07-09T23:00:00Z","first_posted":"2025-02-11","last_posted":"2025-06-10","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W6QK ACC-RSA","naics":"334511","psc":"6610","set_aside":null,"place_state":null,"place_scope":"nationwide","site":null,"place_state_source":null,"place_evidence":"UTILIZED. REQUIRED DELIVERY SHALL BE FOB ORIGIN","place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"a76e60be6cbb4b92a748522107f085be","title":"Sources Sought Overhaul of the Display Unit Flight Information, UH-60","solicitation_number":"W58RGZ-25-B-0018","notice_type":"r","base_type":"r","posted":"2025-02-11","posted_at":"2025-02-11T20:17:35.070Z","due_at":"2025-02-26T23:00:00Z","due_date":"2025-02-26","cancelled":false,"archived":true,"archive_date":"2025-03-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a76e60be6cbb4b92a748522107f085be/view","enriched":true,"history":[{"index":3,"title":"Sources Sought Overhaul of the Display Unit Flight Information, UH-60","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T20:17:35.070Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"a76e60be6cbb4b92a748522107f085be","solicitation_number":"W58RGZ-25-B-0018"}]},{"notice_id":"af01afdd0a9b4e74bb6ae0d144b3d436","title":"Synopsis Overhaul of the Display Unit Flight Information","solicitation_number":"W58RGZ-25-B-0018","notice_type":"p","base_type":"p","posted":"2025-04-11","posted_at":"2025-04-11T18:39:43.241Z","due_at":"2025-04-28T21:00:00Z","due_date":"2025-04-28","cancelled":false,"archived":true,"archive_date":"2025-05-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/af01afdd0a9b4e74bb6ae0d144b3d436/view","enriched":true,"history":[{"index":3,"title":"Synopsis Overhaul of the Display Unit Flight Information","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:39:43.241Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"af01afdd0a9b4e74bb6ae0d144b3d436","solicitation_number":"W58RGZ-25-B-0018"}]},{"notice_id":"b2a1e96a6ec740ca9b40f49577b8ae1e","title":"Amendment 001 W58RGZ-25-B-0018 (Technical Evaluation) Step 1","solicitation_number":"W58RGZ25B0018","notice_type":"o","base_type":"o","posted":"2025-06-10","posted_at":"2025-06-10T14:24:39.812Z","due_at":"2025-07-09T23:00:00Z","due_date":"2025-07-09","cancelled":false,"archived":true,"archive_date":"2025-07-24","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b2a1e96a6ec740ca9b40f49577b8ae1e/view","enriched":true,"history":[{"index":3,"title":"Amendment 001 W58RGZ-25-B-0018 (Technical Evaluation) Step 1","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-10T14:24:39.812Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b2a1e96a6ec740ca9b40f49577b8ae1e","solicitation_number":"W58RGZ25B0018"}]}],"latest_notice_id":"b2a1e96a6ec740ca9b40f49577b8ae1e","first_type":"r","notices":[{"dates":{"posted":"2025-02-11","posted_at":"2025-02-11T20:17:35.070Z","created_at":"2025-02-11T14:29:16.866Z","modified_at":"2025-03-14T03:55:46.335Z","response_deadline":{"raw":"2025-02-26T17:00:00-06:00","utc":"2025-02-26T23:00:00Z","date":"2025-02-26","time":"17:00:00","timezone":"America/Chicago","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a76e60be6cbb4b92a748522107f085be/view"},"naics":{"codes":["334511"],"primary":"334511"},"title":"Sources Sought Overhaul of the Display Unit Flight Information, UH-60","agency":{"office":{"code":"W58RGZ","name":"W6QK ACC-RSA"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"35898-0000","city":"REDSTONE ARSENAL","state":"AL","country":"USA"},"organization_id":"500045573","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-03-13","archive_type":"auto15"},"history":[{"index":3,"title":"Sources Sought Overhaul of the Display Unit Flight Information, UH-60","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T20:17:35.070Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"a76e60be6cbb4b92a748522107f085be","solicitation_number":"W58RGZ-25-B-0018"}],"contacts":[{"name":"Maryssa Sanchez","role":"primary","email":"maryssa.d.sanchez.civ@army.mil","phone":"2565859706"},{"name":"Edward A. Peterson","role":"secondary","email":"edward.a.peterson4.civ@army.mil","phone":"2563138529"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"a76e60be6cbb4b92a748522107f085be","lineage_id":"a76e60be6cbb4b92a748522107f085be","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-23T00:14:30.018456174Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"b87ea093059b6d61a8d52dbe4caf2098aebf91415070918018a5e595242d4d09","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-23T00:14:30.018456174Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>SOURCES SOUGHT</p>\n\n<p>W58RGZ-25-B-0018</p>\n\n<p>OVERHAUL OF THE DISPLAY UNIT FLIGHT INFORMATION, UH-60</p>\n\n<p>INTRODUCTION</p>\n\n<p>The U.S. Army Contracting Command-Redstone Arsenal (W58RGZ) ATTN: CCAM- ALB, Building 5303, Martin Road Redstone Arsenal, AL 35898-5280 (US) is issuing this Sources Sought as a means of conducting market research to identify potential sources having an interest and industry technologies available to support/provide inspection and Overhaul of the DISPLAY UNIT, FLIGHT INFORMATION, Input and Output- NSN: 6610-01-656-0041, PN: 9200-45201-0101.</p>\n\n<p>The resulting contract will be a 3-YEAR, Indefinite Delivery Indefinite Quantity, firm fixed- price contract with a MIN/MAX 60/216.</p>\n\n<p>The result of this market research will contribute to determining the method of procurement, if a requirement materializes. Based on the responses to this Sources Sought notice/market research, this requirement may be set-aside for small businesses (in full or in part) or procured through full and open competition. Multiple awards may be made. All small business set-aside categories will be considered. Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding submissions.</p>\n\n<p>DISCLAIMER</p>\n\n<p>THIS SOURCES SOUGHT IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL (RFP) TO BE SUBMITTED. IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS TO THIS TECHNICAL DESCRIPTION IS STRICTLY VOLUNTARY.</p>\n\n<p>REQUIRED CAPABILITIES</p>\n\n<p>The Government requires that contractors be able to provide all services, facilities, labor, parts, materials, equipment, tools, and data necessary to accomplish the inspection and overhaul of the Display Unit, Flight Information with the specifications listed above, and to return the items to condition code A as defined by Army Regulation 725-50. Upon completion of the overhaul, the items shall be packaged and shipped to the required destination(s). Display Unit, Flight Information is a non-Critical Safety Item. A DMWR is not available.</p>\n\n<p></p>\n\n<p>SPECIAL REQUIREMENTS</p>\n\n<p>The data needed to acquire this part competitively is not physically available, it cannot be obtained economically, nor is it possible to draft adequate specifications or any other adequate, economical description of the material for a competitive solicitation. Tech Data is unavailable.</p>\n\n<p>SOURCE(S) UNIQUE QUALIFICATIONS TO PROVIDE THIS PART</p>\n\n<p>&nbsp; This item is not a Critical safety item. A current DMWR is not available. This item has been classified as a non-commercial item. The applicable NAICS code for this requirement is 334511 with a Small Business Size Standard of 1350. The Product Service Code (PSC) is 6610.</p>\n\n<p></p>\n\n<p>The only known sources for this item are L3HARRIS AVIATION PRODUCTS, INC (Cage: 25583) and Sikorsky Aircraft Corp (Cage: 78286).</p>\n\n<p>SUBMISSION DETAILS</p>\n\n<p>Interested parties who have the capability to provide the item listed above submit a brief capabilities statement package (no more than ten 8.5 X 11 inch pages, font no smaller than 10 point) demonstrating ability to provide the products/systems.</p>\n\n<p>This announcement is for information and planning purposes only and should not be construed as a commitment by the Government for any purposes. This announcement does not constitute a Request for Proposal (RFP). A synopsis will be issued at a later date for this requirement. Requests for a solicitation will not receive a response. No reimbursement will be made for any costs associated with providing information in response to this announcement and any follow-up information requested. No basis for claim against the Government shall arise as a result of a response to this announcement or Government use of any information provided. This announcement does not restrict the Government to an ultimate acquisition strategy. The Government reserves the right to consider acquisition strategies as deemed appropriate. No phone or email solicitations with regards to the status of the RFP will be accepted prior to its release.<u> </u></p>\n\n<p>Your response to this Sources Sought, shall be electronically submitted to the Contract Specialist, Maryssa Sanchez in either Microsoft Word or Portable Document Format (PDF), via email maryssa.d.sanchez.civ@army.mil no later than 1700 p.m. Central Time on 26 February 2025 and reference the solicitation number in the subject line of the sources sought. Information and materials submitted in response to this request WILL NOT be returned. DO NOT SUBMIT CLASSIFIED MATERIAL.</p>\n\n<p>If your organization has the potential capacity to provide the required products/systems, please provide the following information: 1) Organization name, address, primary points of contact (POCs) and their email address, Web site address, telephone number, and type of ownership for the organization; and 2) Tailored capability statements based on the technical requirements addressing the requirements of this notice, with appropriate documentation supporting claims of organizational and staff capability. If significant subcontracting or teaming is anticipated in order to deliver technical capability, organizations should address the administrative and management structure of such arrangements.</p>\n\n<p>All data received in response to this Sources Sought that is marked or designated as corporate or proprietary will be fully protected from any release outside the Government<strong>.</strong></p>","text":"SOURCES SOUGHT\n\nW58RGZ-25-B-0018\n\nOVERHAUL OF THE DISPLAY UNIT FLIGHT INFORMATION, UH-60\n\nINTRODUCTION\n\nThe U.S. Army Contracting Command-Redstone Arsenal (W58RGZ) ATTN: CCAM- ALB, Building 5303, Martin Road Redstone Arsenal, AL 35898-5280 (US) is issuing this Sources Sought as a means of conducting market research to identify potential sources having an interest and industry technologies available to support/provide inspection and Overhaul of the DISPLAY UNIT, FLIGHT INFORMATION, Input and Output- NSN: 6610-01-656-0041, PN: 9200-45201-0101.\n\nThe resulting contract will be a 3-YEAR, Indefinite Delivery Indefinite Quantity, firm fixed- price contract with a MIN/MAX 60/216.\n\nThe result of this market research will contribute to determining the method of procurement, if a requirement materializes. Based on the responses to this Sources Sought notice/market research, this requirement may be set-aside for small businesses (in full or in part) or procured through full and open competition. Multiple awards may be made. All small business set-aside categories will be considered. Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding submissions.\n\nDISCLAIMER\n\nTHIS SOURCES SOUGHT IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL (RFP) TO BE SUBMITTED. IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS TO THIS TECHNICAL DESCRIPTION IS STRICTLY VOLUNTARY.\n\nREQUIRED CAPABILITIES\n\nThe Government requires that contractors be able to provide all services, facilities, labor, parts, materials, equipment, tools, and data necessary to accomplish the inspection and overhaul of the Display Unit, Flight Information with the specifications listed above, and to return the items to condition code A as defined by Army Regulation 725-50. Upon completion of the overhaul, the items shall be packaged and shipped to the required destination(s). Display Unit, Flight Information is a non-Critical Safety Item. A DMWR is not available.\n\nSPECIAL REQUIREMENTS\n\nThe data needed to acquire this part competitively is not physically available, it cannot be obtained economically, nor is it possible to draft adequate specifications or any other adequate, economical description of the material for a competitive solicitation. Tech Data is unavailable.\n\nSOURCE(S) UNIQUE QUALIFICATIONS TO PROVIDE THIS PART\n\nThis item is not a Critical safety item. A current DMWR is not available. This item has been classified as a non-commercial item. The applicable NAICS code for this requirement is 334511 with a Small Business Size Standard of 1350. The Product Service Code (PSC) is 6610.\n\nThe only known sources for this item are L3HARRIS AVIATION PRODUCTS, INC (Cage: 25583) and Sikorsky Aircraft Corp (Cage: 78286).\n\nSUBMISSION DETAILS\n\nInterested parties who have the capability to provide the item listed above submit a brief capabilities statement package (no more than ten 8.5 X 11 inch pages, font no smaller than 10 point) demonstrating ability to provide the products/systems.\n\nThis announcement is for information and planning purposes only and should not be construed as a commitment by the Government for any purposes. This announcement does not constitute a Request for Proposal (RFP). A synopsis will be issued at a later date for this requirement. Requests for a solicitation will not receive a response. No reimbursement will be made for any costs associated with providing information in response to this announcement and any follow-up information requested. No basis for claim against the Government shall arise as a result of a response to this announcement or Government use of any information provided. This announcement does not restrict the Government to an ultimate acquisition strategy. The Government reserves the right to consider acquisition strategies as deemed appropriate. No phone or email solicitations with regards to the status of the RFP will be accepted prior to its release.\n\nYour response to this Sources Sought, shall be electronically submitted to the Contract Specialist, Maryssa Sanchez in either Microsoft Word or Portable Document Format (PDF), via email maryssa.d.sanchez.civ@army.mil no later than 1700 p.m. Central Time on 26 February 2025 and reference the solicitation number in the subject line of the sources sought. Information and materials submitted in response to this request WILL NOT be returned. DO NOT SUBMIT CLASSIFIED MATERIAL.\n\nIf your organization has the potential capacity to provide the required products/systems, please provide the following information: 1) Organization name, address, primary points of contact (POCs) and their email address, Web site address, telephone number, and type of ownership for the organization; and 2) Tailored capability statements based on the technical requirements addressing the requirements of this notice, with appropriate documentation supporting claims of organizational and staff capability. If significant subcontracting or teaming is anticipated in order to deliver technical capability, organizations should address the administrative and management structure of such arrangements.\n\nAll data received in response to this Sources Sought that is marked or designated as corporate or proprietary will be fully protected from any release outside the Government.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"W58RGZ-25-B-0018","product_service_code":"6610"},{"dates":{"posted":"2025-04-11","posted_at":"2025-04-11T18:39:43.241Z","created_at":"2025-04-11T18:27:20.748Z","modified_at":"2025-05-14T03:55:57.609Z","response_deadline":{"raw":"2025-04-28T16:00:00-05:00","utc":"2025-04-28T21:00:00Z","date":"2025-04-28","time":"16:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/af01afdd0a9b4e74bb6ae0d144b3d436/view"},"naics":{"codes":["334511"],"primary":"334511"},"title":"Synopsis Overhaul of the Display Unit Flight Information","agency":{"office":{"code":"W58RGZ","name":"W6QK ACC-RSA"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"35898-0000","city":"REDSTONE ARSENAL","state":"AL","country":"USA"},"organization_id":"500045573","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-13","archive_type":"auto15"},"history":[{"index":3,"title":"Synopsis Overhaul of the Display Unit Flight Information","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:39:43.241Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"af01afdd0a9b4e74bb6ae0d144b3d436","solicitation_number":"W58RGZ-25-B-0018"}],"contacts":[{"name":"Maryssa Sanchez","role":"primary","email":"maryssa.d.sanchez.civ@army.mil","phone":"2565859706"},{"name":"Edward A. Peterson","role":"secondary","email":"edward.a.peterson4.civ@army.mil","phone":"2563138529"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"af01afdd0a9b4e74bb6ae0d144b3d436","lineage_id":"af01afdd0a9b4e74bb6ae0d144b3d436","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-18T02:10:39.311624353Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"93fef21b029ac81bc8dbabd73312ed8c53565c275f453bdf267999269780ac92","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-18T02:10:39.311624353Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><strong><u>SYNOPSIS</u></strong></p>\n\n<p><strong>ACTION CODE: </strong>Pre-Solicitation Notice</p>\n\n<p><strong><u>DATE:</u></strong><strong> </strong>11 April</p>\n\n<p><strong><u>YEAR:</u></strong><strong> </strong>2025</p>\n\n<p><strong><u>CONTRACTING OFFICE ZIP CODE</u></strong>: 35898-5820</p>\n\n<p><strong><u>Product or Service Code: </u></strong>1680</p>\n\n<p><strong><u>Contracting Office Address: </u></strong></p>\n\n<p>U.S. Army Aviation and Missile Command (W58RGZ)</p>\n\n<p>ATTN: CCAM-ALB, Building 5303, Martin Road Redstone Arsenal, AL 35898-5280 (US)</p>\n\n<p><strong>SUBJECT: </strong>DISPLAY UNIT FLIGHT INFORMATION for the (UH-60) Blackhawk</p>\n\n<p><strong>SOLICITATION NUMBER: </strong>W58RGZ-25-B-0018</p>\n\n<p><strong>S</strong><strong>ET-ASIDE CODE</strong>: <strong>N/A</strong></p>\n\n<p><strong>RESPONSE DATE: </strong>15 days from posting.</p>\n\n<p><strong><u>Contracting Officer:</u></strong><strong> </strong>Edward A. Peterson, email:edward.a.peterson4.civ@army.mil</p>\n\n<p><strong><u>PLACE OF PERFORMANCE</u></strong><strong>:</strong> TBD</p>\n\n<p><strong><u>Set-Aside Status</u></strong><strong>: NA</strong></p>\n\n<p><strong>DESCRIPTION: </strong>The contractor shall furnish all labor, facilities, parts, materials, equipment, tools and data (other than Government Furnished Property), necessary to accomplish the overhaul of the following assets:</p>\n\n<p>INPUT NSN: 6610-01-656-0041</p>\n\n<p>INPUT P/N: 9200-45201-0101</p>\n\n<p>OUTPUT NSN: 6610-01-656-0041</p>\n\n<p>OUTPUT P/N: 9200-45201-0101</p>\n\n<p>ESTIMATED QUANTITY RANGE: Minimum 60 each &ndash; Maximum 216 each (Maximum includes a Foreign Military Sales (FMS) Quantity of 36 each)</p>\n\n<p>The proposed contractual action will be a Five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) Maintenance and Overhaul type contract, with minimum/maximum quantities listed above. These items are commercial; FAR Part 12 will be utilized. Required delivery shall be FOB Origin. This procurement will be solicited as a Full and Open competitive requirement.</p>\n\n<ol>\n\t<li>The U.S. Army Contracting Command &ndash; Redstone Arsenal (ACC-RSA) will issue an Invitation for Bid (IFB) for the overhaul of the DISPLAY UNIT, FLIGHT INFORMATION. All work shall be completed in accordance with the Statement of Work (SOW). The Government does not have a Depot Maintenance Work Requirement (DMWR) for the proposed solicitation.</li>\n</ol>\n\n<p>The IFB will be issued as a Full and Open Competitive action using the Two-Step Sealed Bidding Method. It is anticipated that a single Firm-fixed Price (FFP) type contract will be awarded to the responsive, responsible bidder.&nbsp; Only bids based upon technical proposals determined to be acceptable, either initially or as a result of discussions, will be considered further for award into Step-Two. Each bid in the second step must be based on the bidder&rsquo;s own technical proposal. Bidders shall submit bids that are acceptable without additional explanation or information. The Government may make a final determination regarding a technical proposal&rsquo;s acceptability solely based on the bid as submitted. The Government may proceed with Step-Two without requesting further information from any bidder. A notice of unacceptability will be forwarded to the Bidder upon completion of the technical proposal evaluation and final determination of unacceptability. Only one technical proposal may be submitted by each bidder.&nbsp;</p>\n\n<ol>\n\t<li>Technical proposals shall not include prices or pricing information. The Technical proposal due date will be established upon issuance of the solicitation.</li>\n</ol>\n\n<p>2. Bidders shall ensure submission of fully complete bids, including all fill-in-the blanks. Any bidder submitting a bid agrees by submission that its bid and the prices contained therein will be valid for 60 days after receipt of bids.</p>\n\n<p>3. Technical acceptability will be determined by the bidder&rsquo;s response to the following questions.</p>\n\n<p>A. Has your company ever conducted a repair/overhaul or manufacture of the DISPLAY UNIT, FLIGHT INFORMATION for the UH-60? If not, has your company performed repair on the same, or like item in the past?</p>\n\n<p>B. If yes, when, for how long, in what quantity, and what specific item? If it was under a military contract, what is the contract number?</p>\n\n<p>C. Who was the Primary Contracting Officer? Please provide his or her name, organization, and contact information.</p>\n\n<p>D. Please provide contact information for the Defense contract management Agency (DCMA) that served as your administrative contracting officer.</p>\n\n<p>E. Describe the following in the amount of detail necessary:</p>\n\n<p>Does your company have overhaul and replacement capability?</p>\n\n<p>Does your company have a documented quality plan/process?</p>\n\n<p>Please provide the following details regarding your company&rsquo;s quality plan.</p>\n\n<ul>\n\t<li>Calibration program</li>\n\t<li>Continues improvement/self-audits program</li>\n\t<li>Non-conformance parts &amp; quality escapes</li>\n\t<li>Parts obsolescence review</li>\n\t<li>Periodic training/certification/recertification program</li>\n\t<li>Certification/release of test stand/equipment for production</li>\n\t<li>Traceability of repair &amp; maintenance performed, records keeping program</li>\n\t<li>IUID (Item Unique Identification) program</li>\n</ul>\n\n<p>What are the required minimal qualification and specialized skills of an electronic technician?</p>\n\n<p>Describe experience in depinning and pinning electrical connectors.</p>\n\n<p>Describe experience in replacing crimp type pins.</p>\n\n<p>Describe experience in circuit-board level repair, desolder and solder of electrical components.</p>\n\n<p>Describe experience in repairing and replacing electrical wires.</p>\n\n<p>Do you have electrical static discharge (ESD) prevention program/capability?</p>\n\n<p>Do you have paint removal capabilities?</p>\n\n<p>Do you have corrosion repair/prevention/application capability?</p>\n\n<p>Do you have painting and minor touch-up capability?</p>\n\n<p>Do you have repair capability for minor surface defects such as nicks, scratches on housing/enclosure?</p>\n\n<p>F. Do you have facilities, special tools and equipment as follows:</p>\n\n<p>Overhaul facility equipped with environmental controls of temperature, humidity, and adequate equipment to vent hazardous fumes?</p>\n\n<p>Equipment, documentation, and procedure to fully support an IUID (Item Unique Identifier) program?</p>\n\n<p>Adequate workbench with ESD control and access to standard shop tools?</p>\n\n<p>Availability of electronic test equipment necessary for electrical circuit troubleshooting and performing milliohm electrical bond tests?</p>\n\n<p>If applicable, the required equipment to install, verify, and update application software/firmware?</p>\n\n<p>Original Equipment Manufacturer (OEM) test stand/equipment, or certified equivalent for Acceptance Test Procedure (ATP)?</p>\n\n<p>Equipment to read and fabrication of UID (Unique Identification) data plate?</p>\n\n<p>&nbsp; *NOTE* For certified equivalent, be prepared to provide procedure and data&nbsp;&nbsp;&nbsp;&nbsp; establishing equivalency.</p>\n\n<p>G. Do you have an overhaul plan for the subject, or like item?</p>\n\n<p>If yes, are you willing to submit a copy for evaluation? The plan must contain instructions and procedures covering the following major categories, at a minimum:</p>\n\n<ul>\n\t<li>Receiving inspection instructions.</li>\n\t<li>Pre-test/Pre-shop analysis instructions.</li>\n\t<li>Disassembly instructions.</li>\n\t<li>Cleaning instructions.</li>\n\t<li>Overhaul Inspection Requirements (OIP).</li>\n\t<li>Repair and replacement instructions.</li>\n\t<li>Assembly instructions.</li>\n\t<li>Final Test instructions.</li>\n\t<li>Primer, paint, coating, and or corrosion protection instructions</li>\n\t<li>Packaging, marking and shipping instructions.</li>\n</ul>\n\n<p></p>\n\n<p>H. Can your company acquire all necessary parts, tooling and materials to complete an overhaul?</p>\n\n<p>I. If you have worked with L3 Avionics Systems, Cage 25583 for the subject item, or one of its approved suppliers, provide a copy of a completed, showing item receipt, purchase order for the Original Equipment Manufacturer (OEM), or approved supplier, parts, or materials.</p>\n\n<p>J. Do you possess any OEM data or drawings of this item, including Acceptance Test Procedure (ATP), Maintenance and Overhaul Procedures/Instructions, or Commercial Maintenance Manual (CMM)? Is it complete or partial?</p>\n\n<p>If yes to possession of complete or partial OEM Data or Drawings, how did your company acquire the rights to the data or drawings? Please provide your license or certificate to substantiate this.</p>\n\n<p>K. Provide a copy of the purchase order, or other evidence that you have the rights to the data or drawings in your possession.</p>\n\n<p>No telephone requests for the solicitation will be accepted. The technical submission piece of the solicitation, (step 1) will be posted on SAM.gov | Home. The pricing piece of the solicitation (step 2) will not be posted on SAM.gov | Home and will only be provided to the contractors who pass the technical submission piece of the solicitation. Requests for the solicitation shall not be responded to.&nbsp; This requirement is currently unfunded.</p>\n\n<p>Award will be withheld pending receipt of sufficient funds. The closing date annotated is an estimated date and may be adjusted dependent upon the date of release of the solicitation; however, the solicitation will not close prior to the closing date stated above.</p>\n\n<p></p>","text":"SYNOPSIS\n\nACTION CODE: Pre-Solicitation Notice\n\nDATE: 11 April\n\nYEAR: 2025\n\nCONTRACTING OFFICE ZIP CODE: 35898-5820\n\nProduct or Service Code: 1680\n\nContracting Office Address:\n\nU.S. Army Aviation and Missile Command (W58RGZ)\n\nATTN: CCAM-ALB, Building 5303, Martin Road Redstone Arsenal, AL 35898-5280 (US)\n\nSUBJECT: DISPLAY UNIT FLIGHT INFORMATION for the (UH-60) Blackhawk\n\nSOLICITATION NUMBER: W58RGZ-25-B-0018\n\nSET-ASIDE CODE: N/A\n\nRESPONSE DATE: 15 days from posting.\n\nContracting Officer: Edward A. Peterson, email:edward.a.peterson4.civ@army.mil\n\nPLACE OF PERFORMANCE: TBD\n\nSet-Aside Status: NA\n\nDESCRIPTION: The contractor shall furnish all labor, facilities, parts, materials, equipment, tools and data (other than Government Furnished Property), necessary to accomplish the overhaul of the following assets:\n\nINPUT NSN: 6610-01-656-0041\n\nINPUT P/N: 9200-45201-0101\n\nOUTPUT NSN: 6610-01-656-0041\n\nOUTPUT P/N: 9200-45201-0101\n\nESTIMATED QUANTITY RANGE: Minimum 60 each – Maximum 216 each (Maximum includes a Foreign Military Sales (FMS) Quantity of 36 each)\n\nThe proposed contractual action will be a Five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) Maintenance and Overhaul type contract, with minimum/maximum quantities listed above. These items are commercial; FAR Part 12 will be utilized. Required delivery shall be FOB Origin. This procurement will be solicited as a Full and Open competitive requirement.\n\n• The U.S. Army Contracting Command – Redstone Arsenal (ACC-RSA) will issue an Invitation for Bid (IFB) for the overhaul of the DISPLAY UNIT, FLIGHT INFORMATION. All work shall be completed in accordance with the Statement of Work (SOW). The Government does not have a Depot Maintenance Work Requirement (DMWR) for the proposed solicitation.\n\nThe IFB will be issued as a Full and Open Competitive action using the Two-Step Sealed Bidding Method. It is anticipated that a single Firm-fixed Price (FFP) type contract will be awarded to the responsive, responsible bidder. Only bids based upon technical proposals determined to be acceptable, either initially or as a result of discussions, will be considered further for award into Step-Two. Each bid in the second step must be based on the bidder’s own technical proposal. Bidders shall submit bids that are acceptable without additional explanation or information. The Government may make a final determination regarding a technical proposal’s acceptability solely based on the bid as submitted. The Government may proceed with Step-Two without requesting further information from any bidder. A notice of unacceptability will be forwarded to the Bidder upon completion of the technical proposal evaluation and final determination of unacceptability. Only one technical proposal may be submitted by each bidder.\n\n• Technical proposals shall not include prices or pricing information. The Technical proposal due date will be established upon issuance of the solicitation.\n\n2. Bidders shall ensure submission of fully complete bids, including all fill-in-the blanks. Any bidder submitting a bid agrees by submission that its bid and the prices contained therein will be valid for 60 days after receipt of bids.\n\n3. Technical acceptability will be determined by the bidder’s response to the following questions.\n\nA. Has your company ever conducted a repair/overhaul or manufacture of the DISPLAY UNIT, FLIGHT INFORMATION for the UH-60? If not, has your company performed repair on the same, or like item in the past?\n\nB. If yes, when, for how long, in what quantity, and what specific item? If it was under a military contract, what is the contract number?\n\nC. Who was the Primary Contracting Officer? Please provide his or her name, organization, and contact information.\n\nD. Please provide contact information for the Defense contract management Agency (DCMA) that served as your administrative contracting officer.\n\nE. Describe the following in the amount of detail necessary:\n\nDoes your company have overhaul and replacement capability?\n\nDoes your company have a documented quality plan/process?\n\nPlease provide the following details regarding your company’s quality plan.\n\n• Calibration program\n\n• Continues improvement/self-audits program\n\n• Non-conformance parts & quality escapes\n\n• Parts obsolescence review\n\n• Periodic training/certification/recertification program\n\n• Certification/release of test stand/equipment for production\n\n• Traceability of repair & maintenance performed, records keeping program\n\n• IUID (Item Unique Identification) program\n\nWhat are the required minimal qualification and specialized skills of an electronic technician?\n\nDescribe experience in depinning and pinning electrical connectors.\n\nDescribe experience in replacing crimp type pins.\n\nDescribe experience in circuit-board level repair, desolder and solder of electrical components.\n\nDescribe experience in repairing and replacing electrical wires.\n\nDo you have electrical static discharge (ESD) prevention program/capability?\n\nDo you have paint removal capabilities?\n\nDo you have corrosion repair/prevention/application capability?\n\nDo you have painting and minor touch-up capability?\n\nDo you have repair capability for minor surface defects such as nicks, scratches on housing/enclosure?\n\nF. Do you have facilities, special tools and equipment as follows:\n\nOverhaul facility equipped with environmental controls of temperature, humidity, and adequate equipment to vent hazardous fumes?\n\nEquipment, documentation, and procedure to fully support an IUID (Item Unique Identifier) program?\n\nAdequate workbench with ESD control and access to standard shop tools?\n\nAvailability of electronic test equipment necessary for electrical circuit troubleshooting and performing milliohm electrical bond tests?\n\nIf applicable, the required equipment to install, verify, and update application software/firmware?\n\nOriginal Equipment Manufacturer (OEM) test stand/equipment, or certified equivalent for Acceptance Test Procedure (ATP)?\n\nEquipment to read and fabrication of UID (Unique Identification) data plate?\n\n*NOTE* For certified equivalent, be prepared to provide procedure and data establishing equivalency.\n\nG. Do you have an overhaul plan for the subject, or like item?\n\nIf yes, are you willing to submit a copy for evaluation? The plan must contain instructions and procedures covering the following major categories, at a minimum:\n\n• Receiving inspection instructions.\n\n• Pre-test/Pre-shop analysis instructions.\n\n• Disassembly instructions.\n\n• Cleaning instructions.\n\n• Overhaul Inspection Requirements (OIP).\n\n• Repair and replacement instructions.\n\n• Assembly instructions.\n\n• Final Test instructions.\n\n• Primer, paint, coating, and or corrosion protection instructions\n\n• Packaging, marking and shipping instructions.\n\nH. Can your company acquire all necessary parts, tooling and materials to complete an overhaul?\n\nI. If you have worked with L3 Avionics Systems, Cage 25583 for the subject item, or one of its approved suppliers, provide a copy of a completed, showing item receipt, purchase order for the Original Equipment Manufacturer (OEM), or approved supplier, parts, or materials.\n\nJ. Do you possess any OEM data or drawings of this item, including Acceptance Test Procedure (ATP), Maintenance and Overhaul Procedures/Instructions, or Commercial Maintenance Manual (CMM)? Is it complete or partial?\n\nIf yes to possession of complete or partial OEM Data or Drawings, how did your company acquire the rights to the data or drawings? Please provide your license or certificate to substantiate this.\n\nK. Provide a copy of the purchase order, or other evidence that you have the rights to the data or drawings in your possession.\n\nNo telephone requests for the solicitation will be accepted. The technical submission piece of the solicitation, (step 1) will be posted on SAM.gov | Home. The pricing piece of the solicitation (step 2) will not be posted on SAM.gov | Home and will only be provided to the contractors who pass the technical submission piece of the solicitation. Requests for the solicitation shall not be responded to. This requirement is currently unfunded.\n\nAward will be withheld pending receipt of sufficient funds. The closing date annotated is an estimated date and may be adjusted dependent upon the date of release of the solicitation; however, the solicitation will not close prior to the closing date stated above.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W58RGZ-25-B-0018","product_service_code":"6610"},{"dates":{"posted":"2025-06-10","posted_at":"2025-06-10T14:24:39.812Z","created_at":"2025-06-10T11:57:59.406Z","modified_at":"2025-07-25T03:55:47.767Z","response_deadline":{"raw":"2025-07-09T18:00:00-05:00","utc":"2025-07-09T23:00:00Z","date":"2025-07-09","time":"18:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b2a1e96a6ec740ca9b40f49577b8ae1e/view"},"naics":{"codes":["334511"],"primary":"334511"},"title":"Amendment 001 W58RGZ-25-B-0018 (Technical Evaluation) Step 1","agency":{"office":{"code":"W58RGZ","name":"W6QK ACC-RSA"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"35898-0000","city":"REDSTONE ARSENAL","state":"AL","country":"USA"},"organization_id":"500045573","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-07-24","archive_type":"auto15"},"history":[{"index":3,"title":"Amendment 001 W58RGZ-25-B-0018 (Technical Evaluation) Step 1","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-10T14:24:39.812Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b2a1e96a6ec740ca9b40f49577b8ae1e","solicitation_number":"W58RGZ25B0018"}],"contacts":[{"name":"Maryssa Sanchez","role":"primary","email":"maryssa.d.sanchez.civ@army.mil","phone":"2565859706"},{"name":"Edward A. Peterson","role":"secondary","email":"edward.a.peterson4.civ@army.mil","phone":"2563138529"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"b2a1e96a6ec740ca9b40f49577b8ae1e","lineage_id":"b2a1e96a6ec740ca9b40f49577b8ae1e","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-13T01:38:44.212901160Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"b6774b9eeec57d68ee5c3765eca024975bfb7262e615666a58bcecb5652b408f","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-13T01:38:44.212901160Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><strong>Step-One (Technical Evaluation) Solicitation- W58RGZ-25-B-0018</strong></p>\n\n<p><strong><u>Amendment 001</u></strong></p>\n\n<p></p>\n\n<p><strong><u>DATE:</u></strong><strong> </strong><strong><u>10 June 2025</u></strong></p>\n\n<p></p>\n\n<p></p>\n\n<p><strong><u>Product or Service Code: </u></strong>6610</p>\n\n<p></p>\n\n<p><strong><u>Contracting Office Address: </u></strong></p>\n\n<p>U.S. Army Aviation and Missile Command (W58RGZ)</p>\n\n<p>ATTN: CCAM-ALB, Building 5303, Martin Road Redstone Arsenal, AL 35898-5280 (US)</p>\n\n<p><strong><u>SUBJECT</u>: OVERHAUL OF THE </strong>DISPLAY UNIT FLIGHT INFORMATION for the (UH-60) Blackhawk TECHNICAL SUBMISSION (STEP-1)</p>\n\n<p><strong><u>SOLICITATION NUMBER</u></strong><strong>: </strong>W58RGZ-25-B-0018</p>\n\n<p><strong><u>RESPONSE DATE</u></strong><strong>:</strong> <strong><u>9 July 2025</u></strong></p>\n\n<p><strong><u>Contracting Officer:</u></strong><strong> </strong>Edward A. Peterson, email:edward.a.peterson4.civ@army.mil</p>\n\n<p><strong><u>Set-Aside Status</u></strong><strong>: NA</strong></p>\n\n<p><strong>DESCRIPTION: </strong>The contractor shall furnish all labor, facilities, parts, materials, equipment, tools and data (other than Government Furnished Property), necessary to accomplish the overhaul of the following assets:</p>\n\n<p>INPUT NSN: 6610-01-656-0041</p>\n\n<p>INPUT P/N: 9200-45201-0101</p>\n\n<p>OUTPUT NSN: 6610-01-656-0041</p>\n\n<p>OUTPUT P/N: 9200-45201-0101</p>\n\n<p>ESTIMATED QUANTITY RANGE: Minimum 60 each &ndash; Maximum 216 each (Maximum includes a Foreign Military Sales (FMS) Quantity of 36 each)</p>\n\n<p>The proposed contractual action will be a Five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) Maintenance and Overhaul type contract, with minimum/maximum quantities listed above. These items are commercial; FAR Part 12 will be utilized. Required delivery shall be FOB Origin. This procurement will be solicited as a Full and Open competitive requirement.</p>\n\n<ol>\n\t<li>The U.S. Army Contracting Command &ndash; Redstone Arsenal (ACC-RSA) will issue an Invitation for Bid (IFB) for the overhaul of the DISPLAY UNIT, FLIGHT INFORMATION. All work shall be completed in accordance with the Statement of Work (SOW). The Government does not have a Depot Maintenance Work Requirement (DMWR) for the proposed solicitation.</li>\n</ol>\n\n<p>The IFB will be issued as a Full and Open Competitive action using the Two-Step Sealed Bidding Method. It is anticipated that a single Firm-fixed Price (FFP) type contract will be awarded to the responsive, responsible bidder.&nbsp; &nbsp;Only bids based upon technical proposals (Step-One) determined to be acceptable, either initially or as a result of discussions, will be considered further for award into Step-Two. Each bid in the second step must be based on the bidder&rsquo;s own technical proposal. Bidders shall submit bids that are acceptable without additional explanation or information. The Government may make a final determination regarding a technical proposal&rsquo;s acceptability solely based on the bid as submitted. The Government may proceed with Step-Two without requesting further information from any bidder. A notice of unacceptability will be forwarded to the Bidder upon completion of the technical proposal evaluation (Step-One) and final determination of unacceptability. <strong><u>This begins the start of step-one technical submission. </u></strong></p>\n\n<p><strong><u>2. Technical proposals (Step-One) shall not include prices or pricing information. </u></strong></p>\n\n<p>3. Bidders shall ensure submission of fully complete bids, including all fill-in-the blanks. Any bidder submitting a bid agrees by submission that its bid and the prices contained therein will be valid for <strong><u>120</u></strong> days after receipt of bids.</p>\n\n<p>Technical acceptability for step-one will be determined by the bidder&rsquo;s response to the following questions.</p>\n\n<p>A. Has your company ever conducted a repair/overhaul or manufacture of the DISPLAY UNIT, FLIGHT INFORMATION for the UH-60? If not, has your company performed repair on the same, or like item in the past?</p>\n\n<p>B. If yes, when, for how long, in what quantity, and what specific item? If it was under a military contract, what is the contract number?</p>\n\n<p>C. Who was the Primary Contracting Officer? Please provide his or her name, organization, and contact information.</p>\n\n<p>D. &nbsp;Please provide contact information for the Defense contract management Agency (DCMA) that served as your administrative contracting officer.</p>\n\n<p>E. Describe the following in the amount of detail necessary:</p>\n\n<p>Does your company have overhaul and replacement capability?</p>\n\n<p>Does your company have a documented quality plan/process?</p>\n\n<p>Please provide the following details regarding your company&rsquo;s quality plan.</p>\n\n<ul>\n\t<li>Calibration program</li>\n\t<li>Continues improvement/self-audits program</li>\n\t<li>Non-conformance parts &amp; quality escapes</li>\n\t<li>Parts obsolescence review</li>\n\t<li>Periodic training/certification/recertification program</li>\n\t<li>Certification/release of test stand/equipment for production</li>\n\t<li>Traceability of repair &amp; maintenance performed, records keeping program</li>\n\t<li>IUID (Item Unique Identification) program</li>\n</ul>\n\n<p>What are the required minimal qualification and specialized skills of an electronic technician?</p>\n\n<p></p>\n\n<p>Describe experience in depinning and pinning electrical connectors.</p>\n\n<p>Describe experience in replacing crimp type pins.</p>\n\n<p>Describe experience in circuit-board level repair, desolder and solder of electrical components.</p>\n\n<p>Describe experience in repairing and replacing electrical wires.</p>\n\n<p>Do you have electrical static discharge (ESD) prevention program/capability?</p>\n\n<p>Do you have paint removal capabilities?</p>\n\n<p>Do you have corrosion repair/prevention/application capability?</p>\n\n<p>Do you have painting and minor touch-up capability?</p>\n\n<p>Do you have repair capability for minor surface defects such as nicks, scratches on housing/enclosure?</p>\n\n<p>F. Do you have facilities, special tools and equipment as follows:</p>\n\n<p>Overhaul facility equipped with environmental controls of temperature, humidity, and adequate equipment to vent hazardous fumes?</p>\n\n<p>Equipment, documentation, and procedure to fully support an IUID (Item Unique Identifier) program?</p>\n\n<p>Adequate workbench with ESD control and access to standard shop tools?</p>\n\n<p>Availability of electronic test equipment necessary for electrical circuit troubleshooting and performing milliohm electrical bond tests?</p>\n\n<p>If applicable, the required equipment to install, verify, and update application software/firmware?</p>\n\n<p>Original Equipment Manufacturer (OEM) test stand/equipment, or certified equivalent for Acceptance Test Procedure (ATP)?</p>\n\n<p>Equipment to read and fabrication of UID (Unique Identification) data plate?</p>\n\n<p>&nbsp; *NOTE* For certified equivalent, be prepared to provide procedure and data&nbsp;&nbsp;&nbsp;&nbsp; establishing equivalency.</p>\n\n<p>G. Do you have an overhaul plan for the subject, or like item?</p>\n\n<p>If yes, are you willing to submit a copy for evaluation? The plan must contain instructions and procedures covering the following major categories, at a minimum:</p>\n\n<ul>\n\t<li>Receiving inspection instructions.</li>\n\t<li>Pre-test/Pre-shop analysis instructions.</li>\n\t<li>Disassembly instructions.</li>\n\t<li>Cleaning instructions.</li>\n\t<li>Overhaul Inspection Requirements (OIP).</li>\n\t<li>Repair and replacement instructions.</li>\n\t<li>Assembly instructions.</li>\n\t<li>Final Test instructions.</li>\n\t<li>Primer, paint, coating, and or corrosion protection instructions</li>\n\t<li>Packaging, marking and shipping instructions.</li>\n</ul>\n\n<p></p>\n\n<p>H. Can your company acquire all necessary parts, tooling and materials to complete an overhaul?</p>\n\n<p></p>\n\n<p>I. If you have worked with L3 Avionics Systems, Cage 25583 for the subject item, or one of its approved suppliers, provide a copy of a completed, showing item receipt, purchase order for the Original Equipment Manufacturer (OEM), or approved supplier, parts, or materials.</p>\n\n<p></p>\n\n<p>J. Do you possess any OEM data or drawings of this item, including Acceptance Test Procedure (ATP), Maintenance and Overhaul Procedures/Instructions, or Commercial Maintenance Manual (CMM)? Is it complete or partial?</p>\n\n<p>If yes to possession of complete or partial OEM Data or Drawings, how did your company acquire the rights to data or drawings? Please provide your license or certificate to substantiate this.</p>\n\n<p></p>\n\n<p>K. Provide a copy of the purchase order, or other evidence that you have the rights to the data or drawings in your possession.</p>\n\n<p></p>\n\n<p>Offerors should submit proposals that are acceptable without additional explanation or information.</p>\n\n<p></p>\n\n<p>They Government may make a final determination regarding a proposal&rsquo;s acceptability solely on the basis of the proposals as submitted; and may proceed with the second step without requesting further information from any offeror. However, the Government may request additional information from offerors of proposals that it considers reasonably susceptible of being made acceptable and may discuss proposals with their offerors.</p>\n\n<p></p>\n\n<p>A notice of unacceptability will be forwarded to the offeror upon completion of the proposal evaluation and final determination of unacceptability.</p>\n\n<p></p>\n\n<p>Multiple technical proposals may be submitted by each offeror. No telephone requests for the solicitation will be accepted. The pricing piece of the solicitation (Step 2) will not be posted on SAM.gov and will only be provided to the contractors who pass step 1. Requests for step 2 of the solicitation shall not be responded to. This requirement is currently unfunded</p>\n\n<p></p>","text":"Step-One (Technical Evaluation) Solicitation- W58RGZ-25-B-0018\n\nAmendment 001\n\nDATE: 10 June 2025\n\nProduct or Service Code: 6610\n\nContracting Office Address:\n\nU.S. Army Aviation and Missile Command (W58RGZ)\n\nATTN: CCAM-ALB, Building 5303, Martin Road Redstone Arsenal, AL 35898-5280 (US)\n\nSUBJECT: OVERHAUL OF THE DISPLAY UNIT FLIGHT INFORMATION for the (UH-60) Blackhawk TECHNICAL SUBMISSION (STEP-1)\n\nSOLICITATION NUMBER: W58RGZ-25-B-0018\n\nRESPONSE DATE: 9 July 2025\n\nContracting Officer: Edward A. Peterson, email:edward.a.peterson4.civ@army.mil\n\nSet-Aside Status: NA\n\nDESCRIPTION: The contractor shall furnish all labor, facilities, parts, materials, equipment, tools and data (other than Government Furnished Property), necessary to accomplish the overhaul of the following assets:\n\nINPUT NSN: 6610-01-656-0041\n\nINPUT P/N: 9200-45201-0101\n\nOUTPUT NSN: 6610-01-656-0041\n\nOUTPUT P/N: 9200-45201-0101\n\nESTIMATED QUANTITY RANGE: Minimum 60 each – Maximum 216 each (Maximum includes a Foreign Military Sales (FMS) Quantity of 36 each)\n\nThe proposed contractual action will be a Five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) Maintenance and Overhaul type contract, with minimum/maximum quantities listed above. These items are commercial; FAR Part 12 will be utilized. Required delivery shall be FOB Origin. This procurement will be solicited as a Full and Open competitive requirement.\n\n• The U.S. Army Contracting Command – Redstone Arsenal (ACC-RSA) will issue an Invitation for Bid (IFB) for the overhaul of the DISPLAY UNIT, FLIGHT INFORMATION. All work shall be completed in accordance with the Statement of Work (SOW). The Government does not have a Depot Maintenance Work Requirement (DMWR) for the proposed solicitation.\n\nThe IFB will be issued as a Full and Open Competitive action using the Two-Step Sealed Bidding Method. It is anticipated that a single Firm-fixed Price (FFP) type contract will be awarded to the responsive, responsible bidder. Only bids based upon technical proposals (Step-One) determined to be acceptable, either initially or as a result of discussions, will be considered further for award into Step-Two. Each bid in the second step must be based on the bidder’s own technical proposal. Bidders shall submit bids that are acceptable without additional explanation or information. The Government may make a final determination regarding a technical proposal’s acceptability solely based on the bid as submitted. The Government may proceed with Step-Two without requesting further information from any bidder. A notice of unacceptability will be forwarded to the Bidder upon completion of the technical proposal evaluation (Step-One) and final determination of unacceptability. This begins the start of step-one technical submission.\n\n2. Technical proposals (Step-One) shall not include prices or pricing information.\n\n3. Bidders shall ensure submission of fully complete bids, including all fill-in-the blanks. Any bidder submitting a bid agrees by submission that its bid and the prices contained therein will be valid for 120 days after receipt of bids.\n\nTechnical acceptability for step-one will be determined by the bidder’s response to the following questions.\n\nA. Has your company ever conducted a repair/overhaul or manufacture of the DISPLAY UNIT, FLIGHT INFORMATION for the UH-60? If not, has your company performed repair on the same, or like item in the past?\n\nB. If yes, when, for how long, in what quantity, and what specific item? If it was under a military contract, what is the contract number?\n\nC. Who was the Primary Contracting Officer? Please provide his or her name, organization, and contact information.\n\nD. Please provide contact information for the Defense contract management Agency (DCMA) that served as your administrative contracting officer.\n\nE. Describe the following in the amount of detail necessary:\n\nDoes your company have overhaul and replacement capability?\n\nDoes your company have a documented quality plan/process?\n\nPlease provide the following details regarding your company’s quality plan.\n\n• Calibration program\n\n• Continues improvement/self-audits program\n\n• Non-conformance parts & quality escapes\n\n• Parts obsolescence review\n\n• Periodic training/certification/recertification program\n\n• Certification/release of test stand/equipment for production\n\n• Traceability of repair & maintenance performed, records keeping program\n\n• IUID (Item Unique Identification) program\n\nWhat are the required minimal qualification and specialized skills of an electronic technician?\n\nDescribe experience in depinning and pinning electrical connectors.\n\nDescribe experience in replacing crimp type pins.\n\nDescribe experience in circuit-board level repair, desolder and solder of electrical components.\n\nDescribe experience in repairing and replacing electrical wires.\n\nDo you have electrical static discharge (ESD) prevention program/capability?\n\nDo you have paint removal capabilities?\n\nDo you have corrosion repair/prevention/application capability?\n\nDo you have painting and minor touch-up capability?\n\nDo you have repair capability for minor surface defects such as nicks, scratches on housing/enclosure?\n\nF. Do you have facilities, special tools and equipment as follows:\n\nOverhaul facility equipped with environmental controls of temperature, humidity, and adequate equipment to vent hazardous fumes?\n\nEquipment, documentation, and procedure to fully support an IUID (Item Unique Identifier) program?\n\nAdequate workbench with ESD control and access to standard shop tools?\n\nAvailability of electronic test equipment necessary for electrical circuit troubleshooting and performing milliohm electrical bond tests?\n\nIf applicable, the required equipment to install, verify, and update application software/firmware?\n\nOriginal Equipment Manufacturer (OEM) test stand/equipment, or certified equivalent for Acceptance Test Procedure (ATP)?\n\nEquipment to read and fabrication of UID (Unique Identification) data plate?\n\n*NOTE* For certified equivalent, be prepared to provide procedure and data establishing equivalency.\n\nG. Do you have an overhaul plan for the subject, or like item?\n\nIf yes, are you willing to submit a copy for evaluation? The plan must contain instructions and procedures covering the following major categories, at a minimum:\n\n• Receiving inspection instructions.\n\n• Pre-test/Pre-shop analysis instructions.\n\n• Disassembly instructions.\n\n• Cleaning instructions.\n\n• Overhaul Inspection Requirements (OIP).\n\n• Repair and replacement instructions.\n\n• Assembly instructions.\n\n• Final Test instructions.\n\n• Primer, paint, coating, and or corrosion protection instructions\n\n• Packaging, marking and shipping instructions.\n\nH. Can your company acquire all necessary parts, tooling and materials to complete an overhaul?\n\nI. If you have worked with L3 Avionics Systems, Cage 25583 for the subject item, or one of its approved suppliers, provide a copy of a completed, showing item receipt, purchase order for the Original Equipment Manufacturer (OEM), or approved supplier, parts, or materials.\n\nJ. Do you possess any OEM data or drawings of this item, including Acceptance Test Procedure (ATP), Maintenance and Overhaul Procedures/Instructions, or Commercial Maintenance Manual (CMM)? Is it complete or partial?\n\nIf yes to possession of complete or partial OEM Data or Drawings, how did your company acquire the rights to data or drawings? Please provide your license or certificate to substantiate this.\n\nK. Provide a copy of the purchase order, or other evidence that you have the rights to the data or drawings in your possession.\n\nOfferors should submit proposals that are acceptable without additional explanation or information.\n\nThey Government may make a final determination regarding a proposal’s acceptability solely on the basis of the proposals as submitted; and may proceed with the second step without requesting further information from any offeror. However, the Government may request additional information from offerors of proposals that it considers reasonably susceptible of being made acceptable and may discuss proposals with their offerors.\n\nA notice of unacceptability will be forwarded to the offeror upon completion of the proposal evaluation and final determination of unacceptability.\n\nMultiple technical proposals may be submitted by each offeror. No telephone requests for the solicitation will be accepted. The pricing piece of the solicitation (Step 2) will not be posted on SAM.gov and will only be provided to the contractors who pass step 1. Requests for step 2 of the solicitation shall not be responded to. This requirement is currently unfunded","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W58RGZ25B0018","product_service_code":"6610"}],"due_at":"2025-07-09T23:00:00Z","due_date":"2025-07-09","closes_at":"2025-07-09T23:00:00Z","awardable":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W58RGZ","office_name":"W6QK ACC-RSA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"state_source":null,"state_evidence":"UTILIZED. REQUIRED DELIVERY SHALL BE FOB ORIGIN","site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-13T02:19:37.924363Z","principal_notice_id":"b2a1e96a6ec740ca9b40f49577b8ae1e","description":{"text":"Step-One (Technical Evaluation) Solicitation- W58RGZ-25-B-0018\n\nAmendment 001\n\nDATE: 10 June 2025\n\nProduct or Service Code: 6610\n\nContracting Office Address:\n\nU.S. Army Aviation and Missile Command (W58RGZ)\n\nATTN: CCAM-ALB, Building 5303, Martin Road Redstone Arsenal, AL 35898-5280 (US)\n\nSUBJECT: OVERHAUL OF THE DISPLAY UNIT FLIGHT INFORMATION for the (UH-60) Blackhawk TECHNICAL SUBMISSION (STEP-1)\n\nSOLICITATION NUMBER: W58RGZ-25-B-0018\n\nRESPONSE DATE: 9 July 2025\n\nContracting Officer: Edward A. Peterson, email:edward.a.peterson4.civ@army.mil\n\nSet-Aside Status: NA\n\nDESCRIPTION: The contractor shall furnish all labor, facilities, parts, materials, equipment, tools and data (other than Government Furnished Property), necessary to accomplish the overhaul of the following assets:\n\nINPUT NSN: 6610-01-656-0041\n\nINPUT P/N: 9200-45201-0101\n\nOUTPUT NSN: 6610-01-656-0041\n\nOUTPUT P/N: 9200-45201-0101\n\nESTIMATED QUANTITY RANGE: Minimum 60 each – Maximum 216 each (Maximum includes a Foreign Military Sales (FMS) Quantity of 36 each)\n\nThe proposed contractual action will be a Five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) Maintenance and Overhaul type contract, with minimum/maximum quantities listed above. These items are commercial; FAR Part 12 will be utilized. Required delivery shall be FOB Origin. This procurement will be solicited as a Full and Open competitive requirement.\n\n• The U.S. Army Contracting Command – Redstone Arsenal (ACC-RSA) will issue an Invitation for Bid (IFB) for the overhaul of the DISPLAY UNIT, FLIGHT INFORMATION. All work shall be completed in accordance with the Statement of Work (SOW). The Government does not have a Depot Maintenance Work Requirement (DMWR) for the proposed solicitation.\n\nThe IFB will be issued as a Full and Open Competitive action using the Two-Step Sealed Bidding Method. It is anticipated that a single Firm-fixed Price (FFP) type contract will be awarded to the responsive, responsible bidder. Only bids based upon technical proposals (Step-One) determined to be acceptable, either initially or as a result of discussions, will be considered further for award into Step-Two. Each bid in the second step must be based on the bidder’s own technical proposal. Bidders shall submit bids that are acceptable without additional explanation or information. The Government may make a final determination regarding a technical proposal’s acceptability solely based on the bid as submitted. The Government may proceed with Step-Two without requesting further information from any bidder. A notice of unacceptability will be forwarded to the Bidder upon completion of the technical proposal evaluation (Step-One) and final determination of unacceptability. This begins the start of step-one technical submission.\n\n2. Technical proposals (Step-One) shall not include prices or pricing information.\n\n3. Bidders shall ensure submission of fully complete bids, including all fill-in-the blanks. Any bidder submitting a bid agrees by submission that its bid and the prices contained therein will be valid for 120 days after receipt of bids.\n\nTechnical acceptability for step-one will be determined by the bidder’s response to the following questions.\n\nA. Has your company ever conducted a repair/overhaul or manufacture of the DISPLAY UNIT, FLIGHT INFORMATION for the UH-60? If not, has your company performed repair on the same, or like item in the past?\n\nB. If yes, when, for how long, in what quantity, and what specific item? If it was under a military contract, what is the contract number?\n\nC. Who was the Primary Contracting Officer? Please provide his or her name, organization, and contact information.\n\nD. Please provide contact information for the Defense contract management Agency (DCMA) that served as your administrative contracting officer.\n\nE. Describe the following in the amount of detail necessary:\n\nDoes your company have overhaul and replacement capability?\n\nDoes your company have a documented quality plan/process?\n\nPlease provide the following details regarding your company’s quality plan.\n\n• Calibration program\n\n• Continues improvement/self-audits program\n\n• Non-conformance parts & quality escapes\n\n• Parts obsolescence review\n\n• Periodic training/certification/recertification program\n\n• Certification/release of test stand/equipment for production\n\n• Traceability of repair & maintenance performed, records keeping program\n\n• IUID (Item Unique Identification) program\n\nWhat are the required minimal qualification and specialized skills of an electronic technician?\n\nDescribe experience in depinning and pinning electrical connectors.\n\nDescribe experience in replacing crimp type pins.\n\nDescribe experience in circuit-board level repair, desolder and solder of electrical components.\n\nDescribe experience in repairing and replacing electrical wires.\n\nDo you have electrical static discharge (ESD) prevention program/capability?\n\nDo you have paint removal capabilities?\n\nDo you have corrosion repair/prevention/application capability?\n\nDo you have painting and minor touch-up capability?\n\nDo you have repair capability for minor surface defects such as nicks, scratches on housing/enclosure?\n\nF. Do you have facilities, special tools and equipment as follows:\n\nOverhaul facility equipped with environmental controls of temperature, humidity, and adequate equipment to vent hazardous fumes?\n\nEquipment, documentation, and procedure to fully support an IUID (Item Unique Identifier) program?\n\nAdequate workbench with ESD control and access to standard shop tools?\n\nAvailability of electronic test equipment necessary for electrical circuit troubleshooting and performing milliohm electrical bond tests?\n\nIf applicable, the required equipment to install, verify, and update application software/firmware?\n\nOriginal Equipment Manufacturer (OEM) test stand/equipment, or certified equivalent for Acceptance Test Procedure (ATP)?\n\nEquipment to read and fabrication of UID (Unique Identification) data plate?\n\n*NOTE* For certified equivalent, be prepared to provide procedure and data establishing equivalency.\n\nG. Do you have an overhaul plan for the subject, or like item?\n\nIf yes, are you willing to submit a copy for evaluation? The plan must contain instructions and procedures covering the following major categories, at a minimum:\n\n• Receiving inspection instructions.\n\n• Pre-test/Pre-shop analysis instructions.\n\n• Disassembly instructions.\n\n• Cleaning instructions.\n\n• Overhaul Inspection Requirements (OIP).\n\n• Repair and replacement instructions.\n\n• Assembly instructions.\n\n• Final Test instructions.\n\n• Primer, paint, coating, and or corrosion protection instructions\n\n• Packaging, marking and shipping instructions.\n\nH. Can your company acquire all necessary parts, tooling and materials to complete an overhaul?\n\nI. If you have worked with L3 Avionics Systems, Cage 25583 for the subject item, or one of its approved suppliers, provide a copy of a completed, showing item receipt, purchase order for the Original Equipment Manufacturer (OEM), or approved supplier, parts, or materials.\n\nJ. Do you possess any OEM data or drawings of this item, including Acceptance Test Procedure (ATP), Maintenance and Overhaul Procedures/Instructions, or Commercial Maintenance Manual (CMM)? Is it complete or partial?\n\nIf yes to possession of complete or partial OEM Data or Drawings, how did your company acquire the rights to data or drawings? Please provide your license or certificate to substantiate this.\n\nK. Provide a copy of the purchase order, or other evidence that you have the rights to the data or drawings in your possession.\n\nOfferors should submit proposals that are acceptable without additional explanation or information.\n\nThey Government may make a final determination regarding a proposal’s acceptability solely on the basis of the proposals as submitted; and may proceed with the second step without requesting further information from any offeror. However, the Government may request additional information from offerors of proposals that it considers reasonably susceptible of being made acceptable and may discuss proposals with their offerors.\n\nA notice of unacceptability will be forwarded to the offeror upon completion of the proposal evaluation and final determination of unacceptability.\n\nMultiple technical proposals may be submitted by each offeror. No telephone requests for the solicitation will be accepted. The pricing piece of the solicitation (Step 2) will not be posted on SAM.gov and will only be provided to the contractors who pass step 1. Requests for step 2 of the solicitation shall not be responded to. This requirement is currently unfunded","html":"<p><strong>Step-One (Technical Evaluation) Solicitation- W58RGZ-25-B-0018</strong></p>\n\n<p><strong><u>Amendment 001</u></strong></p>\n\n<p></p>\n\n<p><strong><u>DATE:</u></strong><strong> </strong><strong><u>10 June 2025</u></strong></p>\n\n<p></p>\n\n<p></p>\n\n<p><strong><u>Product or Service Code: </u></strong>6610</p>\n\n<p></p>\n\n<p><strong><u>Contracting Office Address: </u></strong></p>\n\n<p>U.S. Army Aviation and Missile Command (W58RGZ)</p>\n\n<p>ATTN: CCAM-ALB, Building 5303, Martin Road Redstone Arsenal, AL 35898-5280 (US)</p>\n\n<p><strong><u>SUBJECT</u>: OVERHAUL OF THE </strong>DISPLAY UNIT FLIGHT INFORMATION for the (UH-60) Blackhawk TECHNICAL SUBMISSION (STEP-1)</p>\n\n<p><strong><u>SOLICITATION NUMBER</u></strong><strong>: </strong>W58RGZ-25-B-0018</p>\n\n<p><strong><u>RESPONSE DATE</u></strong><strong>:</strong> <strong><u>9 July 2025</u></strong></p>\n\n<p><strong><u>Contracting Officer:</u></strong><strong> </strong>Edward A. Peterson, email:edward.a.peterson4.civ@army.mil</p>\n\n<p><strong><u>Set-Aside Status</u></strong><strong>: NA</strong></p>\n\n<p><strong>DESCRIPTION: </strong>The contractor shall furnish all labor, facilities, parts, materials, equipment, tools and data (other than Government Furnished Property), necessary to accomplish the overhaul of the following assets:</p>\n\n<p>INPUT NSN: 6610-01-656-0041</p>\n\n<p>INPUT P/N: 9200-45201-0101</p>\n\n<p>OUTPUT NSN: 6610-01-656-0041</p>\n\n<p>OUTPUT P/N: 9200-45201-0101</p>\n\n<p>ESTIMATED QUANTITY RANGE: Minimum 60 each &ndash; Maximum 216 each (Maximum includes a Foreign Military Sales (FMS) Quantity of 36 each)</p>\n\n<p>The proposed contractual action will be a Five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) Maintenance and Overhaul type contract, with minimum/maximum quantities listed above. These items are commercial; FAR Part 12 will be utilized. Required delivery shall be FOB Origin. This procurement will be solicited as a Full and Open competitive requirement.</p>\n\n<ol>\n\t<li>The U.S. Army Contracting Command &ndash; Redstone Arsenal (ACC-RSA) will issue an Invitation for Bid (IFB) for the overhaul of the DISPLAY UNIT, FLIGHT INFORMATION. All work shall be completed in accordance with the Statement of Work (SOW). The Government does not have a Depot Maintenance Work Requirement (DMWR) for the proposed solicitation.</li>\n</ol>\n\n<p>The IFB will be issued as a Full and Open Competitive action using the Two-Step Sealed Bidding Method. It is anticipated that a single Firm-fixed Price (FFP) type contract will be awarded to the responsive, responsible bidder.&nbsp; &nbsp;Only bids based upon technical proposals (Step-One) determined to be acceptable, either initially or as a result of discussions, will be considered further for award into Step-Two. Each bid in the second step must be based on the bidder&rsquo;s own technical proposal. Bidders shall submit bids that are acceptable without additional explanation or information. The Government may make a final determination regarding a technical proposal&rsquo;s acceptability solely based on the bid as submitted. The Government may proceed with Step-Two without requesting further information from any bidder. A notice of unacceptability will be forwarded to the Bidder upon completion of the technical proposal evaluation (Step-One) and final determination of unacceptability. <strong><u>This begins the start of step-one technical submission. </u></strong></p>\n\n<p><strong><u>2. Technical proposals (Step-One) shall not include prices or pricing information. </u></strong></p>\n\n<p>3. Bidders shall ensure submission of fully complete bids, including all fill-in-the blanks. Any bidder submitting a bid agrees by submission that its bid and the prices contained therein will be valid for <strong><u>120</u></strong> days after receipt of bids.</p>\n\n<p>Technical acceptability for step-one will be determined by the bidder&rsquo;s response to the following questions.</p>\n\n<p>A. Has your company ever conducted a repair/overhaul or manufacture of the DISPLAY UNIT, FLIGHT INFORMATION for the UH-60? If not, has your company performed repair on the same, or like item in the past?</p>\n\n<p>B. If yes, when, for how long, in what quantity, and what specific item? If it was under a military contract, what is the contract number?</p>\n\n<p>C. Who was the Primary Contracting Officer? Please provide his or her name, organization, and contact information.</p>\n\n<p>D. &nbsp;Please provide contact information for the Defense contract management Agency (DCMA) that served as your administrative contracting officer.</p>\n\n<p>E. Describe the following in the amount of detail necessary:</p>\n\n<p>Does your company have overhaul and replacement capability?</p>\n\n<p>Does your company have a documented quality plan/process?</p>\n\n<p>Please provide the following details regarding your company&rsquo;s quality plan.</p>\n\n<ul>\n\t<li>Calibration program</li>\n\t<li>Continues improvement/self-audits program</li>\n\t<li>Non-conformance parts &amp; quality escapes</li>\n\t<li>Parts obsolescence review</li>\n\t<li>Periodic training/certification/recertification program</li>\n\t<li>Certification/release of test stand/equipment for production</li>\n\t<li>Traceability of repair &amp; maintenance performed, records keeping program</li>\n\t<li>IUID (Item Unique Identification) program</li>\n</ul>\n\n<p>What are the required minimal qualification and specialized skills of an electronic technician?</p>\n\n<p></p>\n\n<p>Describe experience in depinning and pinning electrical connectors.</p>\n\n<p>Describe experience in replacing crimp type pins.</p>\n\n<p>Describe experience in circuit-board level repair, desolder and solder of electrical components.</p>\n\n<p>Describe experience in repairing and replacing electrical wires.</p>\n\n<p>Do you have electrical static discharge (ESD) prevention program/capability?</p>\n\n<p>Do you have paint removal capabilities?</p>\n\n<p>Do you have corrosion repair/prevention/application capability?</p>\n\n<p>Do you have painting and minor touch-up capability?</p>\n\n<p>Do you have repair capability for minor surface defects such as nicks, scratches on housing/enclosure?</p>\n\n<p>F. Do you have facilities, special tools and equipment as follows:</p>\n\n<p>Overhaul facility equipped with environmental controls of temperature, humidity, and adequate equipment to vent hazardous fumes?</p>\n\n<p>Equipment, documentation, and procedure to fully support an IUID (Item Unique Identifier) program?</p>\n\n<p>Adequate workbench with ESD control and access to standard shop tools?</p>\n\n<p>Availability of electronic test equipment necessary for electrical circuit troubleshooting and performing milliohm electrical bond tests?</p>\n\n<p>If applicable, the required equipment to install, verify, and update application software/firmware?</p>\n\n<p>Original Equipment Manufacturer (OEM) test stand/equipment, or certified equivalent for Acceptance Test Procedure (ATP)?</p>\n\n<p>Equipment to read and fabrication of UID (Unique Identification) data plate?</p>\n\n<p>&nbsp; *NOTE* For certified equivalent, be prepared to provide procedure and data&nbsp;&nbsp;&nbsp;&nbsp; establishing equivalency.</p>\n\n<p>G. Do you have an overhaul plan for the subject, or like item?</p>\n\n<p>If yes, are you willing to submit a copy for evaluation? The plan must contain instructions and procedures covering the following major categories, at a minimum:</p>\n\n<ul>\n\t<li>Receiving inspection instructions.</li>\n\t<li>Pre-test/Pre-shop analysis instructions.</li>\n\t<li>Disassembly instructions.</li>\n\t<li>Cleaning instructions.</li>\n\t<li>Overhaul Inspection Requirements (OIP).</li>\n\t<li>Repair and replacement instructions.</li>\n\t<li>Assembly instructions.</li>\n\t<li>Final Test instructions.</li>\n\t<li>Primer, paint, coating, and or corrosion protection instructions</li>\n\t<li>Packaging, marking and shipping instructions.</li>\n</ul>\n\n<p></p>\n\n<p>H. Can your company acquire all necessary parts, tooling and materials to complete an overhaul?</p>\n\n<p></p>\n\n<p>I. If you have worked with L3 Avionics Systems, Cage 25583 for the subject item, or one of its approved suppliers, provide a copy of a completed, showing item receipt, purchase order for the Original Equipment Manufacturer (OEM), or approved supplier, parts, or materials.</p>\n\n<p></p>\n\n<p>J. Do you possess any OEM data or drawings of this item, including Acceptance Test Procedure (ATP), Maintenance and Overhaul Procedures/Instructions, or Commercial Maintenance Manual (CMM)? Is it complete or partial?</p>\n\n<p>If yes to possession of complete or partial OEM Data or Drawings, how did your company acquire the rights to data or drawings? Please provide your license or certificate to substantiate this.</p>\n\n<p></p>\n\n<p>K. Provide a copy of the purchase order, or other evidence that you have the rights to the data or drawings in your possession.</p>\n\n<p></p>\n\n<p>Offerors should submit proposals that are acceptable without additional explanation or information.</p>\n\n<p></p>\n\n<p>They Government may make a final determination regarding a proposal&rsquo;s acceptability solely on the basis of the proposals as submitted; and may proceed with the second step without requesting further information from any offeror. However, the Government may request additional information from offerors of proposals that it considers reasonably susceptible of being made acceptable and may discuss proposals with their offerors.</p>\n\n<p></p>\n\n<p>A notice of unacceptability will be forwarded to the offeror upon completion of the proposal evaluation and final determination of unacceptability.</p>\n\n<p></p>\n\n<p>Multiple technical proposals may be submitted by each offeror. No telephone requests for the solicitation will be accepted. The pricing piece of the solicitation (Step 2) will not be posted on SAM.gov and will only be provided to the contractors who pass step 1. Requests for step 2 of the solicitation shall not be responded to. This requirement is currently unfunded</p>\n\n<p></p>","origin":"detail"},"contacts":[{"name":"Maryssa Sanchez","role":"primary","email":"maryssa.d.sanchez.civ@army.mil","phone":"2565859706"},{"name":"Edward A. Peterson","role":"secondary","email":"edward.a.peterson4.civ@army.mil","phone":"2563138529"}],"place_of_performance":null,"office_address":{"zip":"35898-0000","city":"REDSTONE ARSENAL","state":"AL","country":"USA"},"naics_codes":["334511"],"award":null,"attachments":[],"awards":[],"related":[{"key":"W58RGZ26R00400001","latest_notice_id":"e1faa0368d7848e48481688cf8ca6af5","title":"UH-60 STAKING SET, BEARING","solicitation_number":"W58RGZ-26-R-0040_0001","notice_type":"o","first_type":"o","first_posted":"2026-10-01","last_posted":"2026-10-01","notices":1,"due_at":"2026-11-30T21:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W58RGZ","office_name":"W6QK ACC-RSA","naics":"334413","psc":"5980","set_aside":null,"state":"AL","county":"01089","county_name":"Madison County","city":"0163912","city_name":"Redstone Arsenal","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-02T04:16:43.273742Z"},{"key":"W58RGZ26B00120004","latest_notice_id":"4e703002132841afabc31acd496f3d51","title":"Overhaul of the UH-60 POWER TURBINE MODULE","solicitation_number":"W58RGZ-26-B-0012_0004","notice_type":"o","first_type":"o","first_posted":"2026-09-30","last_posted":"2026-09-30","notices":1,"due_at":"2026-11-30T21:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W58RGZ","office_name":"W6QK ACC-RSA","naics":"336412","psc":"2840","set_aside":null,"state":"AL","county":"01089","county_name":"Madison County","city":"0163912","city_name":"Redstone Arsenal","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-01T04:02:27.010479Z"},{"key":"W58RGZ26R0004","latest_notice_id":"342f3795cefb4401b44461935eac78d5","title":"FIRE CONTROL RADAR (FCR)","solicitation_number":"W58RGZ-26-R-0004","notice_type":"o","first_type":"r","first_posted":"2026-02-12","last_posted":"2026-09-10","notices":3,"due_at":"2026-11-30T23:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W58RGZ","office_name":"W6QK ACC-RSA","naics":"336411","psc":"R706","set_aside":null,"state":"AL","county":"01089","county_name":"Madison County","city":"0163912","city_name":"Redstone Arsenal","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T03:25:58.922164Z"},{"key":"W58RGZ25Q0016","latest_notice_id":"1382ddf28b4043f693446ab0ceba574b","title":"V250 AND TMS KIT","solicitation_number":"W58RGZ-25-Q-0016","notice_type":"o","first_type":"o","first_posted":"2025-11-17","last_posted":"2025-11-17","notices":1,"due_at":"2026-12-01T23:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W58RGZ","office_name":"W6QK ACC-RSA","naics":"336413","psc":"6695","set_aside":null,"state":"AL","county":"01089","county_name":"Madison County","city":"0163912","city_name":"Redstone Arsenal","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T03:25:58.922164Z"},{"key":"W58RGZ26B0024","latest_notice_id":"1f2b536ec2e743b681c266359bc078df","title":"Solicitation for Overhaul of the Hydraulic Valve","solicitation_number":"W58RGZ-26-B-0024","notice_type":"o","first_type":"r","first_posted":"2026-07-21","last_posted":"2026-09-24","notices":5,"due_at":"2026-12-02T20:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W58RGZ","office_name":"W6QK ACC-RSA","naics":"332911","psc":"4810","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 4810)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"removed_at":null,"updated_at":"2026-10-02T05:14:27.609400Z"}],"similar_open":[{"key":"SPRPA127QWA49","latest_notice_id":"cac8b3ed1c6c4c858217ba217cd6d861","title":"AIR DATA MODULE","solicitation_number":"SPRPA127QWA49","notice_type":"o","first_type":"o","first_posted":"2026-11-25","last_posted":"2026-11-25","notices":1,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"334511","psc":"6605","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6605)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-26T04:43:42.403930Z"},{"key":"N0010427QBB76","latest_notice_id":"44270a60206c45e1a40988c6cf348788","title":"ACCELEROMETER,MECHA","solicitation_number":"N0010427QBB76","notice_type":"o","first_type":"o","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":1,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00104","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT MECH","naics":"334511","psc":"6610","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6610)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"SPRMM126QGF41","latest_notice_id":"3ec7bf95748945559bdca6eb1e81411e","title":"MODULE, YIG/SW","solicitation_number":"SPRMM126QGF41","notice_type":"o","first_type":"o","first_posted":"2026-11-12","last_posted":"2026-11-12","notices":1,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRMM1","office_name":"SPRMM1 DLA MECHANICSBURG","naics":"334511","psc":"5865","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 5865)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"}],"similar_open_total":108,"indexable":false}