Presolicitation, first published as sources sought
Synopsis for the Overhaul of the UH-60 Power Turbine Module, Black Hawk
W58RGZ-25-B-0015
Department of the Army, W6QK ACC-RSA. Aircraft Engine and Engine Parts Manufacturing.
Response deadline
August 1, 2025 at 6:00 PM EDT
Closed 482 days ago. Posted July 17, 2025, first published January 15, 2025. Scheduled to archive August 16, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
114 like it are open now in aircraft engine and engine parts manufacturing
- Overhaul of the UH-60 POWER TURBINE MODULE
Department of the Army, W6QK ACC-RSA
SolicitationNAICS 336412Ship to Redstone Arsenal, ALW58RGZ-26-B-0012_0004Due in 4 daysNov 30 - Noun: LINER AND BEARING A NSN:2840009860444 P/N:2-080-120-01
Defense Logistics Agency, DLA Aviation at Huntsville, Al
SolicitationNAICS 336412Ship to Redstone Arsenal, ALSPRRA1-27-Q-A006Closes in 18 daysDec 14 - FRAME, TURNBINE, AIRCRAFT; NSN 2840-01-200-5345PR
Defense Logistics Agency, DLA Aviation at Oklahoma City, Ok
PresolicitationNAICS 336412Ship to the buyerSPRTA127Q0035Due tomorrowNov 27
All 114 open in aircraft engine and engine parts manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 336412 (aircraft engine and engine parts manufacturing), means no more than 1,500 employees, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of January 15, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The contractor shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data (other than Government Furnished Property), necessary to accomplish the Overhaul of the following assets:
NOMENCLATURE: POWER TURBINE MODULE
INPUT NSN: 2840-01-503-1700
INPUT P/N: 6071T26G02
OUTPUT NSN: 2840-01-692-2620
OUTPUT P/N: 6071T26G05
ESTIMATED QUANTITY RANGE: Minimum 25 each – Maximum 390 each (Maximum includes a Foreign Military Sales (FMS) Quantity of 65 each)
The proposed contractual action will be a Five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) Maintenance and Overhaul type contract, with minimum / maximum quantities listed above. These items are non-commercial; FAR Part 12 will not be utilized. Required delivery shall be FOB Origin. This NSN is a critical safety item. Depot Maintenance Work Requirement DMWR 1-2840-248-1/-2/-3/-4 revision date 9/30/2014 (Change #7) and all associated Maintenance Engineering Orders (MEOs) are adequate and available to support the overhaul of the subject item. A Product Verification Audit (PVA) is
required.
The overhaul can only be performed by a source approved by the System Readiness Directorate (SRD). At this time, GE Engine Services Inc., One Neuman Way, Cincinnati, OH 45215, (CAGE Code 062W2), (UEI: FBXVANJWUL78) (Large Business); Bet Shemesh Engines LTD., 1 Virginia Ave, Bet Shemesh, ISR, (CAGE Code 1855A), (UEI: QB6LPRRDX3B6) (Large Business); GE Engine Services LLC,7577 4th St, Winfield, KS 67156, (CAGE Code 24113), (UEI: CJP3G3AGVEJ7) (Large Business); Standard Aero Limited, 20699 Westminster Hwy, Richmond, BC V6V1B3 (CAGE Code L0K02), (UEI: LENPQA72GMG9) (Large Business) are the only sources approved by SRD to overhaul.
If your company wishes to be considered as an approved source, your company must submit a Source Approval Request (SAR) through SRD. The instructions for doing so are located at the following website:
https://www.avmc.army.mil/Directorates/SRD/TechDataMgmt/
This limited competitive procurement utilizes FAR part 14, sealed bidding. No telephone requests for the solicitation will be accepted. Requests for the solicitation shall be by email only. Email requests should be sent to reginald.c.burrell2.civ@army.mil. Proposals shall be e-mailed for the initial proposal. No fax or hard copy responses shall be accepted for the initial proposal. This
requirement is currently unfunded. Award will be withheld pending receipt of sufficient funds. The closing date annotated is an estimated date and may be adjusted depending upon the date of release of the solicitation; however, the solicitation will not close prior to the closing date stated above.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 15, 2025
Sources sought
Sources Sought for the Overhaul of the UH-60 POWER TURBINE MODULE
Due January 30, 2025 at 1:00 PM EST. SAM.gov, notice eb871d3395fc464689676c8dee6043d8
2 revisions on SAM
- July 17, 2025: publish, presolicitation
- January 15, 2025: publish, sources sought
July 17, 2025
Presolicitation, originally sources sought
Due August 1, 2025 at 6:00 PM EDT. SAM.gov, notice f78cd411343a496880bb729c4338b790
3 revisions on SAM
- January 26, 2026: publish, solicitation
- July 17, 2025: publish, presolicitation
- January 15, 2025: publish, sources sought
Points of contact
- Reginald C. Burrellreginald.c.burrell2.civ@mail.mil520-674-8698
- Lindy L. Pinchonlindy.l.pinchon.civ@army.mil(256) 955-9304