# Vendor Managed Inventory System (VMI) for Tool & Fixture - RIA JMTC

Canonical: https://sealedbidder.com/opportunities/w519tc26qa141

- Solicitation number: W519TC26QA141
- Notice type: Solicitation (first published as sources sought)
- Status: Closed. Deadline was August 11, 2026 at 11:00 AM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W6QK ACC-RI (W519TC)
- NAICS: 332510 Hardware Manufacturing
- Product or service code: 5340 Hardware
- Small business size standard: 750 employees (13 CFR 121.201, NAICS 332510)
- Place of performance: Rock Island, Illinois
- Who can bid, by location: Anywhere in the US. Location does not limit who can bid: a product shipped to the buyer, research at the performer's facility, or work at the contractor's site. A state shown is the delivery point.
- County: Rock Island County (FIPS 17161). https://sealedbidder.com/counties/rock-island-county-il-17161
- City: Rock Island. https://sealedbidder.com/cities/rock-island-il-1765078
- First posted: May 15, 2026
- Last posted: July 21, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/c1990b8773c846b59179a5ed4425d864/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 332510 (hardware manufacturing), means no more than 750 employees, counted with affiliates.
- Time to respond: Bidders had 28 days from the day the solicitation was posted, July 14, 2026, to the deadline. The deadline moved 2 times: it was first May 22, 2026 and ended as August 11, 2026.
- Before the solicitation: The agency published a sources sought on May 15, 2026, 60 days before the solicitation.

## Description

Amendment 0001:

The purpose Amendment 0001 is to publish questions and answers for Solicitation W519TC26QA141.

1. Question: When may the contractor invoice? The PWS says the Government assumes ownership when an item is removed from the cabinet, but it also says the contractor may invoice after stocking.

Answer: The contractor shall invoice monthly, stated in section 6.3 in the PWS. &ldquo;The Contractor shall submit invoices for approval and payment on a monthly basis. The contractor&rsquo;s monthly invoice may include cost incurred from multiple visits within the month&rdquo; which will be invoiced through Defense Finance and Accounting (DFAS) via Wide Area Workflow (WAWF). See DFARS 252.223-7003 & 252.223-7006 for additional guidance on invoicing.

2. Question: Where are the VMI equipment costs placed? There is no separate CLIN for cabinets, software, installation, connectivity, maintenance, or onsite labor. Should those be allocated across the item unit prices?

Answer: Per 1.1, Scope of the PWS, the items shall be placed in the vendor supplied cabinets/bins/shelving and designated Government owned racks. The Contractor shall provide, install, stock, and maintain the cabinets/bins/shelves. Therefore, ALL COSTS of services and supplies shall be included on the corresponding price matrix items, quote must be complete and accurate.

3. Question: Minimum versus maximum quantities. The guaranteed minimum is based on the minimum-on-hand quantities, but the spreadsheet&rsquo;s evaluated extended prices appear to use maximum quantities. Can you confirm the intended calculation and initial delivery order quantity?

Answer: The extended price is what our maximum quantity is for storage, and for projected usage.

4. Question: Site access before bidding. The contractor is instructed to verify cellular reception for the electronic cabinets. Will that be offered so the proposed VMI operator can inspect the 20-by-50-foot room and test connectivity?

Answer: A site visit can be approved for this solicitation, please reach out to travis.l.thomas38.civ@army.mil to coordinate a visit.

- End of AMD 0001 Narrative -

See Solicitation and PWS

## Attachments

- [Attachment 0006_CDRL00004_SDSRequirements SIGNED.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/677a31b6bbcb494a86ee72540c39a299/download)
- [Tool Room VMI FINAL REVISED PWS dated 04-07-2026 (1).pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0090d5e8087644b48c2815da3ea6d845/download)

## Open now in the same industry

254 open in NAICS 332510.

- SPMYM227Q0231 FOLDING PARTITION (SPMYM227Q0231), due November 27, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/spmym227q0231
- BRACKET,ANGLE (SPE7L427U0165), due November 27, 2026. https://sealedbidder.com/opportunities/spe7l427u0165
- BRACKET,MOUNTING (SPE7L427U0169), due November 27, 2026. https://sealedbidder.com/opportunities/spe7l427u0169

## Publications

- May 15, 2026: Sources sought, due May 22, 2026 at 11:00 AM EDT. Notice 8351087670bf4999b3abf4d68dffd6ef. https://sam.gov/workspace/contract/opp/8351087670bf4999b3abf4d68dffd6ef/view
- June 18, 2026: Presolicitation, due June 24, 2026 at 11:00 AM EDT. Notice 629ddfe9a189467198f391204eb029af. https://sam.gov/workspace/contract/opp/629ddfe9a189467198f391204eb029af/view
- July 14, 2026: Solicitation, due August 11, 2026 at 11:00 AM EDT. Notice 92048f4ffca24df7a8b89fa52d754aab. https://sam.gov/workspace/contract/opp/92048f4ffca24df7a8b89fa52d754aab/view
- July 20, 2026: Solicitation, due August 11, 2026 at 11:00 AM EDT. Notice 654ec8e92fb34d7ca549d76ada706d15. https://sam.gov/workspace/contract/opp/654ec8e92fb34d7ca549d76ada706d15/view
- July 21, 2026: Solicitation, due August 11, 2026 at 11:00 AM EDT. Notice c1990b8773c846b59179a5ed4425d864. https://sam.gov/workspace/contract/opp/c1990b8773c846b59179a5ed4425d864/view

## Points of contact

- Travis Thomas, travis.l.thomas38.civ@army.mil
- JOHN JACOBSEN, JOHN.E.JACOBSEN16.CIV@ARMY.MIL

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/w519tc26qa141.
