Solicitation, first published as presolicitation
5-Ton Electric ARC Furnace
W519TC25RA021
Department of the Army, W6QK ACC-RI. All Other Industrial Machinery Manufacturing.
Response deadline
September 22, 2025 at 1:00 PM EDT
Closed 429 days ago. Posted September 16, 2025, first published August 14, 2025. Scheduled to archive October 7, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
6 like it are open now in all other industrial machinery manufacturing
- X209 Meltio M600 Laser Metal Wire 3D Printer FY27
Department of Energy, ORNL Ut-Battelle LLC-DOE Contractor
Combined synopsis and solicitationNAICS 333248Ship to Oak Ridge, TNRFP518395Due in 5 daysNov 30 - Automated Fluidized Bed Mixer Facility Modernization for end use at Pine Bluff Arsenal – CSO
Department of the Army, W6QK ACC-RI
Due in 6 daysDec 1 - Dual Heat Laminator
Department of Energy, ORNL Ut-Battelle LLC-DOE Contractor
Combined synopsis and solicitationNAICS 333248Ship to Oak Ridge, TNRFQ518918Due in 7 daysDec 2
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 333248 (all other industrial machinery manufacturing), means no more than 750 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 39 days from the day the solicitation was posted, August 14, 2025, to the deadline. The deadline moved once: it was first September 15, 2025 and ended as September 22, 2025.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Provide the following: Detailed design engineering, specification development, project management, equipment installation, concrete work, construction services, equipment commissioning, training and the procurement of (1) 5-Ton Electric Arc furnace (with the option for a second) and necessary supporting equipment such as bag house dust collection system, compressed Air and Argon storage tanks, (1) 5-ton AOD system, plus the demolition and removal of the existing 5-Ton Arc furnace. These items shall include all materials and labor necessary to make the equipment safely operational and to meet all relevant industry and national standards, per the requirements identified within this document.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Attachment 0001 RIPD E4000 24309 dated 27 Jun 25.docx99 KB, August 14, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 14, 2025
Presolicitation
Due September 15, 2025 at 1:00 PM EDT. SAM.gov, notice 6e3a455099ad4b9e9d0db0cb918927d3
2 revisions on SAM
- August 14, 2025: publish, presolicitation
- August 14, 2025: publish, solicitation
August 14, 2025
Solicitation, originally presolicitation
Due September 15, 2025 at 1:00 PM EDT. SAM.gov, notice 6fe009df1ed8491d985966e97a2980c6
3 revisions on SAM
- September 16, 2025: publish, solicitation
- August 14, 2025: publish, presolicitation
- August 14, 2025: publish, solicitation
September 16, 2025
Solicitation
Due September 22, 2025 at 1:00 PM EDT. SAM.gov, notice 255fe068bf5a40d1b08f11548116d912
3 revisions on SAM
- September 16, 2025: publish, solicitation
- August 14, 2025: publish, presolicitation
- August 14, 2025: publish, solicitation
Points of contact
- Christine Szalochristine.a.szalo.civ@army.mil520-693-0301
- Daniel SinnottDaniel.s.Sinnott.civ@army.mil3097822790