Award notice, total small business set-aside, first published as presolicitation
Repair King Drive - Grade and Pave
W519TC25RA012
Department of the Army, W6QK ACC-RI. Highway, Street, and Bridge Construction.
Awarded
$1,653,050.00 on the award notice, August 21, 2025, contract W519TC25CA036
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one was awarded in 2025
36 like it are open now in highway, street, and bridge construction
- AL-WHEELER NWR-WATERMAN GATE
Departmental Offices, FWS Contracting Activity
SolicitationNAICS 237310Ship to the buyer140FF027Q0077Due tomorrowNov 27 - W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation
Department of the Army, W07V Endist Rock Island
Presolicitation8(a)NAICS 237310MichiganW912EK27BA003Due in 4 daysNov 30 - NPS Repair or Alteration of Highways, Roads, Streets, Trails and Bridges Multip
Departmental Offices, National Park Service Contracting Activity
Sources soughtNAICS 237310Not tied to one place140PP027R0017Due in 4 daysNov 30
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Award notice. Who won, when, and for how much. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 37 days from the day the solicitation was posted, June 23, 2025, to the deadline. The deadline moved 2 times: it was first June 20, 2025 and ended as July 30, 2025.
- Before the solicitation
- The agency published a presolicitation on June 5, 2025, 18 days before the solicitation.
- How it ended
- Awarded to Langman Construction Inc. on August 21, 2025, 22 days after offers were due. The contracting office reported 7 offers (full and open competition after exclusion of sources).
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
This project consists of the regrading and paving of King Drive from the intersection of Rodman Avenue and ending approximately 1,855 feet west of the Blunt Road intersection, on the Rock Island Arsenal, Rock Island, Illinois. The scope includes removing the existing Hot Mix Asphalt (HMA) pavement on King Drive according to the location mentioned above. Removing the existing Portland
Cement Concrete (P.C.C.) islands on Rodman Avenue adjacent to Building 187 and removing approximately 550 feet of the existing HMA trail adjacent to Rodman Avenue near the existing intersection of King Drive and Rodman Avenue. The project shall include relocating the intersection of King Drive and Rodman Avenue approximately 350 feet west. A new exit lane shall be established on
the west side of King Drive with the intent of campground vehicles and patrons to turnaround and exit the island. A new 10-foot HMA shared use path shall be established along the existing alignment of King Drive. The path shall terminate at Blunt Road. A portion of Blunt Road shall be reconstructed. The reconstruction shall begin at the intersection of King Drive and Blunt Road and terminate
approximately 335 feet east of the intersection. This project is being constructed in coordination with a future campground to be built later. The new road is intended to increase the mobility of larger vehicles in the area in relation to the campground.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Attachment 0007 King Drive Project Site Visit Location.pdf192 KB, June 23, 2025
- Attachment 0008 Site Visit Sign In sheet.pdf1.5 MB, July 14, 2025
- Attachment 0006 DB Wage Determination 30 May 2025.pdf8.5 MB, June 23, 2025
- Attachment 0005 KING DRIVE SITE LAYOUT 5-30-25.pdf4.2 MB, June 23, 2025
- Attachment 0004 Appendix C Submittal Register 2025-2923 KING DRIVE.pdf248 KB, June 23, 2025
- Attachment 0003 Appendix B Division 1 SPECS 2025-2923 KING DRIVE.pdf1.1 MB, June 23, 2025
- Attachment 0002 Appendix A FINAL PLANS 2025-2923 KING DRIVE 6-9-25.pdf16.4 MB, June 23, 2025
- Attachment 0001 SOW 2025-2923 KING DRIVE - GRADE AND PAVE 6-9-25.pdf361 KB, June 23, 2025
- W519TC-25-R-A012.pdf5.7 MB, June 23, 2025
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Langman Construction Inc.
- UEI
- KYQ5AUK7TKP3
- CAGE
- 0EB92
- Vendor location
- Rock Island, IL
- Contract
- W519TC25CA036, definitive contract
- Obligated
- $1,653,050.00
- Actions
- 2 between August 21, 2025 and February 3, 2026
- Competition
- Full and Open Competition After Exclusion of Sources, 7 offers received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- This Project Consists of the Regrading and Paving of King Drive from the Intersection of Rodman Avenue and Ending Approximately 1,855 Feet West of the Blunt Road Intersection, on the Rock Island Arsenal, Rock Island, Il.
- Match
- award number W519TC25CA036 equals the contract number; same awarding office W519TC (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 5, 2025
Presolicitation
Due June 20, 2025 at 3:00 PM EDT. SAM.gov, notice a3dfeab0e7af4f77a24720fffdf38e40
2 revisions on SAM
- June 5, 2025: publish, presolicitation
- June 23, 2025: publish, solicitation
June 23, 2025
Solicitation, originally presolicitation
Due July 23, 2025 at 4:00 PM EDT. SAM.gov, notice 3a6cf899e09e4ba1a4e860615b4a0a11
5 revisions on SAM
- July 29, 2025: publish, solicitation
- June 5, 2025: publish, presolicitation
- July 22, 2025: publish, solicitation
- July 14, 2025: publish, solicitation
- June 23, 2025: publish, solicitation
July 14, 2025
Solicitation
Due July 23, 2025 at 4:00 PM EDT. SAM.gov, notice e18337e89aa54121a8babaff3b9d7400
5 revisions on SAM
- July 29, 2025: publish, solicitation
- June 5, 2025: publish, presolicitation
- July 22, 2025: publish, solicitation
- July 14, 2025: publish, solicitation
- June 23, 2025: publish, solicitation
July 22, 2025
Solicitation
Due July 30, 2025 at 4:00 PM EDT. SAM.gov, notice d17a9447531b437bb692609a325d282b
5 revisions on SAM
- July 29, 2025: publish, solicitation
- June 5, 2025: publish, presolicitation
- July 22, 2025: publish, solicitation
- July 14, 2025: publish, solicitation
- June 23, 2025: publish, solicitation
July 29, 2025
Solicitation
Due July 30, 2025 at 4:00 PM EDT. SAM.gov, notice b77fc696e3a646af88c0c7a5780216a4
6 revisions on SAM
- September 16, 2025: publish, award notice
- July 29, 2025: publish, solicitation
- June 5, 2025: publish, presolicitation
- July 22, 2025: publish, solicitation
- July 14, 2025: publish, solicitation
- June 23, 2025: publish, solicitation
September 16, 2025
Award notice, originally solicitation
Awarded to Langman Construction Inc. for $1,653,050. SAM.gov, notice 8bb8fdd4fbc34ce09e6ccbdbff8cbd08
2 revisions on SAM
- September 16, 2025: publish, award notice
- July 29, 2025: publish, solicitation
Points of contact
- Lindsay Parklindsay.p.park.civ@army.mil
- Kathy Wardkathleen.m.ward20.civ@army.mil