# Design-Build and Construction Services MATOC to support Industrial Base Modernization at Government Owned - Contractor Operated (GOCO) Facilities

Canonical: https://sealedbidder.com/opportunities/w519tc25r0026

- Solicitation number: W519TC_25_R0026
- Notice type: Presolicitation (first published as sources sought)
- Status: Closed. Deadline was May 7, 2026 at 6:00 PM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W6QK ACC-RI (W519TC)
- NAICS: 236210 Industrial Building Construction
- Product or service code: Y1EA Construction Of Ammunition Facilities
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 236210)
- Location read from: the notice's description: "026. PLACE OF PERFORMANCE: WORK AT THE TO LEVEL UNDER THE MATOC WILL BE PERFORMED AT THE FOLLOWING GOCO AAPS: HOLSTON AAP (HSAAP), KINGSPORT, TN"
- First posted: December 13, 2024
- Last posted: March 24, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/09e6f55fccdb4805bad5609935e2a69f/view

## Reading this notice

- Kind of notice: Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236210 (industrial building construction), means no more than $45 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 358 days from the day the solicitation was posted, May 14, 2025, to the deadline. The deadline moved 6 times: it was first January 17, 2025 and ended as May 7, 2026.
- Before the solicitation: The agency published a sources sought on December 13, 2024, 152 days before the solicitation.

## Description

The Army Contracting Command &ndash; Rock Island (ACC-RI) on behalf of Project Lead Joint Services (PL JS) intends to issue a Request for Proposal (RFP) to establish a Multiple Award Task Order Contract (MATOC) to provide comprehensive Design, Build, and Commissioning support for modernization efforts at the Department of War (DOW) Government-Owned, Contractor-Operated (GOCO) Army Ammunition Plants (AAPs) identified hereafter

The scope of this MATOC is broad and covers a wide range of substantial projects utilizing various methods, including design-build, design-bid-build, and progressive design-build. Projects will support the modernization of the Army&rsquo;s industrial base and may include, but are not limited to:

	Design, construction and commissioning of energetic material manufacturing lines (e.g., explosives, propellants).

	Load, assembly, and pack lines.

	Shell casing and metal parts production lines.

	Building upgrades, energy projects, and environmental projects.

	Full commissioning of new or upgraded facilities to prove production capability and readiness.

Successful offerors will be responsible for providing all personnel, equipment, supplies, supervision, architectural, engineering, design, construction, and commissioning work as defined in subsequent Task Orders (TOs) issued under the MATOC.

Contract Vehicle: The Government will award a MATOC Indefinite Delivery/Indefinite Quantity (IDIQ) contract.

Period of Performance: The MATOC ordering period will be five (5) years from the date of award.

Competition Strategy: This will be a Full and Open Competition.

Anticipated RFP Release: The Government anticipates the formal RFP will be released in April 2026.

Place of Performance: Work at the TO level under the MATOC will be performed at the following GOCO AAPs:

Holston AAP (HSAAP), Kingsport, TN

Iowa AAP (IAAAP), Middletown, IA

Lake City AAP (LCAAP), Independence, MO

Milan AAP (MLAAP), Milan, TN

Scranton AAP (SCAAP), Scranton, PA

Radford AAP (RFAAP), Radford, VA

Quad City Cartridge Case Facility (QCCCF), Rock Island, IL

Evaluation Approach

The Government intends to award a MATOC to all responsible offerors whose proposals are determined to meet or exceed the Minimum Technical Threshold Rating (MTTR). The source selection will be conducted in accordance with Revolutionary FAR Overhaul 15.2, using a Highest Technically Rated Offeror (HTRO) self-scoring methodology. Price will not be an evaluation factor for the MATOC award but will be evaluated at the individual TO level.

Disclaimer

This pre-solicitation synopsis is for informational purposes only and is not a request for proposal (RFP). The Government is not seeking proposals at this time. The official RFP, containing all information needed to submit a proposal, will be published on Procurement Integrated Enterprise Environment. Interested parties are responsible for monitoring SAM.gov for the solicitation and any related documents or amendments.

## Attachments

- [Attachment 0001 - MATOC Draft SOW_18 DEC 2025.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bce4ae8cd5c64b058d2c01f121046acc/download)
- [Attachment 0004 - MATOC HTRO Self-Scoring Matrix (v2)_12 SEP 2025.xlsx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a3d003c8d0654ee8988b845d89281267/download)
- [GOCO MATOC Virtual Industry Day - Company Registration Form.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b59ddddc1fd44b0fa4ea30bd7f9c4c40/download)
- [W519TC25R0026 MATOC Sources Sought QandA.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e858e6ad57f34ee8ac3d41b198cb6e0e/download)
- [GOCO MATOC Virtual Industry Day - Individual Registration Form.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6331c82cc9db4ff9aa457c3db667ac0e/download)
- [Attachment 0004 - MATOC HTRO SELF-SCORING MATRIX - 13 MAY 2025.xlsx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6958a0c57be94cc4b25f0f93cc1d99c0/download)
- [GOCO MATOC Virtual Industry Day - QandA Form.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f7dff0471c534c8aab730f091c5467e0/download)
- [Attachment 0003 - MATOC SECTION M - EVALUATION FACTORS FOR AWARD - 13 MAY 2025.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fa9a8cc48aa148f2a80759ea3101ad0c/download)
- [DRAFT - W519TC25R0026 GOCO Ammunition Facilities MATOC SOW - DRAFT.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e0b9f530784047a187f35503eef0348f/download)
- [Approved 226-25 GOCO MATOC Industry Day 5 Feb 25 Final.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/aba59de9cf354c0bb1c0c5f429a5a641/download)
- [GOCO MATOC Virtual Industry Day General Session Video.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3f2b7b59a7844cf9b0c19e7cf036237c/download)
- [Attachment 0002 - MATOC SECTION L - INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS - 13 MAY 2025.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c69514276f664ea4bbc8b46a70aafb60/download)
- [Industry Participants_Consented to Release Info.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d4d8158514a84161933c0752b857c57e/download)
- [W519TC-25-R-0026 Industry Day Questions and Answers.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/79eefe0c8ea94c188c68f0e236b70fe0/download)
- [Attachment 0001 - MATOC STATEMENT OF WORK - 13 MAY 2025.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/26685020ffe24b049de7c2ed30310aa0/download)
- [W519TC25R0026 5-13-2025.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/71be9ca3f4df4918bacbdf695911c1eb/download)

## Open now in the same industry

6 open in NAICS 236210.

- IE181 - WHS Greenhouse Construction (140A2327Q0297), due November 30, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/140a2327q0297
- Multiple Award Construction Contract (MACC) (FA706027RXXX2), due November 30, 2026 at 4:00 PM EST. https://sealedbidder.com/opportunities/fa706027rxxx2
- Tinker AFB 2026 Multiple Award Construction Contract (MACC) (FA8137-26-R-0040), due December 3, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/fa813726r0040

## Publications

- December 13, 2024: Sources sought, due January 17, 2025 at 5:00 PM EST. Notice 3c65b352dbd04765a70506171376dc85. https://sam.gov/workspace/contract/opp/3c65b352dbd04765a70506171376dc85/view
- December 19, 2024: Special notice, due January 29, 2025 at 5:00 PM EST. Notice 8979c1d01f124c5db96194582603438a. https://sam.gov/workspace/contract/opp/8979c1d01f124c5db96194582603438a/view
- January 17, 2025: Sources sought, due January 17, 2025 at 5:00 PM EST. Notice 24f634ea5e4f40dd92011ee9e2a85aff. https://sam.gov/workspace/contract/opp/24f634ea5e4f40dd92011ee9e2a85aff/view
- January 31, 2025: Special notice, due January 29, 2025 at 5:00 PM EST. Notice 40abf7dd15af4d129dbe7c9f6cf68519. https://sam.gov/workspace/contract/opp/40abf7dd15af4d129dbe7c9f6cf68519/view
- February 4, 2025: Special notice, due January 29, 2025 at 5:00 PM EST. Notice 9b0c5078ee3c45389352272d8cc0a481. https://sam.gov/workspace/contract/opp/9b0c5078ee3c45389352272d8cc0a481/view
- February 21, 2025: Special notice, due January 29, 2025 at 5:00 PM EST. Notice 0e6f457896b042549b9e1e193e11d1da. https://sam.gov/workspace/contract/opp/0e6f457896b042549b9e1e193e11d1da/view
- February 21, 2025: Special notice, due January 29, 2025 at 5:00 PM EST. Notice a38c0270a09d4834aa1a25f70cee21ec. https://sam.gov/workspace/contract/opp/a38c0270a09d4834aa1a25f70cee21ec/view
- February 25, 2025: Special notice, due January 29, 2025 at 5:00 PM EST. Notice d28ba31774d045ddbc601249fd437755. https://sam.gov/workspace/contract/opp/d28ba31774d045ddbc601249fd437755/view
- March 14, 2025: Special notice, due January 29, 2025 at 5:00 PM EST. Notice d8506885387347be9f8e98bd932cce09. https://sam.gov/workspace/contract/opp/d8506885387347be9f8e98bd932cce09/view
- May 14, 2025: Solicitation, due May 28, 2025 at 5:00 PM EDT. Notice ec08a7ef174241dcb0c99b3069b89ddb. https://sam.gov/workspace/contract/opp/ec08a7ef174241dcb0c99b3069b89ddb/view
- June 24, 2025: Solicitation, due May 28, 2025 at 5:00 PM EDT. Notice b1e94bd46e95414da66e9e4557399925. https://sam.gov/workspace/contract/opp/b1e94bd46e95414da66e9e4557399925/view
- September 12, 2025: Presolicitation, due September 25, 2025 at 6:00 PM EDT. Notice 09297b2447214a84bfbe04829def031e. https://sam.gov/workspace/contract/opp/09297b2447214a84bfbe04829def031e/view
- September 26, 2025: Presolicitation, due October 3, 2025 at 6:00 PM EDT. Notice f204f80f39c84215b920e92cb738a31d. https://sam.gov/workspace/contract/opp/f204f80f39c84215b920e92cb738a31d/view
- December 19, 2025: Presolicitation, due January 5, 2026 at 4:00 PM EST. Notice f0286360aa1b48e5a769ecb44437d78e. https://sam.gov/workspace/contract/opp/f0286360aa1b48e5a769ecb44437d78e/view
- January 16, 2026: Presolicitation, due January 26, 2026 at 4:00 PM EST. Notice 535406997f2a417dbb24a0f3636d117a. https://sam.gov/workspace/contract/opp/535406997f2a417dbb24a0f3636d117a/view
- March 24, 2026: Presolicitation, due May 7, 2026 at 6:00 PM EDT. Notice 09e6f55fccdb4805bad5609935e2a69f. https://sam.gov/workspace/contract/opp/09e6f55fccdb4805bad5609935e2a69f/view

## Points of contact

- SFC Pramod Khanal, pramod.khanal.mil@army.mil
- Rebecca Bernard, rebecca.s.bernard2.civ@army.mil

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/w519tc25r0026.
