{"canonical":"https://sealedbidder.com/opportunities/w50s8w26q0001","key":"W50S8W26Q0001","url":"https://sealedbidder.com/opportunities/w50s8w26q0001","title":"Upgrade UPS & Cooling System","solicitation_number":"W50S8W-26-Q0001","notice_type":"k","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-06-30T16:00:00Z","first_posted":"2026-06-01","last_posted":"2026-06-01","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W7N9 USPFO ACTIVITY WYANG 153","naics":"335999","psc":"6150","set_aside":"SBA","place_state":"WY","place_scope":"nationwide","site":null,"place_state_source":null,"place_evidence":null,"place_county":"56021","place_county_name":"Laramie County","place_city":"5613900","place_city_name":"Cheyenne","winner":null,"award_amount":null,"publications":[{"notice_id":"19c2cdaeea8d4412b55ebdc452e10d69","title":"Upgrade UPS & Cooling System","solicitation_number":"W50S8W-26-Q0001","notice_type":"k","base_type":"k","posted":"2026-06-01","posted_at":"2026-06-01T14:07:31.729Z","due_at":"2026-06-30T16:00:00Z","due_date":"2026-06-30","cancelled":false,"archived":true,"archive_date":"2026-07-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/19c2cdaeea8d4412b55ebdc452e10d69/view","enriched":true,"history":[{"index":2,"title":"Upgrade UPS & Cooling System","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2026-06-09T13:04:33.714Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"049bb950f6c24886858645fd4e14f730","solicitation_number":"W50S8W-26-Q0001","parent_opportunity_id":"19c2cdaeea8d4412b55ebdc452e10d69"},{"index":1,"title":"Upgrade UPS & Cooling System","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-01T14:07:31.729Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"19c2cdaeea8d4412b55ebdc452e10d69","solicitation_number":"W50S8W-26-Q0001"}]}],"latest_notice_id":"19c2cdaeea8d4412b55ebdc452e10d69","first_type":"k","notices":[{"dates":{"posted":"2026-06-01","posted_at":"2026-06-01T14:07:31.729Z","created_at":"2026-05-22T13:25:43.788Z","modified_at":"2026-06-09T13:04:33.714Z","response_deadline":{"raw":"2026-06-30T10:00:00-06:00","utc":"2026-06-30T16:00:00Z","date":"2026-06-30","time":"10:00:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/19c2cdaeea8d4412b55ebdc452e10d69/view"},"naics":{"codes":["335999"],"primary":"335999"},"title":"Upgrade UPS & Cooling System","agency":{"office":{"code":"W50S8W","name":"W7N9 USPFO ACTIVITY WYANG 153"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"82009-4799","city":"CHEYENNE","state":"WY","country":"USA"},"organization_id":"500044264","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-07-15","archive_type":"auto15"},"history":[{"index":2,"title":"Upgrade UPS & Cooling System","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2026-06-09T13:04:33.714Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"049bb950f6c24886858645fd4e14f730","solicitation_number":"W50S8W-26-Q0001","parent_opportunity_id":"19c2cdaeea8d4412b55ebdc452e10d69"},{"index":1,"title":"Upgrade UPS & Cooling System","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-01T14:07:31.729Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"19c2cdaeea8d4412b55ebdc452e10d69","solicitation_number":"W50S8W-26-Q0001"}],"contacts":[{"name":"Kristopher W Kahle","role":"primary","email":"kristopher.kahle@us.af.mil","phone":"307-772-6887"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"19c2cdaeea8d4412b55ebdc452e10d69","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"19c2cdaeea8d4412b55ebdc452e10d69","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-02T22:33:33.779491472Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"96ee850aec08e20f302b4a144eb8bc5f1c63424c471a11120b636e648037547f","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-02T22:33:33.779491472Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>The vendor shall provide un-installation of outdated equipment<br />\nand installation of brand-new items according to acceptable standards. Contractor<br />\nshall provide Uninterruptible Power and Cooling Distribution Unit replacement/<br />\ninstallation and a Site Lead/Project Manager to provide the following critical tasks to<br />\nsupport to the WYANG per the PWS.<br />\n&bull; 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid.<br />\n&bull; 5.3.4 Demo existing piping<br />\n&bull; 5.3.5 Run new Pex piping to the in-row coolers.<br />\n&bull; 5.3.6 Furnish &amp; install new 350A shut Trip Breaker with nema-1 Enclosure.<br />\nTie existing EPO into new Shunt Trip breaker.<br />\n&bull; 5.3.7 Existing 3&rdquo; Feeder conduit &amp; wire fed from MDP will be shutdown &amp;<br />\nlocked out. Intercept existing Feeder to line side of new 350A Shunt Trip<br />\nBreaker/Enclosure. Install Load side Feeder conduit &amp; wire from new Shunt<br />\nTrip Breaker to new UPS.<br />\n&bull; 5.3.8 Demo existing UPS, remove from Data Center, Dispose/recycle old<br />\nUPS.<br />\n&bull; 5.3.9 Install Power Modules and Battery Cabinets<br />\n&bull; 5.3.10 Assume the existing structural integrity of raised floor is sufficient to<br />\nmove old UPS across floor &amp; new UPS installed at old UPS location. All<br />\nraised floor modifications by others.</p>\n\n<p>SITE VISIT: 10 JUNE 2026 AT 1300 MDT at&nbsp; 217 Dell Range Blvd, Cheyenne, WY 82009 - IF NO REQUEST FOR SITE VISIT ARE RECIEVED BY 08 JUNE 2026 AT 1200 MDT, IT WILL BE CANCELED.</p>\n\n<p>QUESTIONS DUE:&nbsp; &nbsp;12 JUNE 2026 AT 1000 MDT</p>","text":"The vendor shall provide un-installation of outdated equipment\n\nand installation of brand-new items according to acceptable standards. Contractor\n\nshall provide Uninterruptible Power and Cooling Distribution Unit replacement/\n\ninstallation and a Site Lead/Project Manager to provide the following critical tasks to\n\nsupport to the WYANG per the PWS.\n\n• 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid.\n\n• 5.3.4 Demo existing piping\n\n• 5.3.5 Run new Pex piping to the in-row coolers.\n\n• 5.3.6 Furnish & install new 350A shut Trip Breaker with nema-1 Enclosure.\n\nTie existing EPO into new Shunt Trip breaker.\n\n• 5.3.7 Existing 3” Feeder conduit & wire fed from MDP will be shutdown &\n\nlocked out. Intercept existing Feeder to line side of new 350A Shunt Trip\n\nBreaker/Enclosure. Install Load side Feeder conduit & wire from new Shunt\n\nTrip Breaker to new UPS.\n\n• 5.3.8 Demo existing UPS, remove from Data Center, Dispose/recycle old\n\nUPS.\n\n• 5.3.9 Install Power Modules and Battery Cabinets\n\n• 5.3.10 Assume the existing structural integrity of raised floor is sufficient to\n\nmove old UPS across floor & new UPS installed at old UPS location. All\n\nraised floor modifications by others.\n\nSITE VISIT: 10 JUNE 2026 AT 1300 MDT at 217 Dell Range Blvd, Cheyenne, WY 82009 - IF NO REQUEST FOR SITE VISIT ARE RECIEVED BY 08 JUNE 2026 AT 1200 MDT, IT WILL BE CANCELED.\n\nQUESTIONS DUE: 12 JUNE 2026 AT 1000 MDT","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"W50S8W-26-Q0001","place_of_performance":{"zip":"82009","city":{"code":"13900","name":"Cheyenne"},"state":{"code":"WY","name":"Wyoming"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"6150"}],"due_at":"2026-06-30T16:00:00Z","due_date":"2026-06-30","closes_at":"2026-06-30T16:00:00Z","awardable":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W50S8W","office_name":"W7N9 USPFO ACTIVITY WYANG 153","state":"WY","county":"56021","county_name":"Laramie County","city":"5613900","city_name":"Cheyenne","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-02T23:12:37.933822Z","principal_notice_id":"19c2cdaeea8d4412b55ebdc452e10d69","description":{"text":"The vendor shall provide un-installation of outdated equipment\n\nand installation of brand-new items according to acceptable standards. Contractor\n\nshall provide Uninterruptible Power and Cooling Distribution Unit replacement/\n\ninstallation and a Site Lead/Project Manager to provide the following critical tasks to\n\nsupport to the WYANG per the PWS.\n\n• 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid.\n\n• 5.3.4 Demo existing piping\n\n• 5.3.5 Run new Pex piping to the in-row coolers.\n\n• 5.3.6 Furnish & install new 350A shut Trip Breaker with nema-1 Enclosure.\n\nTie existing EPO into new Shunt Trip breaker.\n\n• 5.3.7 Existing 3” Feeder conduit & wire fed from MDP will be shutdown &\n\nlocked out. Intercept existing Feeder to line side of new 350A Shunt Trip\n\nBreaker/Enclosure. Install Load side Feeder conduit & wire from new Shunt\n\nTrip Breaker to new UPS.\n\n• 5.3.8 Demo existing UPS, remove from Data Center, Dispose/recycle old\n\nUPS.\n\n• 5.3.9 Install Power Modules and Battery Cabinets\n\n• 5.3.10 Assume the existing structural integrity of raised floor is sufficient to\n\nmove old UPS across floor & new UPS installed at old UPS location. All\n\nraised floor modifications by others.\n\nSITE VISIT: 10 JUNE 2026 AT 1300 MDT at 217 Dell Range Blvd, Cheyenne, WY 82009 - IF NO REQUEST FOR SITE VISIT ARE RECIEVED BY 08 JUNE 2026 AT 1200 MDT, IT WILL BE CANCELED.\n\nQUESTIONS DUE: 12 JUNE 2026 AT 1000 MDT","html":"<p>The vendor shall provide un-installation of outdated equipment<br />\nand installation of brand-new items according to acceptable standards. Contractor<br />\nshall provide Uninterruptible Power and Cooling Distribution Unit replacement/<br />\ninstallation and a Site Lead/Project Manager to provide the following critical tasks to<br />\nsupport to the WYANG per the PWS.<br />\n&bull; 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid.<br />\n&bull; 5.3.4 Demo existing piping<br />\n&bull; 5.3.5 Run new Pex piping to the in-row coolers.<br />\n&bull; 5.3.6 Furnish &amp; install new 350A shut Trip Breaker with nema-1 Enclosure.<br />\nTie existing EPO into new Shunt Trip breaker.<br />\n&bull; 5.3.7 Existing 3&rdquo; Feeder conduit &amp; wire fed from MDP will be shutdown &amp;<br />\nlocked out. Intercept existing Feeder to line side of new 350A Shunt Trip<br />\nBreaker/Enclosure. Install Load side Feeder conduit &amp; wire from new Shunt<br />\nTrip Breaker to new UPS.<br />\n&bull; 5.3.8 Demo existing UPS, remove from Data Center, Dispose/recycle old<br />\nUPS.<br />\n&bull; 5.3.9 Install Power Modules and Battery Cabinets<br />\n&bull; 5.3.10 Assume the existing structural integrity of raised floor is sufficient to<br />\nmove old UPS across floor &amp; new UPS installed at old UPS location. All<br />\nraised floor modifications by others.</p>\n\n<p>SITE VISIT: 10 JUNE 2026 AT 1300 MDT at&nbsp; 217 Dell Range Blvd, Cheyenne, WY 82009 - IF NO REQUEST FOR SITE VISIT ARE RECIEVED BY 08 JUNE 2026 AT 1200 MDT, IT WILL BE CANCELED.</p>\n\n<p>QUESTIONS DUE:&nbsp; &nbsp;12 JUNE 2026 AT 1000 MDT</p>","origin":"detail"},"contacts":[{"name":"Kristopher W Kahle","role":"primary","email":"kristopher.kahle@us.af.mil","phone":"307-772-6887"}],"place_of_performance":{"zip":"82009","city":{"code":"13900","name":"Cheyenne"},"state":{"code":"WY","name":"Wyoming"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"82009-4799","city":"CHEYENNE","state":"WY","country":"USA"},"naics_codes":["335999"],"award":null,"attachments":[{"resource_id":"446103d1e2cb4434af7328924cef7893","name":"B.08 CS UPS & COOLING SYSTEM - Combo (26-Q-0001).pdf","kind":"file","mime_type":".pdf","size_bytes":177156,"posted_at":"2026-06-01T14:07:31.729Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/446103d1e2cb4434af7328924cef7893/download","mirrored":false}],"awards":[],"related":[],"similar_open":[{"key":"N0010427QUA34","latest_notice_id":"e1f7e2169be44ea89e0ec4af777976f1","title":"CIRCUIT CARD ASSEMB","solicitation_number":"N0010427QUA34","notice_type":"o","first_type":"o","first_posted":"2026-10-27","last_posted":"2026-10-27","notices":1,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00104","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT MECH","naics":"335999","psc":"7E20","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"AGING, GOVERNMENT SOURCE INSPECTION, FOB SOURCE","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-28T04:01:09.175983Z"},{"key":"N0010427QBB10","latest_notice_id":"bd4d137bac154a179488c794369b8ec1","title":"62--FIXTURE,LED LIGHT","solicitation_number":"N0010427QBB10","notice_type":"o","first_type":"p","first_posted":"2026-10-15","last_posted":"2026-11-05","notices":2,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00104","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT MECH","naics":"335999","psc":"6210","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6210)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-06T04:46:59.158685Z"},{"key":"N0010427QQA02","latest_notice_id":"d4f2cf4ce3ff40128595d95f0eb4a9ea","title":"AMPLIFIER,RADIO FRE","solicitation_number":"N0010427QQA02","notice_type":"o","first_type":"o","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":1,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00104","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT MECH","naics":"335999","psc":"5996","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"D IN THE SCHEDULE. ^^ ALL FREIGHT IS FOB ORIGIN","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"}],"similar_open_total":90,"indexable":false}