{"canonical":"https://sealedbidder.com/opportunities/w50s8d26qa015","key":"W50S8D26QA015","url":"https://sealedbidder.com/opportunities/w50s8d26qa015","title":"Battery Energy Storage System (BESS) Relocation","solicitation_number":"W50S8D26QA015","notice_type":"k","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-08-06T14:00:00Z","first_posted":"2026-07-17","last_posted":"2026-07-27","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W7NR USPFO ACTIVITY NYANG 105","naics":"488510","psc":"V119","set_aside":"SBA","place_state":"NY","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"36071","place_county_name":"Orange County","place_city":"3650034","place_city_name":"Newburgh","winner":null,"award_amount":null,"publications":[{"notice_id":"095e3568056844d7b244623ed8742799","title":"Battery Energy Storage System (BESS) Relocation","solicitation_number":"W50S8D26QA015","notice_type":"k","base_type":"k","posted":"2026-07-17","posted_at":"2026-07-17T17:32:11.467Z","due_at":"2026-08-06T14:00:00Z","due_date":"2026-08-06","cancelled":false,"archived":true,"archive_date":"2026-08-21","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/095e3568056844d7b244623ed8742799/view","enriched":true,"history":[{"index":5,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-27T14:52:30.140Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"399b9666130f494990ff0e20bd47fd08","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":3,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-21T18:26:14.941Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"17a617f1e5784f77b1346858cc6a61e9","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":2,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-21T14:58:05.472Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"958f9ba55e1545e994c6a0316aeb75fa","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":1,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-17T17:32:11.467Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"095e3568056844d7b244623ed8742799","solicitation_number":"W50S8D26QA015"}]},{"notice_id":"17a617f1e5784f77b1346858cc6a61e9","title":"Battery Energy Storage System (BESS) Relocation","solicitation_number":"W50S8D26QA015","notice_type":"k","base_type":"k","posted":"2026-07-21","posted_at":"2026-07-21T18:26:14.941Z","due_at":"2026-08-06T14:00:00Z","due_date":"2026-08-06","cancelled":false,"archived":true,"archive_date":"2026-08-21","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/17a617f1e5784f77b1346858cc6a61e9/view","enriched":true,"history":[{"index":5,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-27T14:52:30.140Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"399b9666130f494990ff0e20bd47fd08","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":3,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-21T18:26:14.941Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"17a617f1e5784f77b1346858cc6a61e9","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":2,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-21T14:58:05.472Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"958f9ba55e1545e994c6a0316aeb75fa","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":1,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-17T17:32:11.467Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"095e3568056844d7b244623ed8742799","solicitation_number":"W50S8D26QA015"}]},{"notice_id":"958f9ba55e1545e994c6a0316aeb75fa","title":"Battery Energy Storage System (BESS) Relocation","solicitation_number":"W50S8D26QA015","notice_type":"k","base_type":"k","posted":"2026-07-21","posted_at":"2026-07-21T14:58:05.472Z","due_at":"2026-08-06T14:00:00Z","due_date":"2026-08-06","cancelled":false,"archived":true,"archive_date":"2026-08-21","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/958f9ba55e1545e994c6a0316aeb75fa/view","enriched":true,"history":[{"index":5,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-27T14:52:30.140Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"399b9666130f494990ff0e20bd47fd08","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":3,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-21T18:26:14.941Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"17a617f1e5784f77b1346858cc6a61e9","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":2,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-21T14:58:05.472Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"958f9ba55e1545e994c6a0316aeb75fa","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":1,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-17T17:32:11.467Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"095e3568056844d7b244623ed8742799","solicitation_number":"W50S8D26QA015"}]},{"notice_id":"399b9666130f494990ff0e20bd47fd08","title":"Battery Energy Storage System (BESS) Relocation","solicitation_number":"W50S8D26QA015","notice_type":"k","base_type":"k","posted":"2026-07-27","posted_at":"2026-07-27T14:52:30.140Z","due_at":"2026-08-06T14:00:00Z","due_date":"2026-08-06","cancelled":false,"archived":true,"archive_date":"2026-08-21","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/399b9666130f494990ff0e20bd47fd08/view","enriched":true,"history":[{"index":5,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-27T14:52:30.140Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"399b9666130f494990ff0e20bd47fd08","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":3,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-21T18:26:14.941Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"17a617f1e5784f77b1346858cc6a61e9","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":2,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-21T14:58:05.472Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"958f9ba55e1545e994c6a0316aeb75fa","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":1,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-17T17:32:11.467Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"095e3568056844d7b244623ed8742799","solicitation_number":"W50S8D26QA015"}]}],"latest_notice_id":"399b9666130f494990ff0e20bd47fd08","first_type":"k","notices":[{"dates":{"posted":"2026-07-17","posted_at":"2026-07-17T17:32:11.467Z","created_at":"2026-07-17T17:16:39.926Z","modified_at":"2026-08-21T05:06:34.612Z","response_deadline":{"raw":"2026-08-06T10:00:00-04:00","utc":"2026-08-06T14:00:00Z","date":"2026-08-06","time":"10:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/095e3568056844d7b244623ed8742799/view"},"naics":{"codes":["488510"],"primary":"488510"},"title":"Battery Energy Storage System (BESS) Relocation","agency":{"office":{"code":"W50S8D","name":"W7NR USPFO ACTIVITY NYANG 105"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"12550-5042","city":"NEWBURGH","state":"NY","country":"USA"},"organization_id":"500044337","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-08-21","archive_type":"auto15"},"history":[{"index":5,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-27T14:52:30.140Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"399b9666130f494990ff0e20bd47fd08","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":3,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-21T18:26:14.941Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"17a617f1e5784f77b1346858cc6a61e9","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":2,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-21T14:58:05.472Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"958f9ba55e1545e994c6a0316aeb75fa","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":1,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-17T17:32:11.467Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"095e3568056844d7b244623ed8742799","solicitation_number":"W50S8D26QA015"}],"contacts":[{"name":"Kevin Fenner","role":"primary","email":"kevin.fenner.1@us.af.mil","phone":"8455632832"},{"name":"Joseph Kugler","role":"secondary","email":"joseph.kugler.1@us.af.mil","phone":"8455632831"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"095e3568056844d7b244623ed8742799","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"095e3568056844d7b244623ed8742799","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-29T00:45:58.857153429Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T00:55:27.040971Z","row_sha256":"d043dbf3e7b3b6dceebe484a8551879c6054c6b1e354da9dbf540852baeb548e","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-29T00:45:58.857153429Z","first_seen_at":"2026-09-16T00:55:27.040971Z"},"description":{"html":"<p>There is NO incumbent contractor or existing contract in place for this requirement. This is a first time requirement.&nbsp;</p>\n\n<p>Relocation of a Generac Model SBE500 Battery Energy Storage System (BESS) from a contractor storage lot in the vicinity of Dover&nbsp;Air Force Base (AFB), Delaware, to a designated site at Hanger 101, Stewart Air National Guard Base (ANGB), New York. Contractor will be responsible for, but not limited to: visually inspecting BESS and documenting, load and transfer BESS to 12550, off load BESS on dunnage provided by the contractor for BESS to ensure no damage to the ground surface. All other requirements for this project are listed in the attached Performance Work Statement (PWS). I&#39;ve also attached a picture of the BESS and the spec sheets. NOTE: the contractor is responsible for loading and offloading the BESS. The government will NOT supply a crane, forklift, or any other means to perform this task. Loading and offloading the BESS is the responsibility of the contractor.&nbsp;&nbsp;<br />\n&nbsp;</p>","text":"There is NO incumbent contractor or existing contract in place for this requirement. This is a first time requirement.\n\nRelocation of a Generac Model SBE500 Battery Energy Storage System (BESS) from a contractor storage lot in the vicinity of Dover Air Force Base (AFB), Delaware, to a designated site at Hanger 101, Stewart Air National Guard Base (ANGB), New York. Contractor will be responsible for, but not limited to: visually inspecting BESS and documenting, load and transfer BESS to 12550, off load BESS on dunnage provided by the contractor for BESS to ensure no damage to the ground surface. All other requirements for this project are listed in the attached Performance Work Statement (PWS). I've also attached a picture of the BESS and the spec sheets. NOTE: the contractor is responsible for loading and offloading the BESS. The government will NOT supply a crane, forklift, or any other means to perform this task. Loading and offloading the BESS is the responsibility of the contractor.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"W50S8D26QA015","place_of_performance":{"zip":"12550","city":{"code":"50034","name":"Newburgh"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"V119"},{"dates":{"posted":"2026-07-21","posted_at":"2026-07-21T18:26:14.941Z","created_at":"2026-07-21T18:23:25.385Z","modified_at":"2026-08-21T05:06:34.612Z","response_deadline":{"raw":"2026-08-06T10:00:00-04:00","utc":"2026-08-06T14:00:00Z","date":"2026-08-06","time":"10:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/17a617f1e5784f77b1346858cc6a61e9/view"},"naics":{"codes":["488510"],"primary":"488510"},"title":"Battery Energy Storage System (BESS) Relocation","agency":{"office":{"code":"W50S8D","name":"W7NR USPFO ACTIVITY NYANG 105"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"12550-5042","city":"NEWBURGH","state":"NY","country":"USA"},"organization_id":"500044337","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-08-21","archive_type":"auto15"},"history":[{"index":5,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-27T14:52:30.140Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"399b9666130f494990ff0e20bd47fd08","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":3,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-21T18:26:14.941Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"17a617f1e5784f77b1346858cc6a61e9","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":2,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-21T14:58:05.472Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"958f9ba55e1545e994c6a0316aeb75fa","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":1,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-17T17:32:11.467Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"095e3568056844d7b244623ed8742799","solicitation_number":"W50S8D26QA015"}],"contacts":[{"name":"Kevin Fenner","role":"primary","email":"kevin.fenner.1@us.af.mil","phone":"8455632832"},{"name":"Joseph Kugler","role":"secondary","email":"joseph.kugler.1@us.af.mil","phone":"8455632831"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"17a617f1e5784f77b1346858cc6a61e9","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"095e3568056844d7b244623ed8742799","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-28T03:19:03.392289251Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T00:55:27.040971Z","row_sha256":"1f4354a32d0d598e085d81fc8e976813da2c8f1ba899c5278dcf809546022f66","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-28T03:19:03.392289251Z","first_seen_at":"2026-09-16T00:55:27.040971Z"},"description":{"html":"<p>21 July 2026&nbsp; -Edited to add Questions and Answers.</p>\n\n<p>21 July 2026 - Edited to add Wage Determination.</p>\n\n<p>There is NO incumbent contractor or existing contract in place for this requirement. This is a first time requirement.&nbsp;</p>\n\n<p>Relocation of a Generac Model SBE500 Battery Energy Storage System (BESS) from a contractor storage lot in the vicinity of Dover&nbsp;Air Force Base (AFB), Delaware, to a designated site at Hanger 101, Stewart Air National Guard Base (ANGB), New York. Contractor will be responsible for, but not limited to: visually inspecting BESS and documenting, load and transfer BESS to 12550, off load BESS on dunnage provided by the contractor for BESS to ensure no damage to the ground surface. All other requirements for this project are listed in the attached Performance Work Statement (PWS). I&#39;ve also attached a picture of the BESS and the spec sheets. NOTE: the contractor is responsible for loading and offloading the BESS. The government will NOT supply a crane, forklift, or any other means to perform this task. Loading and offloading the BESS is the responsibility of the contractor.&nbsp;&nbsp;<br />\n&nbsp;</p>","text":"21 July 2026 -Edited to add Questions and Answers.\n\n21 July 2026 - Edited to add Wage Determination.\n\nThere is NO incumbent contractor or existing contract in place for this requirement. This is a first time requirement.\n\nRelocation of a Generac Model SBE500 Battery Energy Storage System (BESS) from a contractor storage lot in the vicinity of Dover Air Force Base (AFB), Delaware, to a designated site at Hanger 101, Stewart Air National Guard Base (ANGB), New York. Contractor will be responsible for, but not limited to: visually inspecting BESS and documenting, load and transfer BESS to 12550, off load BESS on dunnage provided by the contractor for BESS to ensure no damage to the ground surface. All other requirements for this project are listed in the attached Performance Work Statement (PWS). I've also attached a picture of the BESS and the spec sheets. NOTE: the contractor is responsible for loading and offloading the BESS. The government will NOT supply a crane, forklift, or any other means to perform this task. Loading and offloading the BESS is the responsibility of the contractor.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"W50S8D26QA015","place_of_performance":{"zip":"12550","city":{"code":"50034","name":"Newburgh"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"V119"},{"dates":{"posted":"2026-07-21","posted_at":"2026-07-21T14:58:05.472Z","created_at":"2026-07-21T14:50:31.356Z","modified_at":"2026-08-21T05:06:34.612Z","response_deadline":{"raw":"2026-08-06T10:00:00-04:00","utc":"2026-08-06T14:00:00Z","date":"2026-08-06","time":"10:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/958f9ba55e1545e994c6a0316aeb75fa/view"},"naics":{"codes":["488510"],"primary":"488510"},"title":"Battery Energy Storage System (BESS) Relocation","agency":{"office":{"code":"W50S8D","name":"W7NR USPFO ACTIVITY NYANG 105"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"12550-5042","city":"NEWBURGH","state":"NY","country":"USA"},"organization_id":"500044337","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-08-21","archive_type":"auto15"},"history":[{"index":5,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-27T14:52:30.140Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"399b9666130f494990ff0e20bd47fd08","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":3,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-21T18:26:14.941Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"17a617f1e5784f77b1346858cc6a61e9","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":2,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-21T14:58:05.472Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"958f9ba55e1545e994c6a0316aeb75fa","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":1,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-17T17:32:11.467Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"095e3568056844d7b244623ed8742799","solicitation_number":"W50S8D26QA015"}],"contacts":[{"name":"Kevin Fenner","role":"primary","email":"kevin.fenner.1@us.af.mil","phone":"8455632832"},{"name":"Joseph Kugler","role":"secondary","email":"joseph.kugler.1@us.af.mil","phone":"8455632831"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"958f9ba55e1545e994c6a0316aeb75fa","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"095e3568056844d7b244623ed8742799","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-28T03:41:33.820406006Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T00:55:27.040971Z","row_sha256":"139e24e2fc0403dca34fbd144779ec2e1796c1b9aaa0c54b45a95a7c0257ef80","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-28T03:41:33.820406006Z","first_seen_at":"2026-09-16T00:55:27.040971Z"},"description":{"html":"<p>21 July 2026 - Edited to add Wage Determination.</p>\n\n<p>There is NO incumbent contractor or existing contract in place for this requirement. This is a first time requirement.&nbsp;</p>\n\n<p>Relocation of a Generac Model SBE500 Battery Energy Storage System (BESS) from a contractor storage lot in the vicinity of Dover&nbsp;Air Force Base (AFB), Delaware, to a designated site at Hanger 101, Stewart Air National Guard Base (ANGB), New York. Contractor will be responsible for, but not limited to: visually inspecting BESS and documenting, load and transfer BESS to 12550, off load BESS on dunnage provided by the contractor for BESS to ensure no damage to the ground surface. All other requirements for this project are listed in the attached Performance Work Statement (PWS). I&#39;ve also attached a picture of the BESS and the spec sheets. NOTE: the contractor is responsible for loading and offloading the BESS. The government will NOT supply a crane, forklift, or any other means to perform this task. Loading and offloading the BESS is the responsibility of the contractor.&nbsp;&nbsp;<br />\n&nbsp;</p>","text":"21 July 2026 - Edited to add Wage Determination.\n\nThere is NO incumbent contractor or existing contract in place for this requirement. This is a first time requirement.\n\nRelocation of a Generac Model SBE500 Battery Energy Storage System (BESS) from a contractor storage lot in the vicinity of Dover Air Force Base (AFB), Delaware, to a designated site at Hanger 101, Stewart Air National Guard Base (ANGB), New York. Contractor will be responsible for, but not limited to: visually inspecting BESS and documenting, load and transfer BESS to 12550, off load BESS on dunnage provided by the contractor for BESS to ensure no damage to the ground surface. All other requirements for this project are listed in the attached Performance Work Statement (PWS). I've also attached a picture of the BESS and the spec sheets. NOTE: the contractor is responsible for loading and offloading the BESS. The government will NOT supply a crane, forklift, or any other means to perform this task. Loading and offloading the BESS is the responsibility of the contractor.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"W50S8D26QA015","place_of_performance":{"zip":"12550","city":{"code":"50034","name":"Newburgh"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"V119"},{"dates":{"posted":"2026-07-27","posted_at":"2026-07-27T14:52:30.140Z","created_at":"2026-07-27T14:47:16.655Z","modified_at":"2026-08-21T05:06:34.612Z","response_deadline":{"raw":"2026-08-06T10:00:00-04:00","utc":"2026-08-06T14:00:00Z","date":"2026-08-06","time":"10:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/399b9666130f494990ff0e20bd47fd08/view"},"naics":{"codes":["488510"],"primary":"488510"},"title":"Battery Energy Storage System (BESS) Relocation","agency":{"office":{"code":"W50S8D","name":"W7NR USPFO ACTIVITY NYANG 105"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"12550-5042","city":"NEWBURGH","state":"NY","country":"USA"},"organization_id":"500044337","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-08-21","archive_type":"auto15"},"history":[{"index":5,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-27T14:52:30.140Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"399b9666130f494990ff0e20bd47fd08","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":3,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-21T18:26:14.941Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"17a617f1e5784f77b1346858cc6a61e9","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":2,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-21T14:58:05.472Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"958f9ba55e1545e994c6a0316aeb75fa","solicitation_number":"W50S8D26QA015","parent_opportunity_id":"095e3568056844d7b244623ed8742799"},{"index":1,"title":"Battery Energy Storage System (BESS) Relocation","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-17T17:32:11.467Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"095e3568056844d7b244623ed8742799","solicitation_number":"W50S8D26QA015"}],"contacts":[{"name":"Kevin Fenner","role":"primary","email":"kevin.fenner.1@us.af.mil","phone":"8455632832"},{"name":"Joseph Kugler","role":"secondary","email":"joseph.kugler.1@us.af.mil","phone":"8455632831"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"399b9666130f494990ff0e20bd47fd08","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"095e3568056844d7b244623ed8742799","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-27T04:24:19.505366560Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T00:55:27.040971Z","row_sha256":"0de2ef0cd95d9ec059834e65093ac325200bb10cd107ad8e5acc1ebd64c98926","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-27T04:24:19.505366560Z","first_seen_at":"2026-09-16T00:55:27.040971Z"},"description":{"html":"<p>27 July 2026&nbsp; -Edited to add Questions and Answers.</p>\n\n<p>21 July 2026&nbsp; -Edited to add Questions and Answers.</p>\n\n<p>21 July 2026 - Edited to add Wage Determination.</p>\n\n<p>There is NO incumbent contractor or existing contract in place for this requirement. This is a first time requirement.&nbsp;</p>\n\n<p>Relocation of a Generac Model SBE500 Battery Energy Storage System (BESS) from a contractor storage lot in the vicinity of Dover&nbsp;Air Force Base (AFB), Delaware, to a designated site at Hanger 101, Stewart Air National Guard Base (ANGB), New York. Contractor will be responsible for, but not limited to: visually inspecting BESS and documenting, load and transfer BESS to 12550, off load BESS on dunnage provided by the contractor for BESS to ensure no damage to the ground surface. All other requirements for this project are listed in the attached Performance Work Statement (PWS). I&#39;ve also attached a picture of the BESS and the spec sheets. NOTE: the contractor is responsible for loading and offloading the BESS. The government will NOT supply a crane, forklift, or any other means to perform this task. Loading and offloading the BESS is the responsibility of the contractor.&nbsp;&nbsp;<br />\n&nbsp;</p>","text":"27 July 2026 -Edited to add Questions and Answers.\n\n21 July 2026 -Edited to add Questions and Answers.\n\n21 July 2026 - Edited to add Wage Determination.\n\nThere is NO incumbent contractor or existing contract in place for this requirement. This is a first time requirement.\n\nRelocation of a Generac Model SBE500 Battery Energy Storage System (BESS) from a contractor storage lot in the vicinity of Dover Air Force Base (AFB), Delaware, to a designated site at Hanger 101, Stewart Air National Guard Base (ANGB), New York. Contractor will be responsible for, but not limited to: visually inspecting BESS and documenting, load and transfer BESS to 12550, off load BESS on dunnage provided by the contractor for BESS to ensure no damage to the ground surface. All other requirements for this project are listed in the attached Performance Work Statement (PWS). I've also attached a picture of the BESS and the spec sheets. NOTE: the contractor is responsible for loading and offloading the BESS. The government will NOT supply a crane, forklift, or any other means to perform this task. Loading and offloading the BESS is the responsibility of the contractor.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"W50S8D26QA015","place_of_performance":{"zip":"12550","city":{"code":"50034","name":"Newburgh"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"V119"}],"due_at":"2026-08-06T14:00:00Z","due_date":"2026-08-06","closes_at":"2026-08-06T14:00:00Z","awardable":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W50S8D","office_name":"W7NR USPFO ACTIVITY NYANG 105","state":"NY","county":"36071","county_name":"Orange County","city":"3650034","city_name":"Newburgh","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-09-27T04:58:19.345741Z","principal_notice_id":"399b9666130f494990ff0e20bd47fd08","description":{"text":"27 July 2026 -Edited to add Questions and Answers.\n\n21 July 2026 -Edited to add Questions and Answers.\n\n21 July 2026 - Edited to add Wage Determination.\n\nThere is NO incumbent contractor or existing contract in place for this requirement. This is a first time requirement.\n\nRelocation of a Generac Model SBE500 Battery Energy Storage System (BESS) from a contractor storage lot in the vicinity of Dover Air Force Base (AFB), Delaware, to a designated site at Hanger 101, Stewart Air National Guard Base (ANGB), New York. Contractor will be responsible for, but not limited to: visually inspecting BESS and documenting, load and transfer BESS to 12550, off load BESS on dunnage provided by the contractor for BESS to ensure no damage to the ground surface. All other requirements for this project are listed in the attached Performance Work Statement (PWS). I've also attached a picture of the BESS and the spec sheets. NOTE: the contractor is responsible for loading and offloading the BESS. The government will NOT supply a crane, forklift, or any other means to perform this task. Loading and offloading the BESS is the responsibility of the contractor.","html":"<p>27 July 2026&nbsp; -Edited to add Questions and Answers.</p>\n\n<p>21 July 2026&nbsp; -Edited to add Questions and Answers.</p>\n\n<p>21 July 2026 - Edited to add Wage Determination.</p>\n\n<p>There is NO incumbent contractor or existing contract in place for this requirement. This is a first time requirement.&nbsp;</p>\n\n<p>Relocation of a Generac Model SBE500 Battery Energy Storage System (BESS) from a contractor storage lot in the vicinity of Dover&nbsp;Air Force Base (AFB), Delaware, to a designated site at Hanger 101, Stewart Air National Guard Base (ANGB), New York. Contractor will be responsible for, but not limited to: visually inspecting BESS and documenting, load and transfer BESS to 12550, off load BESS on dunnage provided by the contractor for BESS to ensure no damage to the ground surface. All other requirements for this project are listed in the attached Performance Work Statement (PWS). I&#39;ve also attached a picture of the BESS and the spec sheets. NOTE: the contractor is responsible for loading and offloading the BESS. The government will NOT supply a crane, forklift, or any other means to perform this task. Loading and offloading the BESS is the responsibility of the contractor.&nbsp;&nbsp;<br />\n&nbsp;</p>","origin":"detail"},"contacts":[{"name":"Kevin Fenner","role":"primary","email":"kevin.fenner.1@us.af.mil","phone":"8455632832"},{"name":"Joseph Kugler","role":"secondary","email":"joseph.kugler.1@us.af.mil","phone":"8455632831"}],"place_of_performance":{"zip":"12550","city":{"code":"50034","name":"Newburgh"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"12550-5042","city":"NEWBURGH","state":"NY","country":"USA"},"naics_codes":["488510"],"award":null,"attachments":[{"resource_id":"1b4345ee39e24cd9963a1f6bcd1b82c6","name":"Dover BESS Picture.png","kind":"file","mime_type":".png","size_bytes":1322434,"posted_at":"2026-07-17T17:32:11.467Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1b4345ee39e24cd9963a1f6bcd1b82c6/download","mirrored":false}],"awards":[],"related":[],"similar_open":[],"similar_open_total":0,"indexable":false}