Presolicitation, total small business set-aside
Pease Fire Hydrant Replacement
W50S8A24B5206
Department of the Army, W7NN Uspfo Activity Nhang 157. Water and Sewer Line and Related Structures Construction.
Response deadline
May 10, 2024 at 4:00 PM EDT
Closed 929 days ago. Posted May 1, 2024. Scheduled to archive May 25, 2024.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2024
25 like it are open now in water and sewer line and related structures construction
- HAVO 326181 Rehabilitate Rainshed&Water Treatment
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237110Hawaii140P2026R0091Due in 3 daysNov 28 - New Meadows Range Barn
Forest Service, Payette National Forest
Combined synopsis and solicitationSmall businessNAICS 237110Idaho1240LT27Q0027Due in 4 daysNov 29 - Kelly Pierson OSS
Indian Health Service, Div of Engineering SVCS - Seattle
Combined synopsis and solicitationSmall businessNAICS 237110Shelton, WA75H70127Q00001Due in 5 daysNov 30
All 25 open in water and sewer line and related structures construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 237110 (water and sewer line and related structures construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
- What comes next
- No solicitation was published under this number after the presolicitation of May 1, 2024. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
NAICS Code: 237110- Water and Sewer Line and Related Structures Construction The New Hampshire National Guard intends to issue an Invitation for Bids to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision to replace and install thirteen (13) fire hydrants at Pease Air National Guard Base in Newington, NH. The contract duration will be 60 calendar days after notice to proceed to include inspection.
This project is set aside 100% for small businesses. The North American Industry Classification System (NAICS) Code is 237110, with a small business size standard of $45,000,000.00. The magnitude of construction is between $100,000 and $250,000. The tentative date for issuing the solicitation is on-or-about 17 May 2024. The tentative date for the pre-bid conference is 27 May 2024, 0900 local time, with the location to be provided in the solicitation.
Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-bid conference. All questions for the pre-bid conference must be submitted by 10 June 2024 by 12:00 (noon) EST via email to matthew.r.lapointe.civ@army.mil and william.j.cole68.mil@army.mil. The bid opening date is tentatively planned for on-or-about 17 June 2024. Actual dates and times will be identified in the solicitation.
Interested offerors must be registered in the System for Award Management (SAM). To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration). The solicitation and associated information will be available only from the Contract Opportunities page at SAM.gov.
Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states “By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities.
Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded.” In accordance with FAR 36.211(b), the following information is provided: The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204.
Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror’s responsibility to check the website periodically for any amendments to the solicitation.
Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 1, 2024
Presolicitation
Due May 10, 2024 at 4:00 PM EDT. SAM.gov, notice c270555b3dc247e9843f662f5511fecb
Points of contact
- Matthew Lapointematthew.r.lapointe.civ@army.mil6032251220
- Bill Colewilliam.j.cole68.mil@army.mil6032271445