# HVAC Repair by Replacement - 147th MSG

Canonical: https://sealedbidder.com/opportunities/w50s7726q1ckx

- Solicitation number: W50S7726Q1CKX
- Notice type: Combined synopsis and solicitation
- Status: Closed. Deadline was September 24, 2026 at 11:00 AM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W7N2 Uspfo Activity Txang 147 (W50S77)
- NAICS: 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Product or service code: Z2NB Repair Or Alteration Of Heating And Cooling Plants
- Set-aside: Total small business set-aside
- Small business size standard: $19 million in average annual receipts (13 CFR 121.201, NAICS 238220)
- Place of performance: Houston, Texas
- County: Harris County (FIPS 48201). https://sealedbidder.com/counties/harris-county-tx-48201
- City: Houston. https://sealedbidder.com/cities/houston-tx-4835000
- First posted: September 15, 2026
- Last posted: September 23, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/e07ce1bdbcbb4c9caac4d3f0a8b9a50e/view

## Reading this notice

- Kind of notice: Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation.
- Who may compete: Total small business set-aside. Only small businesses may compete. Small, under NAICS 238220 (plumbing, heating, and air-conditioning contractors), means no more than $19 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 9 days from the day the solicitation was posted, September 15, 2026, to the deadline. The deadline moved 3 times: it was first September 22, 2026 and ended as September 24, 2026.

## Description

Amendment 00001

	Is temporary cooling required? There will be a temporary chiller, coordination when this needs to be removed for the permanent will need to be coordinated with CE.

	Is new electrical conductors required from the disconnect to the new unit.? Contractor to see SOW section 3 and 5.

	Is flexible weather resistant conduit approved for any electrical work need to be performed for the chiller replacement?  All installs shall be per NEC and Local Code. The contractor shall submit the proposed raceway type and intended installation location for Government review before installation.

	Is a new wye strainer going to be required to prevent partials from the existing system from entering the new chiller? The contractor shall field verify whether a serviceable strainer is already installed upstream of the chiller and confirm the replacement chiller manufacturer&rsquo;s filtration requirements.

	Is a new check valve going to be required at the new chiller? The contractor shall verify the existing piping arrangement and the manufacturer&rsquo;s requirements for the dual VFD pump package.

A check valve shall be provided if required to:

	Prevent reverse flow through the chiller

	Protect the integral pump package

	Prevent flow through an inactive chiller

	Maintain proper system hydraulic operation

	Comply with the manufacturer&rsquo;s installation diagram

If a new check valve is necessary, the contractor shall submit the proposed valve type, size, location, pressure rating, and pressure-drop information for Government review and written authorization.

	Does the base have a designated controls contractor they are currently working with? TekPlan

	Is the chiller currently on a BAS system ? Yes

	Is the chiller currently running just off of local  controls? Yes, but will be integrated into the DDC system.

	Is there a certain percentage of glycol that needs to be blended into the system? The current system is not glycol. Before filling the new chiller, the contractor shall sample and test the existing chilled-water solution to determine whether glycol is present and document its existing concentration and condition. The contractor shall also review the replacement chiller manufacturer&rsquo;s freeze-protection and water-quality requirements.

	Is the base going to assure that the chiller can isolated with having to drain the whole system? Contractor to field verify.

	If the base is going to require temporary cooling is there going to be chiller isolation valves added?  Yes, Temporary chilling will be required as stated, isolation valves will be contractor responsibility to meet the requirements.

1. Are Press fittings permitted: Press fittings are not permitted

Please see attachments for changes. All changes were higlighted in Red.

This is a combined synopsis/solicitation for HVAC Repair by Replacement. Please see all attached documents.

## Attachments

- [W5S077-26-Q-1CKX - HVAC Replacement.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0d5cd4f3a2cd460fb19ac01599a37966/download)
- [Attachment 2 - Wage Determination.txt](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/cab29658200b48fe85176ddbced4753d/download)

## Open now in the same industry

59 open in NAICS 238220.

- CON | Z1DA | REPLACE OR CHILLERS | 580-23-105 | SOLICITATION (36C25626R0130), due December 2, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/36c25626r0130
- CON | Z2DA | REPLACE CHILLER 1 B104 | 580-24-111 | SOLICITATION (36C25626R0131), due December 8, 2026 at 3:00 AM EST. https://sealedbidder.com/opportunities/36c25626r0131
- NTX VAMC Utility Tunnel Pump Room (36C25727Q0097), due December 16, 2026 at 11:00 AM EST. https://sealedbidder.com/opportunities/36c25727q0097

## Publications

- September 15, 2026: Combined synopsis and solicitation, due September 22, 2026 at 11:00 AM EDT. Notice c8219c4c074543efa79354344cea9d34. https://sam.gov/workspace/contract/opp/c8219c4c074543efa79354344cea9d34/view
- September 22, 2026: Combined synopsis and solicitation, due September 24, 2026 at 11:00 AM EDT. Notice 37f508f6714d430aa21a11476d1da519. https://sam.gov/workspace/contract/opp/37f508f6714d430aa21a11476d1da519/view
- September 22, 2026: Combined synopsis and solicitation, due September 24, 2026 at 11:00 AM EDT. Notice 696556c4681547729611ba04fdad98de. https://sam.gov/workspace/contract/opp/696556c4681547729611ba04fdad98de/view
- September 22, 2026: Combined synopsis and solicitation, due September 22, 2026 at 3:00 PM EDT. Notice 860464b8dc9d414fbbdbc7764c1cf1ff. https://sam.gov/workspace/contract/opp/860464b8dc9d414fbbdbc7764c1cf1ff/view
- September 22, 2026: Combined synopsis and solicitation, due September 24, 2026 at 11:00 AM EDT. Notice 91587043094649b4810bc8160e21303a. https://sam.gov/workspace/contract/opp/91587043094649b4810bc8160e21303a/view
- September 22, 2026: Combined synopsis and solicitation, due September 24, 2026 at 11:00 AM EDT. Notice b2e9e0cf53384dd69fa4a20d92bae6a5. https://sam.gov/workspace/contract/opp/b2e9e0cf53384dd69fa4a20d92bae6a5/view
- September 23, 2026: Combined synopsis and solicitation, due September 24, 2026 at 11:00 AM EDT. Notice bde71d598f574bc199a69268dd6d0989. https://sam.gov/workspace/contract/opp/bde71d598f574bc199a69268dd6d0989/view
- September 23, 2026: Combined synopsis and solicitation, due September 24, 2026 at 11:00 AM EDT. Notice e07ce1bdbcbb4c9caac4d3f0a8b9a50e. https://sam.gov/workspace/contract/opp/e07ce1bdbcbb4c9caac4d3f0a8b9a50e/view

## Points of contact

- MSgt Brandon Council, brandon.council.7@us.af.mil, 2819292743
- SSgt Socrates Rosimo, socrates.rosimo.2@us.af.mil, 2819292741

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/w50s7726q1ckx.
