Solicitation, total small business set-aside
Replace Flooring Bldg 102 & Bldg 110
W50S6T26QA021
Department of the Army, W7MX Uspfo Activity Caang 144. Poured Concrete Foundation and Structure Contractors.
Response deadline
June 12, 2026 at 4:00 PM EDT
Closed 166 days ago. Posted June 10, 2026, first published May 19, 2026. Scheduled to archive June 27, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2026
3 like it are open now in poured concrete foundation and structure contractors
- Irrigation Canal Lining Maintenance and Repair for
Bureau of Indian Affairs, Western Region
Combined synopsis and solicitationSmall businessNAICS 238110Location not published140A1127R0016Due in 5 daysNov 30 - LOADING DOCK CONCRETE REPAIRS
Department of Veterans Affairs, 246-Network Contracting Office 6
SolicitationSDVOSBNAICS 238110Richmond, VA36C24626Q1099_1Due in 7 daysDec 2 - Crow Agency Admin Building Concrete Pad
Bureau of Indian Affairs, Bureau of Indian Affairs
SolicitationNAICS 238110Location not published140A1627Q0111Closes in 21 daysDec 16
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 238110 (poured concrete foundation and structure contractors), means no more than $19 million in average annual receipts, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 24 days from the day the solicitation was posted, May 19, 2026, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The scope of work for this requirement involves removing approximately 1,260 square feet of vinyl and carpet flooring, reconditioning approximately 4,825 square feet of existing floors in two separate buildings. The Contractor shall provide all necessary supervision, labor, materials, tools, and equipment necessary to accomplish the work, as identified in the Statement of Work.
The magnitude of this requirement is between $25,000 and $100,000.
A site visit is tentatively scheduled for Wednesday 27 May at 0800 PDT. The designated rally point will be the west gate parking lot. Parking space is limited, carpooling is strongly advised. Offerors must complete the Defense Biometric Identification System (DBIDS) Prequalification and be listed on the base access form to obtain base access. Complete all fields under the CONTRACTOR/VENDOR/VISITOR INFORMATION section consisting of attendee names, citizenship, and DBIDS code (6-digit code). The base access form must be provided 5 business days before the site visit. Refer to Attachment, Base Access Request for additional instructions.
As required by 15 U.S.C. § 644(w), implemented by RFO FAR 36.101-4, the following information is provided to interested small businesses:
(A). The National Guard Bureau (NGB) has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts, other than those described at FAR 43.204, DFARS 243.204 and Army FAR Supplement (AFARS) 5143.204.
(B). Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the NGB is currently unavailable, however data for Department of the Army (which NGB reports to) is listed below:
Selected Agency: DEPT OF THE ARMY
Time to definitize after receipt of an adequate Change Order Definitization Proposal under Construction Contracts: Number of Change Order Proposals definitized under Construction Contracts
30 days or less: 0
31 to 60 days: 1
61 to 90 days: 0
91 to 180 days: 0
181 to 365 days: 1
Greater than 365 days: 1
After completion of contract performance via a contract modification addressing all undefinitized equitable adjustments received during contract performance 2
Update 1: Questions and Answers, Images of Flooring and Drawings are attached.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Attachment 3 SOW HAYW262010 - Replace B102 and B110 Floor.pdf410 KB, May 19, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 19, 2026
Solicitation
Due June 12, 2026 at 4:00 PM EDT. SAM.gov, notice 93e099d1612c48758180681031f3fea6
3 revisions on SAM
- June 10, 2026: publish, solicitation
- May 21, 2026: publish, solicitation
- May 19, 2026: publish, solicitation
May 21, 2026
Solicitation
Due June 12, 2026 at 4:00 PM EDT. SAM.gov, notice a6e5cb6dbb284a9cb35daa39311525c2
3 revisions on SAM
- June 10, 2026: publish, solicitation
- May 21, 2026: publish, solicitation
- May 19, 2026: publish, solicitation
June 10, 2026
Solicitation
Due June 12, 2026 at 4:00 PM EDT. SAM.gov, notice d5851c6053a348329de67341099fc4d0
4 revisions on SAM
- June 26, 2026: publish, award notice
- June 10, 2026: publish, solicitation
- May 21, 2026: publish, solicitation
- May 19, 2026: publish, solicitation
Points of contact
- Justin Scalesjustin.scales.1@us.af.mil5594545129
- Jarrod Sanchezjarrod.sanchez@us.af.mil5594545129