# B1130 ROOF REPLACEMENT

Canonical: https://sealedbidder.com/opportunities/vlsb260069

- Solicitation number: VLSB260069
- Notice type: Sources sought
- Status: Closed. Deadline was March 13, 2026 at 4:00 PM EDT
- Department: Department of the Air Force
- Agency: Department of the Air Force
- Contracting office: FA4803 20 Cons Lgca (FA4803)
- NAICS: 238160 Roofing Contractors
- Product or service code: Z2AZ Repair Or Alteration Of Other Administrative Facilities And Service Buildings
- Small business size standard: $19 million in average annual receipts (13 CFR 121.201, NAICS 238160)
- Place of performance: Sumter, South Carolina
- County: Sumter County (FIPS 45085). https://sealedbidder.com/counties/sumter-county-sc-45085
- City: Sumter. https://sealedbidder.com/cities/sumter-sc-4570405
- First posted: March 6, 2026
- Last posted: March 6, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/dd8cd84007db431bb4f27f24a7032425/view

## Reading this notice

- Kind of notice: Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 238160 (roofing contractors), means no more than $19 million in average annual receipts, counted with affiliates.
- What comes next: No solicitation was published under this number after the sources sought of March 6, 2026. An agency sometimes issues the solicitation under a new number.

## Description

1. Description:

This is a Sources Sought Notice and is issued solely for market research and planning purposes to identify potential sources capable of providing the construction needs for a Design-Build (DB) contract to execute a complete roof replacement for Section A of Building 1130 (highlighted in the Condition Assessment Report) at Shaw AFB.

The contractor shall provide all design, engineering, labor, materials, equipment, and supervision necessary to:

a) Completely demolish the existing roofing system down to the structural concrete deck to include the elevator shaft roof.

b) Repair the spalls and cracks on the existing concrete deck. Prepare the concrete deck with a new air & vapor barrier and insulation board for a standing seam metal roofing retro fit/hugger system.

c) Design and install a new, fully compliant, Single Sloped Hydrostatic Standing Seam Metal Roofing hugger system incorporating an adequate slope to ensure positive water drainage/flow. The slope of the new SSMR will be directed to the back of the building. The height of the new SSMR must not be higher than the existing front building&rsquo;s parapet wall height primarily to maintain the overall aesthetic of the building&rsquo;s front. Demolish all parapet wall in the rear building area to incorporate a new external drainage system at the rear of the building. All existing drainage and appurtenances of the building is to be sealed and removed.

d) Design and install a new, 2-ply, cold-applied SBS Modified Bitumen roofing system, complete with new insulation for the elevator shaft. The system shall be drained via new scuppers designed to discharge water onto the new main standing seam metal roof.

e) Engineer and execute a comprehensive redesign of the drainage system, demolishing the 25 existing internal drains, in its entirety. The new external drainage system will be located at the back of the building. The sizing of the gutters, downspouts and tie-in locations to the storm drains must be designed to handle the massive volume and velocity of water from a 100-year storm event impacting the entirety of the new roof.

f) Demolish the existing penthouse roof access. Demolish all existing access past the floor below the roof as these appurtenances are no longer required. Provide all necessary renovations and additions to structurally frame and fill the opening left from the penthouse demolition. Provide all necessary renovations and additions to retain stairway functions, fire rating and overall operations after transformation (drop down ceiling, lights, fire protection system etc).

g) Remove and replace all metal coping on all the remaining parapet walls, including the elevator shaft.

h) Extend existing vents, roof curbs, ducts and other penetrations as required and flash properly.

i) Install a new Horizontal Lifeline System / Fall Protection System.

j) Ensure all work complies with the Unified Facilities Criteria (UFC), UFC 3-110-03 Roofing, the Shaw AFB Design and Construction Guide, and all attached specifications.

k) Accomplish the work while omitting/minimizing operational impact on the fully functional, 24/7 mission-critical B1130 facility.

2. Submission Requirements:

Interested vendors are invited to submit the following information:

Company Information

	Company name, address, and point of contact (name, email, phone)

	CAGE code and UEI (if available)

	Applicable NAICS codes

	Capabilities Statement

	Description of your ability to fulfill the listed requirements in the Statement of Work

	Indicate your ability to perform at Shaw, AFB.

3. Submission Instructions:

Response Deadline: 13 March 2026, 4:00 PM EST

Submission Method: Email responses to hutton.cobb@us.af.mil

Subject Line: Sources Sought Response - B1130 Roof Replacement.

Disclaimer: This Sources Sought is issued solely for information and planning purposes and does not constitute a solicitation. This notice shall not be construed as a commitment by the Government to issue a solicitation or award a contract. The Government will not reimburse any costs incurred.

## Attachments

- [Attachment 04 - Thermal Board Insulation Specification.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1bc90c60f0e54a769076aa3ef0c9cf32/download)

## Open now in the same industry

10 open in NAICS 238160.

- DSCR Building 70 Roof Replacement (SP470327Q0006), due November 25, 2026 at 11:59 PM EST. https://sealedbidder.com/opportunities/sp470327q0006
- FCI Bastrop - Remove and Replace Housing Unit Roofs (10) 27Z5BB3 (15B50127PR000024), due November 30, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/15b50127pr000024
- GAOA Mesa Falls VC Roof Repairs in Caribou-Targhee National Forest, Idaho (1240LT27Q0003), due December 1, 2026 at 5:00 PM EST. https://sealedbidder.com/opportunities/1240lt27q0003

## Publications

- March 6, 2026: Sources sought, due March 13, 2026 at 4:00 PM EDT. Notice 9ddc3271738642d78ce79053960c014a. https://sam.gov/workspace/contract/opp/9ddc3271738642d78ce79053960c014a/view
- March 6, 2026: Sources sought, due March 13, 2026 at 4:00 PM EDT. Notice dd8cd84007db431bb4f27f24a7032425. https://sam.gov/workspace/contract/opp/dd8cd84007db431bb4f27f24a7032425/view

## Points of contact

- Hutton Cobb, hutton.cobb@us.af.mil, 803-895-9434

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/vlsb260069.
