{"canonical":"https://sealedbidder.com/opportunities/tk040925","key":"TK040925","url":"https://sealedbidder.com/opportunities/tk040925","title":"Site and Space Planning Services TK040925","solicitation_number":"TK040925","notice_type":"p","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-11-21T21:00:00Z","first_posted":"2025-10-30","last_posted":"2025-11-07","department":"ENERGY, DEPARTMENT OF","subagency":"ENERGY, DEPARTMENT OF","office":"BERKELEY NATL LAB - DOE CONTRACTOR","naics":"541310","psc":"C1EZ","set_aside":null,"place_state":"CA","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"06095","place_county_name":"Solano County","place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"3bffdaee39394863a11f054403f1a962","title":"Site and Space Planning Services TK040925","solicitation_number":"TK040925","notice_type":"p","base_type":"p","posted":"2025-10-30","posted_at":"2025-10-30T21:54:54.311Z","due_at":"2025-11-21T21:00:00Z","due_date":"2025-11-21","cancelled":false,"archived":true,"archive_date":"2025-12-06","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3bffdaee39394863a11f054403f1a962/view","enriched":true,"history":[{"index":4,"title":"Site and Space Planning Services TK040925","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-07T21:53:10.095Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"69d599b675264ee4a73b08814735223a","solicitation_number":"TK040925","parent_opportunity_id":"3bffdaee39394863a11f054403f1a962"},{"index":2,"title":"Site and Space Planning Services TK040925","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-04T19:06:03.820Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"modify","opportunity_id":"733e9c8447f74f29a8c907af8f1adc69","solicitation_number":"TK040925","parent_opportunity_id":"3bffdaee39394863a11f054403f1a962"},{"index":1,"title":"Site and Space Planning Services TK040925","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-30T21:54:54.311Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"3bffdaee39394863a11f054403f1a962","solicitation_number":"TK040925"}]},{"notice_id":"733e9c8447f74f29a8c907af8f1adc69","title":"Site and Space Planning Services TK040925","solicitation_number":"TK040925","notice_type":"p","base_type":"p","posted":"2025-11-04","posted_at":"2025-11-04T19:06:03.820Z","due_at":"2025-11-21T21:00:00Z","due_date":"2025-11-21","cancelled":false,"archived":true,"archive_date":"2025-12-06","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/733e9c8447f74f29a8c907af8f1adc69/view","enriched":true,"history":[{"index":4,"title":"Site and Space Planning Services TK040925","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-07T21:53:10.095Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"69d599b675264ee4a73b08814735223a","solicitation_number":"TK040925","parent_opportunity_id":"3bffdaee39394863a11f054403f1a962"},{"index":2,"title":"Site and Space Planning Services TK040925","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-04T19:06:03.820Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"modify","opportunity_id":"733e9c8447f74f29a8c907af8f1adc69","solicitation_number":"TK040925","parent_opportunity_id":"3bffdaee39394863a11f054403f1a962"},{"index":1,"title":"Site and Space Planning Services TK040925","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-30T21:54:54.311Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"3bffdaee39394863a11f054403f1a962","solicitation_number":"TK040925"}]},{"notice_id":"69d599b675264ee4a73b08814735223a","title":"Site and Space Planning Services TK040925","solicitation_number":"TK040925","notice_type":"p","base_type":"p","posted":"2025-11-07","posted_at":"2025-11-07T21:53:10.095Z","due_at":"2025-11-21T21:00:00Z","due_date":"2025-11-21","cancelled":false,"archived":true,"archive_date":"2025-12-06","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/69d599b675264ee4a73b08814735223a/view","enriched":true,"history":[{"index":4,"title":"Site and Space Planning Services TK040925","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-07T21:53:10.095Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"69d599b675264ee4a73b08814735223a","solicitation_number":"TK040925","parent_opportunity_id":"3bffdaee39394863a11f054403f1a962"},{"index":2,"title":"Site and Space Planning Services TK040925","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-04T19:06:03.820Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"modify","opportunity_id":"733e9c8447f74f29a8c907af8f1adc69","solicitation_number":"TK040925","parent_opportunity_id":"3bffdaee39394863a11f054403f1a962"},{"index":1,"title":"Site and Space Planning Services TK040925","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-30T21:54:54.311Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"3bffdaee39394863a11f054403f1a962","solicitation_number":"TK040925"}]}],"latest_notice_id":"69d599b675264ee4a73b08814735223a","first_type":"p","notices":[{"dates":{"posted":"2025-10-30","posted_at":"2025-10-30T21:54:54.311Z","created_at":"2025-10-30T21:50:39.842Z","modified_at":"2025-12-06T05:04:29.010Z","response_deadline":{"raw":"2025-11-21T16:00:00-05:00","utc":"2025-11-21T21:00:00Z","date":"2025-11-21","time":"16:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3bffdaee39394863a11f054403f1a962/view"},"naics":{"codes":["541310"],"primary":"541310"},"title":"Site and Space Planning Services TK040925","agency":{"office":{"code":"899032","name":"BERKELEY NATL LAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"94720","city":"Berkeley","state":"CA","country":"USA"},"organization_id":"500047665","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-06","archive_type":"auto15"},"history":[{"index":4,"title":"Site and Space Planning Services TK040925","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-07T21:53:10.095Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"69d599b675264ee4a73b08814735223a","solicitation_number":"TK040925","parent_opportunity_id":"3bffdaee39394863a11f054403f1a962"},{"index":2,"title":"Site and Space Planning Services TK040925","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-04T19:06:03.820Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"modify","opportunity_id":"733e9c8447f74f29a8c907af8f1adc69","solicitation_number":"TK040925","parent_opportunity_id":"3bffdaee39394863a11f054403f1a962"},{"index":1,"title":"Site and Space Planning Services TK040925","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-30T21:54:54.311Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"3bffdaee39394863a11f054403f1a962","solicitation_number":"TK040925"}],"contacts":[{"name":"Tracy Kaae","role":"primary","email":"tracykaae@lbl.gov","phone":"510-486-4234"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"3bffdaee39394863a11f054403f1a962","lineage_id":"3bffdaee39394863a11f054403f1a962","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-24T02:39:41.915770786Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"43b7e27e50330bfe86d6aaf3424211e7040458227773bd7e1c5a39701aa52eed","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-24T02:39:41.915770786Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p><strong><u>A/E SERVICES</u></strong></p>\n\n<p>Site and space planning services are expected to include a range of efforts to meet ongoing and developing needs. The following outline aims to provide an overview of the types of site and space planning features and activities envisioned as part of the Master Agreement. This list is intended to be representative, not comprehensive and restrictive.</p>\n\n<ol>\n\t<li>Study Laboratory Foundational Background Documents. The Laboratory has several previously completed studies and reports, which serve as foundational background documents. Develop proficiency with these documents to guide and direct service planning. Access and understand key archive and planning systems. The following key documents and systems will be essential to be familiar with to effectively perform the desired services:\n\t<ol>\n\t\t<li>Campus Master Plan</li>\n\t\t<li>Campus Massing Study</li>\n\t\t<li>2025 Long Range Development Plan/EIR</li>\n\t\t<li>LBNL Annual Laboratory Plan</li>\n\t\t<li>Facilities Division GIS Database</li>\n\t\t<li>Meridian Drawing Archive</li>\n\t\t<li>Deferred maintenance database</li>\n\t\t<li>Condition assessment reports</li>\n\t</ol>\n\t</li>\n\t<li>General Site Features/Systems:\n\t<ol>\n\t\t<li>Landscaping, trees, planting beds, erosion control, vegetation management</li>\n\t\t<li>Roadways, bike lanes, parking spaces and lots, fleet management, streetside parking, sidewalks, crosswalks, accessibility compliance</li>\n\t\t<li>Storm drainage systems, culverts, and channels</li>\n\t\t<li>Wayfinding, general site signage</li>\n\t\t<li>Bus/shuttle routes/stops/shelters, transportation routes, and loading docks</li>\n\t\t<li>Security gates, security fencing, and site access points</li>\n\t\t<li>Pathways, walkways, and site staircases</li>\n\t\t<li>Retaining walls</li>\n\t\t<li>Seating areas, lunch areas, and social spaces</li>\n\t</ol>\n\t</li>\n\t<li>Site Utilities:\n\t<ol>\n\t\t<li>Power, water systems (including irrigation), natural gas, compressed air, telecommunications, and sanitary sewer</li>\n\t\t<li>Exterior lighting</li>\n\t\t<li>Mechanical and electrical pads and yards</li>\n\t\t<li>Vaults and other buried structures.</li>\n\t</ol>\n\t</li>\n\t<li>Facilities and Structures:\n\t<ol>\n\t\t<li>New facilities</li>\n\t\t<li>Facility rehabilitations and repairs</li>\n\t\t<li>Facility alterations and additions</li>\n\t\t<li>Roofing and M/E/P system rehabilitations, repairs, and replacements</li>\n\t\t<li>Office and Laboratory space audits, need studies, utilization studies, consolidations, refreshes, repurposing, and adjacency</li>\n\t\t<li>Surge spaces</li>\n\t\t<li>Move logistics</li>\n\t</ol>\n\t</li>\n\t<li>Meetings and Site Visits:\n\t<ol>\n\t\t<li>Periodic hybrid-based meetings to check in on ongoing efforts and longer-term activities</li>\n\t\t<li>Focused meetings as needed to support specific subcontracted efforts under the Master Agreement</li>\n\t\t<li>Site visits as required to support the Master Agreement</li>\n\t</ol>\n\t</li>\n\t<li>Deliverables:\n\t<ol>\n\t\t<li>Architectural and engineering reports, studies, and findings</li>\n\t\t<li>Options planning</li>\n\t\t<li>Cost estimates</li>\n\t\t<li>Graphics</li>\n\t\t<li>Renderings</li>\n\t</ol>\n\t</li>\n</ol>","text":"A/E SERVICES\n\nSite and space planning services are expected to include a range of efforts to meet ongoing and developing needs. The following outline aims to provide an overview of the types of site and space planning features and activities envisioned as part of the Master Agreement. This list is intended to be representative, not comprehensive and restrictive.\n\n• Study Laboratory Foundational Background Documents. The Laboratory has several previously completed studies and reports, which serve as foundational background documents. Develop proficiency with these documents to guide and direct service planning. Access and understand key archive and planning systems. The following key documents and systems will be essential to be familiar with to effectively perform the desired services:\n\n• Campus Master Plan\n\n• Campus Massing Study\n\n• 2025 Long Range Development Plan/EIR\n\n• LBNL Annual Laboratory Plan\n\n• Facilities Division GIS Database\n\n• Meridian Drawing Archive\n\n• Deferred maintenance database\n\n• Condition assessment reports\n\n• General Site Features/Systems:\n\n• Landscaping, trees, planting beds, erosion control, vegetation management\n\n• Roadways, bike lanes, parking spaces and lots, fleet management, streetside parking, sidewalks, crosswalks, accessibility compliance\n\n• Storm drainage systems, culverts, and channels\n\n• Wayfinding, general site signage\n\n• Bus/shuttle routes/stops/shelters, transportation routes, and loading docks\n\n• Security gates, security fencing, and site access points\n\n• Pathways, walkways, and site staircases\n\n• Retaining walls\n\n• Seating areas, lunch areas, and social spaces\n\n• Site Utilities:\n\n• Power, water systems (including irrigation), natural gas, compressed air, telecommunications, and sanitary sewer\n\n• Exterior lighting\n\n• Mechanical and electrical pads and yards\n\n• Vaults and other buried structures.\n\n• Facilities and Structures:\n\n• New facilities\n\n• Facility rehabilitations and repairs\n\n• Facility alterations and additions\n\n• Roofing and M/E/P system rehabilitations, repairs, and replacements\n\n• Office and Laboratory space audits, need studies, utilization studies, consolidations, refreshes, repurposing, and adjacency\n\n• Surge spaces\n\n• Move logistics\n\n• Meetings and Site Visits:\n\n• Periodic hybrid-based meetings to check in on ongoing efforts and longer-term activities\n\n• Focused meetings as needed to support specific subcontracted efforts under the Master Agreement\n\n• Site visits as required to support the Master Agreement\n\n• Deliverables:\n\n• Architectural and engineering reports, studies, and findings\n\n• Options planning\n\n• Cost estimates\n\n• Graphics\n\n• Renderings","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"TK040925","place_of_performance":{"zip":"94510","state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"C1EZ"},{"dates":{"posted":"2025-11-04","posted_at":"2025-11-04T19:06:03.820Z","created_at":"2025-11-04T19:05:26.679Z","modified_at":"2025-12-06T05:04:29.010Z","response_deadline":{"raw":"2025-11-21T16:00:00-05:00","utc":"2025-11-21T21:00:00Z","date":"2025-11-21","time":"16:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/733e9c8447f74f29a8c907af8f1adc69/view"},"naics":{"codes":["541310"],"primary":"541310"},"title":"Site and Space Planning Services TK040925","agency":{"office":{"code":"899032","name":"BERKELEY NATL LAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"94720","city":"Berkeley","state":"CA","country":"USA"},"organization_id":"500047665","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-06","archive_type":"auto15"},"history":[{"index":4,"title":"Site and Space Planning Services TK040925","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-07T21:53:10.095Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"69d599b675264ee4a73b08814735223a","solicitation_number":"TK040925","parent_opportunity_id":"3bffdaee39394863a11f054403f1a962"},{"index":2,"title":"Site and Space Planning Services TK040925","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-04T19:06:03.820Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"modify","opportunity_id":"733e9c8447f74f29a8c907af8f1adc69","solicitation_number":"TK040925","parent_opportunity_id":"3bffdaee39394863a11f054403f1a962"},{"index":1,"title":"Site and Space Planning Services TK040925","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-30T21:54:54.311Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"3bffdaee39394863a11f054403f1a962","solicitation_number":"TK040925"}],"contacts":[{"name":"Tracy Kaae","role":"primary","email":"tracykaae@lbl.gov","phone":"510-486-4234"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"733e9c8447f74f29a8c907af8f1adc69","lineage_id":"3bffdaee39394863a11f054403f1a962","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-24T00:59:38.997227360Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"3aa3d32885e4989fac2b2d6e3273243386b7d4be48e0edd29984dde0ad56c347","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-24T00:59:38.997227360Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p><strong><u>A/E SERVICES</u></strong></p>\n\n<p>Site and space planning services are expected to include a range of efforts to meet ongoing and developing needs. The following outline aims to provide an overview of the types of site and space planning features and activities envisioned as part of the Master Agreement. This list is intended to be representative, not comprehensive and restrictive.</p>\n\n<ol>\n\t<li>Study Laboratory Foundational Background Documents. The Laboratory has several previously completed studies and reports, which serve as foundational background documents. Develop proficiency with these documents to guide and direct service planning. Access and understand key archive and planning systems. The following key documents and systems will be essential to be familiar with to effectively perform the desired services:\n\t<ol>\n\t\t<li>Campus Master Plan</li>\n\t\t<li>Campus Massing Study</li>\n\t\t<li>2025 Long Range Development Plan/EIR</li>\n\t\t<li>LBNL Annual Laboratory Plan</li>\n\t\t<li>Facilities Division GIS Database</li>\n\t\t<li>Meridian Drawing Archive</li>\n\t\t<li>Deferred maintenance database</li>\n\t\t<li>Condition assessment reports</li>\n\t</ol>\n\t</li>\n\t<li>General Site Features/Systems:\n\t<ol>\n\t\t<li>Landscaping, trees, planting beds, erosion control, vegetation management</li>\n\t\t<li>Roadways, bike lanes, parking spaces and lots, fleet management, streetside parking, sidewalks, crosswalks, accessibility compliance</li>\n\t\t<li>Storm drainage systems, culverts, and channels</li>\n\t\t<li>Wayfinding, general site signage</li>\n\t\t<li>Bus/shuttle routes/stops/shelters, transportation routes, and loading docks</li>\n\t\t<li>Security gates, security fencing, and site access points</li>\n\t\t<li>Pathways, walkways, and site staircases</li>\n\t\t<li>Retaining walls</li>\n\t\t<li>Seating areas, lunch areas, and social spaces</li>\n\t</ol>\n\t</li>\n\t<li>Site Utilities:\n\t<ol>\n\t\t<li>Power, water systems (including irrigation), natural gas, compressed air, telecommunications, and sanitary sewer</li>\n\t\t<li>Exterior lighting</li>\n\t\t<li>Mechanical and electrical pads and yards</li>\n\t\t<li>Vaults and other buried structures.</li>\n\t</ol>\n\t</li>\n\t<li>Facilities and Structures:\n\t<ol>\n\t\t<li>New facilities</li>\n\t\t<li>Facility rehabilitations and repairs</li>\n\t\t<li>Facility alterations and additions</li>\n\t\t<li>Roofing and M/E/P system rehabilitations, repairs, and replacements</li>\n\t\t<li>Office and Laboratory space audits, need studies, utilization studies, consolidations, refreshes, repurposing, and adjacency</li>\n\t\t<li>Surge spaces</li>\n\t\t<li>Move logistics</li>\n\t</ol>\n\t</li>\n\t<li>Meetings and Site Visits:\n\t<ol>\n\t\t<li>Periodic hybrid-based meetings to check in on ongoing efforts and longer-term activities</li>\n\t\t<li>Focused meetings as needed to support specific subcontracted efforts under the Master Agreement</li>\n\t\t<li>Site visits as required to support the Master Agreement</li>\n\t</ol>\n\t</li>\n\t<li>Deliverables:\n\t<ol>\n\t\t<li>Architectural and engineering reports, studies, and findings</li>\n\t\t<li>Options planning</li>\n\t\t<li>Cost estimates</li>\n\t\t<li>Graphics</li>\n\t\t<li>Renderings</li>\n\t</ol>\n\t</li>\n</ol>","text":"A/E SERVICES\n\nSite and space planning services are expected to include a range of efforts to meet ongoing and developing needs. The following outline aims to provide an overview of the types of site and space planning features and activities envisioned as part of the Master Agreement. This list is intended to be representative, not comprehensive and restrictive.\n\n• Study Laboratory Foundational Background Documents. The Laboratory has several previously completed studies and reports, which serve as foundational background documents. Develop proficiency with these documents to guide and direct service planning. Access and understand key archive and planning systems. The following key documents and systems will be essential to be familiar with to effectively perform the desired services:\n\n• Campus Master Plan\n\n• Campus Massing Study\n\n• 2025 Long Range Development Plan/EIR\n\n• LBNL Annual Laboratory Plan\n\n• Facilities Division GIS Database\n\n• Meridian Drawing Archive\n\n• Deferred maintenance database\n\n• Condition assessment reports\n\n• General Site Features/Systems:\n\n• Landscaping, trees, planting beds, erosion control, vegetation management\n\n• Roadways, bike lanes, parking spaces and lots, fleet management, streetside parking, sidewalks, crosswalks, accessibility compliance\n\n• Storm drainage systems, culverts, and channels\n\n• Wayfinding, general site signage\n\n• Bus/shuttle routes/stops/shelters, transportation routes, and loading docks\n\n• Security gates, security fencing, and site access points\n\n• Pathways, walkways, and site staircases\n\n• Retaining walls\n\n• Seating areas, lunch areas, and social spaces\n\n• Site Utilities:\n\n• Power, water systems (including irrigation), natural gas, compressed air, telecommunications, and sanitary sewer\n\n• Exterior lighting\n\n• Mechanical and electrical pads and yards\n\n• Vaults and other buried structures.\n\n• Facilities and Structures:\n\n• New facilities\n\n• Facility rehabilitations and repairs\n\n• Facility alterations and additions\n\n• Roofing and M/E/P system rehabilitations, repairs, and replacements\n\n• Office and Laboratory space audits, need studies, utilization studies, consolidations, refreshes, repurposing, and adjacency\n\n• Surge spaces\n\n• Move logistics\n\n• Meetings and Site Visits:\n\n• Periodic hybrid-based meetings to check in on ongoing efforts and longer-term activities\n\n• Focused meetings as needed to support specific subcontracted efforts under the Master Agreement\n\n• Site visits as required to support the Master Agreement\n\n• Deliverables:\n\n• Architectural and engineering reports, studies, and findings\n\n• Options planning\n\n• Cost estimates\n\n• Graphics\n\n• Renderings","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"TK040925","place_of_performance":{"zip":"94510","state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"C1EZ"},{"dates":{"posted":"2025-11-07","posted_at":"2025-11-07T21:53:10.095Z","created_at":"2025-11-07T21:52:37.106Z","modified_at":"2025-12-06T05:04:29.010Z","response_deadline":{"raw":"2025-11-21T16:00:00-05:00","utc":"2025-11-21T21:00:00Z","date":"2025-11-21","time":"16:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/69d599b675264ee4a73b08814735223a/view"},"naics":{"codes":["541310"],"primary":"541310"},"title":"Site and Space Planning Services TK040925","agency":{"office":{"code":"899032","name":"BERKELEY NATL LAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"94720","city":"Berkeley","state":"CA","country":"USA"},"organization_id":"500047665","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-06","archive_type":"auto15"},"history":[{"index":4,"title":"Site and Space Planning Services TK040925","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-07T21:53:10.095Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"69d599b675264ee4a73b08814735223a","solicitation_number":"TK040925","parent_opportunity_id":"3bffdaee39394863a11f054403f1a962"},{"index":2,"title":"Site and Space Planning Services TK040925","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-04T19:06:03.820Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"modify","opportunity_id":"733e9c8447f74f29a8c907af8f1adc69","solicitation_number":"TK040925","parent_opportunity_id":"3bffdaee39394863a11f054403f1a962"},{"index":1,"title":"Site and Space Planning Services TK040925","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-30T21:54:54.311Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"3bffdaee39394863a11f054403f1a962","solicitation_number":"TK040925"}],"contacts":[{"name":"Tracy Kaae","role":"primary","email":"tracykaae@lbl.gov","phone":"510-486-4234"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"69d599b675264ee4a73b08814735223a","lineage_id":"3bffdaee39394863a11f054403f1a962","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-23T02:48:33.787607742Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"88b7ae89f5ea48c239f4f1cd8853b516e2958f554d58cd4313db3ce7b3c473e0","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-23T02:48:33.787607742Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p><strong><u>A/E SERVICES</u></strong></p>\n\n<p>Site and space planning services are expected to include a range of efforts to meet ongoing and developing needs. The following outline aims to provide an overview of the types of site and space planning features and activities envisioned as part of the Master Agreement. This list is intended to be representative, not comprehensive and restrictive.</p>\n\n<ol>\n\t<li>Study Laboratory Foundational Background Documents. The Laboratory has several previously completed studies and reports, which serve as foundational background documents. Develop proficiency with these documents to guide and direct service planning. Access and understand key archive and planning systems. The following key documents and systems will be essential to be familiar with to effectively perform the desired services:\n\t<ol>\n\t\t<li>Campus Master Plan</li>\n\t\t<li>Campus Massing Study</li>\n\t\t<li>2025 Long Range Development Plan/EIR</li>\n\t\t<li>LBNL Annual Laboratory Plan</li>\n\t\t<li>Facilities Division GIS Database</li>\n\t\t<li>Meridian Drawing Archive</li>\n\t\t<li>Deferred maintenance database</li>\n\t\t<li>Condition assessment reports</li>\n\t</ol>\n\t</li>\n\t<li>General Site Features/Systems:\n\t<ol>\n\t\t<li>Landscaping, trees, planting beds, erosion control, vegetation management</li>\n\t\t<li>Roadways, bike lanes, parking spaces and lots, fleet management, streetside parking, sidewalks, crosswalks, accessibility compliance</li>\n\t\t<li>Storm drainage systems, culverts, and channels</li>\n\t\t<li>Wayfinding, general site signage</li>\n\t\t<li>Bus/shuttle routes/stops/shelters, transportation routes, and loading docks</li>\n\t\t<li>Security gates, security fencing, and site access points</li>\n\t\t<li>Pathways, walkways, and site staircases</li>\n\t\t<li>Retaining walls</li>\n\t\t<li>Seating areas, lunch areas, and social spaces</li>\n\t</ol>\n\t</li>\n\t<li>Site Utilities:\n\t<ol>\n\t\t<li>Power, water systems (including irrigation), natural gas, compressed air, telecommunications, and sanitary sewer</li>\n\t\t<li>Exterior lighting</li>\n\t\t<li>Mechanical and electrical pads and yards</li>\n\t\t<li>Vaults and other buried structures.</li>\n\t</ol>\n\t</li>\n\t<li>Facilities and Structures:\n\t<ol>\n\t\t<li>New facilities</li>\n\t\t<li>Facility rehabilitations and repairs</li>\n\t\t<li>Facility alterations and additions</li>\n\t\t<li>Roofing and M/E/P system rehabilitations, repairs, and replacements</li>\n\t\t<li>Office and Laboratory space audits, need studies, utilization studies, consolidations, refreshes, repurposing, and adjacency</li>\n\t\t<li>Surge spaces</li>\n\t\t<li>Move logistics</li>\n\t</ol>\n\t</li>\n\t<li>Meetings and Site Visits:\n\t<ol>\n\t\t<li>Periodic hybrid-based meetings to check in on ongoing efforts and longer-term activities</li>\n\t\t<li>Focused meetings as needed to support specific subcontracted efforts under the Master Agreement</li>\n\t\t<li>Site visits as required to support the Master Agreement</li>\n\t</ol>\n\t</li>\n\t<li>Deliverables:\n\t<ol>\n\t\t<li>Architectural and engineering reports, studies, and findings</li>\n\t\t<li>Options planning</li>\n\t\t<li>Cost estimates</li>\n\t\t<li>Graphics</li>\n\t\t<li>Renderings</li>\n\t</ol>\n\t</li>\n</ol>","text":"A/E SERVICES\n\nSite and space planning services are expected to include a range of efforts to meet ongoing and developing needs. The following outline aims to provide an overview of the types of site and space planning features and activities envisioned as part of the Master Agreement. This list is intended to be representative, not comprehensive and restrictive.\n\n• Study Laboratory Foundational Background Documents. The Laboratory has several previously completed studies and reports, which serve as foundational background documents. Develop proficiency with these documents to guide and direct service planning. Access and understand key archive and planning systems. The following key documents and systems will be essential to be familiar with to effectively perform the desired services:\n\n• Campus Master Plan\n\n• Campus Massing Study\n\n• 2025 Long Range Development Plan/EIR\n\n• LBNL Annual Laboratory Plan\n\n• Facilities Division GIS Database\n\n• Meridian Drawing Archive\n\n• Deferred maintenance database\n\n• Condition assessment reports\n\n• General Site Features/Systems:\n\n• Landscaping, trees, planting beds, erosion control, vegetation management\n\n• Roadways, bike lanes, parking spaces and lots, fleet management, streetside parking, sidewalks, crosswalks, accessibility compliance\n\n• Storm drainage systems, culverts, and channels\n\n• Wayfinding, general site signage\n\n• Bus/shuttle routes/stops/shelters, transportation routes, and loading docks\n\n• Security gates, security fencing, and site access points\n\n• Pathways, walkways, and site staircases\n\n• Retaining walls\n\n• Seating areas, lunch areas, and social spaces\n\n• Site Utilities:\n\n• Power, water systems (including irrigation), natural gas, compressed air, telecommunications, and sanitary sewer\n\n• Exterior lighting\n\n• Mechanical and electrical pads and yards\n\n• Vaults and other buried structures.\n\n• Facilities and Structures:\n\n• New facilities\n\n• Facility rehabilitations and repairs\n\n• Facility alterations and additions\n\n• Roofing and M/E/P system rehabilitations, repairs, and replacements\n\n• Office and Laboratory space audits, need studies, utilization studies, consolidations, refreshes, repurposing, and adjacency\n\n• Surge spaces\n\n• Move logistics\n\n• Meetings and Site Visits:\n\n• Periodic hybrid-based meetings to check in on ongoing efforts and longer-term activities\n\n• Focused meetings as needed to support specific subcontracted efforts under the Master Agreement\n\n• Site visits as required to support the Master Agreement\n\n• Deliverables:\n\n• Architectural and engineering reports, studies, and findings\n\n• Options planning\n\n• Cost estimates\n\n• Graphics\n\n• Renderings","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"TK040925","place_of_performance":{"zip":"94510","state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"C1EZ"}],"due_at":"2025-11-21T21:00:00Z","due_date":"2025-11-21","closes_at":"2025-11-21T21:00:00Z","awardable":true,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899032","office_name":"BERKELEY NATL LAB - DOE CONTRACTOR","state":"CA","county":"06095","county_name":"Solano County","city":null,"city_name":null,"country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-23T03:14:00.761323Z","principal_notice_id":"69d599b675264ee4a73b08814735223a","description":{"text":"A/E SERVICES\n\nSite and space planning services are expected to include a range of efforts to meet ongoing and developing needs. The following outline aims to provide an overview of the types of site and space planning features and activities envisioned as part of the Master Agreement. This list is intended to be representative, not comprehensive and restrictive.\n\n• Study Laboratory Foundational Background Documents. The Laboratory has several previously completed studies and reports, which serve as foundational background documents. Develop proficiency with these documents to guide and direct service planning. Access and understand key archive and planning systems. The following key documents and systems will be essential to be familiar with to effectively perform the desired services:\n\n• Campus Master Plan\n\n• Campus Massing Study\n\n• 2025 Long Range Development Plan/EIR\n\n• LBNL Annual Laboratory Plan\n\n• Facilities Division GIS Database\n\n• Meridian Drawing Archive\n\n• Deferred maintenance database\n\n• Condition assessment reports\n\n• General Site Features/Systems:\n\n• Landscaping, trees, planting beds, erosion control, vegetation management\n\n• Roadways, bike lanes, parking spaces and lots, fleet management, streetside parking, sidewalks, crosswalks, accessibility compliance\n\n• Storm drainage systems, culverts, and channels\n\n• Wayfinding, general site signage\n\n• Bus/shuttle routes/stops/shelters, transportation routes, and loading docks\n\n• Security gates, security fencing, and site access points\n\n• Pathways, walkways, and site staircases\n\n• Retaining walls\n\n• Seating areas, lunch areas, and social spaces\n\n• Site Utilities:\n\n• Power, water systems (including irrigation), natural gas, compressed air, telecommunications, and sanitary sewer\n\n• Exterior lighting\n\n• Mechanical and electrical pads and yards\n\n• Vaults and other buried structures.\n\n• Facilities and Structures:\n\n• New facilities\n\n• Facility rehabilitations and repairs\n\n• Facility alterations and additions\n\n• Roofing and M/E/P system rehabilitations, repairs, and replacements\n\n• Office and Laboratory space audits, need studies, utilization studies, consolidations, refreshes, repurposing, and adjacency\n\n• Surge spaces\n\n• Move logistics\n\n• Meetings and Site Visits:\n\n• Periodic hybrid-based meetings to check in on ongoing efforts and longer-term activities\n\n• Focused meetings as needed to support specific subcontracted efforts under the Master Agreement\n\n• Site visits as required to support the Master Agreement\n\n• Deliverables:\n\n• Architectural and engineering reports, studies, and findings\n\n• Options planning\n\n• Cost estimates\n\n• Graphics\n\n• Renderings","html":"<p><strong><u>A/E SERVICES</u></strong></p>\n\n<p>Site and space planning services are expected to include a range of efforts to meet ongoing and developing needs. The following outline aims to provide an overview of the types of site and space planning features and activities envisioned as part of the Master Agreement. This list is intended to be representative, not comprehensive and restrictive.</p>\n\n<ol>\n\t<li>Study Laboratory Foundational Background Documents. The Laboratory has several previously completed studies and reports, which serve as foundational background documents. Develop proficiency with these documents to guide and direct service planning. Access and understand key archive and planning systems. The following key documents and systems will be essential to be familiar with to effectively perform the desired services:\n\t<ol>\n\t\t<li>Campus Master Plan</li>\n\t\t<li>Campus Massing Study</li>\n\t\t<li>2025 Long Range Development Plan/EIR</li>\n\t\t<li>LBNL Annual Laboratory Plan</li>\n\t\t<li>Facilities Division GIS Database</li>\n\t\t<li>Meridian Drawing Archive</li>\n\t\t<li>Deferred maintenance database</li>\n\t\t<li>Condition assessment reports</li>\n\t</ol>\n\t</li>\n\t<li>General Site Features/Systems:\n\t<ol>\n\t\t<li>Landscaping, trees, planting beds, erosion control, vegetation management</li>\n\t\t<li>Roadways, bike lanes, parking spaces and lots, fleet management, streetside parking, sidewalks, crosswalks, accessibility compliance</li>\n\t\t<li>Storm drainage systems, culverts, and channels</li>\n\t\t<li>Wayfinding, general site signage</li>\n\t\t<li>Bus/shuttle routes/stops/shelters, transportation routes, and loading docks</li>\n\t\t<li>Security gates, security fencing, and site access points</li>\n\t\t<li>Pathways, walkways, and site staircases</li>\n\t\t<li>Retaining walls</li>\n\t\t<li>Seating areas, lunch areas, and social spaces</li>\n\t</ol>\n\t</li>\n\t<li>Site Utilities:\n\t<ol>\n\t\t<li>Power, water systems (including irrigation), natural gas, compressed air, telecommunications, and sanitary sewer</li>\n\t\t<li>Exterior lighting</li>\n\t\t<li>Mechanical and electrical pads and yards</li>\n\t\t<li>Vaults and other buried structures.</li>\n\t</ol>\n\t</li>\n\t<li>Facilities and Structures:\n\t<ol>\n\t\t<li>New facilities</li>\n\t\t<li>Facility rehabilitations and repairs</li>\n\t\t<li>Facility alterations and additions</li>\n\t\t<li>Roofing and M/E/P system rehabilitations, repairs, and replacements</li>\n\t\t<li>Office and Laboratory space audits, need studies, utilization studies, consolidations, refreshes, repurposing, and adjacency</li>\n\t\t<li>Surge spaces</li>\n\t\t<li>Move logistics</li>\n\t</ol>\n\t</li>\n\t<li>Meetings and Site Visits:\n\t<ol>\n\t\t<li>Periodic hybrid-based meetings to check in on ongoing efforts and longer-term activities</li>\n\t\t<li>Focused meetings as needed to support specific subcontracted efforts under the Master Agreement</li>\n\t\t<li>Site visits as required to support the Master Agreement</li>\n\t</ol>\n\t</li>\n\t<li>Deliverables:\n\t<ol>\n\t\t<li>Architectural and engineering reports, studies, and findings</li>\n\t\t<li>Options planning</li>\n\t\t<li>Cost estimates</li>\n\t\t<li>Graphics</li>\n\t\t<li>Renderings</li>\n\t</ol>\n\t</li>\n</ol>","origin":"detail"},"contacts":[{"name":"Tracy Kaae","role":"primary","email":"tracykaae@lbl.gov","phone":"510-486-4234"}],"place_of_performance":{"zip":"94510","state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"94720","city":"Berkeley","state":"CA","country":"USA"},"naics_codes":["541310"],"award":null,"attachments":[{"resource_id":"544708642d1d45cea661beb422e21151","name":"RFI Site and Space Planning Services TK040925 Rev 1.docx","kind":"file","mime_type":".docx","size_bytes":386068,"posted_at":"2025-11-04T19:06:03.820Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/544708642d1d45cea661beb422e21151/download","mirrored":false}],"awards":[],"related":[{"key":"AA202702","latest_notice_id":"82ba018cdef0464e8c504512681fa22c","title":"Fabricated Components for the SR Embedded Floor Plates for the ALS-U Project","solicitation_number":"AA-2027-02","notice_type":"k","first_type":"k","first_posted":"2026-10-19","last_posted":"2026-11-19","notices":7,"due_at":"2026-11-26T01:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-26T01:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899032","office_name":"BERKELEY NATL LAB - DOE CONTRACTOR","naics":"332999","psc":"6640","set_aside":null,"state":"CA","county":"06001","county_name":"Alameda County","city":"0606000","city_name":"Berkeley","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"BZ202702","latest_notice_id":"2adcc9edc63d4b44bd8c02ec45f2fdb6","title":"Direct Write Lithography System","solicitation_number":"BZ-2027-02","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-12-02T22:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899032","office_name":"BERKELEY NATL LAB - DOE CONTRACTOR","naics":"333242","psc":"3670","set_aside":null,"state":"CA","county":"06001","county_name":"Alameda County","city":"0606000","city_name":"Berkeley","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"MG11192026","latest_notice_id":"8f3d5eef1fe34a6d85b78cf7dc3a3695","title":"Advanced Light Source Upgrade (ALS-U) STORAGE RING (SR) BENDB AND BENDC MAGNETS","solicitation_number":"MG-11192026","notice_type":"o","first_type":"o","first_posted":"2026-11-18","last_posted":"2026-11-19","notices":2,"due_at":"2026-12-21T23:00:00Z","due_date":"2026-12-21","closes_at":"2026-12-21T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899032","office_name":"BERKELEY NATL LAB - DOE CONTRACTOR","naics":"332999","psc":"5999","set_aside":null,"state":"CA","county":"06001","county_name":"Alameda County","city":"0606000","city_name":"Berkeley","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"2026PTGFACPR","latest_notice_id":"08b23b2676624773a82f5ef5e64db152","title":"Fire Alarm Control Panel Replacement Project (FACPR)","solicitation_number":"2026-PTG-FACPR","notice_type":"o","first_type":"o","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2027-01-09T01:00:00Z","due_date":"2027-01-08","closes_at":"2027-01-09T01:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899032","office_name":"BERKELEY NATL LAB - DOE CONTRACTOR","naics":"238210","psc":"1230","set_aside":null,"state":"CA","county":"06001","county_name":"Alameda County","city":null,"city_name":null,"country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"}],"similar_open":[{"key":"36C24526R0101","latest_notice_id":"e84156527a944ee3bd5001d28af5d713","title":"C1DA-- Renovate Specialty Clinics on 2nd","solicitation_number":"36C24526R0101","notice_type":"r","first_type":"r","first_posted":"2026-09-24","last_posted":"2026-11-18","notices":4,"due_at":"2026-11-25T19:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"541310","psc":"C1DA","set_aside":"SDVOSBC","state":"WV","county":"54081","county_name":"Raleigh County","city":"5405332","city_name":"Beckley","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"AEASSERVICES2027","latest_notice_id":"a11b054dddee4d1c8ba20ff7d12e4d8c","title":"Sources Sought Advisory and Assistance Services contract.","solicitation_number":"A-E_A-SServices2027","notice_type":"r","first_type":"r","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-12-03T17:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA2521","office_name":"FA2521 45 CONS PK","naics":"541310","psc":"C219","set_aside":"8A","state":"FL","county":"12009","county_name":"Brevard County","city":"1255375","city_name":"Patrick AFB","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T07:05:05.540398Z"},{"key":"N6247026R0022","latest_notice_id":"e9f785e4103446a2af5d74da35cccc31","title":"INDEFINITE DELIVERY/ INDEFINITE QUANTITY (IDIQ) CONTRACT FOR ARCHITECT-ENGINEER (A-E) SERVICES FOR FACILITIES WITH SECURED SPACES LOCATED THROUGHOUT NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND AREA OF RESPONSIBILITY, WORLDWIDE","solicitation_number":"N6247026R0022","notice_type":"k","first_type":"r","first_posted":"2026-04-01","last_posted":"2026-11-19","notices":7,"due_at":"2026-12-10T19:00:00Z","due_date":"2026-12-10","closes_at":"2026-12-10T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N62470","office_name":"NAVFACSYSCOM ATLANTIC","naics":"541310","psc":"C211","set_aside":null,"state":"VA","county":"51710","county_name":"City of Norfolk","city":"5157000","city_name":"Norfolk","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"}],"similar_open_total":5,"indexable":false}