Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,667 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans

Sources sought

Central Monorail Hoist Commissioning

SS-368455-BF

Department of Energy, Fermilab - DOE Contractor. Overhead Traveling Crane, Hoist, and Monorail System Manufacturing.

Response deadline

May 30, 2025 at 7:00 PM EDT

Closed 546 days ago. Posted May 16, 2025. Scheduled to archive May 31, 2025.

Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities

This one closed in 2025

20 like it are open now in overhead traveling crane, hoist, and monorail system manufacturing

  • Hoist Blocks, Naval Base San Diego

    Department of the Navy, NAVSUP FLT Log CTR San Diego

    Sources soughtNAICS 333923Ship to San Diego, CAN0024427Q0010
    Due todayNov 27
  • BOOM EXTENSION,MIDDLE,

    Defense Logistics Agency, DLA Troop Support

    Combined synopsis and solicitationNAICS 333923Ship to the buyerSPE8EE27T0460
    Due tomorrowNov 27
  • HOIST,CHAIN

    Defense Logistics Agency, DLA Troop Support

    Combined synopsis and solicitationSmall businessNAICS 333923Ship to the buyerSPE8EE27T0457
    Due tomorrowNov 27

All 20 open in overhead traveling crane, hoist, and monorail system manufacturing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 333923 (overhead traveling crane, hoist, and monorail system manufacturing), means no more than 1,250 employees, counted with affiliates. What a set-aside is
What comes next
No solicitation was published under this number after the sources sought of May 16, 2025. An agency sometimes issues the solicitation under a new number.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

Project Background:

A global neutrino physics community is developing a leading-edge, dual-site experiment for neutrino science and proton decay studies, the Deep Underground Neutrino Experiment (DUNE), hosted by Fermi National Accelerator Laboratory (Fermilab) in Batavia, IL (the Near Site).

The facility required for this experiment, the Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment-US (LBNF/DUNE-US), is an internationally designed, coordinated, and funded program.  Once it is completed, it will comprise the world's highest-intensity neutrino beam, at Fermilab, and the infrastructure necessary to support massive, cryogenic detectors installed deep underground at the Sanford Underground Research Facility (SURF), 800 miles (1,300 km) downstream, in Lead, South Dakota (the Far Site).  The LBNF/DUNE-US Project is also responsible for the facilities to house the experiment's near detectors on the Fermilab site.

The LBNF/DUNE-US beamline will be built off Fermilab's existing Main Injector, extracting a proton beam from this source and using magnets to direct the proton beam toward the DUNE detectors.  Once the beam direction is established, the protons will smash into a target creating secondary particles, most of which decay into neutrinos in the decay pipe and continue traveling in the same direction.  An absorber will stop the leftover secondary particles, creating a very pure beam of neutrinos for the experiment.

More information may be found at https://lbnf.fnal.gov.   

Under contract to the U.S. Department of Energy (DOE), the Fermi Forward Discovery Group, LLC (FermiForward), is leading the Long-Baseline Neutrino Facility (LBNF) Project to enable a world-class program in neutrino physics.  Specifically, the LBNF Project (https://lbnf-dune.fnal.gov) provides the infrastructure for the Deep Underground Neutrino Experiment (DUNE), which will consist of two large liquid argon-based neutrino detectors located nearly a mile underground at the Sanford Underground Research Facility (SURF) in Lead, SD.

Description of Services Required:

The excavation of the caverns at LBNF has been completed.  A contractor has installed the central monorail beams in the North and South Caverns.  Due to discrepancy in specifications, the beams were not installed in compliance with CMAA guidelines for straightness.  Fermi Forward is seeking to engage from qualified crane and hoist contractors who are interested in performing the Central Monorail Hoist Installation Statement of Work (SOW).  The SOW requires modification, installation, and commissioning of the new hoists/trolley assembly on the existing beams in the North and South caverns.  Two 20-ton CMCO electric monorail hoist and trolley assemblies have been purchased and are currently warehoused in Omaha, NE.

This Sources Sought/Request for Information is to inform potential offerors of this opportunity and to build an interested supplier list for the purpose of direct solicitation once the associated Request for Proposal (RFP) is released.  The RFP is anticipated to be released by the end of May 2025.

FFDG intends to solicit for the Central Monorail and hoist installation  using the lowest price technically acceptable, and the result will be the award of one Subcontract. 

Anticipated Dates for Solicitation/Award:

Solicitation Posting: End of May 2025

Solicitation Period: 7 weeks

Award of Subcontract: September 1, 2025

Period of Performance: September 1, 2025, through December 31, 2025.

The dates and details specified in this notice are subject to change based on the final Request for Proposal document. 

Response:

Interested parties are requested to submit an Expression of Interest (EOI) to @fnal.gov   Submission of an EOI does not commit an interested party to submit a proposal, nor does failure to submit a response preclude an interested party from submitting a proposal. 

While there is no specific format required, EOI’s should include the following information: 

1.    Prospective offerors business name, including parent and member organizations 

2.    Point of contact, including a telephone number and an email address

3.    Brief description of your firm’s capabilities 

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 16, 2025

    Sources sought

    Due May 30, 2025 at 7:00 PM EDT. SAM.gov, notice eb9d72edb560494d84c4bb283cb1ddd7

    2 revisions on SAM
    • June 17, 2025: publish, solicitation
    • May 16, 2025: publish, sources sought

Points of contact