{"canonical":"https://sealedbidder.com/opportunities/ss25072r","key":"SS25072R","url":"https://sealedbidder.com/opportunities/ss25072r","title":"Acquisition of Water Management Plan (Storm Water Pollution Prevention)","solicitation_number":"SS-25-072R","notice_type":"r","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-11-12T21:00:00Z","first_posted":"2025-10-30","last_posted":"2025-10-30","department":"ENERGY, DEPARTMENT OF","subagency":"ENERGY, DEPARTMENT OF","office":"PRINCETON LAB - DOE CONTRACTOR","naics":"924110","psc":"F103","set_aside":"LAS","place_state":"NJ","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"2e7601a9bad7496aa8ad08d226235270","title":"Acquisition of Water Management Plan (Storm Water Pollution Prevention)","solicitation_number":"SS-25-072R","notice_type":"r","base_type":"r","posted":"2025-10-30","posted_at":"2025-10-30T19:28:07.957Z","due_at":"2025-11-12T21:00:00Z","due_date":"2025-11-12","cancelled":false,"archived":true,"archive_date":"2025-11-27","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2e7601a9bad7496aa8ad08d226235270/view","enriched":true,"history":[{"index":3,"title":"Acquisition of Water Management Plan (Storm Water Pollution Prevention)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-30T19:28:07.957Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"2e7601a9bad7496aa8ad08d226235270","solicitation_number":"SS-25-072R"}]}],"latest_notice_id":"2e7601a9bad7496aa8ad08d226235270","first_type":"r","notices":[{"dates":{"posted":"2025-10-30","posted_at":"2025-10-30T19:28:07.957Z","created_at":"2025-10-30T19:13:08.274Z","modified_at":"2025-11-28T04:55:45.718Z","response_deadline":{"raw":"2025-11-12T16:00:00-05:00","utc":"2025-11-12T21:00:00Z","date":"2025-11-12","time":"16:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2e7601a9bad7496aa8ad08d226235270/view"},"naics":{"codes":["924110"],"primary":"924110"},"title":"Acquisition of Water Management Plan (Storm Water Pollution Prevention)","agency":{"office":{"code":"899035","name":"PRINCETON LAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"08540","city":"Princeton","state":"NJ","country":"USA"},"organization_id":"500047668","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-11-27","archive_type":"auto15"},"history":[{"index":3,"title":"Acquisition of Water Management Plan (Storm Water Pollution Prevention)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-30T19:28:07.957Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"2e7601a9bad7496aa8ad08d226235270","solicitation_number":"SS-25-072R"}],"contacts":[{"name":"Jimmy Russell","role":"primary","email":"jrussell@pppl.gov","phone":"6092433963"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"2e7601a9bad7496aa8ad08d226235270","set_aside":{"code":"LAS","label":"Local Area Set-Aside (FAR 26.2)"},"lineage_id":"2e7601a9bad7496aa8ad08d226235270","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-24T02:38:54.878495971Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"dd40b31437d0e314628701251c8cf7db38d7060b5e1ffbc6b2ad37eb64ceb816","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-24T02:38:54.878495971Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>The Princeton Plasma Physics Laboratory is seeking qualified sources to<strong> draft and certify a SPCC Plan with SWPP and Legionella water management program addendums and provide certification of a permitted LSI through a Subcontractor in full<br />\ncompliance with US EPA regulations and all federal, state, local, and PPPL environmental rules IAW the attached Statement of Work</strong></p>\n\n<p><strong>Sevices shall include the following tasks:</strong></p>\n\n<p>Task 1: Site Visits and Inspections<br />\nTo satisfy the USEPA planning requirements, Subcontractor will<br />\nconduct one site visit at the facility. The site visit will be conducted to<br />\nkick off the project and accomplish the following tasks:<br />\n Consult with PPPL personnel to make sure the information<br />\ncontained within the current plans coincides with the actual<br />\noperations at the facility;<br />\n Gather information on any changes or facility upgrades that have<br />\noccurred at the site since the last update of the plans;<br />\n Discuss the existing plans and policies;<br />\n Discuss the new format of the plan and focus on potential<br />\nadditions and/or removal of information;<br />\n Review and mark-up the existing facility drawings/diagrams; and<br />\n Conduct a site walk.<br />\nb. Task 2: Plan Preparation<br />\n Using the information gathered during the site visit, Subcontractor<br />\nwill update the SPCC Plan with good engineering practices. The<br />\nplan will include information for SWPP and Legionella water<br />\nmanagement program addendums.<br />\n The cost of this scope assumes that one site visit will be required<br />\nand that information from PPPL is provided in a timely fashion.<br />\nShould additional technical changes occur at the site during the<br />\npreparation of the plan, Subcontractor may need to conduct<br />\nadditional on-site visits for verification of the change(s) and would<br />\nprepare a separate cost estimate to incorporate the site visit(s).<br />\n Subcontractor will professionally certify the combined plan that<br />\nsatisfies requirements and guidelines per USEPA 40 CFR 112.<br />\n After PPPL&rsquo;s review and after Subcontractor incorporates<br />\npertinent modifications or changes, Subcontractor will provide two<br />\nhard copies of the certified Plan. An electronic version of the final<br />\ndocument will also be provided in PDF format for PPPL&rsquo;s records.<br />\n Upon notification from PPPL of significant site changes affecting<br />\nthe Plan, Subcontractor will review and revise the document(s), as<br />\nnecessary. This may include portions of Tasks 1 and 2.<br />\nc. Task 3 Training<br />\n Subcontractor will identify groups to be trained.<br />\n Generate and tailor training materials for each group.<br />\n After PPPL&rsquo;s review and after Subcontractor incorporates<br />\npertinent modifications or changes Subcontractor will deliver<br />\nfinalized training materials.<br />\n Subcontractor will review and revise the training materials upon<br />\nany changes to the Plan, as necessary.<br />\nd. Task 4 LSI Certification<br />\nSubcontractor will conduct an inspection, repair, integrity test, and PE<br />\ncertification of PPPL&rsquo;s LSI in conformance with the following<br />\nrequirements:<br />\n Inspection: Identify all rips, torn seams, and any punctures.<br />\nPPL-PD-SERV-SOW; REV 0 (3/2017) Page 5<br />\n Repair: Any rips, tears, or punctures must be repaired using a<br />\nmanufacturer-recommended method that is agreed upon between<br />\nthe PE and repair technician or similar manufacturerrecommended<br />\nmethod with the same or similar material as the<br />\nexisting liner.<br />\n Liner integrity test: Subcontractor will need to complete a liner<br />\nintegrity test upon completion of the repairs. The integrity test will<br />\nadhere to ASTM Standard Test Method D 6392 standard, or a<br />\nsimilar manufacturer-recommended method.<br />\n Certification: Subcontractor&rsquo;s PE will need to certify the patches<br />\nwere applied correctly and the liner integrity test passed.</p>\n\n<p>This is a local area set-aside for firms physically located within 60 miles of Princeton , NJ</p>\n\n<p></p>","text":"The Princeton Plasma Physics Laboratory is seeking qualified sources to draft and certify a SPCC Plan with SWPP and Legionella water management program addendums and provide certification of a permitted LSI through a Subcontractor in full\n\ncompliance with US EPA regulations and all federal, state, local, and PPPL environmental rules IAW the attached Statement of Work\n\nSevices shall include the following tasks:\n\nTask 1: Site Visits and Inspections\n\nTo satisfy the USEPA planning requirements, Subcontractor will\n\nconduct one site visit at the facility. The site visit will be conducted to\n\nkick off the project and accomplish the following tasks:\n\n Consult with PPPL personnel to make sure the information\n\ncontained within the current plans coincides with the actual\n\noperations at the facility;\n\n Gather information on any changes or facility upgrades that have\n\noccurred at the site since the last update of the plans;\n\n Discuss the existing plans and policies;\n\n Discuss the new format of the plan and focus on potential\n\nadditions and/or removal of information;\n\n Review and mark-up the existing facility drawings/diagrams; and\n\n Conduct a site walk.\n\nb. Task 2: Plan Preparation\n\n Using the information gathered during the site visit, Subcontractor\n\nwill update the SPCC Plan with good engineering practices. The\n\nplan will include information for SWPP and Legionella water\n\nmanagement program addendums.\n\n The cost of this scope assumes that one site visit will be required\n\nand that information from PPPL is provided in a timely fashion.\n\nShould additional technical changes occur at the site during the\n\npreparation of the plan, Subcontractor may need to conduct\n\nadditional on-site visits for verification of the change(s) and would\n\nprepare a separate cost estimate to incorporate the site visit(s).\n\n Subcontractor will professionally certify the combined plan that\n\nsatisfies requirements and guidelines per USEPA 40 CFR 112.\n\n After PPPL’s review and after Subcontractor incorporates\n\npertinent modifications or changes, Subcontractor will provide two\n\nhard copies of the certified Plan. An electronic version of the final\n\ndocument will also be provided in PDF format for PPPL’s records.\n\n Upon notification from PPPL of significant site changes affecting\n\nthe Plan, Subcontractor will review and revise the document(s), as\n\nnecessary. This may include portions of Tasks 1 and 2.\n\nc. Task 3 Training\n\n Subcontractor will identify groups to be trained.\n\n Generate and tailor training materials for each group.\n\n After PPPL’s review and after Subcontractor incorporates\n\npertinent modifications or changes Subcontractor will deliver\n\nfinalized training materials.\n\n Subcontractor will review and revise the training materials upon\n\nany changes to the Plan, as necessary.\n\nd. Task 4 LSI Certification\n\nSubcontractor will conduct an inspection, repair, integrity test, and PE\n\ncertification of PPPL’s LSI in conformance with the following\n\nrequirements:\n\n Inspection: Identify all rips, torn seams, and any punctures.\n\nPPL-PD-SERV-SOW; REV 0 (3/2017) Page 5\n\n Repair: Any rips, tears, or punctures must be repaired using a\n\nmanufacturer-recommended method that is agreed upon between\n\nthe PE and repair technician or similar manufacturerrecommended\n\nmethod with the same or similar material as the\n\nexisting liner.\n\n Liner integrity test: Subcontractor will need to complete a liner\n\nintegrity test upon completion of the repairs. The integrity test will\n\nadhere to ASTM Standard Test Method D 6392 standard, or a\n\nsimilar manufacturer-recommended method.\n\n Certification: Subcontractor’s PE will need to certify the patches\n\nwere applied correctly and the liner integrity test passed.\n\nThis is a local area set-aside for firms physically located within 60 miles of Princeton , NJ","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"SS-25-072R","place_of_performance":{"zip":"08543","state":{"code":"NJ","name":"New Jersey"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"F103"}],"due_at":"2025-11-12T21:00:00Z","due_date":"2025-11-12","closes_at":"2025-11-12T21:00:00Z","awardable":true,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899035","office_name":"PRINCETON LAB - DOE CONTRACTOR","state":"NJ","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-24T02:54:43.418465Z","principal_notice_id":"2e7601a9bad7496aa8ad08d226235270","description":{"text":"The Princeton Plasma Physics Laboratory is seeking qualified sources to draft and certify a SPCC Plan with SWPP and Legionella water management program addendums and provide certification of a permitted LSI through a Subcontractor in full\n\ncompliance with US EPA regulations and all federal, state, local, and PPPL environmental rules IAW the attached Statement of Work\n\nSevices shall include the following tasks:\n\nTask 1: Site Visits and Inspections\n\nTo satisfy the USEPA planning requirements, Subcontractor will\n\nconduct one site visit at the facility. The site visit will be conducted to\n\nkick off the project and accomplish the following tasks:\n\n Consult with PPPL personnel to make sure the information\n\ncontained within the current plans coincides with the actual\n\noperations at the facility;\n\n Gather information on any changes or facility upgrades that have\n\noccurred at the site since the last update of the plans;\n\n Discuss the existing plans and policies;\n\n Discuss the new format of the plan and focus on potential\n\nadditions and/or removal of information;\n\n Review and mark-up the existing facility drawings/diagrams; and\n\n Conduct a site walk.\n\nb. Task 2: Plan Preparation\n\n Using the information gathered during the site visit, Subcontractor\n\nwill update the SPCC Plan with good engineering practices. The\n\nplan will include information for SWPP and Legionella water\n\nmanagement program addendums.\n\n The cost of this scope assumes that one site visit will be required\n\nand that information from PPPL is provided in a timely fashion.\n\nShould additional technical changes occur at the site during the\n\npreparation of the plan, Subcontractor may need to conduct\n\nadditional on-site visits for verification of the change(s) and would\n\nprepare a separate cost estimate to incorporate the site visit(s).\n\n Subcontractor will professionally certify the combined plan that\n\nsatisfies requirements and guidelines per USEPA 40 CFR 112.\n\n After PPPL’s review and after Subcontractor incorporates\n\npertinent modifications or changes, Subcontractor will provide two\n\nhard copies of the certified Plan. An electronic version of the final\n\ndocument will also be provided in PDF format for PPPL’s records.\n\n Upon notification from PPPL of significant site changes affecting\n\nthe Plan, Subcontractor will review and revise the document(s), as\n\nnecessary. This may include portions of Tasks 1 and 2.\n\nc. Task 3 Training\n\n Subcontractor will identify groups to be trained.\n\n Generate and tailor training materials for each group.\n\n After PPPL’s review and after Subcontractor incorporates\n\npertinent modifications or changes Subcontractor will deliver\n\nfinalized training materials.\n\n Subcontractor will review and revise the training materials upon\n\nany changes to the Plan, as necessary.\n\nd. Task 4 LSI Certification\n\nSubcontractor will conduct an inspection, repair, integrity test, and PE\n\ncertification of PPPL’s LSI in conformance with the following\n\nrequirements:\n\n Inspection: Identify all rips, torn seams, and any punctures.\n\nPPL-PD-SERV-SOW; REV 0 (3/2017) Page 5\n\n Repair: Any rips, tears, or punctures must be repaired using a\n\nmanufacturer-recommended method that is agreed upon between\n\nthe PE and repair technician or similar manufacturerrecommended\n\nmethod with the same or similar material as the\n\nexisting liner.\n\n Liner integrity test: Subcontractor will need to complete a liner\n\nintegrity test upon completion of the repairs. The integrity test will\n\nadhere to ASTM Standard Test Method D 6392 standard, or a\n\nsimilar manufacturer-recommended method.\n\n Certification: Subcontractor’s PE will need to certify the patches\n\nwere applied correctly and the liner integrity test passed.\n\nThis is a local area set-aside for firms physically located within 60 miles of Princeton , NJ","html":"<p>The Princeton Plasma Physics Laboratory is seeking qualified sources to<strong> draft and certify a SPCC Plan with SWPP and Legionella water management program addendums and provide certification of a permitted LSI through a Subcontractor in full<br />\ncompliance with US EPA regulations and all federal, state, local, and PPPL environmental rules IAW the attached Statement of Work</strong></p>\n\n<p><strong>Sevices shall include the following tasks:</strong></p>\n\n<p>Task 1: Site Visits and Inspections<br />\nTo satisfy the USEPA planning requirements, Subcontractor will<br />\nconduct one site visit at the facility. The site visit will be conducted to<br />\nkick off the project and accomplish the following tasks:<br />\n Consult with PPPL personnel to make sure the information<br />\ncontained within the current plans coincides with the actual<br />\noperations at the facility;<br />\n Gather information on any changes or facility upgrades that have<br />\noccurred at the site since the last update of the plans;<br />\n Discuss the existing plans and policies;<br />\n Discuss the new format of the plan and focus on potential<br />\nadditions and/or removal of information;<br />\n Review and mark-up the existing facility drawings/diagrams; and<br />\n Conduct a site walk.<br />\nb. Task 2: Plan Preparation<br />\n Using the information gathered during the site visit, Subcontractor<br />\nwill update the SPCC Plan with good engineering practices. The<br />\nplan will include information for SWPP and Legionella water<br />\nmanagement program addendums.<br />\n The cost of this scope assumes that one site visit will be required<br />\nand that information from PPPL is provided in a timely fashion.<br />\nShould additional technical changes occur at the site during the<br />\npreparation of the plan, Subcontractor may need to conduct<br />\nadditional on-site visits for verification of the change(s) and would<br />\nprepare a separate cost estimate to incorporate the site visit(s).<br />\n Subcontractor will professionally certify the combined plan that<br />\nsatisfies requirements and guidelines per USEPA 40 CFR 112.<br />\n After PPPL&rsquo;s review and after Subcontractor incorporates<br />\npertinent modifications or changes, Subcontractor will provide two<br />\nhard copies of the certified Plan. An electronic version of the final<br />\ndocument will also be provided in PDF format for PPPL&rsquo;s records.<br />\n Upon notification from PPPL of significant site changes affecting<br />\nthe Plan, Subcontractor will review and revise the document(s), as<br />\nnecessary. This may include portions of Tasks 1 and 2.<br />\nc. Task 3 Training<br />\n Subcontractor will identify groups to be trained.<br />\n Generate and tailor training materials for each group.<br />\n After PPPL&rsquo;s review and after Subcontractor incorporates<br />\npertinent modifications or changes Subcontractor will deliver<br />\nfinalized training materials.<br />\n Subcontractor will review and revise the training materials upon<br />\nany changes to the Plan, as necessary.<br />\nd. Task 4 LSI Certification<br />\nSubcontractor will conduct an inspection, repair, integrity test, and PE<br />\ncertification of PPPL&rsquo;s LSI in conformance with the following<br />\nrequirements:<br />\n Inspection: Identify all rips, torn seams, and any punctures.<br />\nPPL-PD-SERV-SOW; REV 0 (3/2017) Page 5<br />\n Repair: Any rips, tears, or punctures must be repaired using a<br />\nmanufacturer-recommended method that is agreed upon between<br />\nthe PE and repair technician or similar manufacturerrecommended<br />\nmethod with the same or similar material as the<br />\nexisting liner.<br />\n Liner integrity test: Subcontractor will need to complete a liner<br />\nintegrity test upon completion of the repairs. The integrity test will<br />\nadhere to ASTM Standard Test Method D 6392 standard, or a<br />\nsimilar manufacturer-recommended method.<br />\n Certification: Subcontractor&rsquo;s PE will need to certify the patches<br />\nwere applied correctly and the liner integrity test passed.</p>\n\n<p>This is a local area set-aside for firms physically located within 60 miles of Princeton , NJ</p>\n\n<p></p>","origin":"detail"},"contacts":[{"name":"Jimmy Russell","role":"primary","email":"jrussell@pppl.gov","phone":"6092433963"}],"place_of_performance":{"zip":"08543","state":{"code":"NJ","name":"New Jersey"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"08540","city":"Princeton","state":"NJ","country":"USA"},"naics_codes":["924110"],"award":null,"attachments":[{"resource_id":"d605c876c67046ab8cdf2b7707e89655","name":"SOW Water Management_091125 (1) (4).pdf","kind":"file","mime_type":".pdf","size_bytes":276474,"posted_at":"2025-10-30T19:28:07.957Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d605c876c67046ab8cdf2b7707e89655/download","mirrored":false}],"awards":[],"related":[{"key":"RFP27005JR","latest_notice_id":"91e1a83848304f2d84cfe6e95588d9e6","title":"RF Roof Replacement Project","solicitation_number":"RFP27-005JR","notice_type":"k","first_type":"k","first_posted":"2026-10-30","last_posted":"2026-11-09","notices":6,"due_at":"2026-12-10T21:00:00Z","due_date":"2026-12-10","closes_at":"2026-12-10T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899035","office_name":"PRINCETON LAB - DOE CONTRACTOR","naics":"238160","psc":"Y1EZ","set_aside":null,"state":"NJ","county":"34021","county_name":"Mercer County","city":"3460900","city_name":"Princeton","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-10T04:49:28.155858Z"}],"similar_open":[],"similar_open_total":0,"indexable":false}