Sources sought, total small business set-aside
Campus and Leased Facilities Patching, Painting and Drywall Restoration Services
SS-2025-25771
Department of Energy, Alliance for Energy Innovation, LLC - DOE Contractor. Painting and Wall Covering Contractors.
Response deadline
July 25, 2025 at 6:00 PM EDT
Closed 489 days ago. Posted July 2, 2025. Scheduled to archive August 9, 2025.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2025
2 like it are open now in painting and wall covering contractors
- Pittsburgh, PA Window Film, Interior Painting, and
National Oceanic and Atmospheric Administration, Department of Commerce NOAA
Combined synopsis and solicitationSmall businessNAICS 238320Pennsylvania1305M327Q0061Closes in 18 daysDec 14 - Tohaali School REPAINT EXTERIOR WALLS BLDG. 102
Bureau of Indian Affairs, Indian Education Acquisition Office
Combined synopsis and solicitationIndian small businessNAICS 238320Location not published140A2327Q0319Closes in 19 daysDec 15
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 238320 (painting and wall covering contractors), means no more than $19 million in average annual receipts, counted with affiliates. Open Small business opportunities
- What comes next
- No solicitation was published under this number after the sources sought of July 2, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The Subcontractor shall prepare surfaces for patching and painting in accordance with industry standards. This shall include, but is not limited to: inspecting and approving surfaces prior to paint, patch or repair, wall prep for all areas to be included along with surface protection at carpet, base, grid, cubicles, and frame; prescribe a methodology for measuring surfaces for the purposes of estimating and submitting proposals for painting and repairs.
Fire barriers are a critical component of a building’s passive fire protection strategy and may be included in the building construction for various reasons. To maintain the required fire-rated separation between occupancies or areas, damaged systems must be repaired so that they are restored to their original fire-resistive condition.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Patch and Paint_SSN-2025-25771.pdf283 KB, July 2, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 2, 2025
Sources sought
Due July 25, 2025 at 6:00 PM EDT. SAM.gov, notice b93dca7d688a4be093e44e402eb1d22f
1 revision on SAM
- July 2, 2025: publish, sources sought
Points of contact
- Andrew Jacksonandrew.jackson@nrel.gov3036305398