{"canonical":"https://sealedbidder.com/opportunities/sprpa127rya42","key":"SPRPA127RYA42","url":"https://sealedbidder.com/opportunities/sprpa127rya42","title":"48--VALVE ASSEMBLY,MANI","solicitation_number":"SPRPA127RYA42","notice_type":"o","open":true,"removed":false,"removed_at":null,"response_deadline":"2026-12-10T18:00:00Z","first_posted":"2026-10-25","last_posted":"2026-11-17","department":"DEPT OF DEFENSE","subagency":"DEFENSE LOGISTICS AGENCY","office":"DLA AVIATION AT PHILADELPHIA, PA","naics":"332919","psc":"4820","set_aside":null,"place_state":null,"place_scope":"nationwide","site":null,"place_state_source":null,"place_evidence":"Product purchase (PSC 4820)","place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"f19d45aa53024f7380f0a87207209985","title":"48--VALVE ASSEMBLY,MANI","solicitation_number":"SPRPA127RYA42","notice_type":"p","base_type":"p","posted":"2026-10-25","posted_at":"2026-10-25T11:58:42.316Z","due_at":"2026-12-09T04:00:00Z","due_date":"2026-12-09","cancelled":false,"archived":false,"archive_date":"2026-12-24","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f19d45aa53024f7380f0a87207209985/view","enriched":true,"history":[{"index":1,"title":"48--VALVE ASSEMBLY,MANI","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-25T11:58:42.316Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"f19d45aa53024f7380f0a87207209985","solicitation_number":"SPRPA127RYA42"}]},{"notice_id":"31879a03706c4e8d96cf27289230cd6a","title":"48--VALVE ASSEMBLY,MANI","solicitation_number":"SPRPA127RYA42","notice_type":"o","base_type":"o","posted":"2026-11-10","posted_at":"2026-11-10T12:22:42.251Z","due_at":"2026-12-10T18:00:00Z","due_date":"2026-12-10","cancelled":false,"archived":false,"archive_date":"2026-12-25","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/31879a03706c4e8d96cf27289230cd6a/view","enriched":true,"history":[{"index":1,"title":"48--VALVE ASSEMBLY,MANI","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-10T12:22:42.251Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"31879a03706c4e8d96cf27289230cd6a","solicitation_number":"SPRPA127RYA42"}]},{"notice_id":"9e4c131784664bd6a2c6e3a772fc75a6","title":"48--VALVE ASSEMBLY,MANI","solicitation_number":"SPRPA127RYA42","notice_type":"o","base_type":"o","posted":"2026-11-16","posted_at":"2026-11-16T14:04:43.467Z","due_at":"2026-12-10T19:00:00Z","due_date":"2026-12-10","cancelled":false,"archived":false,"archive_date":"2026-12-25","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/9e4c131784664bd6a2c6e3a772fc75a6/view","enriched":true,"history":[{"index":2,"title":"48--VALVE ASSEMBLY,MANI","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-16T14:04:43.467Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9e4c131784664bd6a2c6e3a772fc75a6","solicitation_number":"SPRPA127RYA42","parent_opportunity_id":"31879a03706c4e8d96cf27289230cd6a"},{"index":1,"title":"48--VALVE ASSEMBLY,MANI","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-10T12:22:42.251Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"31879a03706c4e8d96cf27289230cd6a","solicitation_number":"SPRPA127RYA42"}]},{"notice_id":"7e759b623cad4445b2f6b4fd2a4ee3b3","title":"48--VALVE ASSEMBLY,MANI","solicitation_number":"SPRPA127RYA42","notice_type":"o","base_type":"o","posted":"2026-11-17","posted_at":"2026-11-17T12:24:04.457Z","due_at":"2026-12-10T18:00:00Z","due_date":"2026-12-10","cancelled":false,"archived":false,"archive_date":"2026-12-25","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/7e759b623cad4445b2f6b4fd2a4ee3b3/view","enriched":true,"history":[{"index":3,"title":"48--VALVE ASSEMBLY,MANI","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-17T12:24:04.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e759b623cad4445b2f6b4fd2a4ee3b3","solicitation_number":"SPRPA127RYA42","parent_opportunity_id":"31879a03706c4e8d96cf27289230cd6a"},{"index":2,"title":"48--VALVE ASSEMBLY,MANI","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-16T14:04:43.467Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9e4c131784664bd6a2c6e3a772fc75a6","solicitation_number":"SPRPA127RYA42","parent_opportunity_id":"31879a03706c4e8d96cf27289230cd6a"},{"index":1,"title":"48--VALVE ASSEMBLY,MANI","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-10T12:22:42.251Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"31879a03706c4e8d96cf27289230cd6a","solicitation_number":"SPRPA127RYA42"}]}],"latest_notice_id":"7e759b623cad4445b2f6b4fd2a4ee3b3","first_type":"p","notices":[{"dates":{"posted":"2026-10-25","posted_at":"2026-10-25T11:58:42.316Z","created_at":"2026-10-25T11:58:42.269Z","modified_at":"2026-10-25T11:58:42.316Z","response_deadline":{"raw":"2026-12-09T00:00:00-04:00","utc":"2026-12-09T04:00:00Z","date":"2026-12-09","time":"00:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f19d45aa53024f7380f0a87207209985/view"},"naics":{},"title":"48--VALVE ASSEMBLY,MANI","agency":{"office":{"code":"SPRPA1","name":"DLA AVIATION AT PHILADELPHIA, PA"},"subtier":{"code":"97AS","name":"DEFENSE LOGISTICS AGENCY"},"department":{"code":"097","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19111-5098","city":"PHILADELPHIA","state":"PA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-12-24","archive_type":"auto_custom"},"history":[{"index":1,"title":"48--VALVE ASSEMBLY,MANI","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-25T11:58:42.316Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"f19d45aa53024f7380f0a87207209985","solicitation_number":"SPRPA127RYA42"}],"contacts":[{"name":"THOMAS KUHNLE, APBB.15, PHONE (215)737-4024, FAX (215)737-7149, EMAIL THOMAS.KUHNLE@DLA.MIL","role":"primary","email":"THOMAS.KUHNLE@DLA.MIL"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"f19d45aa53024f7380f0a87207209985","lineage_id":"f19d45aa53024f7380f0a87207209985","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-26T04:40:58.326743741Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"b94de9b6046827e57b66174ae67794eeaf1b21600d924434477ef41b3e7b0a15","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-10-26T04:13:21.740567849Z"},"description":{"html":"NSN 7R-4820-013726151-EY, TDP VER 009, QTY 30 EA, DELIVERY FOB ORIGIN. This is a NEW SPARES requirement. No drawings are available for this requirement. This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing uniquedesign capability, engineering skills, and manufacturing/repair knowledge by the qualified source(s) require acquisition/repair of the part from the approved source(s). The approved source(s) retain data rights,manufacturing/repair knowledge, or technical data that are not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part. An alternate source must qualify in accordance with the design control activity's procedures, as approved by the cognizant Government engineering activity. The qualification procedures must be approved by the Government engineering activity having jurisdiction over the part in the intended application. The subject item requires Government source approval prior to contract award, as the item is flight critical and/or the technical data available has not been determined adequate to support acquisition via full and open competition. Only the source(s) previously approved by the Government for this item have been solicited. The time required for approval of a new source is normally such that an award cannot be delayed pending approval of a new source. If you are not an approved source you must submit, together with your proposal, the information detailed in one of the NAVSUP Weapon Systems Support (NAVSUP WSS)Source Approval Information Brochures listed below. Spares: https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Sup port/Business-Opps/ Repair: https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP -Weapon-Systems-Support/Business-Opps/ technical data required to be submitted based on your company's experience in production of the same or similar item, or if this is an item you have never made. If your request for source approval is currently being evaluated at NAVSUP WSS submit with your offer a copy of the cover letter which forwarded your request for source approval. Offers received which fail to provide all data required by the Source Approval Brochure or document previous submission of all data required by the Source Approval Brochure will not be considered for award under this solicitation. Please note, if evaluation of a source approval request submitted hereunder cannot be processed in time and/or approval requirements preclude the ability to obtain subject items in time to meet Government requirements, award of the subject requirement may continue based on Fleet support needs. The NAVSUP WSS Commercial Item Identification Brochure is now available at: \"https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Bus iness-Opps/\"Interested parties may obtain copies of Military and Federal Specificationsand Standards, Qualified Products Lists (QPLs), Qualified Product Databases(QPDs), Military Handbooks, and other standardized documents from the DoDSingle Stock Point (DODSSP) at Document Automation and Production Service(DAPS) in Philadelphia, PA. NOTE: Patterns, Drawings, Deviation Lists, Purchase Descriptions, etc. are NOT stocked at DODSSP. Most documents are available in Adobe PDF format from ASSIST-Online at: http://quicksearch.dla.mil/. Users may use ASSIST-Quick Search to search for and download available documents directly using standard browser software. Documents that are not available for downloading from ASSIST-Quick Search can be ordered from the DODSSP website using the ASSIST Shopping Wizard after obtaining a DODSSP Customer Account by following the registration procedures. Users who do not have access to the internet may contact the DODSSP ASSISTHelp Desk at 215-697-2667 or 215-697-2179 (DSN: 442-2667), or mail their request to DLADocument Services, Bldg. 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094.The proposed contract action is for supplies or services for which theGovernment intends to solicit and negotiate with only one source under the authority of FAR 6.302-1. All responsible sources may identify their interest and capability to respond to the requirement or submit proposals, quotationsor capability statements. This notice of intent is not a request forcompetitive proposals. However, all proposals received within 45 days (30days if award is issued under an existing Basic Ordering Agreement (BOA) afterdate of publication of this synopsis will be considered by the Government. A determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement.Based upon market research, the Government is not using the policies containedin FAR Part 12, Acquisition of Commercial Items, in its solicitation for thedescribed supplies or services. However, interested persons may identify tothe contracting officer their interest and capability to satisfy theGovernment's requirement with a commercial item within 15 days of this notice.","text":"NSN 7R-4820-013726151-EY, TDP VER 009, QTY 30 EA, DELIVERY FOB ORIGIN. This is a NEW SPARES requirement. No drawings are available for this requirement. This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing uniquedesign capability, engineering skills, and manufacturing/repair knowledge by the qualified source(s) require acquisition/repair of the part from the approved source(s). The approved source(s) retain data rights,manufacturing/repair knowledge, or technical data that are not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part. An alternate source must qualify in accordance with the design control activity's procedures, as approved by the cognizant Government engineering activity. The qualification procedures must be approved by the Government engineering activity having jurisdiction over the part in the intended application. The subject item requires Government source approval prior to contract award, as the item is flight critical and/or the technical data available has not been determined adequate to support acquisition via full and open competition. Only the source(s) previously approved by the Government for this item have been solicited. The time required for approval of a new source is normally such that an award cannot be delayed pending approval of a new source. If you are not an approved source you must submit, together with your proposal, the information detailed in one of the NAVSUP Weapon Systems Support (NAVSUP WSS)Source Approval Information Brochures listed below. Spares: https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Sup port/Business-Opps/ Repair: https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP -Weapon-Systems-Support/Business-Opps/ technical data required to be submitted based on your company's experience in production of the same or similar item, or if this is an item you have never made. If your request for source approval is currently being evaluated at NAVSUP WSS submit with your offer a copy of the cover letter which forwarded your request for source approval. Offers received which fail to provide all data required by the Source Approval Brochure or document previous submission of all data required by the Source Approval Brochure will not be considered for award under this solicitation. Please note, if evaluation of a source approval request submitted hereunder cannot be processed in time and/or approval requirements preclude the ability to obtain subject items in time to meet Government requirements, award of the subject requirement may continue based on Fleet support needs. The NAVSUP WSS Commercial Item Identification Brochure is now available at: \"https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Bus iness-Opps/\"Interested parties may obtain copies of Military and Federal Specificationsand Standards, Qualified Products Lists (QPLs), Qualified Product Databases(QPDs), Military Handbooks, and other standardized documents from the DoDSingle Stock Point (DODSSP) at Document Automation and Production Service(DAPS) in Philadelphia, PA. NOTE: Patterns, Drawings, Deviation Lists, Purchase Descriptions, etc. are NOT stocked at DODSSP. Most documents are available in Adobe PDF format from ASSIST-Online at: http://quicksearch.dla.mil/. Users may use ASSIST-Quick Search to search for and download available documents directly using standard browser software. Documents that are not available for downloading from ASSIST-Quick Search can be ordered from the DODSSP website using the ASSIST Shopping Wizard after obtaining a DODSSP Customer Account by following the registration procedures. Users who do not have access to the internet may contact the DODSSP ASSISTHelp Desk at 215-697-2667 or 215-697-2179 (DSN: 442-2667), or mail their request to DLADocument Services, Bldg. 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094.The proposed contract action is for supplies or services for which theGovernment intends to solicit and negotiate with only one source under the authority of FAR 6.302-1. All responsible sources may identify their interest and capability to respond to the requirement or submit proposals, quotationsor capability statements. This notice of intent is not a request forcompetitive proposals. However, all proposals received within 45 days (30days if award is issued under an existing Basic Ordering Agreement (BOA) afterdate of publication of this synopsis will be considered by the Government. A determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement.Based upon market research, the Government is not using the policies containedin FAR Part 12, Acquisition of Commercial Items, in its solicitation for thedescribed supplies or services. However, interested persons may identify tothe contracting officer their interest and capability to satisfy theGovernment's requirement with a commercial item within 15 days of this notice.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"SPRPA127RYA42","product_service_code":"4820"},{"dates":{"posted":"2026-11-10","posted_at":"2026-11-10T12:22:42.251Z","created_at":"2026-11-10T12:22:42.203Z","modified_at":"2026-11-10T12:22:42.251Z","response_deadline":{"raw":"2026-12-10T14:00:00-04:00","utc":"2026-12-10T18:00:00Z","date":"2026-12-10","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/31879a03706c4e8d96cf27289230cd6a/view"},"naics":{"codes":["332919"],"primary":"332919"},"title":"48--VALVE ASSEMBLY,MANI","agency":{"office":{"code":"SPRPA1","name":"DLA AVIATION AT PHILADELPHIA, PA"},"subtier":{"code":"97AS","name":"DEFENSE LOGISTICS AGENCY"},"department":{"code":"097","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19111-5098","city":"PHILADELPHIA","state":"PA","country":"USA"},"organization_id":"500044424","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-12-25","archive_type":"auto15"},"history":[{"index":1,"title":"48--VALVE ASSEMBLY,MANI","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-10T12:22:42.251Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"31879a03706c4e8d96cf27289230cd6a","solicitation_number":"SPRPA127RYA42"}],"contacts":[{"name":"Telephone: 2157374024","role":"primary","email":"THOMAS.KUHNLE@DLA.MIL"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"31879a03706c4e8d96cf27289230cd6a","lineage_id":"31879a03706c4e8d96cf27289230cd6a","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-12T07:44:58.878939852Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"0257206118ebe9482b80da2b24f1e441-27\"","fetched_at":"2026-11-11T04:50:18.941800608Z","row_sha256":"e8614ed8d925d5ca82da2c05d6ad7c01367b6bf306bcc617f8b7a39c463c758a","last_modified":"2026-11-11T04:30:18Z"},"updated_at":"2026-11-12T07:44:58.878939852Z","first_seen_at":"2026-11-11T04:50:18.941800608Z"},"description":{"html":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rINSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|ISO 9001 or its equivalent||||||||\rSTOP-WORK ORDER (AUG 1989)|1||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|SPRPA1|TBD|TBD|SEE SCHEDULE|TBD||||||||N/A|\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||\rMANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|robyn.grinarml@dla.mil|\rVALUE ENGINEERING (JUN 2020)|3||||\rINTEGRITY OF UNIT PRICES (NOV 2021)|1||\rEQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4|||||\rWARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS AFTER THE DATE OF THE LAST DELIVERY UNDER THIS CONTRACT,|45 DAYS AFTER DISCOVERY OF ANY DEFECT OR NONCONFORMANCE,|||||\rSMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4|||||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4|||||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rFIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10|||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rWARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2|||\rLIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1||\rESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1||\rREQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA --MODIFICATIONS (DEV 2026-O0048)(MAR 2026))|7||||||||\rFEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-PROHIBITION (DEC 2023)|12|||||||||||||\rSECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||\rROYALTY INFORMATION (APR 1984)|1||\rCOST ACCOUNTING STANDARD NOTICES AND CERTIFICATION (DEV 2026-O0006)(FEB 2026)|1||\rREQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)|1|Submit .pdf proposal and all supporting data by email.|\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|\rONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1||\rEVALUATION OF FIRST ARTICLE TESTING|3||||\rThis is a NEW SPARES requirement.\rNo drawings are available for this requirement.\rNOTE: N23 APPROVED WAIVER ESRS CASE# N-KE-26-2000626 dtd 27JUL2026 APPLIES\rNOTE: FAR 52.246-17 Warranty of Supplies of a Noncomplex Nature, is included by full text within this solicitation:\r1. Warranty Obligation: Notwithstanding any prior First Article Testing (FAT) or Production Lot Testing (PLT), the contractor warrants that all supplies delivered under this contract will be free from defects in material, workmanship, and design, and will conform\rto all contract requirements after delivery.\r2. Proposal Requirement: If the offeror takes exception to, or does not explicitly comply with these warranty terms, the offeror must propose an alternate warranty within their submission.\r3. Consequence of Non-Compliance: Failure to explicitly agree to these terms or to propose an acceptable alternate warranty may result in the proposal being deemed technically unacceptable and excluded from evaluation.\rNotice to Distributors/Offerors: Consideration for award shall be given only to authorized distributors of the Original Equipment Manufacturer (OEM). If quoting as a distributor, the offeror MUST submit an unredacted OEM Distributor Letter explicitly authorizing\rresale of this Part Number at the exact time of proposal submission. Failure to provide this documentation with the initial offer will result in the quote being determined non-responsive and excluded from evaluation.\rFor Critical Safety Items (CSI), DFARS clause 252.209-7010, Identification of Critical Safety Items, is incorporated by reference.\rFor items for which Government inspection and acceptance will be conducted at the source, DLAD clause 52.246-9004, Product Verification Testing, is  incorporated by reference.  DLAD clauses can be viewed at http://www.dla.mil/Acquisition/Pages/DLAD.aspx.\rAs applicable, DFARS clause 252.242-7005, Contractor Business Systems, is incorporated by reference.\r\\\r1.  SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command.  Only those companies who have submitted requests for source approval and been approved\rwill be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the\rSF33 for name and code).  The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation:\r(A)  Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the\rsame materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval.\r(B)  Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches.  These plans must note those operations and processes performed by subcontractors/ vendors.\r(C)  Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service.  Provide the most recent copies of the documents.\r(D)  A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval.  This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings,\rforgings, etc.\r(E)  Copy of inspection method sheets used in the manufacturing and at final inspection.  These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics\rshould be discernible from all other characteristics.\rThe above requirements are a subset of requirements specified in the ASO\rSource Approval Information Brochure dated January 1995.  The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with\rMDA which includes availability of complete data, MRB disposition, etc.  Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval\rBrochure.\r1.4 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.5 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.6 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.8 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.9 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;6532E398-2; ) ;80020;      , Revision ;AE; and all details and specifications referenced therein.\r1.11  Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.12  If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r2.  APPLICABLE DOCUMENTS\rDRAWING DATA=523123                                  |80020| C|   |D|            |  |     |\rDRAWING DATA=523736                                  |80020| -|   |D|            |  |     |\rDRAWING DATA=6530C124                                |80020| J|   |D|            |  |     |\rDRAWING DATA=6532B401                                |80020| E|   |D|            |  |     |\rDRAWING DATA=6532B402                                |80020| E|   |D|            |  |     |\rDRAWING DATA=6532B408                                |80020| E|   |A|            |  |     |\rDRAWING DATA=6532B409                                |80020| D|   |D|            |  |     |\rDRAWING DATA=6532B412                                |80020| H|   |D|            |  |     |\rDRAWING DATA=6532B413                                |80020| D|   |D|            |  |     |\rDRAWING DATA=6532B430                                |80020| F|   |A|            |  |     |\rDRAWING DATA=6532B468                                |80020| F|   |D|            |  |     |\rDRAWING DATA=6532C405                                |80020| G|   |D|            |  |     |\rDRAWING DATA=6532C406                                |80020| E|   |D|            |  |     |\rDRAWING DATA=6532C407                                |80020| K|   |D|            |  |     |\rDRAWING DATA=6532D411                                |80020| K|   |A|            |  |     |\rDRAWING DATA=6532E398                                |80020|AE|   |D|            |  |     |\r3.  REQUIREMENTS - NOT APPLICABLE\r4.  QUALITY ASSURANCE\rQUALITY ASSURANCE REQUIREMENTS:\r1. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications:\ra. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%;\rb. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%;\rc. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4.\rd. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4.\r2. First Article Testing:\rThe contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the\rprovisions of the applicable Contract Data Requirements List (CDRL).\ra. Requirements:\r  i. First Article quantity is one (1); in uncoated condition.\r  ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel.\r  iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance;\r  iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report;\rv. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or surveys;\rany problems identified during the conduct of the test will also require correction.\rb. Testing and evaluation:\r  i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications.Results shall consist of actual\rdimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report.\rc. Acceptance/reject criteria:\ri. Satisfactorily meeting all requirements cited in the First Article Testing \"Requirements\" paragraph above and satisfactorily demonstrating 100% conformance to the test and evaluation elements cited in the First Article Testing \"Testing and evaluation\"\rparagraph above shall constitute acceptance of the First Article;\r  ii. Failure to meet any of the conditions in the First Article Testing \"Requirements\" paragraph above or the First Article Testing \"Testing and evaluation\" paragraph above shall be cause for rejection.\rd. Delivery:\r  i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming;\r  ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's.\r3. Production Lot Special Tests: N/A\r4. For purposes of this TDR, the term NDT shall refer to the following methods: MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing.\r5. Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the organizations listed below as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall be bear\rthe symbols of accreditation and the accreditation body.\ra. American Association for Laboratory Accreditation (A2LA)\rb. ANSI National Accreditation Board (ANAB)\rc. International Accreditation Service, Inc (IAS)\rd. National Voluntary Laboratory Accreditation Program (NVLAP)\re. Perry Johnson Laboratory Accreditation, Inc (PJLA)\rf. Canadian Association for Laboratory Accreditation Inc. (CALA)\rg. Standards Council of Canada (SCC)\r4.1  Review documentation as provided under DD 1423 requirements.\r4.2 CRITICAL MANUFACTURING PROCESSES\r( ;APPLIES; )  HEAT TREAT\r( ; ; ) WELDING\r( ;APPLIES. PER DWG. 6532B430; ) CADMIUM PLATING\r( ; ; ) ENGINEERING CHROME PLATING\r( ; ; ) NICKEL CHROME PLATING\r( ; ; ) CASTING(S)\r( ; ; ) FORGING(S)\r( ; ; ) MPR (MATERIAL PROCESSING REQUIREMENTS)\r4.3  The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below\r4.3.1 Dimensional test (special)\r    ;APPLIES;\r4.3.2  Requirements of:\r     ;LKE DRAWING PACKAGE;\r4.3.3  Form\r    ;APPLIES;\r4.3.4  Fit\r     ;N/A;\r4.3.5  Function\r     ;N/A;\r4.3.6  Compliance with drawing ( ;6532E398; ) ;AE; , Revision ;80020; and specifications referenced therein.\r4.4  In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements\r4.5  The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection\r4.6  The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing.\r4.6.1  The QAR shall be present to witness all First Article Testing.\r4.6.2  The following additional personnel shall witness the First Article Testing: ;DCMA QAR;\r4.7  Disposition of FAT samples\r4.7.1 ; ; Sample(s) may be destroyed during testing.\r4.7.2 ;APPLIES;  Unless otherwise provided for in the contract, sample(s) shall  remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the\rsample(s) have inspection approval of the cognizant DCMC QAR.  Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.\r4.8  Test Sample Coating Instructions\r4.8.1  Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required.\r4.9  Notice to Government of Testing at the contractors facility.\r4.9.1  FAR 52.209-3 applies\r(A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;80020; ; ), Part Number ;6534E398-2; ; , Revision ;AE; ; as specified in this contract.  At least fourteen (14) calendar days before the beginning of the First Article testing, the\rcontractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests.\r(B)  The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ;\rThe contractor shall mark the report \"First Article Test Report\" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements.\r(C)  Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article.  The notice of approval, conditional\rapproval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.  A notice of conditional approval shall state any further action required of the\rcontractor.  A notice of disapproval shall cite reasons for disapproval.\r(D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests.  After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First\rArticle or select another First Article for testing.  All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval.  The contractor shall then conduct the tests and deliver another\rreport to the Government under the terms and conditions and within the time specified in paragraph B above.  The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any\radditional costs to the Government related to these tests.\r(E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract.\r(F)  Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for\racceptance.\r(G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates\rand/or the contract price, and any other contractual term affected by the delay.\r(H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor.  Before First Article approval, the costs thereof shall not be\rallocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair\rof the First Article during any First Article test.\r(I)  The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article.\r(J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on\rForm DD1222 (2 copies) which shall be forwarded with the test report.  Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test\rreport.\r4.10 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate)\r(A)  Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the\rOriginal Equipment Manufacturer/Prime Manufacturer.  An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that:\r(I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and\r(II) the production location to be used for this requirement is the same as used for the previous production run.\rAdditionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that:\r(I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer,\rand\r(II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause.\r(NOTE: This certification concerns a matter within the jurisdiction of an     agency of the United States and the making of a false, fictitious, or         fraudulent certification may render the maker subject to prosecution under    Title 18, United States\rCode, Section 1001.)\r(B)  Offerors requesting waiver of First Article Approval Requirements under  the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article      Approval Requirements and\rone that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the   price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First\rArticle Approval Requirements\r(C)  In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the\rgovernment notification of conditional approval or approval.  These requirements are specified in the quality assurance section of this solicitation.  If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule\rhe offers to the government.\r             Offeror's Proposed Alternate Delivery Schedule\r        (Based on waiver of First Article Approval Requirements)\rWithin Days:\rItem No. _____________  Quantity:_______   After Date of Contract:_________\r4.11 .  Mandatory Inspection Requirements:\r100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR).\rDuring production, mandatory inspection is required to be accomplished by the contractor as follows:\r  A.  Level of Inspection (LOI).\r      1.  Critical characteristics:  100% inspection shall apply.\r      2.  Major and Minor characteristics:  LOI shall be in accordance with a           sampling plan acceptable to the QAR.\r  B.  Critical characteristics:\r      ;DCMA QAR;\r   C.  Major and Minor characteristics\r      1.  Shall be defined by the contractor subject to QAR concurrence,       unless defined on applicable drawings and associated specifications.\r4.12 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying\roffice/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of\rwitnessing the final inspection. The contractor shall notify by email or\rTELEFAX PCO and NAWC Lakehurst QA ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-2834\rE-mail: jose.g.torraca.civ@us.navy.mil; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units.\r5.  PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6.  NOTES - NOT APPLICABLE\rTHIS IS A ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET.\rNAVSUP REFERENCE ONLY: PROCUREMENT TDR (24-10118):\r                       REPAIR TDR (26-10015)\rTHE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS \"CRITICAL\" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMMIT AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION.\rANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION.\rAll records pertaining to ALRE CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Tech-nical Authority. All records shall bemaintained by LKE QA and by the manufacturer for a period of seven years.\r\\\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items.\r Inspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked \"INSPECTION/CERTIFICATION DATA INCLUDED\".\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Material properties per Drawing 6532E398, 6532C406, 6532B408,6532B401,    6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419,    523736, 6532C405, 6532C407, and 6530C124.\rc. Dimensional Inspection per Drawing 6532E398, 6532C406, 6532B409, 6532B408,    6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468,    6532B419, 523736, 6532C405, 6532C407, and 6530C124.\rd. Torque per Drawing 6532E398.\re. Adjust valve per Drawing 6532E398.\rf. Identification per Drawing 6532E398, 6532C406, 6532B402, 6532D411,6532B412,    6532B413, 6532B430, 6532B468, 6532B419, 6532C405, and 6530C124.\rg. Lubrication per Drawing 6532B408.\rh. Verify weight not to exceed 3.0 pounds per Drawing 6532D411.\ri. Packaging and preservation per Drawing 6532D411.\rj. Heat Treat per Drawing 6532B419, 6532430, and 523736.\rk. Shot peen per Drawing 6532B419 and 523736.\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of Final Inspection.\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Material properties per Drawing 6532E398, 6532C406, 6532B408, 6532B401,    6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419,    523736, 6532C405, 6532C407, and 6530C124.\rc. Dimensional Inspection per Drawing 6532E398, 6532C406, 6532B409,    6532B408, 6532B401, 6532B402, 6532D411, 6532B412, 6532B413,    6532B430,    6532B468, 6532B419, 523736, 6532C405, 6532C407, and    6530C124.\rd. Torque per Drawing 6532E398.\re. Adjust valve per Drawing 6532E398.\rf. Identification per Drawing 6532E398, 6532C406, 6532B402, 6532D411,    6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 6532C405, and 6530C124.\rg. Anodize coating per Drawing 6532C406, 6532C405, and 6530C124.\rh. Lubrication per Drawing 6532B408.\ri. Passivate per Drawing 6532B401, 6532B402, 523736, and 6532C407.\rj. Finish per Drawing 6532D411 and 6532B412.\rk. Verify weight not to exceed 3.0 pounds per Drawing 6532D411.\rl. Packaging and preservation per Drawing 6532D411.\rm. Cadmium Plate per Drawing 6532B430.\rn. Heat Treat per Drawing 6532B419, 6532430, and 523736.\ro. Shot peen per Drawing 6532B419 and 523736.","text":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rINSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|ISO 9001 or its equivalent||||||||\rSTOP-WORK ORDER (AUG 1989)|1||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|SPRPA1|TBD|TBD|SEE SCHEDULE|TBD||||||||N/A|\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||\rMANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|robyn.grinarml@dla.mil|\rVALUE ENGINEERING (JUN 2020)|3||||\rINTEGRITY OF UNIT PRICES (NOV 2021)|1||\rEQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4|||||\rWARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS AFTER THE DATE OF THE LAST DELIVERY UNDER THIS CONTRACT,|45 DAYS AFTER DISCOVERY OF ANY DEFECT OR NONCONFORMANCE,|||||\rSMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4|||||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4|||||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rFIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10|||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rWARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2|||\rLIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1||\rESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1||\rREQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA --MODIFICATIONS (DEV 2026-O0048)(MAR 2026))|7||||||||\rFEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-PROHIBITION (DEC 2023)|12|||||||||||||\rSECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||\rROYALTY INFORMATION (APR 1984)|1||\rCOST ACCOUNTING STANDARD NOTICES AND CERTIFICATION (DEV 2026-O0006)(FEB 2026)|1||\rREQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)|1|Submit .pdf proposal and all supporting data by email.|\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|\rONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1||\rEVALUATION OF FIRST ARTICLE TESTING|3||||\rThis is a NEW SPARES requirement.\rNo drawings are available for this requirement.\rNOTE: N23 APPROVED WAIVER ESRS CASE# N-KE-26-2000626 dtd 27JUL2026 APPLIES\rNOTE: FAR 52.246-17 Warranty of Supplies of a Noncomplex Nature, is included by full text within this solicitation:\r1. Warranty Obligation: Notwithstanding any prior First Article Testing (FAT) or Production Lot Testing (PLT), the contractor warrants that all supplies delivered under this contract will be free from defects in material, workmanship, and design, and will conform\rto all contract requirements after delivery.\r2. Proposal Requirement: If the offeror takes exception to, or does not explicitly comply with these warranty terms, the offeror must propose an alternate warranty within their submission.\r3. Consequence of Non-Compliance: Failure to explicitly agree to these terms or to propose an acceptable alternate warranty may result in the proposal being deemed technically unacceptable and excluded from evaluation.\rNotice to Distributors/Offerors: Consideration for award shall be given only to authorized distributors of the Original Equipment Manufacturer (OEM). If quoting as a distributor, the offeror MUST submit an unredacted OEM Distributor Letter explicitly authorizing\rresale of this Part Number at the exact time of proposal submission. Failure to provide this documentation with the initial offer will result in the quote being determined non-responsive and excluded from evaluation.\rFor Critical Safety Items (CSI), DFARS clause 252.209-7010, Identification of Critical Safety Items, is incorporated by reference.\rFor items for which Government inspection and acceptance will be conducted at the source, DLAD clause 52.246-9004, Product Verification Testing, is incorporated by reference. DLAD clauses can be viewed at http://www.dla.mil/Acquisition/Pages/DLAD.aspx.\rAs applicable, DFARS clause 252.242-7005, Contractor Business Systems, is incorporated by reference.\r\\\r1. SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved\rwill be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the\rSF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation:\r(A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the\rsame materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval.\r(B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors.\r(C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents.\r(D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings,\rforgings, etc.\r(E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics\rshould be discernible from all other characteristics.\rThe above requirements are a subset of requirements specified in the ASO\rSource Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with\rMDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval\rBrochure.\r1.4 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.5 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.6 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.8 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.9 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;6532E398-2; ) ;80020; , Revision ;AE; and all details and specifications referenced therein.\r1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r2. APPLICABLE DOCUMENTS\rDRAWING DATA=523123 |80020| C| |D| | | |\rDRAWING DATA=523736 |80020| -| |D| | | |\rDRAWING DATA=6530C124 |80020| J| |D| | | |\rDRAWING DATA=6532B401 |80020| E| |D| | | |\rDRAWING DATA=6532B402 |80020| E| |D| | | |\rDRAWING DATA=6532B408 |80020| E| |A| | | |\rDRAWING DATA=6532B409 |80020| D| |D| | | |\rDRAWING DATA=6532B412 |80020| H| |D| | | |\rDRAWING DATA=6532B413 |80020| D| |D| | | |\rDRAWING DATA=6532B430 |80020| F| |A| | | |\rDRAWING DATA=6532B468 |80020| F| |D| | | |\rDRAWING DATA=6532C405 |80020| G| |D| | | |\rDRAWING DATA=6532C406 |80020| E| |D| | | |\rDRAWING DATA=6532C407 |80020| K| |D| | | |\rDRAWING DATA=6532D411 |80020| K| |A| | | |\rDRAWING DATA=6532E398 |80020|AE| |D| | | |\r3. REQUIREMENTS - NOT APPLICABLE\r4. QUALITY ASSURANCE\rQUALITY ASSURANCE REQUIREMENTS:\r1. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications:\ra. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%;\rb. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%;\rc. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4.\rd. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4.\r2. First Article Testing:\rThe contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the\rprovisions of the applicable Contract Data Requirements List (CDRL).\ra. Requirements:\r i. First Article quantity is one (1); in uncoated condition.\r ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel.\r iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance;\r iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report;\rv. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or surveys;\rany problems identified during the conduct of the test will also require correction.\rb. Testing and evaluation:\r i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications.Results shall consist of actual\rdimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report.\rc. Acceptance/reject criteria:\ri. Satisfactorily meeting all requirements cited in the First Article Testing \"Requirements\" paragraph above and satisfactorily demonstrating 100% conformance to the test and evaluation elements cited in the First Article Testing \"Testing and evaluation\"\rparagraph above shall constitute acceptance of the First Article;\r ii. Failure to meet any of the conditions in the First Article Testing \"Requirements\" paragraph above or the First Article Testing \"Testing and evaluation\" paragraph above shall be cause for rejection.\rd. Delivery:\r i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming;\r ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's.\r3. Production Lot Special Tests: N/A\r4. For purposes of this TDR, the term NDT shall refer to the following methods: MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing.\r5. Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the organizations listed below as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall be bear\rthe symbols of accreditation and the accreditation body.\ra. American Association for Laboratory Accreditation (A2LA)\rb. ANSI National Accreditation Board (ANAB)\rc. International Accreditation Service, Inc (IAS)\rd. National Voluntary Laboratory Accreditation Program (NVLAP)\re. Perry Johnson Laboratory Accreditation, Inc (PJLA)\rf. Canadian Association for Laboratory Accreditation Inc. (CALA)\rg. Standards Council of Canada (SCC)\r4.1 Review documentation as provided under DD 1423 requirements.\r4.2 CRITICAL MANUFACTURING PROCESSES\r( ;APPLIES; ) HEAT TREAT\r( ; ; ) WELDING\r( ;APPLIES. PER DWG. 6532B430; ) CADMIUM PLATING\r( ; ; ) ENGINEERING CHROME PLATING\r( ; ; ) NICKEL CHROME PLATING\r( ; ; ) CASTING(S)\r( ; ; ) FORGING(S)\r( ; ; ) MPR (MATERIAL PROCESSING REQUIREMENTS)\r4.3 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below\r4.3.1 Dimensional test (special)\r ;APPLIES;\r4.3.2 Requirements of:\r ;LKE DRAWING PACKAGE;\r4.3.3 Form\r ;APPLIES;\r4.3.4 Fit\r ;N/A;\r4.3.5 Function\r ;N/A;\r4.3.6 Compliance with drawing ( ;6532E398; ) ;AE; , Revision ;80020; and specifications referenced therein.\r4.4 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements\r4.5 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection\r4.6 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing.\r4.6.1 The QAR shall be present to witness all First Article Testing.\r4.6.2 The following additional personnel shall witness the First Article Testing: ;DCMA QAR;\r4.7 Disposition of FAT samples\r4.7.1 ; ; Sample(s) may be destroyed during testing.\r4.7.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the\rsample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.\r4.8 Test Sample Coating Instructions\r4.8.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required.\r4.9 Notice to Government of Testing at the contractors facility.\r4.9.1 FAR 52.209-3 applies\r(A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;80020; ; ), Part Number ;6534E398-2; ; , Revision ;AE; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the\rcontractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests.\r(B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ;\rThe contractor shall mark the report \"First Article Test Report\" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements.\r(C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional\rapproval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the\rcontractor. A notice of disapproval shall cite reasons for disapproval.\r(D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First\rArticle or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another\rreport to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any\radditional costs to the Government related to these tests.\r(E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract.\r(F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for\racceptance.\r(G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates\rand/or the contract price, and any other contractual term affected by the delay.\r(H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be\rallocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair\rof the First Article during any First Article test.\r(I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article.\r(J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on\rForm DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test\rreport.\r4.10 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate)\r(A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the\rOriginal Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that:\r(I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and\r(II) the production location to be used for this requirement is the same as used for the previous production run.\rAdditionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that:\r(I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer,\rand\r(II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause.\r(NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States\rCode, Section 1001.)\r(B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and\rone that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First\rArticle Approval Requirements\r(C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the\rgovernment notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule\rhe offers to the government.\r Offeror's Proposed Alternate Delivery Schedule\r (Based on waiver of First Article Approval Requirements)\rWithin Days:\rItem No. _____________ Quantity:_______ After Date of Contract:_________\r4.11 . Mandatory Inspection Requirements:\r100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR).\rDuring production, mandatory inspection is required to be accomplished by the contractor as follows:\r A. Level of Inspection (LOI).\r 1. Critical characteristics: 100% inspection shall apply.\r 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR.\r B. Critical characteristics:\r ;DCMA QAR;\r C. Major and Minor characteristics\r 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications.\r4.12 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying\roffice/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of\rwitnessing the final inspection. The contractor shall notify by email or\rTELEFAX PCO and NAWC Lakehurst QA ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-2834\rE-mail: jose.g.torraca.civ@us.navy.mil; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units.\r5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6. NOTES - NOT APPLICABLE\rTHIS IS A ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET.\rNAVSUP REFERENCE ONLY: PROCUREMENT TDR (24-10118):\r REPAIR TDR (26-10015)\rTHE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS \"CRITICAL\" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMMIT AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION.\rANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION.\rAll records pertaining to ALRE CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Tech-nical Authority. All records shall bemaintained by LKE QA and by the manufacturer for a period of seven years.\r\\\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items.\r Inspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked \"INSPECTION/CERTIFICATION DATA INCLUDED\".\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Material properties per Drawing 6532E398, 6532C406, 6532B408,6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124.\rc. Dimensional Inspection per Drawing 6532E398, 6532C406, 6532B409, 6532B408, 6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124.\rd. Torque per Drawing 6532E398.\re. Adjust valve per Drawing 6532E398.\rf. Identification per Drawing 6532E398, 6532C406, 6532B402, 6532D411,6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 6532C405, and 6530C124.\rg. Lubrication per Drawing 6532B408.\rh. Verify weight not to exceed 3.0 pounds per Drawing 6532D411.\ri. Packaging and preservation per Drawing 6532D411.\rj. Heat Treat per Drawing 6532B419, 6532430, and 523736.\rk. Shot peen per Drawing 6532B419 and 523736.\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of Final Inspection.\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Material properties per Drawing 6532E398, 6532C406, 6532B408, 6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124.\rc. Dimensional Inspection per Drawing 6532E398, 6532C406, 6532B409, 6532B408, 6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124.\rd. Torque per Drawing 6532E398.\re. Adjust valve per Drawing 6532E398.\rf. Identification per Drawing 6532E398, 6532C406, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 6532C405, and 6530C124.\rg. Anodize coating per Drawing 6532C406, 6532C405, and 6530C124.\rh. Lubrication per Drawing 6532B408.\ri. Passivate per Drawing 6532B401, 6532B402, 523736, and 6532C407.\rj. Finish per Drawing 6532D411 and 6532B412.\rk. Verify weight not to exceed 3.0 pounds per Drawing 6532D411.\rl. Packaging and preservation per Drawing 6532D411.\rm. Cadmium Plate per Drawing 6532B430.\rn. Heat Treat per Drawing 6532B419, 6532430, and 523736.\ro. Shot peen per Drawing 6532B419 and 523736.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"SPRPA127RYA42","product_service_code":"4820"},{"dates":{"posted":"2026-11-16","posted_at":"2026-11-16T14:04:43.467Z","created_at":"2026-11-16T13:23:31.568Z","modified_at":"2026-11-16T14:04:43.476Z","response_deadline":{"raw":"2026-12-10T14:00:00-05:00","utc":"2026-12-10T19:00:00Z","date":"2026-12-10","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/9e4c131784664bd6a2c6e3a772fc75a6/view"},"naics":{"codes":["332919"],"primary":"332919"},"title":"48--VALVE ASSEMBLY,MANI","agency":{"office":{"code":"SPRPA1","name":"DLA AVIATION AT PHILADELPHIA, PA"},"subtier":{"code":"97AS","name":"DEFENSE LOGISTICS AGENCY"},"department":{"code":"097","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19111-5098","city":"PHILADELPHIA","state":"PA","country":"USA"},"organization_id":"500044424","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-12-25","archive_type":"auto15"},"history":[{"index":2,"title":"48--VALVE ASSEMBLY,MANI","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-16T14:04:43.467Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9e4c131784664bd6a2c6e3a772fc75a6","solicitation_number":"SPRPA127RYA42","parent_opportunity_id":"31879a03706c4e8d96cf27289230cd6a"},{"index":1,"title":"48--VALVE ASSEMBLY,MANI","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-10T12:22:42.251Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"31879a03706c4e8d96cf27289230cd6a","solicitation_number":"SPRPA127RYA42"}],"contacts":[{"name":"Telephone: 2157374024","role":"primary","email":"THOMAS.KUHNLE@DLA.MIL"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"9e4c131784664bd6a2c6e3a772fc75a6","lineage_id":"31879a03706c4e8d96cf27289230cd6a","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-17T07:11:13.239500562Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"85e14329eca27c595e9baeb82aefb456-27\"","fetched_at":"2026-11-17T04:39:38.100364673Z","row_sha256":"38c7d4f53f3f526de75bbb49712ec89838fc4c27462085adb65fd745f4ba897a","last_modified":"2026-11-17T04:30:19Z"},"updated_at":"2026-11-17T07:11:13.239500562Z","first_seen_at":"2026-11-17T04:39:38.100364673Z"},"description":{"html":"<p>ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|ISO 9001 or its equivalent|||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|SPRPA1|TBD|TBD|SEE SCHEDULE|TBD||||||||N/A| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|robyn.grinarml@dla.mil| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS AFTER THE DATE OF THE LAST DELIVERY UNDER THIS CONTRACT,|45 DAYS AFTER DISCOVERY OF ANY DEFECT OR NONCONFORMANCE,||||| SMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1|| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA --MODIFICATIONS (DEV 2026-O0048)(MAR 2026))|7|||||||| FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-PROHIBITION (DEC 2023)|12||||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| COST ACCOUNTING STANDARD NOTICES AND CERTIFICATION (DEV 2026-O0006)(FEB 2026)|1|| REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)|1|Submit .pdf proposal and all supporting data by email.| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| EVALUATION OF FIRST ARTICLE TESTING|3|||| This is a NEW SPARES requirement. No drawings are available for this requirement. NOTE: N23 APPROVED WAIVER ESRS CASE# N-KE-26-2000626 dtd 27JUL2026 APPLIES NOTE: FAR 52.246-17 Warranty of Supplies of a Noncomplex Nature, is included by full text within this solicitation: 1. Warranty Obligation: Notwithstanding any prior First Article Testing (FAT) or Production Lot Testing (PLT), the contractor warrants that all supplies delivered under this contract will be free from defects in material, workmanship, and design, and will conform to all contract requirements after delivery. 2. Proposal Requirement: If the offeror takes exception to, or does not explicitly comply with these warranty terms, the offeror must propose an alternate warranty within their submission. 3. Consequence of Non-Compliance: Failure to explicitly agree to these terms or to propose an acceptable alternate warranty may result in the proposal being deemed technically unacceptable and excluded from evaluation. Notice to Distributors/Offerors: Consideration for award shall be given only to authorized distributors of the Original Equipment Manufacturer (OEM). If quoting as a distributor, the offeror MUST submit an unredacted OEM Distributor Letter explicitly authorizing resale of this Part Number at the exact time of proposal submission. Failure to provide this documentation with the initial offer will result in the quote being determined non-responsive and excluded from evaluation. For Critical Safety Items (CSI), DFARS clause 252.209-7010, Identification of Critical Safety Items, is incorporated by reference. For items for which Government inspection and acceptance will be conducted at the source, DLAD clause 52.246-9004, Product Verification Testing, is incorporated by reference. DLAD clauses can be viewed at http://www.dla.mil/Acquisition/Pages/DLAD.aspx. As applicable, DFARS clause 252.242-7005, Contractor Business Systems, is incorporated by reference. \\ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;6532E398-2; ) ;80020; , Revision ;AE; and all details and specifications referenced therein. 1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=523123 |80020| C| |D| | | | DRAWING DATA=523736 |80020| -| |D| | | | DRAWING DATA=6530C124 |80020| J| |D| | | | DRAWING DATA=6532B401 |80020| E| |D| | | | DRAWING DATA=6532B402 |80020| E| |D| | | | DRAWING DATA=6532B408 |80020| E| |A| | | | DRAWING DATA=6532B409 |80020| D| |D| | | | DRAWING DATA=6532B412 |80020| H| |D| | | | DRAWING DATA=6532B413 |80020| D| |D| | | | DRAWING DATA=6532B430 |80020| F| |A| | | | DRAWING DATA=6532B468 |80020| F| |D| | | | DRAWING DATA=6532C405 |80020| G| |D| | | | DRAWING DATA=6532C406 |80020| E| |D| | | | DRAWING DATA=6532C407 |80020| K| |D| | | | DRAWING DATA=6532D411 |80020| K| |A| | | | DRAWING DATA=6532E398 |80020|AE| |D| | | | 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE QUALITY ASSURANCE REQUIREMENTS: 1. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications: a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%; b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%; c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4. d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4. 2. First Article Testing: The contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the provisions of the applicable Contract Data Requirements List (CDRL). a. Requirements: i. First Article quantity is one (1); in uncoated condition. ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel. iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance; iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report; v. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or surveys; any problems identified during the conduct of the test will also require correction. b. Testing and evaluation: i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications.Results shall consist of actual dimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report. c. Acceptance/reject criteria: i. Satisfactorily meeting all requirements cited in the First Article Testing &quot;Requirements&quot; paragraph above and satisfactorily demonstrating 100% conformance to the test and evaluation elements cited in the First Article Testing &quot;Testing and evaluation&quot; paragraph above shall constitute acceptance of the First Article; ii. Failure to meet any of the conditions in the First Article Testing &quot;Requirements&quot; paragraph above or the First Article Testing &quot;Testing and evaluation&quot; paragraph above shall be cause for rejection. d. Delivery: i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming; ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL&#39;s. 3. Production Lot Special Tests: N/A 4. For purposes of this TDR, the term NDT shall refer to the following methods: MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing. 5. Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the organizations listed below as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall be bear the symbols of accreditation and the accreditation body. a. American Association for Laboratory Accreditation (A2LA) b. ANSI National Accreditation Board (ANAB) c. International Accreditation Service, Inc (IAS) d. National Voluntary Laboratory Accreditation Program (NVLAP) e. Perry Johnson Laboratory Accreditation, Inc (PJLA) f. Canadian Association for Laboratory Accreditation Inc. (CALA) g. Standards Council of Canada (SCC) 4.1 Review documentation as provided under DD 1423 requirements. 4.2 CRITICAL MANUFACTURING PROCESSES ( ;APPLIES; ) HEAT TREAT ( ; ; ) WELDING ( ;APPLIES. PER DWG. 6532B430; ) CADMIUM PLATING ( ; ; ) ENGINEERING CHROME PLATING ( ; ; ) NICKEL CHROME PLATING ( ; ; ) CASTING(S) ( ; ; ) FORGING(S) ( ; ; ) MPR (MATERIAL PROCESSING REQUIREMENTS) 4.3 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.3.1 Dimensional test (special) ;APPLIES; 4.3.2 Requirements of: ;LKE DRAWING PACKAGE; 4.3.3 Form ;APPLIES; 4.3.4 Fit ;N/A; 4.3.5 Function ;N/A; 4.3.6 Compliance with drawing ( ;6532E398; ) ;AE; , Revision ;80020; and specifications referenced therein. 4.4 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.5 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.6 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.6.1 The QAR shall be present to witness all First Article Testing. 4.6.2 The following additional personnel shall witness the First Article Testing: ;DCMA QAR; 4.7 Disposition of FAT samples 4.7.1 ; ; Sample(s) may be destroyed during testing. 4.7.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.8 Test Sample Coating Instructions 4.8.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.9 Notice to Government of Testing at the contractors facility. 4.9.1 FAR 52.209-3 applies (A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;80020; ; ), Part Number ;6534E398-2; ; , Revision ;AE; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ; The contractor shall mark the report &quot;First Article Test Report&quot; and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO&#39;s responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.10 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror&#39;s Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 4.11 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;DCMA QAR; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.12 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-2834 E-mail: jose.g.torraca.civ@us.navy.mil; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS A ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: PROCUREMENT TDR (24-10118): REPAIR TDR (26-10015) THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS &quot;CRITICAL&quot; REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMMIT AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION. ANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION. All records pertaining to ALRE CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Tech-nical Authority. All records shall bemaintained by LKE QA and by the manufacturer for a period of seven years. \\ DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items. Inspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked &quot;INSPECTION/CERTIFICATION DATA INCLUDED&quot;. Data Requirements: a. Copies of all approved requests for variations. b. Material properties per Drawing 6532E398, 6532C406, 6532B408,6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124. c. Dimensional Inspection per Drawing 6532E398, 6532C406, 6532B409, 6532B408, 6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124. d. Torque per Drawing 6532E398. e. Adjust valve per Drawing 6532E398. f. Identification per Drawing 6532E398, 6532C406, 6532B402, 6532D411,6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 6532C405, and 6530C124. g. Lubrication per Drawing 6532B408. h. Verify weight not to exceed 3.0 pounds per Drawing 6532D411. i. Packaging and preservation per Drawing 6532D411. j. Heat Treat per Drawing 6532B419, 6532430, and 523736. k. Shot peen per Drawing 6532B419 and 523736. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of Final Inspection. Data Requirements: a. Copies of all approved requests for variations. b. Material properties per Drawing 6532E398, 6532C406, 6532B408, 6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124. c. Dimensional Inspection per Drawing 6532E398, 6532C406, 6532B409, 6532B408, 6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124. d. Torque per Drawing 6532E398. e. Adjust valve per Drawing 6532E398. f. Identification per Drawing 6532E398, 6532C406, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 6532C405, and 6530C124. g. Anodize coating per Drawing 6532C406, 6532C405, and 6530C124. h. Lubrication per Drawing 6532B408. i. Passivate per Drawing 6532B401, 6532B402, 523736, and 6532C407. j. Finish per Drawing 6532D411 and 6532B412. k. Verify weight not to exceed 3.0 pounds per Drawing 6532D411. l. Packaging and preservation per Drawing 6532D411. m. Cadmium Plate per Drawing 6532B430. n. Heat Treat per Drawing 6532B419, 6532430, and 523736. o. Shot peen per Drawing 6532B419 and 523736.</p>","text":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|ISO 9001 or its equivalent|||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|SPRPA1|TBD|TBD|SEE SCHEDULE|TBD||||||||N/A| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|robyn.grinarml@dla.mil| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS AFTER THE DATE OF THE LAST DELIVERY UNDER THIS CONTRACT,|45 DAYS AFTER DISCOVERY OF ANY DEFECT OR NONCONFORMANCE,||||| SMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1|| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA --MODIFICATIONS (DEV 2026-O0048)(MAR 2026))|7|||||||| FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-PROHIBITION (DEC 2023)|12||||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| COST ACCOUNTING STANDARD NOTICES AND CERTIFICATION (DEV 2026-O0006)(FEB 2026)|1|| REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)|1|Submit .pdf proposal and all supporting data by email.| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| EVALUATION OF FIRST ARTICLE TESTING|3|||| This is a NEW SPARES requirement. No drawings are available for this requirement. NOTE: N23 APPROVED WAIVER ESRS CASE# N-KE-26-2000626 dtd 27JUL2026 APPLIES NOTE: FAR 52.246-17 Warranty of Supplies of a Noncomplex Nature, is included by full text within this solicitation: 1. Warranty Obligation: Notwithstanding any prior First Article Testing (FAT) or Production Lot Testing (PLT), the contractor warrants that all supplies delivered under this contract will be free from defects in material, workmanship, and design, and will conform to all contract requirements after delivery. 2. Proposal Requirement: If the offeror takes exception to, or does not explicitly comply with these warranty terms, the offeror must propose an alternate warranty within their submission. 3. Consequence of Non-Compliance: Failure to explicitly agree to these terms or to propose an acceptable alternate warranty may result in the proposal being deemed technically unacceptable and excluded from evaluation. Notice to Distributors/Offerors: Consideration for award shall be given only to authorized distributors of the Original Equipment Manufacturer (OEM). If quoting as a distributor, the offeror MUST submit an unredacted OEM Distributor Letter explicitly authorizing resale of this Part Number at the exact time of proposal submission. Failure to provide this documentation with the initial offer will result in the quote being determined non-responsive and excluded from evaluation. For Critical Safety Items (CSI), DFARS clause 252.209-7010, Identification of Critical Safety Items, is incorporated by reference. For items for which Government inspection and acceptance will be conducted at the source, DLAD clause 52.246-9004, Product Verification Testing, is incorporated by reference. DLAD clauses can be viewed at http://www.dla.mil/Acquisition/Pages/DLAD.aspx. As applicable, DFARS clause 252.242-7005, Contractor Business Systems, is incorporated by reference. \\ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;6532E398-2; ) ;80020; , Revision ;AE; and all details and specifications referenced therein. 1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=523123 |80020| C| |D| | | | DRAWING DATA=523736 |80020| -| |D| | | | DRAWING DATA=6530C124 |80020| J| |D| | | | DRAWING DATA=6532B401 |80020| E| |D| | | | DRAWING DATA=6532B402 |80020| E| |D| | | | DRAWING DATA=6532B408 |80020| E| |A| | | | DRAWING DATA=6532B409 |80020| D| |D| | | | DRAWING DATA=6532B412 |80020| H| |D| | | | DRAWING DATA=6532B413 |80020| D| |D| | | | DRAWING DATA=6532B430 |80020| F| |A| | | | DRAWING DATA=6532B468 |80020| F| |D| | | | DRAWING DATA=6532C405 |80020| G| |D| | | | DRAWING DATA=6532C406 |80020| E| |D| | | | DRAWING DATA=6532C407 |80020| K| |D| | | | DRAWING DATA=6532D411 |80020| K| |A| | | | DRAWING DATA=6532E398 |80020|AE| |D| | | | 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE QUALITY ASSURANCE REQUIREMENTS: 1. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications: a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%; b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%; c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4. d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4. 2. First Article Testing: The contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the provisions of the applicable Contract Data Requirements List (CDRL). a. Requirements: i. First Article quantity is one (1); in uncoated condition. ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel. iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance; iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report; v. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or surveys; any problems identified during the conduct of the test will also require correction. b. Testing and evaluation: i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications.Results shall consist of actual dimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report. c. Acceptance/reject criteria: i. Satisfactorily meeting all requirements cited in the First Article Testing \"Requirements\" paragraph above and satisfactorily demonstrating 100% conformance to the test and evaluation elements cited in the First Article Testing \"Testing and evaluation\" paragraph above shall constitute acceptance of the First Article; ii. Failure to meet any of the conditions in the First Article Testing \"Requirements\" paragraph above or the First Article Testing \"Testing and evaluation\" paragraph above shall be cause for rejection. d. Delivery: i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming; ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's. 3. Production Lot Special Tests: N/A 4. For purposes of this TDR, the term NDT shall refer to the following methods: MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing. 5. Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the organizations listed below as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall be bear the symbols of accreditation and the accreditation body. a. American Association for Laboratory Accreditation (A2LA) b. ANSI National Accreditation Board (ANAB) c. International Accreditation Service, Inc (IAS) d. National Voluntary Laboratory Accreditation Program (NVLAP) e. Perry Johnson Laboratory Accreditation, Inc (PJLA) f. Canadian Association for Laboratory Accreditation Inc. (CALA) g. Standards Council of Canada (SCC) 4.1 Review documentation as provided under DD 1423 requirements. 4.2 CRITICAL MANUFACTURING PROCESSES ( ;APPLIES; ) HEAT TREAT ( ; ; ) WELDING ( ;APPLIES. PER DWG. 6532B430; ) CADMIUM PLATING ( ; ; ) ENGINEERING CHROME PLATING ( ; ; ) NICKEL CHROME PLATING ( ; ; ) CASTING(S) ( ; ; ) FORGING(S) ( ; ; ) MPR (MATERIAL PROCESSING REQUIREMENTS) 4.3 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.3.1 Dimensional test (special) ;APPLIES; 4.3.2 Requirements of: ;LKE DRAWING PACKAGE; 4.3.3 Form ;APPLIES; 4.3.4 Fit ;N/A; 4.3.5 Function ;N/A; 4.3.6 Compliance with drawing ( ;6532E398; ) ;AE; , Revision ;80020; and specifications referenced therein. 4.4 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.5 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.6 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.6.1 The QAR shall be present to witness all First Article Testing. 4.6.2 The following additional personnel shall witness the First Article Testing: ;DCMA QAR; 4.7 Disposition of FAT samples 4.7.1 ; ; Sample(s) may be destroyed during testing. 4.7.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.8 Test Sample Coating Instructions 4.8.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.9 Notice to Government of Testing at the contractors facility. 4.9.1 FAR 52.209-3 applies (A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;80020; ; ), Part Number ;6534E398-2; ; , Revision ;AE; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ; The contractor shall mark the report \"First Article Test Report\" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.10 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 4.11 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;DCMA QAR; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.12 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-2834 E-mail: jose.g.torraca.civ@us.navy.mil; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS A ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: PROCUREMENT TDR (24-10118): REPAIR TDR (26-10015) THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS \"CRITICAL\" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMMIT AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION. ANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION. All records pertaining to ALRE CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Tech-nical Authority. All records shall bemaintained by LKE QA and by the manufacturer for a period of seven years. \\ DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items. Inspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked \"INSPECTION/CERTIFICATION DATA INCLUDED\". Data Requirements: a. Copies of all approved requests for variations. b. Material properties per Drawing 6532E398, 6532C406, 6532B408,6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124. c. Dimensional Inspection per Drawing 6532E398, 6532C406, 6532B409, 6532B408, 6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124. d. Torque per Drawing 6532E398. e. Adjust valve per Drawing 6532E398. f. Identification per Drawing 6532E398, 6532C406, 6532B402, 6532D411,6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 6532C405, and 6530C124. g. Lubrication per Drawing 6532B408. h. Verify weight not to exceed 3.0 pounds per Drawing 6532D411. i. Packaging and preservation per Drawing 6532D411. j. Heat Treat per Drawing 6532B419, 6532430, and 523736. k. Shot peen per Drawing 6532B419 and 523736. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of Final Inspection. Data Requirements: a. Copies of all approved requests for variations. b. Material properties per Drawing 6532E398, 6532C406, 6532B408, 6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124. c. Dimensional Inspection per Drawing 6532E398, 6532C406, 6532B409, 6532B408, 6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124. d. Torque per Drawing 6532E398. e. Adjust valve per Drawing 6532E398. f. Identification per Drawing 6532E398, 6532C406, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 6532C405, and 6530C124. g. Anodize coating per Drawing 6532C406, 6532C405, and 6530C124. h. Lubrication per Drawing 6532B408. i. Passivate per Drawing 6532B401, 6532B402, 523736, and 6532C407. j. Finish per Drawing 6532D411 and 6532B412. k. Verify weight not to exceed 3.0 pounds per Drawing 6532D411. l. Packaging and preservation per Drawing 6532D411. m. Cadmium Plate per Drawing 6532B430. n. Heat Treat per Drawing 6532B419, 6532430, and 523736. o. Shot peen per Drawing 6532B419 and 523736.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"SPRPA127RYA42","product_service_code":"4820"},{"dates":{"posted":"2026-11-17","posted_at":"2026-11-17T12:24:04.457Z","created_at":"2026-11-17T12:24:04.335Z","modified_at":"2026-11-17T12:24:04.457Z","response_deadline":{"raw":"2026-12-10T14:00:00-04:00","utc":"2026-12-10T18:00:00Z","date":"2026-12-10","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/7e759b623cad4445b2f6b4fd2a4ee3b3/view"},"naics":{"codes":["332919"],"primary":"332919"},"title":"48--VALVE ASSEMBLY,MANI","agency":{"office":{"code":"SPRPA1","name":"DLA AVIATION AT PHILADELPHIA, PA"},"subtier":{"code":"97AS","name":"DEFENSE LOGISTICS AGENCY"},"department":{"code":"097","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19111-5098","city":"PHILADELPHIA","state":"PA","country":"USA"},"organization_id":"500044424","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-12-25","archive_type":"auto15"},"history":[{"index":3,"title":"48--VALVE ASSEMBLY,MANI","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-17T12:24:04.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e759b623cad4445b2f6b4fd2a4ee3b3","solicitation_number":"SPRPA127RYA42","parent_opportunity_id":"31879a03706c4e8d96cf27289230cd6a"},{"index":2,"title":"48--VALVE ASSEMBLY,MANI","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-16T14:04:43.467Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9e4c131784664bd6a2c6e3a772fc75a6","solicitation_number":"SPRPA127RYA42","parent_opportunity_id":"31879a03706c4e8d96cf27289230cd6a"},{"index":1,"title":"48--VALVE ASSEMBLY,MANI","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-10T12:22:42.251Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"31879a03706c4e8d96cf27289230cd6a","solicitation_number":"SPRPA127RYA42"}],"contacts":[{"name":"Telephone: 2157374024","role":"primary","email":"THOMAS.KUHNLE@DLA.MIL"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"7e759b623cad4445b2f6b4fd2a4ee3b3","lineage_id":"31879a03706c4e8d96cf27289230cd6a","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-19T00:35:42.713921555Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"02a1e57fd8ebcbde3372436eaf712798-27\"","fetched_at":"2026-11-18T05:14:20.700983426Z","row_sha256":"6fb29c4482695cc21e70ff6b0a96aa446f4e52c0a7d9a4518a3922356a45c7ef","last_modified":"2026-11-18T04:30:19Z"},"updated_at":"2026-11-19T00:35:42.713921555Z","first_seen_at":"2026-11-18T05:14:20.700983426Z"},"description":{"html":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rINSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|ISO 9001 or its equivalent||||||||\rSTOP-WORK ORDER (AUG 1989)|1||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|SPRPA1|TBD|TBD|SEE SCHEDULE|TBD||||||||N/A|\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||\rMANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|robyn.grinarml@dla.mil|\rVALUE ENGINEERING (JUN 2020)|3||||\rINTEGRITY OF UNIT PRICES (NOV 2021)|1||\rEQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4|||||\rWARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS AFTER THE DATE OF THE LAST DELIVERY UNDER THIS CONTRACT,|45 DAYS AFTER DISCOVERY OF ANY DEFECT OR NONCONFORMANCE,|||||\rSMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4|||||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4|||||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rFIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10|||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rWARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2|||\rLIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1||\rESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1||\rREQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA --MODIFICATIONS (DEV 2026-O0048)(MAR 2026))|7||||||||\rFEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-PROHIBITION (DEC 2023)|12|||||||||||||\rSECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||\rROYALTY INFORMATION (APR 1984)|1||\rCOST ACCOUNTING STANDARD NOTICES AND CERTIFICATION (DEV 2026-O0006)(FEB 2026)|1||\rREQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)|1|Submit .pdf proposal and all supporting data by email.|\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|\rONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1||\rEVALUATION OF FIRST ARTICLE TESTING|3||||\rThe purpose of this amnedment is to update the TDP:\rFROM: TDP Ver. 009\r  TO: TDP Ver. 010\rAll previous versions are now obsolete.\r\\\rThis is a NEW SPARES requirement.\rNo drawings are available for this requirement.\rNOTE: N23 APPROVED WAIVER ESRS CASE# N-KE-26-2000626 dtd 27JUL2026 APPLIES\rNOTE: FAR 52.246-17 Warranty of Supplies of a Noncomplex Nature, is included by full text within this solicitation:\r1. Warranty Obligation: Notwithstanding any prior First Article Testing (FAT) or Production Lot Testing (PLT), the contractor warrants that all supplies delivered under this contract will be free from defects in material, workmanship, and design, and will conform\rto all contract requirements after delivery.\r2. Proposal Requirement: If the offeror takes exception to, or does not explicitly comply with these warranty terms, the offeror must propose an alternate warranty within their submission.\r3. Consequence of Non-Compliance: Failure to explicitly agree to these terms or to propose an acceptable alternate warranty may result in the proposal being deemed technically unacceptable and excluded from evaluation.\rNotice to Distributors/Offerors: Consideration for award shall be given only to authorized distributors of the Original Equipment Manufacturer (OEM). If quoting as a distributor, the offeror MUST submit an unredacted OEM Distributor Letter explicitly authorizing\rresale of this Part Number at the exact time of proposal submission. Failure to provide this documentation with the initial offer will result in the quote being determined non-responsive and excluded from evaluation.\rFor Critical Safety Items (CSI), DFARS clause 252.209-7010, Identification of Critical Safety Items, is incorporated by reference.\rFor items for which Government inspection and acceptance will be conducted at the source, DLAD clause 52.246-9004, Product Verification Testing, is  incorporated by reference.  DLAD clauses can be viewed at http://www.dla.mil/Acquisition/Pages/DLAD.aspx.\rAs applicable, DFARS clause 252.242-7005, Contractor Business Systems, is incorporated by reference.\r\\\r1.  SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command.  Only those companies who have submitted requests for source approval and been approved\rwill be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the\rSF33 for name and code).  The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation:\r(A)  Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the\rsame materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval.\r(B)  Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches.  These plans must note those operations and processes performed by subcontractors/ vendors.\r(C)  Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service.  Provide the most recent copies of the documents.\r(D)  A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval.  This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings,\rforgings, etc.\r(E)  Copy of inspection method sheets used in the manufacturing and at final inspection.  These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics\rshould be discernible from all other characteristics.\rThe above requirements are a subset of requirements specified in the ASO\rSource Approval Information Brochure dated January 1995.  The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with\rMDA which includes availability of complete data, MRB disposition, etc.  Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval\rBrochure.\r1.4 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.5 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.6 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.8 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.9 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;6532E398-2; ) ;80020;      , Revision ;AE; and all details and specifications referenced therein.\r1.11  Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.12  If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r2.  APPLICABLE DOCUMENTS\rDRAWING DATA=523123                                  |80020| C|   |D|            |  |     |\rDRAWING DATA=523736                                  |80020| -|   |D|            |  |     |\rDRAWING DATA=6530C124                                |80020| K|   |D|            |  |     |\rDRAWING DATA=6532B401                                |80020| E|   |D|            |  |     |\rDRAWING DATA=6532B402                                |80020| E|   |D|            |  |     |\rDRAWING DATA=6532B408                                |80020| E|   |A|            |  |     |\rDRAWING DATA=6532B409                                |80020| D|   |D|            |  |     |\rDRAWING DATA=6532B412                                |80020| H|   |D|            |  |     |\rDRAWING DATA=6532B413                                |80020| D|   |D|            |  |     |\rDRAWING DATA=6532B430                                |80020| F|   |A|            |  |     |\rDRAWING DATA=6532B468                                |80020| F|   |D|            |  |     |\rDRAWING DATA=6532C405                                |80020| G|   |D|            |  |     |\rDRAWING DATA=6532C406                                |80020| F|   |D|            |  |     |\rDRAWING DATA=6532C407                                |80020| K|   |D|            |  |     |\rDRAWING DATA=6532D411                                |80020| L|   |A|            |  |     |\rDRAWING DATA=6532E398                                |80020|AE|   |D|            |  |     |\r3.  REQUIREMENTS - NOT APPLICABLE\r4.  QUALITY ASSURANCE\rQUALITY ASSURANCE REQUIREMENTS:\r1. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications:\ra. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%;\rb. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%;\rc. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4.\rd. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4.\r2. First Article Testing:\rThe contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the\rprovisions of the applicable Contract Data Requirements List (CDRL).\ra. Requirements:\r  i. First Article quantity is one (1); in uncoated condition.\r  ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel.\r  iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance;\r  iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report;\rv. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or surveys;\rany problems identified during the conduct of the test will also require correction.\rb. Testing and evaluation:\r  i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications.Results shall consist of actual\rdimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report.\rc. Acceptance/reject criteria:\ri. Satisfactorily meeting all requirements cited in the First Article Testing \"Requirements\" paragraph above and satisfactorily demonstrating 100% conformance to the test and evaluation elements cited in the First Article Testing \"Testing and evaluation\"\rparagraph above shall constitute acceptance of the First Article;\r  ii. Failure to meet any of the conditions in the First Article Testing \"Requirements\" paragraph above or the First Article Testing \"Testing and evaluation\" paragraph above shall be cause for rejection.\rd. Delivery:\r  i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming;\r  ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's.\r3. Production Lot Special Tests: N/A\r4. For purposes of this TDR, the term NDT shall refer to the following methods: MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing.\r5. Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the organizations listed below as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall be bear\rthe symbols of accreditation and the accreditation body.\ra. American Association for Laboratory Accreditation (A2LA)\rb. ANSI National Accreditation Board (ANAB)\rc. International Accreditation Service, Inc (IAS)\rd. National Voluntary Laboratory Accreditation Program (NVLAP)\re. Perry Johnson Laboratory Accreditation, Inc (PJLA)\rf. Canadian Association for Laboratory Accreditation Inc. (CALA)\rg. Standards Council of Canada (SCC)\r4.1  Review documentation as provided under DD 1423 requirements.\r4.2 CRITICAL MANUFACTURING PROCESSES\r( ;APPLIES; )  HEAT TREAT\r( ; ; ) WELDING\r( ;APPLIES. PER DWG. 6532B430; ) CADMIUM PLATING\r( ; ; ) ENGINEERING CHROME PLATING\r( ; ; ) NICKEL CHROME PLATING\r( ; ; ) CASTING(S)\r( ; ; ) FORGING(S)\r( ; ; ) MPR (MATERIAL PROCESSING REQUIREMENTS)\r4.3  The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below\r4.3.1 Dimensional test (special)\r    ;APPLIES;\r4.3.2  Requirements of:\r     ;LKE DRAWING PACKAGE;\r4.3.3  Form\r    ;APPLIES;\r4.3.4  Fit\r     ;N/A;\r4.3.5  Function\r     ;N/A;\r4.3.6  Compliance with drawing ( ;6532E398; ) ;AE; , Revision ;80020; and specifications referenced therein.\r4.4  In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements\r4.5  The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection\r4.6  The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing.\r4.6.1  The QAR shall be present to witness all First Article Testing.\r4.6.2  The following additional personnel shall witness the First Article Testing: ;DCMA QAR;\r4.7  Disposition of FAT samples\r4.7.1 ; ; Sample(s) may be destroyed during testing.\r4.7.2 ;APPLIES;  Unless otherwise provided for in the contract, sample(s) shall  remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the\rsample(s) have inspection approval of the cognizant DCMC QAR.  Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.\r4.8  Test Sample Coating Instructions\r4.8.1  Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required.\r4.9  Notice to Government of Testing at the contractors facility.\r4.9.1  FAR 52.209-3 applies\r(A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;80020; ; ), Part Number ;6534E398-2; ; , Revision ;AE; ; as specified in this contract.  At least fourteen (14) calendar days before the beginning of the First Article testing, the\rcontractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests.\r(B)  The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ;\rThe contractor shall mark the report \"First Article Test Report\" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements.\r(C)  Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article.  The notice of approval, conditional\rapproval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.  A notice of conditional approval shall state any further action required of the\rcontractor.  A notice of disapproval shall cite reasons for disapproval.\r(D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests.  After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First\rArticle or select another First Article for testing.  All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval.  The contractor shall then conduct the tests and deliver another\rreport to the Government under the terms and conditions and within the time specified in paragraph B above.  The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any\radditional costs to the Government related to these tests.\r(E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract.\r(F)  Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for\racceptance.\r(G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates\rand/or the contract price, and any other contractual term affected by the delay.\r(H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor.  Before First Article approval, the costs thereof shall not be\rallocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair\rof the First Article during any First Article test.\r(I)  The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article.\r(J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on\rForm DD1222 (2 copies) which shall be forwarded with the test report.  Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test\rreport.\r4.10 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate)\r(A)  Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the\rOriginal Equipment Manufacturer/Prime Manufacturer.  An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that:\r(I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and\r(II) the production location to be used for this requirement is the same as used for the previous production run.\rAdditionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that:\r(I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer,\rand\r(II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause.\r(NOTE: This certification concerns a matter within the jurisdiction of an     agency of the United States and the making of a false, fictitious, or         fraudulent certification may render the maker subject to prosecution under    Title 18, United States\rCode, Section 1001.)\r(B)  Offerors requesting waiver of First Article Approval Requirements under  the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article      Approval Requirements and\rone that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the   price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First\rArticle Approval Requirements\r(C)  In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the\rgovernment notification of conditional approval or approval.  These requirements are specified in the quality assurance section of this solicitation.  If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule\rhe offers to the government.\r             Offeror's Proposed Alternate Delivery Schedule\r        (Based on waiver of First Article Approval Requirements)\rWithin Days:\rItem No. _____________  Quantity:_______   After Date of Contract:_________\r4.11 .  Mandatory Inspection Requirements:\r100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR).\rDuring production, mandatory inspection is required to be accomplished by the contractor as follows:\r  A.  Level of Inspection (LOI).\r      1.  Critical characteristics:  100% inspection shall apply.\r      2.  Major and Minor characteristics:  LOI shall be in accordance with a           sampling plan acceptable to the QAR.\r  B.  Critical characteristics:\r      ;DCMA QAR;\r   C.  Major and Minor characteristics\r      1.  Shall be defined by the contractor subject to QAR concurrence,       unless defined on applicable drawings and associated specifications.\r4.12 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying\roffice/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of\rwitnessing the final inspection. The contractor shall notify by email or\rTELEFAX PCO and NAWC Lakehurst QA ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-2834\rE-mail: jose.g.torraca.civ@us.navy.mil; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units.\r5.  PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6.  NOTES - NOT APPLICABLE\rTHIS IS A ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET.\rNAVSUP REFERENCE ONLY: PROCUREMENT TDR (24-10118):\r                       REPAIR TDR (26-10015)\rTHE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS \"CRITICAL\" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMMIT AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION.\rANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION.\rAll records pertaining to ALRE CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Tech-nical Authority. All records shall bemaintained by LKE QA and by the manufacturer for a period of seven years.\r\\\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items.\r Inspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked \"INSPECTION/CERTIFICATION DATA INCLUDED\".\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Material properties per Drawing 6532E398, 6532C406, 6532B408,6532B401,    6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419,    523736, 6532C405, 6532C407, and 6530C124.\rc. Dimensional Inspection per Drawing 6532E398, 6532C406, 6532B409, 6532B408,    6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468,    6532B419, 523736, 6532C405, 6532C407, and 6530C124.\rd. Torque per Drawing 6532E398.\re. Adjust valve per Drawing 6532E398.\rf. Identification per Drawing 6532E398, 6532C406, 6532B402, 6532D411,6532B412,    6532B413, 6532B430, 6532B468, 6532B419, 6532C405, and 6530C124.\rg. Lubrication per Drawing 6532B408.\rh. Verify weight not to exceed 3.0 pounds per Drawing 6532D411.\ri. Packaging and preservation per Drawing 6532D411.\rj. Heat Treat per Drawing 6532B419, 6532430, and 523736.\rk. Shot peen per Drawing 6532B419 and 523736.\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of Final Inspection.\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Material properties per Drawing 6532E398, 6532C406, 6532B408, 6532B401,    6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419,    523736, 6532C405, 6532C407, and 6530C124.\rc. Dimensional Inspection per Drawing 6532E398, 6532C406, 6532B409,    6532B408, 6532B401, 6532B402, 6532D411, 6532B412, 6532B413,    6532B430,    6532B468, 6532B419, 523736, 6532C405, 6532C407, and    6530C124.\rd. Torque per Drawing 6532E398.\re. Adjust valve per Drawing 6532E398.\rf. Identification per Drawing 6532E398, 6532C406, 6532B402, 6532D411,    6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 6532C405, and 6530C124.\rg. Anodize coating per Drawing 6532C406, 6532C405, and 6530C124.\rh. Lubrication per Drawing 6532B408.\ri. Passivate per Drawing 6532B401, 6532B402, 523736, and 6532C407.\rj. Finish per Drawing 6532D411 and 6532B412.\rk. Verify weight not to exceed 3.0 pounds per Drawing 6532D411.\rl. Packaging and preservation per Drawing 6532D411.\rm. Cadmium Plate per Drawing 6532B430.\rn. Heat Treat per Drawing 6532B419, 6532430, and 523736.\ro. Shot peen per Drawing 6532B419 and 523736.","text":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rINSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|ISO 9001 or its equivalent||||||||\rSTOP-WORK ORDER (AUG 1989)|1||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|SPRPA1|TBD|TBD|SEE SCHEDULE|TBD||||||||N/A|\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||\rMANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|robyn.grinarml@dla.mil|\rVALUE ENGINEERING (JUN 2020)|3||||\rINTEGRITY OF UNIT PRICES (NOV 2021)|1||\rEQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4|||||\rWARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS AFTER THE DATE OF THE LAST DELIVERY UNDER THIS CONTRACT,|45 DAYS AFTER DISCOVERY OF ANY DEFECT OR NONCONFORMANCE,|||||\rSMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4|||||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4|||||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rFIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10|||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rWARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2|||\rLIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1||\rESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1||\rREQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA --MODIFICATIONS (DEV 2026-O0048)(MAR 2026))|7||||||||\rFEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-PROHIBITION (DEC 2023)|12|||||||||||||\rSECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||\rROYALTY INFORMATION (APR 1984)|1||\rCOST ACCOUNTING STANDARD NOTICES AND CERTIFICATION (DEV 2026-O0006)(FEB 2026)|1||\rREQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)|1|Submit .pdf proposal and all supporting data by email.|\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|\rONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1||\rEVALUATION OF FIRST ARTICLE TESTING|3||||\rThe purpose of this amnedment is to update the TDP:\rFROM: TDP Ver. 009\r TO: TDP Ver. 010\rAll previous versions are now obsolete.\r\\\rThis is a NEW SPARES requirement.\rNo drawings are available for this requirement.\rNOTE: N23 APPROVED WAIVER ESRS CASE# N-KE-26-2000626 dtd 27JUL2026 APPLIES\rNOTE: FAR 52.246-17 Warranty of Supplies of a Noncomplex Nature, is included by full text within this solicitation:\r1. Warranty Obligation: Notwithstanding any prior First Article Testing (FAT) or Production Lot Testing (PLT), the contractor warrants that all supplies delivered under this contract will be free from defects in material, workmanship, and design, and will conform\rto all contract requirements after delivery.\r2. Proposal Requirement: If the offeror takes exception to, or does not explicitly comply with these warranty terms, the offeror must propose an alternate warranty within their submission.\r3. Consequence of Non-Compliance: Failure to explicitly agree to these terms or to propose an acceptable alternate warranty may result in the proposal being deemed technically unacceptable and excluded from evaluation.\rNotice to Distributors/Offerors: Consideration for award shall be given only to authorized distributors of the Original Equipment Manufacturer (OEM). If quoting as a distributor, the offeror MUST submit an unredacted OEM Distributor Letter explicitly authorizing\rresale of this Part Number at the exact time of proposal submission. Failure to provide this documentation with the initial offer will result in the quote being determined non-responsive and excluded from evaluation.\rFor Critical Safety Items (CSI), DFARS clause 252.209-7010, Identification of Critical Safety Items, is incorporated by reference.\rFor items for which Government inspection and acceptance will be conducted at the source, DLAD clause 52.246-9004, Product Verification Testing, is incorporated by reference. DLAD clauses can be viewed at http://www.dla.mil/Acquisition/Pages/DLAD.aspx.\rAs applicable, DFARS clause 252.242-7005, Contractor Business Systems, is incorporated by reference.\r\\\r1. SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved\rwill be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the\rSF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation:\r(A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the\rsame materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval.\r(B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors.\r(C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents.\r(D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings,\rforgings, etc.\r(E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics\rshould be discernible from all other characteristics.\rThe above requirements are a subset of requirements specified in the ASO\rSource Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with\rMDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval\rBrochure.\r1.4 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.5 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.6 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.8 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.9 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;6532E398-2; ) ;80020; , Revision ;AE; and all details and specifications referenced therein.\r1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r2. APPLICABLE DOCUMENTS\rDRAWING DATA=523123 |80020| C| |D| | | |\rDRAWING DATA=523736 |80020| -| |D| | | |\rDRAWING DATA=6530C124 |80020| K| |D| | | |\rDRAWING DATA=6532B401 |80020| E| |D| | | |\rDRAWING DATA=6532B402 |80020| E| |D| | | |\rDRAWING DATA=6532B408 |80020| E| |A| | | |\rDRAWING DATA=6532B409 |80020| D| |D| | | |\rDRAWING DATA=6532B412 |80020| H| |D| | | |\rDRAWING DATA=6532B413 |80020| D| |D| | | |\rDRAWING DATA=6532B430 |80020| F| |A| | | |\rDRAWING DATA=6532B468 |80020| F| |D| | | |\rDRAWING DATA=6532C405 |80020| G| |D| | | |\rDRAWING DATA=6532C406 |80020| F| |D| | | |\rDRAWING DATA=6532C407 |80020| K| |D| | | |\rDRAWING DATA=6532D411 |80020| L| |A| | | |\rDRAWING DATA=6532E398 |80020|AE| |D| | | |\r3. REQUIREMENTS - NOT APPLICABLE\r4. QUALITY ASSURANCE\rQUALITY ASSURANCE REQUIREMENTS:\r1. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications:\ra. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%;\rb. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%;\rc. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4.\rd. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4.\r2. First Article Testing:\rThe contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the\rprovisions of the applicable Contract Data Requirements List (CDRL).\ra. Requirements:\r i. First Article quantity is one (1); in uncoated condition.\r ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel.\r iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance;\r iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report;\rv. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or surveys;\rany problems identified during the conduct of the test will also require correction.\rb. Testing and evaluation:\r i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications.Results shall consist of actual\rdimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report.\rc. Acceptance/reject criteria:\ri. Satisfactorily meeting all requirements cited in the First Article Testing \"Requirements\" paragraph above and satisfactorily demonstrating 100% conformance to the test and evaluation elements cited in the First Article Testing \"Testing and evaluation\"\rparagraph above shall constitute acceptance of the First Article;\r ii. Failure to meet any of the conditions in the First Article Testing \"Requirements\" paragraph above or the First Article Testing \"Testing and evaluation\" paragraph above shall be cause for rejection.\rd. Delivery:\r i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming;\r ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's.\r3. Production Lot Special Tests: N/A\r4. For purposes of this TDR, the term NDT shall refer to the following methods: MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing.\r5. Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the organizations listed below as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall be bear\rthe symbols of accreditation and the accreditation body.\ra. American Association for Laboratory Accreditation (A2LA)\rb. ANSI National Accreditation Board (ANAB)\rc. International Accreditation Service, Inc (IAS)\rd. National Voluntary Laboratory Accreditation Program (NVLAP)\re. Perry Johnson Laboratory Accreditation, Inc (PJLA)\rf. Canadian Association for Laboratory Accreditation Inc. (CALA)\rg. Standards Council of Canada (SCC)\r4.1 Review documentation as provided under DD 1423 requirements.\r4.2 CRITICAL MANUFACTURING PROCESSES\r( ;APPLIES; ) HEAT TREAT\r( ; ; ) WELDING\r( ;APPLIES. PER DWG. 6532B430; ) CADMIUM PLATING\r( ; ; ) ENGINEERING CHROME PLATING\r( ; ; ) NICKEL CHROME PLATING\r( ; ; ) CASTING(S)\r( ; ; ) FORGING(S)\r( ; ; ) MPR (MATERIAL PROCESSING REQUIREMENTS)\r4.3 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below\r4.3.1 Dimensional test (special)\r ;APPLIES;\r4.3.2 Requirements of:\r ;LKE DRAWING PACKAGE;\r4.3.3 Form\r ;APPLIES;\r4.3.4 Fit\r ;N/A;\r4.3.5 Function\r ;N/A;\r4.3.6 Compliance with drawing ( ;6532E398; ) ;AE; , Revision ;80020; and specifications referenced therein.\r4.4 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements\r4.5 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection\r4.6 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing.\r4.6.1 The QAR shall be present to witness all First Article Testing.\r4.6.2 The following additional personnel shall witness the First Article Testing: ;DCMA QAR;\r4.7 Disposition of FAT samples\r4.7.1 ; ; Sample(s) may be destroyed during testing.\r4.7.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the\rsample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.\r4.8 Test Sample Coating Instructions\r4.8.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required.\r4.9 Notice to Government of Testing at the contractors facility.\r4.9.1 FAR 52.209-3 applies\r(A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;80020; ; ), Part Number ;6534E398-2; ; , Revision ;AE; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the\rcontractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests.\r(B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ;\rThe contractor shall mark the report \"First Article Test Report\" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements.\r(C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional\rapproval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the\rcontractor. A notice of disapproval shall cite reasons for disapproval.\r(D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First\rArticle or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another\rreport to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any\radditional costs to the Government related to these tests.\r(E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract.\r(F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for\racceptance.\r(G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates\rand/or the contract price, and any other contractual term affected by the delay.\r(H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be\rallocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair\rof the First Article during any First Article test.\r(I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article.\r(J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on\rForm DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test\rreport.\r4.10 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate)\r(A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the\rOriginal Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that:\r(I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and\r(II) the production location to be used for this requirement is the same as used for the previous production run.\rAdditionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that:\r(I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer,\rand\r(II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause.\r(NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States\rCode, Section 1001.)\r(B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and\rone that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First\rArticle Approval Requirements\r(C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the\rgovernment notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule\rhe offers to the government.\r Offeror's Proposed Alternate Delivery Schedule\r (Based on waiver of First Article Approval Requirements)\rWithin Days:\rItem No. _____________ Quantity:_______ After Date of Contract:_________\r4.11 . Mandatory Inspection Requirements:\r100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR).\rDuring production, mandatory inspection is required to be accomplished by the contractor as follows:\r A. Level of Inspection (LOI).\r 1. Critical characteristics: 100% inspection shall apply.\r 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR.\r B. Critical characteristics:\r ;DCMA QAR;\r C. Major and Minor characteristics\r 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications.\r4.12 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying\roffice/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of\rwitnessing the final inspection. The contractor shall notify by email or\rTELEFAX PCO and NAWC Lakehurst QA ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-2834\rE-mail: jose.g.torraca.civ@us.navy.mil; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units.\r5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6. NOTES - NOT APPLICABLE\rTHIS IS A ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET.\rNAVSUP REFERENCE ONLY: PROCUREMENT TDR (24-10118):\r REPAIR TDR (26-10015)\rTHE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS \"CRITICAL\" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMMIT AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION.\rANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION.\rAll records pertaining to ALRE CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Tech-nical Authority. All records shall bemaintained by LKE QA and by the manufacturer for a period of seven years.\r\\\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items.\r Inspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked \"INSPECTION/CERTIFICATION DATA INCLUDED\".\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Material properties per Drawing 6532E398, 6532C406, 6532B408,6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124.\rc. Dimensional Inspection per Drawing 6532E398, 6532C406, 6532B409, 6532B408, 6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124.\rd. Torque per Drawing 6532E398.\re. Adjust valve per Drawing 6532E398.\rf. Identification per Drawing 6532E398, 6532C406, 6532B402, 6532D411,6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 6532C405, and 6530C124.\rg. Lubrication per Drawing 6532B408.\rh. Verify weight not to exceed 3.0 pounds per Drawing 6532D411.\ri. Packaging and preservation per Drawing 6532D411.\rj. Heat Treat per Drawing 6532B419, 6532430, and 523736.\rk. Shot peen per Drawing 6532B419 and 523736.\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of Final Inspection.\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Material properties per Drawing 6532E398, 6532C406, 6532B408, 6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124.\rc. Dimensional Inspection per Drawing 6532E398, 6532C406, 6532B409, 6532B408, 6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124.\rd. Torque per Drawing 6532E398.\re. Adjust valve per Drawing 6532E398.\rf. Identification per Drawing 6532E398, 6532C406, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 6532C405, and 6530C124.\rg. Anodize coating per Drawing 6532C406, 6532C405, and 6530C124.\rh. Lubrication per Drawing 6532B408.\ri. Passivate per Drawing 6532B401, 6532B402, 523736, and 6532C407.\rj. Finish per Drawing 6532D411 and 6532B412.\rk. Verify weight not to exceed 3.0 pounds per Drawing 6532D411.\rl. Packaging and preservation per Drawing 6532D411.\rm. Cadmium Plate per Drawing 6532B430.\rn. Heat Treat per Drawing 6532B419, 6532430, and 523736.\ro. Shot peen per Drawing 6532B419 and 523736.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"SPRPA127RYA42","product_service_code":"4820"}],"due_at":"2026-12-10T18:00:00Z","due_date":"2026-12-10","closes_at":"2026-12-10T18:00:00Z","awardable":true,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"state_source":null,"state_evidence":"Product purchase (PSC 4820)","site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-11-18T05:19:57.406887Z","principal_notice_id":"7e759b623cad4445b2f6b4fd2a4ee3b3","description":{"text":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rINSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|ISO 9001 or its equivalent||||||||\rSTOP-WORK ORDER (AUG 1989)|1||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|SPRPA1|TBD|TBD|SEE SCHEDULE|TBD||||||||N/A|\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||\rMANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|robyn.grinarml@dla.mil|\rVALUE ENGINEERING (JUN 2020)|3||||\rINTEGRITY OF UNIT PRICES (NOV 2021)|1||\rEQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4|||||\rWARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS AFTER THE DATE OF THE LAST DELIVERY UNDER THIS CONTRACT,|45 DAYS AFTER DISCOVERY OF ANY DEFECT OR NONCONFORMANCE,|||||\rSMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4|||||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4|||||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rFIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10|||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rWARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2|||\rLIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1||\rESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1||\rREQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA --MODIFICATIONS (DEV 2026-O0048)(MAR 2026))|7||||||||\rFEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-PROHIBITION (DEC 2023)|12|||||||||||||\rSECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||\rROYALTY INFORMATION (APR 1984)|1||\rCOST ACCOUNTING STANDARD NOTICES AND CERTIFICATION (DEV 2026-O0006)(FEB 2026)|1||\rREQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)|1|Submit .pdf proposal and all supporting data by email.|\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|\rONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1||\rEVALUATION OF FIRST ARTICLE TESTING|3||||\rThe purpose of this amnedment is to update the TDP:\rFROM: TDP Ver. 009\r TO: TDP Ver. 010\rAll previous versions are now obsolete.\r\\\rThis is a NEW SPARES requirement.\rNo drawings are available for this requirement.\rNOTE: N23 APPROVED WAIVER ESRS CASE# N-KE-26-2000626 dtd 27JUL2026 APPLIES\rNOTE: FAR 52.246-17 Warranty of Supplies of a Noncomplex Nature, is included by full text within this solicitation:\r1. Warranty Obligation: Notwithstanding any prior First Article Testing (FAT) or Production Lot Testing (PLT), the contractor warrants that all supplies delivered under this contract will be free from defects in material, workmanship, and design, and will conform\rto all contract requirements after delivery.\r2. Proposal Requirement: If the offeror takes exception to, or does not explicitly comply with these warranty terms, the offeror must propose an alternate warranty within their submission.\r3. Consequence of Non-Compliance: Failure to explicitly agree to these terms or to propose an acceptable alternate warranty may result in the proposal being deemed technically unacceptable and excluded from evaluation.\rNotice to Distributors/Offerors: Consideration for award shall be given only to authorized distributors of the Original Equipment Manufacturer (OEM). If quoting as a distributor, the offeror MUST submit an unredacted OEM Distributor Letter explicitly authorizing\rresale of this Part Number at the exact time of proposal submission. Failure to provide this documentation with the initial offer will result in the quote being determined non-responsive and excluded from evaluation.\rFor Critical Safety Items (CSI), DFARS clause 252.209-7010, Identification of Critical Safety Items, is incorporated by reference.\rFor items for which Government inspection and acceptance will be conducted at the source, DLAD clause 52.246-9004, Product Verification Testing, is incorporated by reference. DLAD clauses can be viewed at http://www.dla.mil/Acquisition/Pages/DLAD.aspx.\rAs applicable, DFARS clause 252.242-7005, Contractor Business Systems, is incorporated by reference.\r\\\r1. SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved\rwill be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the\rSF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation:\r(A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the\rsame materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval.\r(B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors.\r(C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents.\r(D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings,\rforgings, etc.\r(E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics\rshould be discernible from all other characteristics.\rThe above requirements are a subset of requirements specified in the ASO\rSource Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with\rMDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval\rBrochure.\r1.4 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.5 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.6 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.8 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.9 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;6532E398-2; ) ;80020; , Revision ;AE; and all details and specifications referenced therein.\r1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r2. APPLICABLE DOCUMENTS\rDRAWING DATA=523123 |80020| C| |D| | | |\rDRAWING DATA=523736 |80020| -| |D| | | |\rDRAWING DATA=6530C124 |80020| K| |D| | | |\rDRAWING DATA=6532B401 |80020| E| |D| | | |\rDRAWING DATA=6532B402 |80020| E| |D| | | |\rDRAWING DATA=6532B408 |80020| E| |A| | | |\rDRAWING DATA=6532B409 |80020| D| |D| | | |\rDRAWING DATA=6532B412 |80020| H| |D| | | |\rDRAWING DATA=6532B413 |80020| D| |D| | | |\rDRAWING DATA=6532B430 |80020| F| |A| | | |\rDRAWING DATA=6532B468 |80020| F| |D| | | |\rDRAWING DATA=6532C405 |80020| G| |D| | | |\rDRAWING DATA=6532C406 |80020| F| |D| | | |\rDRAWING DATA=6532C407 |80020| K| |D| | | |\rDRAWING DATA=6532D411 |80020| L| |A| | | |\rDRAWING DATA=6532E398 |80020|AE| |D| | | |\r3. REQUIREMENTS - NOT APPLICABLE\r4. QUALITY ASSURANCE\rQUALITY ASSURANCE REQUIREMENTS:\r1. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications:\ra. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%;\rb. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%;\rc. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4.\rd. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4.\r2. First Article Testing:\rThe contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the\rprovisions of the applicable Contract Data Requirements List (CDRL).\ra. Requirements:\r i. First Article quantity is one (1); in uncoated condition.\r ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel.\r iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance;\r iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report;\rv. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or surveys;\rany problems identified during the conduct of the test will also require correction.\rb. Testing and evaluation:\r i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications.Results shall consist of actual\rdimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report.\rc. Acceptance/reject criteria:\ri. Satisfactorily meeting all requirements cited in the First Article Testing \"Requirements\" paragraph above and satisfactorily demonstrating 100% conformance to the test and evaluation elements cited in the First Article Testing \"Testing and evaluation\"\rparagraph above shall constitute acceptance of the First Article;\r ii. Failure to meet any of the conditions in the First Article Testing \"Requirements\" paragraph above or the First Article Testing \"Testing and evaluation\" paragraph above shall be cause for rejection.\rd. Delivery:\r i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming;\r ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's.\r3. Production Lot Special Tests: N/A\r4. For purposes of this TDR, the term NDT shall refer to the following methods: MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing.\r5. Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the organizations listed below as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall be bear\rthe symbols of accreditation and the accreditation body.\ra. American Association for Laboratory Accreditation (A2LA)\rb. ANSI National Accreditation Board (ANAB)\rc. International Accreditation Service, Inc (IAS)\rd. National Voluntary Laboratory Accreditation Program (NVLAP)\re. Perry Johnson Laboratory Accreditation, Inc (PJLA)\rf. Canadian Association for Laboratory Accreditation Inc. (CALA)\rg. Standards Council of Canada (SCC)\r4.1 Review documentation as provided under DD 1423 requirements.\r4.2 CRITICAL MANUFACTURING PROCESSES\r( ;APPLIES; ) HEAT TREAT\r( ; ; ) WELDING\r( ;APPLIES. PER DWG. 6532B430; ) CADMIUM PLATING\r( ; ; ) ENGINEERING CHROME PLATING\r( ; ; ) NICKEL CHROME PLATING\r( ; ; ) CASTING(S)\r( ; ; ) FORGING(S)\r( ; ; ) MPR (MATERIAL PROCESSING REQUIREMENTS)\r4.3 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below\r4.3.1 Dimensional test (special)\r ;APPLIES;\r4.3.2 Requirements of:\r ;LKE DRAWING PACKAGE;\r4.3.3 Form\r ;APPLIES;\r4.3.4 Fit\r ;N/A;\r4.3.5 Function\r ;N/A;\r4.3.6 Compliance with drawing ( ;6532E398; ) ;AE; , Revision ;80020; and specifications referenced therein.\r4.4 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements\r4.5 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection\r4.6 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing.\r4.6.1 The QAR shall be present to witness all First Article Testing.\r4.6.2 The following additional personnel shall witness the First Article Testing: ;DCMA QAR;\r4.7 Disposition of FAT samples\r4.7.1 ; ; Sample(s) may be destroyed during testing.\r4.7.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the\rsample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.\r4.8 Test Sample Coating Instructions\r4.8.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required.\r4.9 Notice to Government of Testing at the contractors facility.\r4.9.1 FAR 52.209-3 applies\r(A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;80020; ; ), Part Number ;6534E398-2; ; , Revision ;AE; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the\rcontractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests.\r(B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ;\rThe contractor shall mark the report \"First Article Test Report\" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements.\r(C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional\rapproval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the\rcontractor. A notice of disapproval shall cite reasons for disapproval.\r(D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First\rArticle or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another\rreport to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any\radditional costs to the Government related to these tests.\r(E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract.\r(F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for\racceptance.\r(G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates\rand/or the contract price, and any other contractual term affected by the delay.\r(H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be\rallocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair\rof the First Article during any First Article test.\r(I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article.\r(J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on\rForm DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test\rreport.\r4.10 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate)\r(A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the\rOriginal Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that:\r(I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and\r(II) the production location to be used for this requirement is the same as used for the previous production run.\rAdditionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that:\r(I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer,\rand\r(II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause.\r(NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States\rCode, Section 1001.)\r(B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and\rone that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First\rArticle Approval Requirements\r(C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the\rgovernment notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule\rhe offers to the government.\r Offeror's Proposed Alternate Delivery Schedule\r (Based on waiver of First Article Approval Requirements)\rWithin Days:\rItem No. _____________ Quantity:_______ After Date of Contract:_________\r4.11 . Mandatory Inspection Requirements:\r100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR).\rDuring production, mandatory inspection is required to be accomplished by the contractor as follows:\r A. Level of Inspection (LOI).\r 1. Critical characteristics: 100% inspection shall apply.\r 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR.\r B. Critical characteristics:\r ;DCMA QAR;\r C. Major and Minor characteristics\r 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications.\r4.12 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying\roffice/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of\rwitnessing the final inspection. The contractor shall notify by email or\rTELEFAX PCO and NAWC Lakehurst QA ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-2834\rE-mail: jose.g.torraca.civ@us.navy.mil; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units.\r5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6. NOTES - NOT APPLICABLE\rTHIS IS A ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET.\rNAVSUP REFERENCE ONLY: PROCUREMENT TDR (24-10118):\r REPAIR TDR (26-10015)\rTHE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS \"CRITICAL\" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMMIT AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION.\rANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION.\rAll records pertaining to ALRE CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Tech-nical Authority. All records shall bemaintained by LKE QA and by the manufacturer for a period of seven years.\r\\\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items.\r Inspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked \"INSPECTION/CERTIFICATION DATA INCLUDED\".\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Material properties per Drawing 6532E398, 6532C406, 6532B408,6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124.\rc. Dimensional Inspection per Drawing 6532E398, 6532C406, 6532B409, 6532B408, 6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124.\rd. Torque per Drawing 6532E398.\re. Adjust valve per Drawing 6532E398.\rf. Identification per Drawing 6532E398, 6532C406, 6532B402, 6532D411,6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 6532C405, and 6530C124.\rg. Lubrication per Drawing 6532B408.\rh. Verify weight not to exceed 3.0 pounds per Drawing 6532D411.\ri. Packaging and preservation per Drawing 6532D411.\rj. Heat Treat per Drawing 6532B419, 6532430, and 523736.\rk. Shot peen per Drawing 6532B419 and 523736.\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of Final Inspection.\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Material properties per Drawing 6532E398, 6532C406, 6532B408, 6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124.\rc. Dimensional Inspection per Drawing 6532E398, 6532C406, 6532B409, 6532B408, 6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 523736, 6532C405, 6532C407, and 6530C124.\rd. Torque per Drawing 6532E398.\re. Adjust valve per Drawing 6532E398.\rf. Identification per Drawing 6532E398, 6532C406, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 6532C405, and 6530C124.\rg. Anodize coating per Drawing 6532C406, 6532C405, and 6530C124.\rh. Lubrication per Drawing 6532B408.\ri. Passivate per Drawing 6532B401, 6532B402, 523736, and 6532C407.\rj. Finish per Drawing 6532D411 and 6532B412.\rk. Verify weight not to exceed 3.0 pounds per Drawing 6532D411.\rl. Packaging and preservation per Drawing 6532D411.\rm. Cadmium Plate per Drawing 6532B430.\rn. Heat Treat per Drawing 6532B419, 6532430, and 523736.\ro. Shot peen per Drawing 6532B419 and 523736.","html":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rINSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|ISO 9001 or its equivalent||||||||\rSTOP-WORK ORDER (AUG 1989)|1||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|SPRPA1|TBD|TBD|SEE SCHEDULE|TBD||||||||N/A|\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||\rMANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|robyn.grinarml@dla.mil|\rVALUE ENGINEERING (JUN 2020)|3||||\rINTEGRITY OF UNIT PRICES (NOV 2021)|1||\rEQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4|||||\rWARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS AFTER THE DATE OF THE LAST DELIVERY UNDER THIS CONTRACT,|45 DAYS AFTER DISCOVERY OF ANY DEFECT OR NONCONFORMANCE,|||||\rSMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4|||||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4|||||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rFIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10|||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rWARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2|||\rLIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1||\rESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1||\rREQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA --MODIFICATIONS (DEV 2026-O0048)(MAR 2026))|7||||||||\rFEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-PROHIBITION (DEC 2023)|12|||||||||||||\rSECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||\rROYALTY INFORMATION (APR 1984)|1||\rCOST ACCOUNTING STANDARD NOTICES AND CERTIFICATION (DEV 2026-O0006)(FEB 2026)|1||\rREQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)|1|Submit .pdf proposal and all supporting data by email.|\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|\rONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1||\rEVALUATION OF FIRST ARTICLE TESTING|3||||\rThe purpose of this amnedment is to update the TDP:\rFROM: TDP Ver. 009\r  TO: TDP Ver. 010\rAll previous versions are now obsolete.\r\\\rThis is a NEW SPARES requirement.\rNo drawings are available for this requirement.\rNOTE: N23 APPROVED WAIVER ESRS CASE# N-KE-26-2000626 dtd 27JUL2026 APPLIES\rNOTE: FAR 52.246-17 Warranty of Supplies of a Noncomplex Nature, is included by full text within this solicitation:\r1. Warranty Obligation: Notwithstanding any prior First Article Testing (FAT) or Production Lot Testing (PLT), the contractor warrants that all supplies delivered under this contract will be free from defects in material, workmanship, and design, and will conform\rto all contract requirements after delivery.\r2. Proposal Requirement: If the offeror takes exception to, or does not explicitly comply with these warranty terms, the offeror must propose an alternate warranty within their submission.\r3. Consequence of Non-Compliance: Failure to explicitly agree to these terms or to propose an acceptable alternate warranty may result in the proposal being deemed technically unacceptable and excluded from evaluation.\rNotice to Distributors/Offerors: Consideration for award shall be given only to authorized distributors of the Original Equipment Manufacturer (OEM). If quoting as a distributor, the offeror MUST submit an unredacted OEM Distributor Letter explicitly authorizing\rresale of this Part Number at the exact time of proposal submission. Failure to provide this documentation with the initial offer will result in the quote being determined non-responsive and excluded from evaluation.\rFor Critical Safety Items (CSI), DFARS clause 252.209-7010, Identification of Critical Safety Items, is incorporated by reference.\rFor items for which Government inspection and acceptance will be conducted at the source, DLAD clause 52.246-9004, Product Verification Testing, is  incorporated by reference.  DLAD clauses can be viewed at http://www.dla.mil/Acquisition/Pages/DLAD.aspx.\rAs applicable, DFARS clause 252.242-7005, Contractor Business Systems, is incorporated by reference.\r\\\r1.  SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command.  Only those companies who have submitted requests for source approval and been approved\rwill be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the\rSF33 for name and code).  The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation:\r(A)  Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the\rsame materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval.\r(B)  Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches.  These plans must note those operations and processes performed by subcontractors/ vendors.\r(C)  Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service.  Provide the most recent copies of the documents.\r(D)  A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval.  This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings,\rforgings, etc.\r(E)  Copy of inspection method sheets used in the manufacturing and at final inspection.  These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics\rshould be discernible from all other characteristics.\rThe above requirements are a subset of requirements specified in the ASO\rSource Approval Information Brochure dated January 1995.  The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with\rMDA which includes availability of complete data, MRB disposition, etc.  Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval\rBrochure.\r1.4 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.5 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.6 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.8 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.9 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;6532E398-2; ) ;80020;      , Revision ;AE; and all details and specifications referenced therein.\r1.11  Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.12  If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r2.  APPLICABLE DOCUMENTS\rDRAWING DATA=523123                                  |80020| C|   |D|            |  |     |\rDRAWING DATA=523736                                  |80020| -|   |D|            |  |     |\rDRAWING DATA=6530C124                                |80020| K|   |D|            |  |     |\rDRAWING DATA=6532B401                                |80020| E|   |D|            |  |     |\rDRAWING DATA=6532B402                                |80020| E|   |D|            |  |     |\rDRAWING DATA=6532B408                                |80020| E|   |A|            |  |     |\rDRAWING DATA=6532B409                                |80020| D|   |D|            |  |     |\rDRAWING DATA=6532B412                                |80020| H|   |D|            |  |     |\rDRAWING DATA=6532B413                                |80020| D|   |D|            |  |     |\rDRAWING DATA=6532B430                                |80020| F|   |A|            |  |     |\rDRAWING DATA=6532B468                                |80020| F|   |D|            |  |     |\rDRAWING DATA=6532C405                                |80020| G|   |D|            |  |     |\rDRAWING DATA=6532C406                                |80020| F|   |D|            |  |     |\rDRAWING DATA=6532C407                                |80020| K|   |D|            |  |     |\rDRAWING DATA=6532D411                                |80020| L|   |A|            |  |     |\rDRAWING DATA=6532E398                                |80020|AE|   |D|            |  |     |\r3.  REQUIREMENTS - NOT APPLICABLE\r4.  QUALITY ASSURANCE\rQUALITY ASSURANCE REQUIREMENTS:\r1. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications:\ra. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%;\rb. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%;\rc. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4.\rd. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4.\r2. First Article Testing:\rThe contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the\rprovisions of the applicable Contract Data Requirements List (CDRL).\ra. Requirements:\r  i. First Article quantity is one (1); in uncoated condition.\r  ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel.\r  iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance;\r  iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report;\rv. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or surveys;\rany problems identified during the conduct of the test will also require correction.\rb. Testing and evaluation:\r  i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications.Results shall consist of actual\rdimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report.\rc. Acceptance/reject criteria:\ri. Satisfactorily meeting all requirements cited in the First Article Testing \"Requirements\" paragraph above and satisfactorily demonstrating 100% conformance to the test and evaluation elements cited in the First Article Testing \"Testing and evaluation\"\rparagraph above shall constitute acceptance of the First Article;\r  ii. Failure to meet any of the conditions in the First Article Testing \"Requirements\" paragraph above or the First Article Testing \"Testing and evaluation\" paragraph above shall be cause for rejection.\rd. Delivery:\r  i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming;\r  ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's.\r3. Production Lot Special Tests: N/A\r4. For purposes of this TDR, the term NDT shall refer to the following methods: MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing.\r5. Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the organizations listed below as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall be bear\rthe symbols of accreditation and the accreditation body.\ra. American Association for Laboratory Accreditation (A2LA)\rb. ANSI National Accreditation Board (ANAB)\rc. International Accreditation Service, Inc (IAS)\rd. National Voluntary Laboratory Accreditation Program (NVLAP)\re. Perry Johnson Laboratory Accreditation, Inc (PJLA)\rf. Canadian Association for Laboratory Accreditation Inc. (CALA)\rg. Standards Council of Canada (SCC)\r4.1  Review documentation as provided under DD 1423 requirements.\r4.2 CRITICAL MANUFACTURING PROCESSES\r( ;APPLIES; )  HEAT TREAT\r( ; ; ) WELDING\r( ;APPLIES. PER DWG. 6532B430; ) CADMIUM PLATING\r( ; ; ) ENGINEERING CHROME PLATING\r( ; ; ) NICKEL CHROME PLATING\r( ; ; ) CASTING(S)\r( ; ; ) FORGING(S)\r( ; ; ) MPR (MATERIAL PROCESSING REQUIREMENTS)\r4.3  The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below\r4.3.1 Dimensional test (special)\r    ;APPLIES;\r4.3.2  Requirements of:\r     ;LKE DRAWING PACKAGE;\r4.3.3  Form\r    ;APPLIES;\r4.3.4  Fit\r     ;N/A;\r4.3.5  Function\r     ;N/A;\r4.3.6  Compliance with drawing ( ;6532E398; ) ;AE; , Revision ;80020; and specifications referenced therein.\r4.4  In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements\r4.5  The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection\r4.6  The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing.\r4.6.1  The QAR shall be present to witness all First Article Testing.\r4.6.2  The following additional personnel shall witness the First Article Testing: ;DCMA QAR;\r4.7  Disposition of FAT samples\r4.7.1 ; ; Sample(s) may be destroyed during testing.\r4.7.2 ;APPLIES;  Unless otherwise provided for in the contract, sample(s) shall  remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the\rsample(s) have inspection approval of the cognizant DCMC QAR.  Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.\r4.8  Test Sample Coating Instructions\r4.8.1  Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required.\r4.9  Notice to Government of Testing at the contractors facility.\r4.9.1  FAR 52.209-3 applies\r(A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;80020; ; ), Part Number ;6534E398-2; ; , Revision ;AE; ; as specified in this contract.  At least fourteen (14) calendar days before the beginning of the First Article testing, the\rcontractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests.\r(B)  The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ;\rThe contractor shall mark the report \"First Article Test Report\" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements.\r(C)  Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article.  The notice of approval, conditional\rapproval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.  A notice of conditional approval shall state any further action required of the\rcontractor.  A notice of disapproval shall cite reasons for disapproval.\r(D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests.  After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First\rArticle or select another First Article for testing.  All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval.  The contractor shall then conduct the tests and deliver another\rreport to the Government under the terms and conditions and within the time specified in paragraph B above.  The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any\radditional costs to the Government related to these tests.\r(E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract.\r(F)  Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for\racceptance.\r(G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates\rand/or the contract price, and any other contractual term affected by the delay.\r(H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor.  Before First Article approval, the costs thereof shall not be\rallocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair\rof the First Article during any First Article test.\r(I)  The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article.\r(J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on\rForm DD1222 (2 copies) which shall be forwarded with the test report.  Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test\rreport.\r4.10 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate)\r(A)  Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the\rOriginal Equipment Manufacturer/Prime Manufacturer.  An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that:\r(I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and\r(II) the production location to be used for this requirement is the same as used for the previous production run.\rAdditionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that:\r(I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer,\rand\r(II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause.\r(NOTE: This certification concerns a matter within the jurisdiction of an     agency of the United States and the making of a false, fictitious, or         fraudulent certification may render the maker subject to prosecution under    Title 18, United States\rCode, Section 1001.)\r(B)  Offerors requesting waiver of First Article Approval Requirements under  the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article      Approval Requirements and\rone that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the   price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First\rArticle Approval Requirements\r(C)  In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the\rgovernment notification of conditional approval or approval.  These requirements are specified in the quality assurance section of this solicitation.  If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule\rhe offers to the government.\r             Offeror's Proposed Alternate Delivery Schedule\r        (Based on waiver of First Article Approval Requirements)\rWithin Days:\rItem No. _____________  Quantity:_______   After Date of Contract:_________\r4.11 .  Mandatory Inspection Requirements:\r100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR).\rDuring production, mandatory inspection is required to be accomplished by the contractor as follows:\r  A.  Level of Inspection (LOI).\r      1.  Critical characteristics:  100% inspection shall apply.\r      2.  Major and Minor characteristics:  LOI shall be in accordance with a           sampling plan acceptable to the QAR.\r  B.  Critical characteristics:\r      ;DCMA QAR;\r   C.  Major and Minor characteristics\r      1.  Shall be defined by the contractor subject to QAR concurrence,       unless defined on applicable drawings and associated specifications.\r4.12 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying\roffice/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of\rwitnessing the final inspection. The contractor shall notify by email or\rTELEFAX PCO and NAWC Lakehurst QA ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-2834\rE-mail: jose.g.torraca.civ@us.navy.mil; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units.\r5.  PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6.  NOTES - NOT APPLICABLE\rTHIS IS A ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET.\rNAVSUP REFERENCE ONLY: PROCUREMENT TDR (24-10118):\r                       REPAIR TDR (26-10015)\rTHE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS \"CRITICAL\" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMMIT AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION.\rANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION.\rAll records pertaining to ALRE CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Tech-nical Authority. All records shall bemaintained by LKE QA and by the manufacturer for a period of seven years.\r\\\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items.\r Inspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked \"INSPECTION/CERTIFICATION DATA INCLUDED\".\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Material properties per Drawing 6532E398, 6532C406, 6532B408,6532B401,    6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419,    523736, 6532C405, 6532C407, and 6530C124.\rc. Dimensional Inspection per Drawing 6532E398, 6532C406, 6532B409, 6532B408,    6532B401, 6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468,    6532B419, 523736, 6532C405, 6532C407, and 6530C124.\rd. Torque per Drawing 6532E398.\re. Adjust valve per Drawing 6532E398.\rf. Identification per Drawing 6532E398, 6532C406, 6532B402, 6532D411,6532B412,    6532B413, 6532B430, 6532B468, 6532B419, 6532C405, and 6530C124.\rg. Lubrication per Drawing 6532B408.\rh. Verify weight not to exceed 3.0 pounds per Drawing 6532D411.\ri. Packaging and preservation per Drawing 6532D411.\rj. Heat Treat per Drawing 6532B419, 6532430, and 523736.\rk. Shot peen per Drawing 6532B419 and 523736.\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of Final Inspection.\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Material properties per Drawing 6532E398, 6532C406, 6532B408, 6532B401,    6532B402, 6532D411, 6532B412, 6532B413, 6532B430, 6532B468, 6532B419,    523736, 6532C405, 6532C407, and 6530C124.\rc. Dimensional Inspection per Drawing 6532E398, 6532C406, 6532B409,    6532B408, 6532B401, 6532B402, 6532D411, 6532B412, 6532B413,    6532B430,    6532B468, 6532B419, 523736, 6532C405, 6532C407, and    6530C124.\rd. Torque per Drawing 6532E398.\re. Adjust valve per Drawing 6532E398.\rf. Identification per Drawing 6532E398, 6532C406, 6532B402, 6532D411,    6532B412, 6532B413, 6532B430, 6532B468, 6532B419, 6532C405, and 6530C124.\rg. Anodize coating per Drawing 6532C406, 6532C405, and 6530C124.\rh. Lubrication per Drawing 6532B408.\ri. Passivate per Drawing 6532B401, 6532B402, 523736, and 6532C407.\rj. Finish per Drawing 6532D411 and 6532B412.\rk. Verify weight not to exceed 3.0 pounds per Drawing 6532D411.\rl. Packaging and preservation per Drawing 6532D411.\rm. Cadmium Plate per Drawing 6532B430.\rn. Heat Treat per Drawing 6532B419, 6532430, and 523736.\ro. Shot peen per Drawing 6532B419 and 523736.","origin":"detail"},"contacts":[{"name":"Telephone: 2157374024","role":"primary","email":"THOMAS.KUHNLE@DLA.MIL"}],"place_of_performance":null,"office_address":{"zip":"19111-5098","city":"PHILADELPHIA","state":"PA","country":"USA"},"naics_codes":["332919"],"award":null,"attachments":[{"resource_id":"931d24dc9b3a4b85977c9e09c246f8d6","name":"See Solicitation SPRPA127RYA42","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2026-11-10T12:22:42.251Z","export_controlled":false,"sha256":null,"url":"https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=SPRPA127RYA42","mirrored":false},{"resource_id":"fcc5b657bd1243a6807bca711e62d20a","name":"TDR 24-10118 DRAWING PACKAGE.zip","kind":"file","mime_type":".zip","size_bytes":2748037,"posted_at":"2026-11-16T14:04:43.467Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fcc5b657bd1243a6807bca711e62d20a/download","mirrored":false},{"resource_id":"a7ee3076d81443158397dcc2cf1f59f8","name":"neco.navy.mil","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2026-10-25T11:58:42.316Z","export_controlled":false,"sha256":null,"url":"https://www.neco.navy.mil/biz_ops/search_edi.aspx","mirrored":false},{"resource_id":"805333c9afbd4c279a358cd8c3bbdec3","name":"See Solicitation SPRPA127RYA420001","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2026-11-17T12:24:04.457Z","export_controlled":false,"sha256":null,"url":"https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=SPRPA127RYA420001","mirrored":false}],"awards":[],"related":[{"key":"SPRPA127RWA06","latest_notice_id":"62027fdd1ec0472296a914565dd09ba8","title":"16--DRIVE UNIT,HYDRAULI","solicitation_number":"SPRPA127RWA06","notice_type":"o","first_type":"p","first_posted":"2026-10-22","last_posted":"2026-11-10","notices":2,"due_at":"2026-11-25T18:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"336413","psc":"1650","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1650)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"SPRPA127QVA05","latest_notice_id":"f3bde6b5580d4dbead00d33fc462c395","title":"DISTRIBUTING SYSTEM","solicitation_number":"SPRPA127QVA05","notice_type":"o","first_type":"o","first_posted":"2026-10-20","last_posted":"2026-11-17","notices":3,"due_at":"2026-11-25T20:30:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"335311","psc":"6150","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6150)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"SPRPA127QRA38","latest_notice_id":"886537c7eaa6460daea352da2ed74210","title":"MISC RELAY PANEL,AI","solicitation_number":"SPRPA127QRA38","notice_type":"o","first_type":"o","first_posted":"2026-11-10","last_posted":"2026-11-10","notices":1,"due_at":"2026-11-25T20:30:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"336413","psc":"1680","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1680)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"SPRPA126RUX02","latest_notice_id":"5acedf5132b34461953e3b0dd7398fe8","title":"Performance Based Support (PB Follow-On) Consumable Item Requirements","solicitation_number":"SPRPA1-26-R-UX02","notice_type":"r","first_type":"r","first_posted":"2026-11-10","last_posted":"2026-11-10","notices":2,"due_at":"2026-11-25T21:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"336413","psc":"1560","set_aside":null,"state":"MO","county":"29189","county_name":"St. Louis County","city":"2931276","city_name":"Hazelwood","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"SPRPA126QYA91","latest_notice_id":"f99daa3ef7b744428be58f3ea9fafa58","title":"6615 - Procurement of NIIN 01-660-5102, Qty 12 each, SERVOCYLINDER","solicitation_number":"SPRPA126QYA91","notice_type":"p","first_type":"o","first_posted":"2026-01-08","last_posted":"2026-11-10","notices":2,"due_at":"2026-11-26T04:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T04:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"334511","psc":"6615","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6615)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"}],"similar_open":[{"key":"N5005427Q0020","latest_notice_id":"86b21068fc2e46218badc8b7e60a8ef6","title":"USS ARLINGTON (LPD-24) Expansion Joint Parts","solicitation_number":"N5005427Q0020","notice_type":"k","first_type":"k","first_posted":"2026-11-03","last_posted":"2026-11-17","notices":2,"due_at":"2026-11-25T16:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N50054","office_name":"MID ATLANTIC REG MAINT CTR","naics":"332919","psc":"4730","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 4730)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"SPRMM126QMJ18","latest_notice_id":"d983f6bad3d84a0b93b8a46a404d2cd9","title":"VALVE,DIAPHRAGM CON","solicitation_number":"SPRMM126QMJ18","notice_type":"o","first_type":"o","first_posted":"2026-09-11","last_posted":"2026-10-22","notices":2,"due_at":"2026-11-25T20:30:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRMM1","office_name":"SPRMM1 DLA MECHANICSBURG","naics":"332919","psc":"4820","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 4820)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-23T03:46:32.604852Z"},{"key":"N0010426QNE94","latest_notice_id":"76c3a2bd86c5455aaee0cf0a9cbc288f","title":"CAP,VALVE","solicitation_number":"N0010426QNE94","notice_type":"o","first_type":"o","first_posted":"2026-10-20","last_posted":"2026-10-28","notices":2,"due_at":"2026-11-26T22:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00104","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT MECH","naics":"332919","psc":"4820","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 4820)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"}],"similar_open_total":195,"indexable":true}