{"canonical":"https://sealedbidder.com/opportunities/sprpa125ret02","key":"SPRPA125RET02","url":"https://sealedbidder.com/opportunities/sprpa125ret02","title":"61--MOTOR,ALTERNATING C","solicitation_number":"SPRPA125RET02","notice_type":"a","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-08-14T18:00:00Z","first_posted":"2025-06-23","last_posted":"2025-10-22","department":"DEPT OF DEFENSE","subagency":"DEFENSE LOGISTICS AGENCY","office":"DLA AVIATION AT PHILADELPHIA, PA","naics":"335312","psc":"6105","set_aside":null,"place_state":"CT","place_scope":"nationwide","site":null,"place_state_source":null,"place_evidence":"Product purchase (PSC 6105)","place_county":"09180","place_county_name":"Southeastern Connecticut Planning Region","place_city":"0918006820","place_city_name":"Bozrah","winner":"ELECTRO MECHANICAL SPECIALISTS, LLC","award_amount":"892000","publications":[{"notice_id":"c823df54ab9945d1804018de6581dbb7","title":"6105 - 2 each P/N 400425-1 Motor Alternating","solicitation_number":"SPRPA125RET02","notice_type":"r","base_type":"r","posted":"2025-06-23","posted_at":"2025-06-23T16:21:44.300Z","due_at":"2025-06-30T04:00:00Z","due_date":"2025-06-30","cancelled":false,"archived":true,"archive_date":"2025-12-31","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c823df54ab9945d1804018de6581dbb7/view","enriched":true,"history":[{"index":3,"title":"6105 - 2 each P/N 400425-1 Motor Alternating","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-23T16:21:44.300Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"c823df54ab9945d1804018de6581dbb7","solicitation_number":"SPRPA125RET02"}]},{"notice_id":"5357c9a4980e4d1bb1ca94703e87f09f","title":"61--MOTOR,ALTERNATING C","solicitation_number":"SPRPA125RET02","notice_type":"p","base_type":"p","posted":"2025-06-28","posted_at":"2025-06-28T12:56:24.759Z","due_at":"2025-08-13T04:00:00Z","due_date":"2025-08-13","cancelled":false,"archived":true,"archive_date":"2025-08-28","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5357c9a4980e4d1bb1ca94703e87f09f/view","enriched":true,"history":[{"index":3,"title":"61--MOTOR,ALTERNATING C","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-28T12:56:24.759Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"5357c9a4980e4d1bb1ca94703e87f09f","solicitation_number":"SPRPA125RET02"}]},{"notice_id":"e11a1d4e97a24a9e97b54dcd0b65ba6b","title":"61--MOTOR,ALTERNATING C","solicitation_number":"SPRPA125RET02","notice_type":"o","base_type":"o","posted":"2025-07-15","posted_at":"2025-07-15T11:24:13.157Z","due_at":"2025-08-14T18:00:00Z","due_date":"2025-08-14","cancelled":false,"archived":true,"archive_date":"2025-08-29","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e11a1d4e97a24a9e97b54dcd0b65ba6b/view","enriched":true,"history":[{"index":3,"title":"61--MOTOR,ALTERNATING C","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T11:24:13.157Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e11a1d4e97a24a9e97b54dcd0b65ba6b","solicitation_number":"SPRPA125RET02"}]},{"notice_id":"ca842a35d4ed4500a9e1222797232803","title":"61--MOTOR,ALTERNATING C","solicitation_number":"SPRPA125RET02","notice_type":"a","base_type":"a","posted":"2025-10-22","posted_at":"2025-10-22T12:31:19.929Z","due_at":null,"due_date":null,"cancelled":false,"archived":true,"archive_date":"2025-11-05","removed_at":null,"award_number":"SPRPA126CYA02","awardee_name":"ELECTRO MECHANICAL SPECIALISTS, LLC","amount":"892000","link_sam":"https://sam.gov/workspace/contract/opp/ca842a35d4ed4500a9e1222797232803/view","enriched":true,"history":[{"index":3,"title":"61--MOTOR,ALTERNATING C","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-22T12:31:19.929Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"ca842a35d4ed4500a9e1222797232803","solicitation_number":"SPRPA125RET02"}]}],"latest_notice_id":"ca842a35d4ed4500a9e1222797232803","first_type":"r","notices":[{"dates":{"posted":"2025-06-23","posted_at":"2025-06-23T16:21:44.300Z","created_at":"2025-06-23T16:21:44.250Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-06-30T00:00:00-04:00","utc":"2025-06-30T04:00:00Z","date":"2025-06-30","time":"00:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c823df54ab9945d1804018de6581dbb7/view"},"naics":{"codes":["335312"],"primary":"335312"},"title":"6105 - 2 each P/N 400425-1 Motor Alternating","agency":{"office":{"code":"SPRPA1","name":"DLA AVIATION AT PHILADELPHIA, PA"},"subtier":{"code":"97AS","name":"DEFENSE LOGISTICS AGENCY"},"department":{"code":"097","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19111-5098","city":"PHILADELPHIA","state":"PA","country":"USA"},"organization_id":"500044424","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-31","archive_type":"auto_custom"},"history":[{"index":3,"title":"6105 - 2 each P/N 400425-1 Motor Alternating","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-23T16:21:44.300Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"c823df54ab9945d1804018de6581dbb7","solicitation_number":"SPRPA125RET02"}],"contacts":[{"name":"John McCarry APBB.16 \r\n445-737-0887","role":"primary","email":"john.mccarry@dla.mil"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"c823df54ab9945d1804018de6581dbb7","lineage_id":"c823df54ab9945d1804018de6581dbb7","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-12T03:04:01.803750925Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"755c3331e3d6698f0f15e17eed5c9209bfd41077f3483ad12f18c3d89f3928ec","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-12T03:04:01.803750925Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"DLA Aviation Philadelphia is seeking eligible contractors to furnish effort including labor, material, and facilities as may be required to manufacture the items as specified within this document.  \r\nThe Government intends to solicit and negotiate with only one source or a limited number of responsible sources under the authority of FAR 6.302-1. The Government intends to solicit for the procurement of: NSN 7RH 6105-00-635-5575, P/N 400425-1 Motor, Alternating  and the BRASO Team  the item is used on or supports.   The Government does not possess the data necessary to perform the required manufacture of the item.  \r\nAll responsible sources may express their interest and provide capability statements in response to this notice.\r\n This notice of intent is not a request for competitive proposals.  However, all proposals received within 15 days after the date of publication of this Sources Sought Notice may be considered by the Government.  A decision by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Only approved sources will be solicited, and source approval may be required.  DLA Aviation Philadelphia will not delay the award while source approval is pending.    \r\nThe time required for approval of a new source is normally such that an award cannot be delayed pending approval of a new source.   If you are not an approved source you must submit, together with your proposal, the information detailed in Source Approval Information Brochure for Spares.\r\n Additional information for submitting a Source Approval Request package can be obtained at: \r\nhttps://www.navsup.navy.mil \r\n\r\n\r\n \r\nThe POC is (john.mccarry@dla.mil).","text":"DLA Aviation Philadelphia is seeking eligible contractors to furnish effort including labor, material, and facilities as may be required to manufacture the items as specified within this document.\nThe Government intends to solicit and negotiate with only one source or a limited number of responsible sources under the authority of FAR 6.302-1. The Government intends to solicit for the procurement of: NSN 7RH 6105-00-635-5575, P/N 400425-1 Motor, Alternating and the BRASO Team the item is used on or supports. The Government does not possess the data necessary to perform the required manufacture of the item.\nAll responsible sources may express their interest and provide capability statements in response to this notice.\nThis notice of intent is not a request for competitive proposals. However, all proposals received within 15 days after the date of publication of this Sources Sought Notice may be considered by the Government. A decision by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Only approved sources will be solicited, and source approval may be required. DLA Aviation Philadelphia will not delay the award while source approval is pending.\nThe time required for approval of a new source is normally such that an award cannot be delayed pending approval of a new source. If you are not an approved source you must submit, together with your proposal, the information detailed in Source Approval Information Brochure for Spares.\nAdditional information for submitting a Source Approval Request package can be obtained at:\nhttps://www.navsup.navy.mil\n\nThe POC is (john.mccarry@dla.mil).","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"SPRPA125RET02","product_service_code":"6105"},{"dates":{"posted":"2025-06-28","posted_at":"2025-06-28T12:56:24.759Z","created_at":"2025-06-28T12:56:24.727Z","modified_at":"2025-08-29T04:04:37.364Z","response_deadline":{"raw":"2025-08-13T00:00:00-04:00","utc":"2025-08-13T04:00:00Z","date":"2025-08-13","time":"00:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5357c9a4980e4d1bb1ca94703e87f09f/view"},"naics":{},"title":"61--MOTOR,ALTERNATING C","agency":{"office":{"code":"SPRPA1","name":"DLA AVIATION AT PHILADELPHIA, PA"},"subtier":{"code":"97AS","name":"DEFENSE LOGISTICS AGENCY"},"department":{"code":"097","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19111-5098","city":"PHILADELPHIA","state":"PA","country":"USA"},"organization_id":"500044424","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-28","archive_type":"auto_custom"},"history":[{"index":3,"title":"61--MOTOR,ALTERNATING C","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-28T12:56:24.759Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"5357c9a4980e4d1bb1ca94703e87f09f","solicitation_number":"SPRPA125RET02"}],"contacts":[{"name":"JOHN M. MCCARRY, APBB.16, PHONE (215)737-3416, FAX (215)737-7149, EMAIL JOHN.MCCARRY@DLA.MIL","role":"primary","email":"JOHN.MCCARRY@DLA.MIL"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"5357c9a4980e4d1bb1ca94703e87f09f","lineage_id":"5357c9a4980e4d1bb1ca94703e87f09f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-11T16:41:49.965242169Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"8bf1d60252823b9a07c2d098c372640b432407aa78b2f62dbda5dbe00b203532","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-11T16:41:49.965242169Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"NSN 7R-6105-006355575-EY, TDP VER 002, QTY 2 EA, DELIVERY FOB ORIGIN. This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing/repair knowledge by the qualified source(s) require acquisition/repair of the part from the approved source(s). The approved source(s) retain data rights,manufacturing/repair knowledge, or technical data that are not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part. An alternate source must qualify in accordance with the design control activity's procedures, as approved by the cognizant Government engineering activity. The qualification procedures must be approved by the Government engineering activity having jurisdiction over the part in the intended application. Interested parties may obtain copies of Military and Federal Specificationsand Standards, Qualified Products Lists (QPLs), Qualified Product Databases(QPDs), Military Handbooks, and other standardized documents from the DoDSingle Stock Point (DODSSP) at Document Automation and Production Service(DAPS) in Philadelphia, PA. NOTE: Patterns, Drawings, Deviation Lists, Purchase Descriptions, etc. are NOT stocked at DODSSP. Most documents are available in Adobe PDF format from ASSIST-Online at: http://quicksearch.dla.mil/. Users may use ASSIST-Quick Search to search for and download available documents directly using standard browser software. Documents that are not available for downloading from ASSIST-Quick Search can be ordered from the DODSSP website using the ASSIST Shopping Wizard after obtaining a DODSSP Customer Account by following the registration procedures. Users who do not have access to the internet may contact the DODSSP ASSISTHelp Desk at 215-697-2667 or 215-697-2179 (DSN: 442-2667), or mail their request to DLADocument Services, Bldg. 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094. Award will be made only if the offeror, the product/service, or the manufacturer meets the qualification requirement(s) at time of award, in accordance with FAR clause 52.209-1. The solicitation identifies the office where additional information can be obtained concerning qualification requirements and is cited in each individual solicitation.","text":"NSN 7R-6105-006355575-EY, TDP VER 002, QTY 2 EA, DELIVERY FOB ORIGIN. This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing/repair knowledge by the qualified source(s) require acquisition/repair of the part from the approved source(s). The approved source(s) retain data rights,manufacturing/repair knowledge, or technical data that are not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part. An alternate source must qualify in accordance with the design control activity's procedures, as approved by the cognizant Government engineering activity. The qualification procedures must be approved by the Government engineering activity having jurisdiction over the part in the intended application. Interested parties may obtain copies of Military and Federal Specificationsand Standards, Qualified Products Lists (QPLs), Qualified Product Databases(QPDs), Military Handbooks, and other standardized documents from the DoDSingle Stock Point (DODSSP) at Document Automation and Production Service(DAPS) in Philadelphia, PA. NOTE: Patterns, Drawings, Deviation Lists, Purchase Descriptions, etc. are NOT stocked at DODSSP. Most documents are available in Adobe PDF format from ASSIST-Online at: http://quicksearch.dla.mil/. Users may use ASSIST-Quick Search to search for and download available documents directly using standard browser software. Documents that are not available for downloading from ASSIST-Quick Search can be ordered from the DODSSP website using the ASSIST Shopping Wizard after obtaining a DODSSP Customer Account by following the registration procedures. Users who do not have access to the internet may contact the DODSSP ASSISTHelp Desk at 215-697-2667 or 215-697-2179 (DSN: 442-2667), or mail their request to DLADocument Services, Bldg. 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094. Award will be made only if the offeror, the product/service, or the manufacturer meets the qualification requirement(s) at time of award, in accordance with FAR clause 52.209-1. The solicitation identifies the office where additional information can be obtained concerning qualification requirements and is cited in each individual solicitation.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"SPRPA125RET02","product_service_code":"6105"},{"dates":{"posted":"2025-07-15","posted_at":"2025-07-15T11:24:13.157Z","created_at":"2025-07-15T11:24:13.095Z","modified_at":"2025-08-29T04:04:37.364Z","response_deadline":{"raw":"2025-08-14T14:00:00-04:00","utc":"2025-08-14T18:00:00Z","date":"2025-08-14","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e11a1d4e97a24a9e97b54dcd0b65ba6b/view"},"naics":{"codes":["335312"],"primary":"335312"},"title":"61--MOTOR,ALTERNATING C","agency":{"office":{"code":"SPRPA1","name":"DLA AVIATION AT PHILADELPHIA, PA"},"subtier":{"code":"97AS","name":"DEFENSE LOGISTICS AGENCY"},"department":{"code":"097","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19111-5098","city":"PHILADELPHIA","state":"PA","country":"USA"},"organization_id":"500044424","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-29","archive_type":"auto15"},"history":[{"index":3,"title":"61--MOTOR,ALTERNATING C","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T11:24:13.157Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e11a1d4e97a24a9e97b54dcd0b65ba6b","solicitation_number":"SPRPA125RET02"}],"contacts":[{"name":"Telephone: 2157373416","role":"primary","email":"JOHN.MCCARRY@DLA.MIL"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"e11a1d4e97a24a9e97b54dcd0b65ba6b","lineage_id":"e11a1d4e97a24a9e97b54dcd0b65ba6b","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-10T02:06:21.393608274Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"3fa449537c38d0cdd7c79a72e3827c69bd3006e45b493f7df52bb67da9e6eb69","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-10T02:06:21.393608274Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|.|||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|.||||||||\rTIME OF DELIVERY (JUNE 1997)|20|0001|2 each|365||||||||||||||||||\rSTOP-WORK ORDER (AUG 1989)|1|.|\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|.|\rVALUE ENGINEERING (JUN 2020)|3|.|||\rINTEGRITY OF UNIT PRICES (NOV 2021)|1|.|\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|.||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|.||\rFIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|1 each|0001|14|15|jose.g.torraca.civ@us.navy.mil|TBD|0001|30|||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|.|||||||||||\rLIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|.|\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|.|||||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|.|||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|.|\rANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|335312|1250|||||||||||\rFACSIMILE PROPOSALS (OCT 1997)|1|na|\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||xx|\rEVALUATION OF FIRST ARTICLE TESTING|3|||x|\r1.  SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command.  Only those companies who have submitted requests for source approval and been approved\rwill be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the\rSF33 for name and code).  The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation:\r(A)  Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the\rsame materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval.\r(B)  Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches.  These plans must note those operations and processes performed by subcontractors/ vendors.\r(C)  Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service.  Provide the most recent copies of the documents.\r(D)  A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval.  This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings,\rforgings, etc.\r(E)  Copy of inspection method sheets used in the manufacturing and at final inspection.  These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics\rshould be discernible from all other characteristics.\rThe above requirements are a subset of requirements specified in the ASO\rSource Approval Information Brochure dated January 1995.  The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with\rMDA which includes availability of complete data, MRB disposition, etc.  Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval\rBrochure.\r1.4 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.5 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.6 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.8 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.9 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;80020; ) ;400425-1;      , Revision ;19; and all details and specifications referenced therein.\r1.11  Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.12  If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r2.  APPLICABLE DOCUMENTS\rDRAWING DATA=400425                                  |80020|19|   |D|            |  |     |\r3.  REQUIREMENTS - NOT APPLICABLE\r4.  QUALITY ASSURANCE\rQUALITY ASSURANCE REQUIREMENTS:\r1. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications:\r  a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%;\r  b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%;\r  c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4.\r  d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4.\r2. First Article Testing:\rThe contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the\rprovisions of the applicable Contract Data Requirements List (CDRL).\r  a. Requirements:\r    i. First Article quantity is one (1); in uncoated condition.\r    ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel.\r    iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance;\r    iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report;\r    v. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or\rsurveys; any problems identified during the conduct of the test will also require correction.\r  b. Testing and evaluation:\r    i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications.Results shall consist of actual\rdimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report.\rc. Acceptance/reject criteria:\r    i. Satisfactorily meeting all requirements cited in the First Article Testing \"Requirements\" paragraph above and satisfactorily demonstrating 100% conformance to the test and evaluation elements cited in the First Article Testing \"Testing and evaluation\"\rparagraph above shall constitute acceptance of the First Article;\r    ii. Failure to meet any of the conditions in the First Article Testing  \"Requirements\" paragraph above or the First Article Testing \"Testing and evaluation\" paragraph above shall be cause for rejection.\r  d. Delivery:\r    i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming;\r    ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's.\r3. Production Lot Special Tests:  N/A\r4. N/A\r5. N/A\r4.1  Review documentation as provided under DD 1423 requirements.\r4.2  The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below\r4.2.1 Dimensional test (special)\r    ;APPLIES;\r4.2.2  Requirements of:\r     ;NAWC LAKEHURST;\r4.2.3  Form\r    ;APPLIES;\r4.2.4  Fit\r     ;N/A;\r4.2.5  Function\r     ;N/A;\r4.2.6  Compliance with drawing ( ;(80020); ) ;400425; , Revision ;REV 19; and specifications referenced therein.\r4.3  In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements\r4.4  The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection\r4.5  The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing.\r4.5.1  The QAR shall be present to witness all First Article Testing.\r4.5.2  The following additional personnel shall witness the First Article Testing: ;DCMA QAR;\r4.6  Disposition of FAT samples\r4.6.1 ; ; Sample(s) may be destroyed during testing.\r4.6.2 ;ONE;  Unless otherwise provided for in the contract, sample(s) shall  remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s)\rhave inspection approval of the cognizant DCMC QAR.  Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.\r4.7  Test Sample Coating Instructions\r4.7.1  Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required.\r4.8  Notice to Government of Testing at the contractors facility.\r4.8.1  FAR 52.209-3 applies\r(A) The contractor shall present ;N/A; ; unit(s) of the following CAGE( ;(80020); ; ), Part Number ;400425-1; ; , Revision ;REV 19; ; as specified in this contract.  At least fourteen (14) calendar days before the beginning of the First Article testing, the\rcontractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests.\r(B)  The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ;\rThe contractor shall mark the report \"First Article Test Report\" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements.\r(C)  Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article.  The notice of approval, conditional\rapproval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.  A notice of conditional approval shall state any further action required of the\rcontractor.  A notice of disapproval shall cite reasons for disapproval.\r(D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests.  After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First\rArticle or select another First Article for testing.  All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval.  The contractor shall then conduct the tests and deliver another\rreport to the Government under the terms and conditions and within the time specified in paragraph B above.  The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any\radditional costs to the Government related to these tests.\r(E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract.\r(F)  Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for\racceptance.\r(G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates\rand/or the contract price, and any other contractual term affected by the delay.\r(H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor.  Before First Article approval, the costs thereof shall not be\rallocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair\rof the First Article during any First Article test.\r(I)  The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article.\r(J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on\rForm DD1222 (2 copies) which shall be forwarded with the test report.  Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test\rreport.\r4.9 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate)\r(A)  Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the\rOriginal Equipment Manufacturer/Prime Manufacturer.  An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that:\r(I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and\r(II) the production location to be used for this requirement is the same as used for the previous production run.\rAdditionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that:\r(I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer,\rand\r(II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause.\r(NOTE: This certification concerns a matter within the jurisdiction of an     agency of the United States and the making of a false, fictitious, or         fraudulent certification may render the maker subject to prosecution under    Title 18, United States\rCode, Section 1001.)\r(B)  Offerors requesting waiver of First Article Approval Requirements under  the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article      Approval Requirements and\rone that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the   price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First\rArticle Approval Requirements\r(C)  In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the\rgovernment notification of conditional approval or approval.  These requirements are specified in the quality assurance section of this solicitation.  If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule\rhe offers to the government.\r             Offeror's Proposed Alternate Delivery Schedule\r        (Based on waiver of First Article Approval Requirements)\rWithin Days:\rItem No. _____________  Quantity:_______   After Date of Contract:_________\r4.10 .  Mandatory Inspection Requirements:\r100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR).\rDuring production, mandatory inspection is required to be accomplished by the contractor as follows:\r  A.  Level of Inspection (LOI).\r      1.  Critical characteristics:  100% inspection shall apply.\r      2.  Major and Minor characteristics:  LOI shall be in accordance with a           sampling plan acceptable to the QAR.\r  B.  Critical characteristics:\r      ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-4265\rE-mail: jose.g.torraca.civ@us.navy.mil;\r   C.  Major and Minor characteristics\r      1.  Shall be defined by the contractor subject to QAR concurrence,       unless defined on applicable drawings and associated specifications.\r4.11 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying\roffice/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of\rwitnessing the final inspection. The contractor shall notify by email or\rTELEFAX PCO and NAWC Lakehurst QA ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-4265\rE-mail: jose.g.torraca.civ@us.navy.mil; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units.\r5.  PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6.  NOTES - NOT APPLICABLE\rTHIS IS A ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED  NAWC LKE DRAWING UPDATE SHEET.\rNAVSUP REFERENCE ONLY: PROCUREMENT TDR 25-10048\r                       REPAIR TDR 24-10158A\rTHE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS \"CRITICAL\" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMITTED AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION.\r ANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION.\rALL RECORDS PERTAINING TO ALRE CSI/CAI MANUFACTURE AND INSPECTION/TEST SHALL BE PROVIDED TO THE ALRE COGNIZANT TECHNICAL AUTHORITY. ALL RECORDS SHALL BE MAINTAINED BY LKE QA AND BY THE MANUFACTURER FOR A PERIOD OF SEVEN YEARS.\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items.\rInspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked \"INSPECTION/CERTIFICATION DATA INCLUDED\".\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Motor design requirements per Drawing 400425.\rc. Identification per Drawing 400425.\rd. Dimensional inspection per Drawing 400425.\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with Final Inspection.\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Motor design requirements per Drawing 400425.\rc. Identification per Drawing 400425.\rd. Dimensional inspection per Drawing 400425.","text":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|.|||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|.||||||||\rTIME OF DELIVERY (JUNE 1997)|20|0001|2 each|365||||||||||||||||||\rSTOP-WORK ORDER (AUG 1989)|1|.|\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|.|\rVALUE ENGINEERING (JUN 2020)|3|.|||\rINTEGRITY OF UNIT PRICES (NOV 2021)|1|.|\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|.||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|.||\rFIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|1 each|0001|14|15|jose.g.torraca.civ@us.navy.mil|TBD|0001|30|||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|.|||||||||||\rLIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|.|\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|.|||||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|.|||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|.|\rANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|335312|1250|||||||||||\rFACSIMILE PROPOSALS (OCT 1997)|1|na|\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||xx|\rEVALUATION OF FIRST ARTICLE TESTING|3|||x|\r1. SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved\rwill be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the\rSF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation:\r(A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the\rsame materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval.\r(B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors.\r(C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents.\r(D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings,\rforgings, etc.\r(E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics\rshould be discernible from all other characteristics.\rThe above requirements are a subset of requirements specified in the ASO\rSource Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with\rMDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval\rBrochure.\r1.4 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.5 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.6 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.8 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.9 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;80020; ) ;400425-1; , Revision ;19; and all details and specifications referenced therein.\r1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r2. APPLICABLE DOCUMENTS\rDRAWING DATA=400425 |80020|19| |D| | | |\r3. REQUIREMENTS - NOT APPLICABLE\r4. QUALITY ASSURANCE\rQUALITY ASSURANCE REQUIREMENTS:\r1. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications:\r a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%;\r b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%;\r c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4.\r d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4.\r2. First Article Testing:\rThe contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the\rprovisions of the applicable Contract Data Requirements List (CDRL).\r a. Requirements:\r i. First Article quantity is one (1); in uncoated condition.\r ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel.\r iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance;\r iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report;\r v. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or\rsurveys; any problems identified during the conduct of the test will also require correction.\r b. Testing and evaluation:\r i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications.Results shall consist of actual\rdimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report.\rc. Acceptance/reject criteria:\r i. Satisfactorily meeting all requirements cited in the First Article Testing \"Requirements\" paragraph above and satisfactorily demonstrating 100% conformance to the test and evaluation elements cited in the First Article Testing \"Testing and evaluation\"\rparagraph above shall constitute acceptance of the First Article;\r ii. Failure to meet any of the conditions in the First Article Testing \"Requirements\" paragraph above or the First Article Testing \"Testing and evaluation\" paragraph above shall be cause for rejection.\r d. Delivery:\r i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming;\r ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's.\r3. Production Lot Special Tests: N/A\r4. N/A\r5. N/A\r4.1 Review documentation as provided under DD 1423 requirements.\r4.2 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below\r4.2.1 Dimensional test (special)\r ;APPLIES;\r4.2.2 Requirements of:\r ;NAWC LAKEHURST;\r4.2.3 Form\r ;APPLIES;\r4.2.4 Fit\r ;N/A;\r4.2.5 Function\r ;N/A;\r4.2.6 Compliance with drawing ( ;(80020); ) ;400425; , Revision ;REV 19; and specifications referenced therein.\r4.3 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements\r4.4 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection\r4.5 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing.\r4.5.1 The QAR shall be present to witness all First Article Testing.\r4.5.2 The following additional personnel shall witness the First Article Testing: ;DCMA QAR;\r4.6 Disposition of FAT samples\r4.6.1 ; ; Sample(s) may be destroyed during testing.\r4.6.2 ;ONE; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s)\rhave inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.\r4.7 Test Sample Coating Instructions\r4.7.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required.\r4.8 Notice to Government of Testing at the contractors facility.\r4.8.1 FAR 52.209-3 applies\r(A) The contractor shall present ;N/A; ; unit(s) of the following CAGE( ;(80020); ; ), Part Number ;400425-1; ; , Revision ;REV 19; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the\rcontractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests.\r(B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ;\rThe contractor shall mark the report \"First Article Test Report\" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements.\r(C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional\rapproval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the\rcontractor. A notice of disapproval shall cite reasons for disapproval.\r(D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First\rArticle or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another\rreport to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any\radditional costs to the Government related to these tests.\r(E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract.\r(F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for\racceptance.\r(G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates\rand/or the contract price, and any other contractual term affected by the delay.\r(H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be\rallocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair\rof the First Article during any First Article test.\r(I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article.\r(J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on\rForm DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test\rreport.\r4.9 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate)\r(A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the\rOriginal Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that:\r(I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and\r(II) the production location to be used for this requirement is the same as used for the previous production run.\rAdditionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that:\r(I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer,\rand\r(II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause.\r(NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States\rCode, Section 1001.)\r(B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and\rone that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First\rArticle Approval Requirements\r(C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the\rgovernment notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule\rhe offers to the government.\r Offeror's Proposed Alternate Delivery Schedule\r (Based on waiver of First Article Approval Requirements)\rWithin Days:\rItem No. _____________ Quantity:_______ After Date of Contract:_________\r4.10 . Mandatory Inspection Requirements:\r100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR).\rDuring production, mandatory inspection is required to be accomplished by the contractor as follows:\r A. Level of Inspection (LOI).\r 1. Critical characteristics: 100% inspection shall apply.\r 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR.\r B. Critical characteristics:\r ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-4265\rE-mail: jose.g.torraca.civ@us.navy.mil;\r C. Major and Minor characteristics\r 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications.\r4.11 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying\roffice/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of\rwitnessing the final inspection. The contractor shall notify by email or\rTELEFAX PCO and NAWC Lakehurst QA ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-4265\rE-mail: jose.g.torraca.civ@us.navy.mil; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units.\r5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6. NOTES - NOT APPLICABLE\rTHIS IS A ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET.\rNAVSUP REFERENCE ONLY: PROCUREMENT TDR 25-10048\r REPAIR TDR 24-10158A\rTHE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS \"CRITICAL\" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMITTED AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION.\r ANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION.\rALL RECORDS PERTAINING TO ALRE CSI/CAI MANUFACTURE AND INSPECTION/TEST SHALL BE PROVIDED TO THE ALRE COGNIZANT TECHNICAL AUTHORITY. ALL RECORDS SHALL BE MAINTAINED BY LKE QA AND BY THE MANUFACTURER FOR A PERIOD OF SEVEN YEARS.\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items.\rInspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked \"INSPECTION/CERTIFICATION DATA INCLUDED\".\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Motor design requirements per Drawing 400425.\rc. Identification per Drawing 400425.\rd. Dimensional inspection per Drawing 400425.\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with Final Inspection.\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Motor design requirements per Drawing 400425.\rc. Identification per Drawing 400425.\rd. Dimensional inspection per Drawing 400425.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"SPRPA125RET02","product_service_code":"6105"},{"award":{"date":"2025-10-21","amount":"892000","number":"SPRPA126CYA02","awardee":{"raw":"ELECTRO MECHANICAL SPECIALISTS, LLC","uei":"QVMBB4UCMEH4","cage":"3BAS6","name":"ELECTRO MECHANICAL SPECIALISTS, LLC"}},"dates":{"posted":"2025-10-22","posted_at":"2025-10-22T12:31:19.929Z","award_date":"2025-10-21","created_at":"2025-10-22T12:31:19.878Z","modified_at":"2025-11-06T04:55:45.018Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/ca842a35d4ed4500a9e1222797232803/view"},"naics":{},"title":"61--MOTOR,ALTERNATING C","agency":{"office":{"code":"SPRPA1","name":"DLA AVIATION AT PHILADELPHIA, PA"},"subtier":{"code":"97AS","name":"DEFENSE LOGISTICS AGENCY"},"department":{"code":"097","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19111-5098","city":"PHILADELPHIA","state":"PA","country":"USA"},"organization_id":"500044424","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-11-05","archive_type":"auto_custom"},"history":[{"index":3,"title":"61--MOTOR,ALTERNATING C","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-22T12:31:19.929Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"ca842a35d4ed4500a9e1222797232803","solicitation_number":"SPRPA125RET02"}],"contacts":[{"name":"JOHN M. MCCARRY, APBB.16, PHONE (215)737-3416, FAX (215)737-7149, EMAIL JOHN.MCCARRY@DLA.MIL","role":"primary","email":"JOHN.MCCARRY@DLA.MIL"}],"base_type":{"code":"a","label":"Award Notice"},"notice_id":"ca842a35d4ed4500a9e1222797232803","lineage_id":"ca842a35d4ed4500a9e1222797232803","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-25T02:44:00.580817803Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"c65f71b47d6b9925e689626e297985be4aeee270ebd37444cdecb774274b03d5","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-25T02:44:00.580817803Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"SPRPA125RET02","product_service_code":"6105"}],"due_at":"2025-08-14T18:00:00Z","due_date":"2025-08-14","closes_at":"2025-08-14T18:00:00Z","awardable":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","state":"CT","county":"09180","county_name":"Southeastern Connecticut Planning Region","city":"0918006820","city_name":"Bozrah","country":null,"state_source":null,"state_evidence":"Product purchase (PSC 6105)","site_key":null,"winner_key":"QVMBB4UCMEH4","amount":"892000","linked_awards":4,"cancelled":false,"archived":true,"updated_at":"2026-10-25T02:50:49.747137Z","principal_notice_id":"e11a1d4e97a24a9e97b54dcd0b65ba6b","description":{"text":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|.|||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|.||||||||\rTIME OF DELIVERY (JUNE 1997)|20|0001|2 each|365||||||||||||||||||\rSTOP-WORK ORDER (AUG 1989)|1|.|\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|.|\rVALUE ENGINEERING (JUN 2020)|3|.|||\rINTEGRITY OF UNIT PRICES (NOV 2021)|1|.|\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|.||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|.||\rFIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|1 each|0001|14|15|jose.g.torraca.civ@us.navy.mil|TBD|0001|30|||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|.|||||||||||\rLIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|.|\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|.|||||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|.|||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|.|\rANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|335312|1250|||||||||||\rFACSIMILE PROPOSALS (OCT 1997)|1|na|\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||xx|\rEVALUATION OF FIRST ARTICLE TESTING|3|||x|\r1. SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved\rwill be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the\rSF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation:\r(A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the\rsame materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval.\r(B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors.\r(C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents.\r(D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings,\rforgings, etc.\r(E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics\rshould be discernible from all other characteristics.\rThe above requirements are a subset of requirements specified in the ASO\rSource Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with\rMDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval\rBrochure.\r1.4 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.5 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.6 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.8 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.9 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;80020; ) ;400425-1; , Revision ;19; and all details and specifications referenced therein.\r1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r2. APPLICABLE DOCUMENTS\rDRAWING DATA=400425 |80020|19| |D| | | |\r3. REQUIREMENTS - NOT APPLICABLE\r4. QUALITY ASSURANCE\rQUALITY ASSURANCE REQUIREMENTS:\r1. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications:\r a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%;\r b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%;\r c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4.\r d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4.\r2. First Article Testing:\rThe contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the\rprovisions of the applicable Contract Data Requirements List (CDRL).\r a. Requirements:\r i. First Article quantity is one (1); in uncoated condition.\r ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel.\r iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance;\r iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report;\r v. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or\rsurveys; any problems identified during the conduct of the test will also require correction.\r b. Testing and evaluation:\r i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications.Results shall consist of actual\rdimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report.\rc. Acceptance/reject criteria:\r i. Satisfactorily meeting all requirements cited in the First Article Testing \"Requirements\" paragraph above and satisfactorily demonstrating 100% conformance to the test and evaluation elements cited in the First Article Testing \"Testing and evaluation\"\rparagraph above shall constitute acceptance of the First Article;\r ii. Failure to meet any of the conditions in the First Article Testing \"Requirements\" paragraph above or the First Article Testing \"Testing and evaluation\" paragraph above shall be cause for rejection.\r d. Delivery:\r i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming;\r ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's.\r3. Production Lot Special Tests: N/A\r4. N/A\r5. N/A\r4.1 Review documentation as provided under DD 1423 requirements.\r4.2 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below\r4.2.1 Dimensional test (special)\r ;APPLIES;\r4.2.2 Requirements of:\r ;NAWC LAKEHURST;\r4.2.3 Form\r ;APPLIES;\r4.2.4 Fit\r ;N/A;\r4.2.5 Function\r ;N/A;\r4.2.6 Compliance with drawing ( ;(80020); ) ;400425; , Revision ;REV 19; and specifications referenced therein.\r4.3 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements\r4.4 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection\r4.5 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing.\r4.5.1 The QAR shall be present to witness all First Article Testing.\r4.5.2 The following additional personnel shall witness the First Article Testing: ;DCMA QAR;\r4.6 Disposition of FAT samples\r4.6.1 ; ; Sample(s) may be destroyed during testing.\r4.6.2 ;ONE; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s)\rhave inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.\r4.7 Test Sample Coating Instructions\r4.7.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required.\r4.8 Notice to Government of Testing at the contractors facility.\r4.8.1 FAR 52.209-3 applies\r(A) The contractor shall present ;N/A; ; unit(s) of the following CAGE( ;(80020); ; ), Part Number ;400425-1; ; , Revision ;REV 19; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the\rcontractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests.\r(B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ;\rThe contractor shall mark the report \"First Article Test Report\" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements.\r(C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional\rapproval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the\rcontractor. A notice of disapproval shall cite reasons for disapproval.\r(D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First\rArticle or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another\rreport to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any\radditional costs to the Government related to these tests.\r(E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract.\r(F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for\racceptance.\r(G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates\rand/or the contract price, and any other contractual term affected by the delay.\r(H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be\rallocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair\rof the First Article during any First Article test.\r(I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article.\r(J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on\rForm DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test\rreport.\r4.9 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate)\r(A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the\rOriginal Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that:\r(I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and\r(II) the production location to be used for this requirement is the same as used for the previous production run.\rAdditionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that:\r(I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer,\rand\r(II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause.\r(NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States\rCode, Section 1001.)\r(B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and\rone that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First\rArticle Approval Requirements\r(C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the\rgovernment notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule\rhe offers to the government.\r Offeror's Proposed Alternate Delivery Schedule\r (Based on waiver of First Article Approval Requirements)\rWithin Days:\rItem No. _____________ Quantity:_______ After Date of Contract:_________\r4.10 . Mandatory Inspection Requirements:\r100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR).\rDuring production, mandatory inspection is required to be accomplished by the contractor as follows:\r A. Level of Inspection (LOI).\r 1. Critical characteristics: 100% inspection shall apply.\r 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR.\r B. Critical characteristics:\r ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-4265\rE-mail: jose.g.torraca.civ@us.navy.mil;\r C. Major and Minor characteristics\r 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications.\r4.11 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying\roffice/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of\rwitnessing the final inspection. The contractor shall notify by email or\rTELEFAX PCO and NAWC Lakehurst QA ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-4265\rE-mail: jose.g.torraca.civ@us.navy.mil; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units.\r5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6. NOTES - NOT APPLICABLE\rTHIS IS A ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET.\rNAVSUP REFERENCE ONLY: PROCUREMENT TDR 25-10048\r REPAIR TDR 24-10158A\rTHE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS \"CRITICAL\" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMITTED AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION.\r ANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION.\rALL RECORDS PERTAINING TO ALRE CSI/CAI MANUFACTURE AND INSPECTION/TEST SHALL BE PROVIDED TO THE ALRE COGNIZANT TECHNICAL AUTHORITY. ALL RECORDS SHALL BE MAINTAINED BY LKE QA AND BY THE MANUFACTURER FOR A PERIOD OF SEVEN YEARS.\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items.\rInspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked \"INSPECTION/CERTIFICATION DATA INCLUDED\".\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Motor design requirements per Drawing 400425.\rc. Identification per Drawing 400425.\rd. Dimensional inspection per Drawing 400425.\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with Final Inspection.\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Motor design requirements per Drawing 400425.\rc. Identification per Drawing 400425.\rd. Dimensional inspection per Drawing 400425.","html":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|.|||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|.||||||||\rTIME OF DELIVERY (JUNE 1997)|20|0001|2 each|365||||||||||||||||||\rSTOP-WORK ORDER (AUG 1989)|1|.|\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|.|\rVALUE ENGINEERING (JUN 2020)|3|.|||\rINTEGRITY OF UNIT PRICES (NOV 2021)|1|.|\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|.||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|.||\rFIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|1 each|0001|14|15|jose.g.torraca.civ@us.navy.mil|TBD|0001|30|||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|.|||||||||||\rLIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|.|\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|.|||||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|.|||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|.|\rANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|335312|1250|||||||||||\rFACSIMILE PROPOSALS (OCT 1997)|1|na|\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||xx|\rEVALUATION OF FIRST ARTICLE TESTING|3|||x|\r1.  SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command.  Only those companies who have submitted requests for source approval and been approved\rwill be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the\rSF33 for name and code).  The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation:\r(A)  Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the\rsame materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval.\r(B)  Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches.  These plans must note those operations and processes performed by subcontractors/ vendors.\r(C)  Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service.  Provide the most recent copies of the documents.\r(D)  A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval.  This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings,\rforgings, etc.\r(E)  Copy of inspection method sheets used in the manufacturing and at final inspection.  These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics\rshould be discernible from all other characteristics.\rThe above requirements are a subset of requirements specified in the ASO\rSource Approval Information Brochure dated January 1995.  The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with\rMDA which includes availability of complete data, MRB disposition, etc.  Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval\rBrochure.\r1.4 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.5 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.6 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.8 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.9 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;80020; ) ;400425-1;      , Revision ;19; and all details and specifications referenced therein.\r1.11  Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.12  If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r2.  APPLICABLE DOCUMENTS\rDRAWING DATA=400425                                  |80020|19|   |D|            |  |     |\r3.  REQUIREMENTS - NOT APPLICABLE\r4.  QUALITY ASSURANCE\rQUALITY ASSURANCE REQUIREMENTS:\r1. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications:\r  a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%;\r  b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%;\r  c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4.\r  d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4.\r2. First Article Testing:\rThe contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the\rprovisions of the applicable Contract Data Requirements List (CDRL).\r  a. Requirements:\r    i. First Article quantity is one (1); in uncoated condition.\r    ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel.\r    iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance;\r    iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report;\r    v. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or\rsurveys; any problems identified during the conduct of the test will also require correction.\r  b. Testing and evaluation:\r    i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications.Results shall consist of actual\rdimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report.\rc. Acceptance/reject criteria:\r    i. Satisfactorily meeting all requirements cited in the First Article Testing \"Requirements\" paragraph above and satisfactorily demonstrating 100% conformance to the test and evaluation elements cited in the First Article Testing \"Testing and evaluation\"\rparagraph above shall constitute acceptance of the First Article;\r    ii. Failure to meet any of the conditions in the First Article Testing  \"Requirements\" paragraph above or the First Article Testing \"Testing and evaluation\" paragraph above shall be cause for rejection.\r  d. Delivery:\r    i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming;\r    ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's.\r3. Production Lot Special Tests:  N/A\r4. N/A\r5. N/A\r4.1  Review documentation as provided under DD 1423 requirements.\r4.2  The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below\r4.2.1 Dimensional test (special)\r    ;APPLIES;\r4.2.2  Requirements of:\r     ;NAWC LAKEHURST;\r4.2.3  Form\r    ;APPLIES;\r4.2.4  Fit\r     ;N/A;\r4.2.5  Function\r     ;N/A;\r4.2.6  Compliance with drawing ( ;(80020); ) ;400425; , Revision ;REV 19; and specifications referenced therein.\r4.3  In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements\r4.4  The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection\r4.5  The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing.\r4.5.1  The QAR shall be present to witness all First Article Testing.\r4.5.2  The following additional personnel shall witness the First Article Testing: ;DCMA QAR;\r4.6  Disposition of FAT samples\r4.6.1 ; ; Sample(s) may be destroyed during testing.\r4.6.2 ;ONE;  Unless otherwise provided for in the contract, sample(s) shall  remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s)\rhave inspection approval of the cognizant DCMC QAR.  Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.\r4.7  Test Sample Coating Instructions\r4.7.1  Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required.\r4.8  Notice to Government of Testing at the contractors facility.\r4.8.1  FAR 52.209-3 applies\r(A) The contractor shall present ;N/A; ; unit(s) of the following CAGE( ;(80020); ; ), Part Number ;400425-1; ; , Revision ;REV 19; ; as specified in this contract.  At least fourteen (14) calendar days before the beginning of the First Article testing, the\rcontractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests.\r(B)  The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ;\rThe contractor shall mark the report \"First Article Test Report\" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements.\r(C)  Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article.  The notice of approval, conditional\rapproval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.  A notice of conditional approval shall state any further action required of the\rcontractor.  A notice of disapproval shall cite reasons for disapproval.\r(D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests.  After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First\rArticle or select another First Article for testing.  All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval.  The contractor shall then conduct the tests and deliver another\rreport to the Government under the terms and conditions and within the time specified in paragraph B above.  The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any\radditional costs to the Government related to these tests.\r(E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract.\r(F)  Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for\racceptance.\r(G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates\rand/or the contract price, and any other contractual term affected by the delay.\r(H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor.  Before First Article approval, the costs thereof shall not be\rallocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair\rof the First Article during any First Article test.\r(I)  The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article.\r(J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on\rForm DD1222 (2 copies) which shall be forwarded with the test report.  Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test\rreport.\r4.9 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate)\r(A)  Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the\rOriginal Equipment Manufacturer/Prime Manufacturer.  An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that:\r(I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and\r(II) the production location to be used for this requirement is the same as used for the previous production run.\rAdditionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that:\r(I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer,\rand\r(II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause.\r(NOTE: This certification concerns a matter within the jurisdiction of an     agency of the United States and the making of a false, fictitious, or         fraudulent certification may render the maker subject to prosecution under    Title 18, United States\rCode, Section 1001.)\r(B)  Offerors requesting waiver of First Article Approval Requirements under  the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article      Approval Requirements and\rone that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the   price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First\rArticle Approval Requirements\r(C)  In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the\rgovernment notification of conditional approval or approval.  These requirements are specified in the quality assurance section of this solicitation.  If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule\rhe offers to the government.\r             Offeror's Proposed Alternate Delivery Schedule\r        (Based on waiver of First Article Approval Requirements)\rWithin Days:\rItem No. _____________  Quantity:_______   After Date of Contract:_________\r4.10 .  Mandatory Inspection Requirements:\r100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR).\rDuring production, mandatory inspection is required to be accomplished by the contractor as follows:\r  A.  Level of Inspection (LOI).\r      1.  Critical characteristics:  100% inspection shall apply.\r      2.  Major and Minor characteristics:  LOI shall be in accordance with a           sampling plan acceptable to the QAR.\r  B.  Critical characteristics:\r      ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-4265\rE-mail: jose.g.torraca.civ@us.navy.mil;\r   C.  Major and Minor characteristics\r      1.  Shall be defined by the contractor subject to QAR concurrence,       unless defined on applicable drawings and associated specifications.\r4.11 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying\roffice/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of\rwitnessing the final inspection. The contractor shall notify by email or\rTELEFAX PCO and NAWC Lakehurst QA ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-4265\rE-mail: jose.g.torraca.civ@us.navy.mil; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units.\r5.  PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6.  NOTES - NOT APPLICABLE\rTHIS IS A ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED  NAWC LKE DRAWING UPDATE SHEET.\rNAVSUP REFERENCE ONLY: PROCUREMENT TDR 25-10048\r                       REPAIR TDR 24-10158A\rTHE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS \"CRITICAL\" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMITTED AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION.\r ANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION.\rALL RECORDS PERTAINING TO ALRE CSI/CAI MANUFACTURE AND INSPECTION/TEST SHALL BE PROVIDED TO THE ALRE COGNIZANT TECHNICAL AUTHORITY. ALL RECORDS SHALL BE MAINTAINED BY LKE QA AND BY THE MANUFACTURER FOR A PERIOD OF SEVEN YEARS.\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items.\rInspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked \"INSPECTION/CERTIFICATION DATA INCLUDED\".\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Motor design requirements per Drawing 400425.\rc. Identification per Drawing 400425.\rd. Dimensional inspection per Drawing 400425.\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with Final Inspection.\rData Requirements:\ra. Copies of all approved requests for variations.\rb. Motor design requirements per Drawing 400425.\rc. Identification per Drawing 400425.\rd. Dimensional inspection per Drawing 400425.","origin":"detail"},"contacts":[{"name":"JOHN M. MCCARRY, APBB.16, PHONE (215)737-3416, FAX (215)737-7149, EMAIL JOHN.MCCARRY@DLA.MIL","role":"primary","email":"JOHN.MCCARRY@DLA.MIL"}],"place_of_performance":null,"office_address":{"zip":"19111-5098","city":"PHILADELPHIA","state":"PA","country":"USA"},"naics_codes":["335312"],"award":null,"attachments":[{"resource_id":"08893b21c8b047a3aec487b0b2db304e","name":"neco.navy.mil","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2025-10-22T12:31:19.929Z","export_controlled":false,"sha256":null,"url":"https://www.neco.navy.mil/biz_ops/search_edi.aspx","mirrored":false},{"resource_id":"4aad912acecd45d188e5c3ba95852043","name":"neco.navy.mil","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2025-06-28T12:56:24.759Z","export_controlled":false,"sha256":null,"url":"https://www.neco.navy.mil/biz_ops/search_edi.aspx","mirrored":false},{"resource_id":"c94cc3aebfff45cf9e1b7058dd25767a","name":"neco.navy.mil","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2025-07-15T11:24:13.157Z","export_controlled":false,"sha256":null,"url":"https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=SPRPA125RET02","mirrored":false}],"awards":[{"award_key":"CONT_AWD_SPRPA126CYA02_9700_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_SPRPA126CYA02_9700_-NONE-_-NONE-/","piid":"SPRPA126CYA02","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"QVMBB4UCMEH4","recipient_name":"ELECTRO MECHANICAL SPECIALISTS, LLC","recipient_uei":"QVMBB4UCMEH4","recipient_cage":"3BAS6","recipient_city":"BOZRAH","recipient_state":"CT","sub_name":"Defense Logistics Agency","office_name":"DLA AVIATION AT PHILADELPHIA, PA","office_key":"o-SPRPA1","first_action_date":"2025-10-21","last_action_date":"2025-10-21","actions":1,"obligated":"892000.00","current_total_value":"892000.00","potential_total_value":"892000.00","naics":"335312","psc":"6105","extent_competed":"NOT COMPETED","set_aside":"NO SET ASIDE USED.","offers_received":1,"description":"MOTOR,ALTERNATING C","method":"solicitation","confidence":"high","evidence":["solicitation number SPRPA125RET02 equals the FPDS solicitation identifier","same awarding office SPRPA1"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"SPRPA127RWA06","latest_notice_id":"62027fdd1ec0472296a914565dd09ba8","title":"16--DRIVE UNIT,HYDRAULI","solicitation_number":"SPRPA127RWA06","notice_type":"o","first_type":"p","first_posted":"2026-10-22","last_posted":"2026-11-10","notices":2,"due_at":"2026-11-25T18:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"336413","psc":"1650","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1650)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"SPRPA127QVA05","latest_notice_id":"f3bde6b5580d4dbead00d33fc462c395","title":"DISTRIBUTING SYSTEM","solicitation_number":"SPRPA127QVA05","notice_type":"o","first_type":"o","first_posted":"2026-10-20","last_posted":"2026-11-17","notices":3,"due_at":"2026-11-25T20:30:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"335311","psc":"6150","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6150)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"SPRPA127QRA38","latest_notice_id":"886537c7eaa6460daea352da2ed74210","title":"MISC RELAY PANEL,AI","solicitation_number":"SPRPA127QRA38","notice_type":"o","first_type":"o","first_posted":"2026-11-10","last_posted":"2026-11-10","notices":1,"due_at":"2026-11-25T20:30:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"336413","psc":"1680","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1680)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"SPRPA126RUX02","latest_notice_id":"5acedf5132b34461953e3b0dd7398fe8","title":"Performance Based Support (PB Follow-On) Consumable Item Requirements","solicitation_number":"SPRPA1-26-R-UX02","notice_type":"r","first_type":"r","first_posted":"2026-11-10","last_posted":"2026-11-10","notices":2,"due_at":"2026-11-25T21:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"336413","psc":"1560","set_aside":null,"state":"MO","county":"29189","county_name":"St. Louis County","city":"2931276","city_name":"Hazelwood","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"SPRPA126QYA91","latest_notice_id":"f99daa3ef7b744428be58f3ea9fafa58","title":"6615 - Procurement of NIIN 01-660-5102, Qty 12 each, SERVOCYLINDER","solicitation_number":"SPRPA126QYA91","notice_type":"p","first_type":"o","first_posted":"2026-01-08","last_posted":"2026-11-10","notices":2,"due_at":"2026-11-26T04:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T04:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"334511","psc":"6615","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6615)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"}],"similar_open":[{"key":"SPE4A527T3459","latest_notice_id":"bbc88fd7dd8540c48799f1207899346c","title":"61--MOTOR,DIRECT CURRENT","solicitation_number":"SPE4A527T3459","notice_type":"k","first_type":"k","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":null,"due_date":"2026-11-25","closes_at":"2026-11-26T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPE4A5","office_name":"DLA AVIATION","naics":"335312","psc":"61","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"ENT: LINE 0001 QTY 17 UI EA DELIVER TO: DLA DISTRIBUTION DEPOT OKLAHOMA BY:","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"W31P4Q27RA007","latest_notice_id":"6a1f8a51ba6c43dba7f1bd620a411cb1","title":"Motor, Control","solicitation_number":"W31P4Q27RA007","notice_type":"o","first_type":"o","first_posted":"2026-10-15","last_posted":"2026-10-15","notices":1,"due_at":"2026-11-26T21:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W31P4Q","office_name":"W6QK ACC-RSA","naics":"335312","psc":"6105","set_aside":null,"state":"TX","county":"48141","county_name":"El Paso County","city":"4826664","city_name":"Fort Bliss","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-16T03:38:05.572608Z"},{"key":"N0010427QLA15","latest_notice_id":"88f3499f27dd4a528d6394868184e847","title":"MOTOR,ALTERNATING C","solicitation_number":"N0010427QLA15","notice_type":"o","first_type":"o","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":1,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00104","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT MECH","naics":"335312","psc":"6105","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"COST TO GOVERNMENT. \"ALL FREIGHT IS FOB ORIGIN","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"}],"similar_open_total":65,"indexable":false}