{"canonical":"https://sealedbidder.com/opportunities/sprpa125reg64","key":"SPRPA125REG64","url":"https://sealedbidder.com/opportunities/sprpa125reg64","title":"SHIPPING AND STORAG","solicitation_number":"SPRPA125REG64","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-04-14T18:00:00Z","first_posted":"2025-02-27","last_posted":"2025-03-18","department":"DEPT OF DEFENSE","subagency":"DEFENSE LOGISTICS AGENCY","office":"DLA AVIATION AT PHILADELPHIA, PA","naics":"332439","psc":"8145","set_aside":null,"place_state":null,"place_scope":"nationwide","site":null,"place_state_source":null,"place_evidence":"Product purchase (PSC 8145)","place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"b5dce1fe749047489679dcbad394e0b8","title":"8145 - NSN 6KH 8145 015638435 YR, P/N 774E001, SHIPPING AND STORAG","solicitation_number":"SPRPA125REG64","notice_type":"r","base_type":"r","posted":"2025-02-27","posted_at":"2025-02-27T22:41:21.578Z","due_at":"2025-03-06T04:00:00Z","due_date":"2025-03-06","cancelled":false,"archived":true,"archive_date":"2025-03-21","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b5dce1fe749047489679dcbad394e0b8/view","enriched":true,"history":[{"index":3,"title":"8145 - NSN 6KH 8145 015638435 YR, P/N 774E001, SHIPPING AND STORAG","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-27T22:41:21.578Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"b5dce1fe749047489679dcbad394e0b8","solicitation_number":"SPRPA125REG64"}]},{"notice_id":"8fd3000b71144edd87a41db50a3fd004","title":"SHIPPING AND STORAG","solicitation_number":"SPRPA125REG64","notice_type":"o","base_type":"o","posted":"2025-03-14","posted_at":"2025-03-14T13:07:11.047Z","due_at":"2025-04-14T18:00:00Z","due_date":"2025-04-14","cancelled":false,"archived":true,"archive_date":"2025-04-29","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/8fd3000b71144edd87a41db50a3fd004/view","enriched":true,"history":[{"index":3,"title":"SHIPPING AND STORAG","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-18T14:40:51.408Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"966b98115883433292abb2153d17dfab","solicitation_number":"SPRPA125REG64","parent_opportunity_id":"8fd3000b71144edd87a41db50a3fd004"},{"index":1,"title":"SHIPPING AND STORAG","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-14T13:07:11.047Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8fd3000b71144edd87a41db50a3fd004","solicitation_number":"SPRPA125REG64"}]},{"notice_id":"966b98115883433292abb2153d17dfab","title":"SHIPPING AND STORAG","solicitation_number":"SPRPA125REG64","notice_type":"o","base_type":"o","posted":"2025-03-18","posted_at":"2025-03-18T14:40:51.408Z","due_at":"2025-04-14T18:00:00Z","due_date":"2025-04-14","cancelled":false,"archived":true,"archive_date":"2025-04-29","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/966b98115883433292abb2153d17dfab/view","enriched":true,"history":[{"index":3,"title":"SHIPPING AND STORAG","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-18T14:40:51.408Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"966b98115883433292abb2153d17dfab","solicitation_number":"SPRPA125REG64","parent_opportunity_id":"8fd3000b71144edd87a41db50a3fd004"},{"index":1,"title":"SHIPPING AND STORAG","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-14T13:07:11.047Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8fd3000b71144edd87a41db50a3fd004","solicitation_number":"SPRPA125REG64"}]}],"latest_notice_id":"966b98115883433292abb2153d17dfab","first_type":"r","notices":[{"dates":{"posted":"2025-02-27","posted_at":"2025-02-27T22:41:21.578Z","created_at":"2025-02-27T22:41:21.569Z","modified_at":"2025-03-22T03:55:45.478Z","response_deadline":{"raw":"2025-03-06T00:00:00-04:00","utc":"2025-03-06T04:00:00Z","date":"2025-03-06","time":"00:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b5dce1fe749047489679dcbad394e0b8/view"},"naics":{"codes":["332439"],"primary":"332439"},"title":"8145 - NSN 6KH 8145 015638435 YR, P/N 774E001, SHIPPING AND STORAG","agency":{"office":{"code":"SPRPA1","name":"DLA AVIATION AT PHILADELPHIA, PA"},"subtier":{"code":"97AS","name":"DEFENSE LOGISTICS AGENCY"},"department":{"code":"097","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19111-5098","city":"PHILADELPHIA","state":"PA","country":"USA"},"organization_id":"500044424","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-03-21","archive_type":"auto_custom"},"history":[{"index":3,"title":"8145 - NSN 6KH 8145 015638435 YR, P/N 774E001, SHIPPING AND STORAG","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-27T22:41:21.578Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"b5dce1fe749047489679dcbad394e0b8","solicitation_number":"SPRPA125REG64"}],"contacts":[{"name":"GIA.PANTALEO@DLA.MIL","role":"primary","email":"gia.pantaleo@dla.mil"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"b5dce1fe749047489679dcbad394e0b8","lineage_id":"b5dce1fe749047489679dcbad394e0b8","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-21T12:05:11.961549371Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"9e031c51aeaee8c0be52eb88dc2ab0ec604f9e574f91d32b281b0a0bf3ae6c47","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-21T12:05:11.961549371Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"DLA Aviation Philadelphia is seeking eligible contractors to furnish effort including labor, material, and facilities as may be required to manufacture the items as specified within this document.  \r\nThe Government intends to solicit and negotiate with only one source or a limited number of responsible sources under the authority of FAR 6.302-1. The Government intends to solicit for the procurement of: NSN 6KH 8145 015638435 YR, P/N 774E001, SHIPPING AND STORAG. (If procuring multiple items, see attached listing). The Government does not possess the data necessary to perform the required manufacture of the item.  \r\nAll responsible sources may express their interest and provide capability statements in response to this notice.\r\n This notice of intent is not a request for competitive proposals.  However, all proposals received within 5 days after the date of publication of this Sources Sought Notice may be considered by the Government.  A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Only approved sources will be solicited, and source approval may be required.  DLA Aviation Philadelphia will not delay award while source approval is pending.    \r\nThe time required for approval of a new source is normally such that an award cannot be delayed pending approval of a new source.  This item requires engineering source approval by the design activity in order to maintain the quality of the part.\r\nIf you have not manufactured this item before for DLA Aviation Philadelphia and want to become an approved source of supply, please contact the buyer to inquire about Source Approval Request procedures.\r\n\r\nThe POC is Gia.Pantaleo@dla.mil.","text":"DLA Aviation Philadelphia is seeking eligible contractors to furnish effort including labor, material, and facilities as may be required to manufacture the items as specified within this document.\nThe Government intends to solicit and negotiate with only one source or a limited number of responsible sources under the authority of FAR 6.302-1. The Government intends to solicit for the procurement of: NSN 6KH 8145 015638435 YR, P/N 774E001, SHIPPING AND STORAG. (If procuring multiple items, see attached listing). The Government does not possess the data necessary to perform the required manufacture of the item.\nAll responsible sources may express their interest and provide capability statements in response to this notice.\nThis notice of intent is not a request for competitive proposals. However, all proposals received within 5 days after the date of publication of this Sources Sought Notice may be considered by the Government. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Only approved sources will be solicited, and source approval may be required. DLA Aviation Philadelphia will not delay award while source approval is pending.\nThe time required for approval of a new source is normally such that an award cannot be delayed pending approval of a new source. This item requires engineering source approval by the design activity in order to maintain the quality of the part.\nIf you have not manufactured this item before for DLA Aviation Philadelphia and want to become an approved source of supply, please contact the buyer to inquire about Source Approval Request procedures.\n\nThe POC is Gia.Pantaleo@dla.mil.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"SPRPA125REG64","product_service_code":"8145"},{"dates":{"posted":"2025-03-14","posted_at":"2025-03-14T13:07:11.047Z","created_at":"2025-03-14T13:07:11.023Z","modified_at":"2025-04-30T03:55:49.556Z","response_deadline":{"raw":"2025-04-14T14:00:00-04:00","utc":"2025-04-14T18:00:00Z","date":"2025-04-14","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/8fd3000b71144edd87a41db50a3fd004/view"},"naics":{"codes":["332439"],"primary":"332439"},"title":"SHIPPING AND STORAG","agency":{"office":{"code":"SPRPA1","name":"DLA AVIATION AT PHILADELPHIA, PA"},"subtier":{"code":"97AS","name":"DEFENSE LOGISTICS AGENCY"},"department":{"code":"097","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19111-5098","city":"PHILADELPHIA","state":"PA","country":"USA"},"organization_id":"500044424","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-04-29","archive_type":"auto15"},"history":[{"index":3,"title":"SHIPPING AND STORAG","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-18T14:40:51.408Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"966b98115883433292abb2153d17dfab","solicitation_number":"SPRPA125REG64","parent_opportunity_id":"8fd3000b71144edd87a41db50a3fd004"},{"index":1,"title":"SHIPPING AND STORAG","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-14T13:07:11.047Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8fd3000b71144edd87a41db50a3fd004","solicitation_number":"SPRPA125REG64"}],"contacts":[{"name":"Telephone: 2157372249","role":"primary","email":"GIA.PANTALEO@DLA.MIL"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"8fd3000b71144edd87a41db50a3fd004","lineage_id":"8fd3000b71144edd87a41db50a3fd004","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-20T09:40:26.048939787Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"2745ec637368f34b5641d56568b924c9b47f7894e97ab50e99d7349d1c3cc6a0","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-20T09:40:26.048939787Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||||||||\rTIME OF DELIVERY (JUNE 1997)|20|0001AA|4 EA|365 DAYS AFTER FAT APPROVAL|0001AB|1 LO|180 DAYS ADO|||||||||||||||\rSTOP-WORK ORDER (AUG 1989)|1||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|TBD|TBD|TBD|TBD|TBD|||||||||\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||\rVALUE ENGINEERING (JUN 2020)|3||||\rEQUAL OPPORTUNITY (SEP 2016)|2|||\rINTEGRITY OF UNIT PRICES (NOV 2021)|1||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rLIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1||\rNOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1||\rROYALTY INFORMATION (APR 1984)|1||\rANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|12|332439|500|||||||||||\rFACSIMILE PROPOSALS (OCT 1997)|1||\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|\rTHIS PROCUREMENT HAS BEEN SET-ASIDE FOR SMALL BUSINESS.\rTHIS ITEM REQUIRES ENGINEERING SOURCE APPROVAL BY THE DESIGN ACTIVITY IN ORDERTO MAINTAIN THE QUALITY OF THE PART.  IF YOU HAVE NOT MANUFACTURED THIS ITEMBEFORE FOR DLA AVIATION PHILADELPHIA AND WANT TO BECOME AN APPROVED SOURCE OFSUPPLY, PLEASE CONTACT THE BUYER\rTO INQUIRE ABOUT SOURCE APPROVAL REQUESTPROCEDURES.\r\\\r1.  SCOPE\r1.1 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.2 Container shell material is ;linear low density polyethylene(Plastic); .\r1.3  Manufacturing process is ;Rotomolding; .\r1.4 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;Container Research Corporation; drawing number ( ;05259; ) ;774E001;      , Revision ;latest; and all details and specifications referenced therein.\r1.5  Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be\rprovided by the Government or any other source and is the sole responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.\r1.6  If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r1.7 When discrepancies exist between these requirements and those on current\rmanufacturer's drawings,contact code ;Contact Buyer on Page 1 of Contract; or code N241.10\r2.  APPLICABLE DOCUMENTS\rDRAWING DATA=DL774E001                               |05259|  |   |D|            |  |     |\rDRAWING DATA=15930                                   |80132| C|   |D|            |  |     |\r3.  REQUIREMENTS\r3.1  One third (1/3) unit of desiccant (MIL-D-3464, Type II nondusting) per cubic foot of container interior volume shall be placed in desiccant holder of each container at time of shipment.\r3.2  Reference to Cadmium plating shall be deleted and the following substituted:  \"Finish shall be electrodeposited alkaline Zinc-Nickel Alloy in accordance with ASTM B 841 Class 1, Type B, Grade 3.\"\r3.3 The shock mount listed in the drawing package (whether identified as sole source, recommended, or suggested) has been tested and approved for the shock mitigation system of this container. No other shock mount may be substituted without written permission\rof Naval Inventory Control Point, Philadelphia unless an alternate is specifically indentified in this contract. ;no other mount; is an approved alternate mount.\rAll containers must be affixed with a nameplate that includes a\rUnique Identification (UID) marking as referenced in the drawing package\rDrawing ;(80132) 15930;  and IAW Mil-STD-130 latest revision. The contractor\rshall contact NAVICP code ;Buyer on Page One; or code 0771.10 for the alphanumeric\rsequential serial number group that makes up part of the UID.\rThe UIDwill be included on the nameplate in data matrix format.\r3.4 Welding and welder qualifications shall be in accordance with AWS D1.1\rfor steel, AWS D1.2 or MIL-W-22248,Class 4 for aluminum, AWS D1.3\rfor sheet steel and AWS D1.6 for stainless steel. Proper controls shall be used to prevent melt through or burn through. For aluminum, filler for welding 6061 alloy shall be 4043: filler for welding 5000 series alloys\rto themselves or to 6061 shall be 5356 or 5556. In addition,welding and\rweld inspection shall include:\r(1) Visual inspection shall include 5X (5power) magnification when a suspect\rcondition is to be examined beyond the capability of normal vision.\r(2) Critical and major welds may be subjected to further non destructive\rtesting (such as dye penetrant inspection)as prescribed by the buying         activity.\r(3) Proper documentation shall be available for review by Government personnel.\r3.5  WORK INSTRUCTIONS.  Work instructions shall be posted at theoperator's  work station giving procedures to control the welding process,   i.e., filler material, weld size, electrical and gas characteristics,      including flow rate.\r3.6  MATERIALS AND MATERIALS CONTROL.  The quality program shall assure that the materials used in fabrication or processing, i.e., base metals and weld filler material, be inspected and conform to the applicable physical, chemical and other technical\rrequirements (supplier's certification is sufficient).\r3.7  CONTROLS.  Weld filler materials shall be clearly identified and segregated from each other both when in storage and at the work station.  Work station environment shall be controlled to prevent conditions adverse to proper gas shielding.\r3.8 CLEANING.  Parts to be welded shall be cleaned to remove surface soils such as oils, waxes, grease, inks, etc. except that uninhibited  alkaline solutions such as sodium hydroxide shall NOT be used.\r3.9 DEOXIDIZING.  The cleaned parts shall be chemically deoxidized NO MORE THAN 10 DAYS PRIOR TO WELDING to remove thick surface oxide films. (If the material or work is exposed to an outdoor environment, this time limit shall be reduced to a maximum of 3 days,\rto account for atmospheric effects.)  Mechanical cleaning methods shall be applied just prior to the actual start of welding, to remove any reoxidation or residual thin oxide films.\r3.9.1  CHEMICAL TREATMENT.  An acid deoxidizing treatment shall be applied  by either immersion or brushing/wiping.  Deoxidizers acceptable for use shall include nitric acid, sulfuric chromic, phosphoric chromic, or equivalent solutions.  Sodium hydroxide\rsolutions shall not be used.  Care shall be taken to assure 100% solution coverage of the area to be welded.  To allow an adequately sized deoxidized area for good welding, the solution shall be applied to an area extending at least 2 inches from the weld site,\ror ending at any closer adjacent edge.\r3.9.2  MECHANICAL MEANS.  Immediately prior to welding, mechanical cleaning methods shall be applied to the weld areas previously chemically treated to assure removal of residual or reformed oxides, if any.  Acceptable methods of mechanical cleaning include\rstainless steel wire brushing, scraping, filing, or sanding. However, abrasives containing iron and its oxides, steel wool and wire, and copper alloy based wire, which may become embedded with galvanically active metals and accelerate corrosion of aluminum\ralloys shall NOT be used.  Mechanical methods shall be vigorous enough to adequately remove any residual oxide films, but gentle enough to avoid forming an excessively rough surface  in the comparatively soft metal underneath.\rContact code ;Buyer on page 1 of the contract; or code N241.10 to arrange for First Article Test location\rWhen a First Article is required, the contractor shall submit a paper copy of the drawings (size 11\" X 17\"), contracts and approved ECP's ECO's, deviations waivers, and modifications in the records recepticle or inside the container submitted for the First\rArticle.\r4.  QUALITY ASSURANCE\r4.1 The tests to be performed under the First Article approval clause (FAR 52.209-4) of the contract are listed below.\r4.1.1  Dimensional test (special)\r     ;to drawing (05259) 774E001 and sub-drawings is applicable;\r4.1.2  Requirements of:\r     ;to drawing (05259) 774E001 and sub-drawings applicable;\r4.1.3  Form:\r     ;applies;\r4.1.4  Fit:\r     ;applies;\r4.1.5  Function\r      ;per 100% production leak test;\r4.1.6  Compliance with drawing ( ;05259; ) ;774E001; , Revision ;latest;  and specifications referenced therein.\r4.2  In addition to the above tests, the First Article(s) to be delivered hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with contract requirements requirements.\r4.3  The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during testing.\r4.4 The cost of the Government testing effort set forth in this solicitation is estimated to be $ ;10,000; for the first article testing.  This cost factor will be added, for solicitation purposes, to the price of all offerors for whom the government will\rrequire such testing.\r4.5 Disposition of FAT samples\r4.5.1 ;zero;  Sample(s) shall not be returned to the contractor because they shall be destroyed during testing.\r4.5.2 ;all;  Unless otherwise provided for in the contract, sample(s) shall be returned to the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the\rsample(s) have inspection approval from the cognizant DCMC QAR.  Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.\r;N/A;  Sample(s) shall be returned to the contractor but shall not be considered as production due.\r4.6  Test Sample Coating Instructions\r4.6.1  Samples are to be unpainted. Corrosive areas are to be coated with a light preservative.\r4.7  FAT Approval Criteria\r4.7.1  FAR 52.209-4 applies\r(A)  The contractors shall deliver ;one(1); ;  unit(s) of the following CAGE   ( ;05259; ; ) Part Number ;774E001; ; , Revision ;latest; ;  within ;90; ;  calendar days from the date of this contract to the Government at\r; TEST FACILITY ADDRESSES\rNaval Air Warfare Center Aircraft Division\rHighway 547, Building 271\rLakehurst, NJ 08733\rNSWC Indian Head Division,\r Detachment Picatinny\rBuilding 458, Whittemore Ave.\rPicatinny Arsenal, NJ 07806-5000; ;\rMarking of test sample(s) shipping container shall be as follows, citing this contract number: \"FOR FIRST ARTICLE TESTING.  NOT RFI MATERIAL.  DO NOT TAKE UP IN STOCK CONTRACT NUMBER:____________\"\rFor First Article Test, the shipping documentation shall contain this contract number and lot/item identification.  The characteristics that the First Article must meet and the testing requirements are specified elsewhere in this contract.\r(B)  Upon shipment of First Article sample(s), two (2) copies of the Material Inspection and Receiving Report (DD Form 250) bearing the QAR's signature and indication of preliminary inspection shall be forwarded to the NAVICP- Philadelphia code cited in Block\r10.a of SF33, with duplicate copies to NAVICP code 072 and to the designated test facility.  The envelopes shall be clearly marked: \"DO NOT OPEN IN MAIL ROOM\".\rWithin ;60; ; days after receipt of the samples, the test site shall complete testing/evaluation and submit two (2) copies of their test report with conclusions and recommendations to the NAVICP code cited in Block 10.a of the SF33.\r(C) Within ;90; ; calendar days after the Government receives the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article.  The notice of approval, conditional\rapproval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor.\rA notice of disapproval shall cite reasons for disapproval.\r(D)  If the First Article is disapproved, the contractor, upon Government request, shall submit an additional First Article for testing.  After each request, the contractor shall make any necessary changes, modifications, or repairs to the First Article or\rselect another First Article for testing.  All costs related to these tests are to be borne by the contractor,  including any and all costs for additional tests following a disapproval.  The contractor shall furnish any additional First Article to the\rGovernment under the terms and conditions and within the time specified by the Government.  The Government shall act on this First Article within the time limit specified in paragraph (B) above.  The Government reserves the right to require an equitable\radjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.\r(E)  If the contractor fails to deliver any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract\r(F)  Unless otherwise provided in the contract, the contractor -\r(1)  May deliver the approved First Article as part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing: and\r(2) Shall remove and dispose of any First Article from the Government test facility at the contractors expense.\r(G)  If the Government does not act within the time specified in paragraph (B) or (C) above the contracting officer shall, upon timely written request from the contractor, equitably adjust under the changes clause of this contract the delivery or performance\rdates and/or the contract price, and any other contractual term affected by the delay.\r(H)  The contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the First Article during any First Article test.\r(I)  Before First Article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the contractor.  Before First Article approval, the costs thereof shall not be\rallocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government\r(J)  The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to this effect with each First Article.\r(K)  The contractor shall provide specific written notification to the procuring contracting officer informing him/her of the shipment of any article(s) furnished in accordance with this clause.  Such notification must be addressed to the attention of the\rNAVICP code specified in Block 10.a  of the SF33, with copies to NAVICP code 072 and to the testing activity.  Failure to provide  such notification shall excuse the Government from any delay in performing First Article Testing and informing the contractor of\rthe results thereof.\r(L)  Fourteen (14) days prior to shipment of First Article Samples, the contractor shall notify the designated test facility in writing of the anticipated shipping date, with an information copy to the PCO, NAVICP Philadelphia, Attn: (Cite code found in Block\r10.a of the SF33).  The contractor shall also arrange for preliminary inspection of test samples by the DCMC/QAR.\r4.8 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate)\r(A)  Unless otherwise specified in the solicitation, the Naval Inventory Control Point reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the\rGovernment or the Original Equipment Manufacturer/Prime Manufacturer.  An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that:\r(I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and\r(II) the production location to be used for this requirement is the same as used for the previous production run\rAdditionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that:\r(I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer,\rand\r(II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause.\r(NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section\r1001.)\r(B)  Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one\rthat is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article\rApproval Requirements\r(C)  In the event of the First Article Approval Requirement is granted, the   delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the\rgovernment notification of conditional approval or approval.  These requirements are specified in the quality assurance section of this solicitation.  If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule\rhe offers to the government.\r              Offeror's Proposed Alternate Delivery Schedule\r         (Based on Waiver of First Article Approval Requirements)\rWithin Days:\rItem No. _______________  Quantity:_______   After Date of Contract:__________\r4.9  100% PRODUCTION LEAK TEST.  Each container shall be prepared for testing by sealing all breathing devices and inserting suitable pressurized fittings and gauges.  The container shall be closed and sealed in a normal manner. Each container, uninstrumented\rand without dummy load, shall then be subjected to a single 18 inch flat drop.  The Pneumatic-Pressure Technique of Method 5008 of Federal Test Method Standard No. 101C shall be used to detect leakage. An initial setting equal to 0.5 + 0.1 - 0 PSIG shall be\rused.  After          stabilization, pressure shall be monitored for thirty minutes.  Any loss in pressure over a 30 minute period that exceeds 25% of the stabilized pressure shall be cause for rejection; tests shall be conducted to ascertain sources of leaks\rand corrective action taken.  Any deformation of the container shell while pressurized which is greater than three-quarters of an inch beyond its point at ambient pressure shall also be cause for rejection.\r                            WARNING\rContainer may explode or fasteners may fail during test.  Use protective barriers to avoid injury to personnel.\r100% Production Leak Tests.  Each container shall be prepared for testing by sealing all breathing devices and inserting pressurizing fittings and       gauges.  The container shall be closed and sealed in a normal manner.  The Pneumatic - Pressure Technique of\rMethod 5009 of Federal Test Method Standard NO. 101C shall be used to detect leakage.  An initial pressure setting equal to 0.50 + 0.1-0 PSIG shall be used.  After stabilization, pressure shall be monitored for thirty minutes.  Any loss in pressure in excess of\r0.05 PSIG (adjusted for changes in temperature and barometric pressure) shall be cause for rejection.  Any deformation of the container shell, while pressurized, which is greater than three quarters of an inch beyond its point at ambient pressure shall also be\rcause for rejection.\rALL COSTS AND RESPONSIBILITIES RELATED TO THE FIRST ARTICLE TEST SUBMISSION CONTAINER SHIPMENT TO AND FROM THE FIRST ARTICLE TEST FACILITY ARE TO BE BORNE BY THE CONTRACTOR.\rFirst Article Testing (FAT) performed by the designated test facility shall include:\r - A visual and dimensional inspection performed in accordance with drawing package (CAGE) PART NUMBER.\r - Initial Leak Test: An air pressure fitting shall be installed in place of oneof the container's inspection ports. The container shall be pressurized to 0.50 +.01-0.0 psig. Allow the container to stabilize for 30 minutes. After the stabilization period, the\rpressure shall be monitored for 30 minute. Any pressure loss in excess of 0.05 psi shall be cause for rejection.\r - 18-inch Free Fall Drop Test: The loaded container shall be raised to a heightof 18 inches in a horizontal attitude. It shall be released from a drop hook, free falling flat on the base to an unyielding surface. Any cracked welds, deformation, or damage to\rthe container shall be cause for rejection.\r - Final Leak Test: This test to be performed in the same manner as previously described in \"Initial leak Test\" paragraph above.\r- Form and Fit Check (actual item): The end-item shall be placed in the container using the installation instructions provided. Any inadequacies, fit issues or interferences shall be noted and recorded. The government is responsible to provide an item to\rperform the form and fit test. An item may be shipped to the FAT facility location or, if the end-item cannot be moved, the FAT container may be shipped to an external location.\r(NIIN:01-554-4255) or equivalent (F condition is preferred) to the assigned First Article Test site upon request from N241 Engineering in order to complete First Article Testing in accordance with the terms of this contract. If item is unable to be sent to the\rtest site, the container may be sent to item location with proper coordination. NAVSUP Supply Planner should contact NAVSUP WSS N241 Engineering for test site Point of Contact.\r5.  PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6.  NOTES - NOT APPLICABLE","text":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||||||||\rTIME OF DELIVERY (JUNE 1997)|20|0001AA|4 EA|365 DAYS AFTER FAT APPROVAL|0001AB|1 LO|180 DAYS ADO|||||||||||||||\rSTOP-WORK ORDER (AUG 1989)|1||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|TBD|TBD|TBD|TBD|TBD|||||||||\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||\rVALUE ENGINEERING (JUN 2020)|3||||\rEQUAL OPPORTUNITY (SEP 2016)|2|||\rINTEGRITY OF UNIT PRICES (NOV 2021)|1||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rLIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1||\rNOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1||\rROYALTY INFORMATION (APR 1984)|1||\rANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|12|332439|500|||||||||||\rFACSIMILE PROPOSALS (OCT 1997)|1||\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|\rTHIS PROCUREMENT HAS BEEN SET-ASIDE FOR SMALL BUSINESS.\rTHIS ITEM REQUIRES ENGINEERING SOURCE APPROVAL BY THE DESIGN ACTIVITY IN ORDERTO MAINTAIN THE QUALITY OF THE PART. IF YOU HAVE NOT MANUFACTURED THIS ITEMBEFORE FOR DLA AVIATION PHILADELPHIA AND WANT TO BECOME AN APPROVED SOURCE OFSUPPLY, PLEASE CONTACT THE BUYER\rTO INQUIRE ABOUT SOURCE APPROVAL REQUESTPROCEDURES.\r\\\r1. SCOPE\r1.1 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.2 Container shell material is ;linear low density polyethylene(Plastic); .\r1.3 Manufacturing process is ;Rotomolding; .\r1.4 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;Container Research Corporation; drawing number ( ;05259; ) ;774E001; , Revision ;latest; and all details and specifications referenced therein.\r1.5 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be\rprovided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.\r1.6 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r1.7 When discrepancies exist between these requirements and those on current\rmanufacturer's drawings,contact code ;Contact Buyer on Page 1 of Contract; or code N241.10\r2. APPLICABLE DOCUMENTS\rDRAWING DATA=DL774E001 |05259| | |D| | | |\rDRAWING DATA=15930 |80132| C| |D| | | |\r3. REQUIREMENTS\r3.1 One third (1/3) unit of desiccant (MIL-D-3464, Type II nondusting) per cubic foot of container interior volume shall be placed in desiccant holder of each container at time of shipment.\r3.2 Reference to Cadmium plating shall be deleted and the following substituted: \"Finish shall be electrodeposited alkaline Zinc-Nickel Alloy in accordance with ASTM B 841 Class 1, Type B, Grade 3.\"\r3.3 The shock mount listed in the drawing package (whether identified as sole source, recommended, or suggested) has been tested and approved for the shock mitigation system of this container. No other shock mount may be substituted without written permission\rof Naval Inventory Control Point, Philadelphia unless an alternate is specifically indentified in this contract. ;no other mount; is an approved alternate mount.\rAll containers must be affixed with a nameplate that includes a\rUnique Identification (UID) marking as referenced in the drawing package\rDrawing ;(80132) 15930; and IAW Mil-STD-130 latest revision. The contractor\rshall contact NAVICP code ;Buyer on Page One; or code 0771.10 for the alphanumeric\rsequential serial number group that makes up part of the UID.\rThe UIDwill be included on the nameplate in data matrix format.\r3.4 Welding and welder qualifications shall be in accordance with AWS D1.1\rfor steel, AWS D1.2 or MIL-W-22248,Class 4 for aluminum, AWS D1.3\rfor sheet steel and AWS D1.6 for stainless steel. Proper controls shall be used to prevent melt through or burn through. For aluminum, filler for welding 6061 alloy shall be 4043: filler for welding 5000 series alloys\rto themselves or to 6061 shall be 5356 or 5556. In addition,welding and\rweld inspection shall include:\r(1) Visual inspection shall include 5X (5power) magnification when a suspect\rcondition is to be examined beyond the capability of normal vision.\r(2) Critical and major welds may be subjected to further non destructive\rtesting (such as dye penetrant inspection)as prescribed by the buying activity.\r(3) Proper documentation shall be available for review by Government personnel.\r3.5 WORK INSTRUCTIONS. Work instructions shall be posted at theoperator's work station giving procedures to control the welding process, i.e., filler material, weld size, electrical and gas characteristics, including flow rate.\r3.6 MATERIALS AND MATERIALS CONTROL. The quality program shall assure that the materials used in fabrication or processing, i.e., base metals and weld filler material, be inspected and conform to the applicable physical, chemical and other technical\rrequirements (supplier's certification is sufficient).\r3.7 CONTROLS. Weld filler materials shall be clearly identified and segregated from each other both when in storage and at the work station. Work station environment shall be controlled to prevent conditions adverse to proper gas shielding.\r3.8 CLEANING. Parts to be welded shall be cleaned to remove surface soils such as oils, waxes, grease, inks, etc. except that uninhibited alkaline solutions such as sodium hydroxide shall NOT be used.\r3.9 DEOXIDIZING. The cleaned parts shall be chemically deoxidized NO MORE THAN 10 DAYS PRIOR TO WELDING to remove thick surface oxide films. (If the material or work is exposed to an outdoor environment, this time limit shall be reduced to a maximum of 3 days,\rto account for atmospheric effects.) Mechanical cleaning methods shall be applied just prior to the actual start of welding, to remove any reoxidation or residual thin oxide films.\r3.9.1 CHEMICAL TREATMENT. An acid deoxidizing treatment shall be applied by either immersion or brushing/wiping. Deoxidizers acceptable for use shall include nitric acid, sulfuric chromic, phosphoric chromic, or equivalent solutions. Sodium hydroxide\rsolutions shall not be used. Care shall be taken to assure 100% solution coverage of the area to be welded. To allow an adequately sized deoxidized area for good welding, the solution shall be applied to an area extending at least 2 inches from the weld site,\ror ending at any closer adjacent edge.\r3.9.2 MECHANICAL MEANS. Immediately prior to welding, mechanical cleaning methods shall be applied to the weld areas previously chemically treated to assure removal of residual or reformed oxides, if any. Acceptable methods of mechanical cleaning include\rstainless steel wire brushing, scraping, filing, or sanding. However, abrasives containing iron and its oxides, steel wool and wire, and copper alloy based wire, which may become embedded with galvanically active metals and accelerate corrosion of aluminum\ralloys shall NOT be used. Mechanical methods shall be vigorous enough to adequately remove any residual oxide films, but gentle enough to avoid forming an excessively rough surface in the comparatively soft metal underneath.\rContact code ;Buyer on page 1 of the contract; or code N241.10 to arrange for First Article Test location\rWhen a First Article is required, the contractor shall submit a paper copy of the drawings (size 11\" X 17\"), contracts and approved ECP's ECO's, deviations waivers, and modifications in the records recepticle or inside the container submitted for the First\rArticle.\r4. QUALITY ASSURANCE\r4.1 The tests to be performed under the First Article approval clause (FAR 52.209-4) of the contract are listed below.\r4.1.1 Dimensional test (special)\r ;to drawing (05259) 774E001 and sub-drawings is applicable;\r4.1.2 Requirements of:\r ;to drawing (05259) 774E001 and sub-drawings applicable;\r4.1.3 Form:\r ;applies;\r4.1.4 Fit:\r ;applies;\r4.1.5 Function\r ;per 100% production leak test;\r4.1.6 Compliance with drawing ( ;05259; ) ;774E001; , Revision ;latest; and specifications referenced therein.\r4.2 In addition to the above tests, the First Article(s) to be delivered hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with contract requirements requirements.\r4.3 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during testing.\r4.4 The cost of the Government testing effort set forth in this solicitation is estimated to be $ ;10,000; for the first article testing. This cost factor will be added, for solicitation purposes, to the price of all offerors for whom the government will\rrequire such testing.\r4.5 Disposition of FAT samples\r4.5.1 ;zero; Sample(s) shall not be returned to the contractor because they shall be destroyed during testing.\r4.5.2 ;all; Unless otherwise provided for in the contract, sample(s) shall be returned to the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the\rsample(s) have inspection approval from the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.\r;N/A; Sample(s) shall be returned to the contractor but shall not be considered as production due.\r4.6 Test Sample Coating Instructions\r4.6.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative.\r4.7 FAT Approval Criteria\r4.7.1 FAR 52.209-4 applies\r(A) The contractors shall deliver ;one(1); ; unit(s) of the following CAGE ( ;05259; ; ) Part Number ;774E001; ; , Revision ;latest; ; within ;90; ; calendar days from the date of this contract to the Government at\r; TEST FACILITY ADDRESSES\rNaval Air Warfare Center Aircraft Division\rHighway 547, Building 271\rLakehurst, NJ 08733\rNSWC Indian Head Division,\r Detachment Picatinny\rBuilding 458, Whittemore Ave.\rPicatinny Arsenal, NJ 07806-5000; ;\rMarking of test sample(s) shipping container shall be as follows, citing this contract number: \"FOR FIRST ARTICLE TESTING. NOT RFI MATERIAL. DO NOT TAKE UP IN STOCK CONTRACT NUMBER:____________\"\rFor First Article Test, the shipping documentation shall contain this contract number and lot/item identification. The characteristics that the First Article must meet and the testing requirements are specified elsewhere in this contract.\r(B) Upon shipment of First Article sample(s), two (2) copies of the Material Inspection and Receiving Report (DD Form 250) bearing the QAR's signature and indication of preliminary inspection shall be forwarded to the NAVICP- Philadelphia code cited in Block\r10.a of SF33, with duplicate copies to NAVICP code 072 and to the designated test facility. The envelopes shall be clearly marked: \"DO NOT OPEN IN MAIL ROOM\".\rWithin ;60; ; days after receipt of the samples, the test site shall complete testing/evaluation and submit two (2) copies of their test report with conclusions and recommendations to the NAVICP code cited in Block 10.a of the SF33.\r(C) Within ;90; ; calendar days after the Government receives the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional\rapproval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor.\rA notice of disapproval shall cite reasons for disapproval.\r(D) If the First Article is disapproved, the contractor, upon Government request, shall submit an additional First Article for testing. After each request, the contractor shall make any necessary changes, modifications, or repairs to the First Article or\rselect another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall furnish any additional First Article to the\rGovernment under the terms and conditions and within the time specified by the Government. The Government shall act on this First Article within the time limit specified in paragraph (B) above. The Government reserves the right to require an equitable\radjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.\r(E) If the contractor fails to deliver any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract\r(F) Unless otherwise provided in the contract, the contractor -\r(1) May deliver the approved First Article as part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing: and\r(2) Shall remove and dispose of any First Article from the Government test facility at the contractors expense.\r(G) If the Government does not act within the time specified in paragraph (B) or (C) above the contracting officer shall, upon timely written request from the contractor, equitably adjust under the changes clause of this contract the delivery or performance\rdates and/or the contract price, and any other contractual term affected by the delay.\r(H) The contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the First Article during any First Article test.\r(I) Before First Article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be\rallocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government\r(J) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to this effect with each First Article.\r(K) The contractor shall provide specific written notification to the procuring contracting officer informing him/her of the shipment of any article(s) furnished in accordance with this clause. Such notification must be addressed to the attention of the\rNAVICP code specified in Block 10.a of the SF33, with copies to NAVICP code 072 and to the testing activity. Failure to provide such notification shall excuse the Government from any delay in performing First Article Testing and informing the contractor of\rthe results thereof.\r(L) Fourteen (14) days prior to shipment of First Article Samples, the contractor shall notify the designated test facility in writing of the anticipated shipping date, with an information copy to the PCO, NAVICP Philadelphia, Attn: (Cite code found in Block\r10.a of the SF33). The contractor shall also arrange for preliminary inspection of test samples by the DCMC/QAR.\r4.8 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate)\r(A) Unless otherwise specified in the solicitation, the Naval Inventory Control Point reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the\rGovernment or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that:\r(I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and\r(II) the production location to be used for this requirement is the same as used for the previous production run\rAdditionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that:\r(I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer,\rand\r(II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause.\r(NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section\r1001.)\r(B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one\rthat is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article\rApproval Requirements\r(C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the\rgovernment notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule\rhe offers to the government.\r Offeror's Proposed Alternate Delivery Schedule\r (Based on Waiver of First Article Approval Requirements)\rWithin Days:\rItem No. _______________ Quantity:_______ After Date of Contract:__________\r4.9 100% PRODUCTION LEAK TEST. Each container shall be prepared for testing by sealing all breathing devices and inserting suitable pressurized fittings and gauges. The container shall be closed and sealed in a normal manner. Each container, uninstrumented\rand without dummy load, shall then be subjected to a single 18 inch flat drop. The Pneumatic-Pressure Technique of Method 5008 of Federal Test Method Standard No. 101C shall be used to detect leakage. An initial setting equal to 0.5 + 0.1 - 0 PSIG shall be\rused. After stabilization, pressure shall be monitored for thirty minutes. Any loss in pressure over a 30 minute period that exceeds 25% of the stabilized pressure shall be cause for rejection; tests shall be conducted to ascertain sources of leaks\rand corrective action taken. Any deformation of the container shell while pressurized which is greater than three-quarters of an inch beyond its point at ambient pressure shall also be cause for rejection.\r WARNING\rContainer may explode or fasteners may fail during test. Use protective barriers to avoid injury to personnel.\r100% Production Leak Tests. Each container shall be prepared for testing by sealing all breathing devices and inserting pressurizing fittings and gauges. The container shall be closed and sealed in a normal manner. The Pneumatic - Pressure Technique of\rMethod 5009 of Federal Test Method Standard NO. 101C shall be used to detect leakage. An initial pressure setting equal to 0.50 + 0.1-0 PSIG shall be used. After stabilization, pressure shall be monitored for thirty minutes. Any loss in pressure in excess of\r0.05 PSIG (adjusted for changes in temperature and barometric pressure) shall be cause for rejection. Any deformation of the container shell, while pressurized, which is greater than three quarters of an inch beyond its point at ambient pressure shall also be\rcause for rejection.\rALL COSTS AND RESPONSIBILITIES RELATED TO THE FIRST ARTICLE TEST SUBMISSION CONTAINER SHIPMENT TO AND FROM THE FIRST ARTICLE TEST FACILITY ARE TO BE BORNE BY THE CONTRACTOR.\rFirst Article Testing (FAT) performed by the designated test facility shall include:\r - A visual and dimensional inspection performed in accordance with drawing package (CAGE) PART NUMBER.\r - Initial Leak Test: An air pressure fitting shall be installed in place of oneof the container's inspection ports. The container shall be pressurized to 0.50 +.01-0.0 psig. Allow the container to stabilize for 30 minutes. After the stabilization period, the\rpressure shall be monitored for 30 minute. Any pressure loss in excess of 0.05 psi shall be cause for rejection.\r - 18-inch Free Fall Drop Test: The loaded container shall be raised to a heightof 18 inches in a horizontal attitude. It shall be released from a drop hook, free falling flat on the base to an unyielding surface. Any cracked welds, deformation, or damage to\rthe container shall be cause for rejection.\r - Final Leak Test: This test to be performed in the same manner as previously described in \"Initial leak Test\" paragraph above.\r- Form and Fit Check (actual item): The end-item shall be placed in the container using the installation instructions provided. Any inadequacies, fit issues or interferences shall be noted and recorded. The government is responsible to provide an item to\rperform the form and fit test. An item may be shipped to the FAT facility location or, if the end-item cannot be moved, the FAT container may be shipped to an external location.\r(NIIN:01-554-4255) or equivalent (F condition is preferred) to the assigned First Article Test site upon request from N241 Engineering in order to complete First Article Testing in accordance with the terms of this contract. If item is unable to be sent to the\rtest site, the container may be sent to item location with proper coordination. NAVSUP Supply Planner should contact NAVSUP WSS N241 Engineering for test site Point of Contact.\r5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6. NOTES - NOT APPLICABLE","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"SPRPA125REG64","product_service_code":"8145"},{"dates":{"posted":"2025-03-18","posted_at":"2025-03-18T14:40:51.408Z","created_at":"2025-03-18T14:14:39.990Z","modified_at":"2025-04-30T03:55:49.556Z","response_deadline":{"raw":"2025-04-14T14:00:00-04:00","utc":"2025-04-14T18:00:00Z","date":"2025-04-14","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/966b98115883433292abb2153d17dfab/view"},"naics":{"codes":["332439"],"primary":"332439"},"title":"SHIPPING AND STORAG","agency":{"office":{"code":"SPRPA1","name":"DLA AVIATION AT PHILADELPHIA, PA"},"subtier":{"code":"97AS","name":"DEFENSE LOGISTICS AGENCY"},"department":{"code":"097","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19111-5098","city":"PHILADELPHIA","state":"PA","country":"USA"},"organization_id":"500044424","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-04-29","archive_type":"auto15"},"history":[{"index":3,"title":"SHIPPING AND STORAG","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-18T14:40:51.408Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"966b98115883433292abb2153d17dfab","solicitation_number":"SPRPA125REG64","parent_opportunity_id":"8fd3000b71144edd87a41db50a3fd004"},{"index":1,"title":"SHIPPING AND STORAG","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-14T13:07:11.047Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8fd3000b71144edd87a41db50a3fd004","solicitation_number":"SPRPA125REG64"}],"contacts":[{"name":"Telephone: 2157372249","role":"primary","email":"GIA.PANTALEO@DLA.MIL"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"966b98115883433292abb2153d17dfab","lineage_id":"8fd3000b71144edd87a41db50a3fd004","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-20T03:16:23.791732158Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"5ef8f4a4a1509c2360f1f5a499e20f7749d27f21f7a79127d0bd16571a3e7d21","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-20T03:16:23.791732158Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||||||||\rTIME OF DELIVERY (JUNE 1997)|20|0001AA|4 EA|365 DAYS AFTER FAT APPROVAL|0001AB|1 LO|180 DAYS ADO|||||||||||||||\rSTOP-WORK ORDER (AUG 1989)|1||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|TBD|TBD|TBD|TBD|TBD|||||||||\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||\rVALUE ENGINEERING (JUN 2020)|3||||\rEQUAL OPPORTUNITY (SEP 2016)|2|||\rINTEGRITY OF UNIT PRICES (NOV 2021)|1||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rLIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1||\rNOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1||\rROYALTY INFORMATION (APR 1984)|1||\rANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|12|332439|500|||||||||||\rFACSIMILE PROPOSALS (OCT 1997)|1||\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|\rTHIS PROCUREMENT HAS BEEN SET-ASIDE FOR SMALL BUSINESS.\rTHIS ITEM REQUIRES ENGINEERING SOURCE APPROVAL BY THE DESIGN ACTIVITY IN ORDERTO MAINTAIN THE QUALITY OF THE PART.  IF YOU HAVE NOT MANUFACTURED THIS ITEMBEFORE FOR DLA AVIATION PHILADELPHIA AND WANT TO BECOME AN APPROVED SOURCE OFSUPPLY, PLEASE CONTACT THE BUYER\rTO INQUIRE ABOUT SOURCE APPROVAL REQUESTPROCEDURES.\r\\\r1.  SCOPE\r1.1 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.2 Container shell material is ;linear low density polyethylene(Plastic); .\r1.3  Manufacturing process is ;Rotomolding; .\r1.4 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;Container Research Corporation; drawing number ( ;05259; ) ;774E001;      , Revision ;latest; and all details and specifications referenced therein.\r1.5  Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be\rprovided by the Government or any other source and is the sole responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.\r1.6  If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r1.7 When discrepancies exist between these requirements and those on current\rmanufacturer's drawings,contact code ;Contact Buyer on Page 1 of Contract; or code N241.10\r2.  APPLICABLE DOCUMENTS\rDRAWING DATA=DL774E001                               |05259|  |   |D|            |  |     |\rDRAWING DATA=15930                                   |80132| C|   |D|            |  |     |\r3.  REQUIREMENTS\r3.1  One third (1/3) unit of desiccant (MIL-D-3464, Type II nondusting) per cubic foot of container interior volume shall be placed in desiccant holder of each container at time of shipment.\r3.2  Reference to Cadmium plating shall be deleted and the following substituted:  \"Finish shall be electrodeposited alkaline Zinc-Nickel Alloy in accordance with ASTM B 841 Class 1, Type B, Grade 3.\"\r3.3 The shock mount listed in the drawing package (whether identified as sole source, recommended, or suggested) has been tested and approved for the shock mitigation system of this container. No other shock mount may be substituted without written permission\rof Naval Inventory Control Point, Philadelphia unless an alternate is specifically indentified in this contract. ;no other mount; is an approved alternate mount.\rAll containers must be affixed with a nameplate that includes a\rUnique Identification (UID) marking as referenced in the drawing package\rDrawing ;(80132) 15930;  and IAW Mil-STD-130 latest revision. The contractor\rshall contact NAVICP code ;Buyer on Page One; or code 0771.10 for the alphanumeric\rsequential serial number group that makes up part of the UID.\rThe UIDwill be included on the nameplate in data matrix format.\r3.4 Welding and welder qualifications shall be in accordance with AWS D1.1\rfor steel, AWS D1.2 or MIL-W-22248,Class 4 for aluminum, AWS D1.3\rfor sheet steel and AWS D1.6 for stainless steel. Proper controls shall be used to prevent melt through or burn through. For aluminum, filler for welding 6061 alloy shall be 4043: filler for welding 5000 series alloys\rto themselves or to 6061 shall be 5356 or 5556. In addition,welding and\rweld inspection shall include:\r(1) Visual inspection shall include 5X (5power) magnification when a suspect\rcondition is to be examined beyond the capability of normal vision.\r(2) Critical and major welds may be subjected to further non destructive\rtesting (such as dye penetrant inspection)as prescribed by the buying         activity.\r(3) Proper documentation shall be available for review by Government personnel.\r3.5  WORK INSTRUCTIONS.  Work instructions shall be posted at theoperator's  work station giving procedures to control the welding process,   i.e., filler material, weld size, electrical and gas characteristics,      including flow rate.\r3.6  MATERIALS AND MATERIALS CONTROL.  The quality program shall assure that the materials used in fabrication or processing, i.e., base metals and weld filler material, be inspected and conform to the applicable physical, chemical and other technical\rrequirements (supplier's certification is sufficient).\r3.7  CONTROLS.  Weld filler materials shall be clearly identified and segregated from each other both when in storage and at the work station.  Work station environment shall be controlled to prevent conditions adverse to proper gas shielding.\r3.8 CLEANING.  Parts to be welded shall be cleaned to remove surface soils such as oils, waxes, grease, inks, etc. except that uninhibited  alkaline solutions such as sodium hydroxide shall NOT be used.\r3.9 DEOXIDIZING.  The cleaned parts shall be chemically deoxidized NO MORE THAN 10 DAYS PRIOR TO WELDING to remove thick surface oxide films. (If the material or work is exposed to an outdoor environment, this time limit shall be reduced to a maximum of 3 days,\rto account for atmospheric effects.)  Mechanical cleaning methods shall be applied just prior to the actual start of welding, to remove any reoxidation or residual thin oxide films.\r3.9.1  CHEMICAL TREATMENT.  An acid deoxidizing treatment shall be applied  by either immersion or brushing/wiping.  Deoxidizers acceptable for use shall include nitric acid, sulfuric chromic, phosphoric chromic, or equivalent solutions.  Sodium hydroxide\rsolutions shall not be used.  Care shall be taken to assure 100% solution coverage of the area to be welded.  To allow an adequately sized deoxidized area for good welding, the solution shall be applied to an area extending at least 2 inches from the weld site,\ror ending at any closer adjacent edge.\r3.9.2  MECHANICAL MEANS.  Immediately prior to welding, mechanical cleaning methods shall be applied to the weld areas previously chemically treated to assure removal of residual or reformed oxides, if any.  Acceptable methods of mechanical cleaning include\rstainless steel wire brushing, scraping, filing, or sanding. However, abrasives containing iron and its oxides, steel wool and wire, and copper alloy based wire, which may become embedded with galvanically active metals and accelerate corrosion of aluminum\ralloys shall NOT be used.  Mechanical methods shall be vigorous enough to adequately remove any residual oxide films, but gentle enough to avoid forming an excessively rough surface  in the comparatively soft metal underneath.\rContact code ;Buyer on page 1 of the contract; or code N241.10 to arrange for First Article Test location\rWhen a First Article is required, the contractor shall submit a paper copy of the drawings (size 11\" X 17\"), contracts and approved ECP's ECO's, deviations waivers, and modifications in the records recepticle or inside the container submitted for the First\rArticle.\r4.  QUALITY ASSURANCE\r4.1 The tests to be performed under the First Article approval clause (FAR 52.209-4) of the contract are listed below.\r4.1.1  Dimensional test (special)\r     ;to drawing (05259) 774E001 and sub-drawings is applicable;\r4.1.2  Requirements of:\r     ;to drawing (05259) 774E001 and sub-drawings applicable;\r4.1.3  Form:\r     ;applies;\r4.1.4  Fit:\r     ;applies;\r4.1.5  Function\r      ;per 100% production leak test;\r4.1.6  Compliance with drawing ( ;05259; ) ;774E001; , Revision ;latest;  and specifications referenced therein.\r4.2  In addition to the above tests, the First Article(s) to be delivered hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with contract requirements requirements.\r4.3  The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during testing.\r4.4 The cost of the Government testing effort set forth in this solicitation is estimated to be $ ;10,000; for the first article testing.  This cost factor will be added, for solicitation purposes, to the price of all offerors for whom the government will\rrequire such testing.\r4.5 Disposition of FAT samples\r4.5.1 ;zero;  Sample(s) shall not be returned to the contractor because they shall be destroyed during testing.\r4.5.2 ;all;  Unless otherwise provided for in the contract, sample(s) shall be returned to the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the\rsample(s) have inspection approval from the cognizant DCMC QAR.  Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.\r;N/A;  Sample(s) shall be returned to the contractor but shall not be considered as production due.\r4.6  Test Sample Coating Instructions\r4.6.1  Samples are to be unpainted. Corrosive areas are to be coated with a light preservative.\r4.7  FAT Approval Criteria\r4.7.1  FAR 52.209-4 applies\r(A)  The contractors shall deliver ;one(1); ;  unit(s) of the following CAGE   ( ;05259; ; ) Part Number ;774E001; ; , Revision ;latest; ;  within ;90; ;  calendar days from the date of this contract to the Government at\r; TEST FACILITY ADDRESSES\rNaval Air Warfare Center Aircraft Division\rHighway 547, Building 271\rLakehurst, NJ 08733\rNSWC Indian Head Division,\r Detachment Picatinny\rBuilding 458, Whittemore Ave.\rPicatinny Arsenal, NJ 07806-5000; ;\rMarking of test sample(s) shipping container shall be as follows, citing this contract number: \"FOR FIRST ARTICLE TESTING.  NOT RFI MATERIAL.  DO NOT TAKE UP IN STOCK CONTRACT NUMBER:____________\"\rFor First Article Test, the shipping documentation shall contain this contract number and lot/item identification.  The characteristics that the First Article must meet and the testing requirements are specified elsewhere in this contract.\r(B)  Upon shipment of First Article sample(s), two (2) copies of the Material Inspection and Receiving Report (DD Form 250) bearing the QAR's signature and indication of preliminary inspection shall be forwarded to the NAVICP- Philadelphia code cited in Block\r10.a of SF33, with duplicate copies to NAVICP code 072 and to the designated test facility.  The envelopes shall be clearly marked: \"DO NOT OPEN IN MAIL ROOM\".\rWithin ;60; ; days after receipt of the samples, the test site shall complete testing/evaluation and submit two (2) copies of their test report with conclusions and recommendations to the NAVICP code cited in Block 10.a of the SF33.\r(C) Within ;90; ; calendar days after the Government receives the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article.  The notice of approval, conditional\rapproval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor.\rA notice of disapproval shall cite reasons for disapproval.\r(D)  If the First Article is disapproved, the contractor, upon Government request, shall submit an additional First Article for testing.  After each request, the contractor shall make any necessary changes, modifications, or repairs to the First Article or\rselect another First Article for testing.  All costs related to these tests are to be borne by the contractor,  including any and all costs for additional tests following a disapproval.  The contractor shall furnish any additional First Article to the\rGovernment under the terms and conditions and within the time specified by the Government.  The Government shall act on this First Article within the time limit specified in paragraph (B) above.  The Government reserves the right to require an equitable\radjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.\r(E)  If the contractor fails to deliver any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract\r(F)  Unless otherwise provided in the contract, the contractor -\r(1)  May deliver the approved First Article as part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing: and\r(2) Shall remove and dispose of any First Article from the Government test facility at the contractors expense.\r(G)  If the Government does not act within the time specified in paragraph (B) or (C) above the contracting officer shall, upon timely written request from the contractor, equitably adjust under the changes clause of this contract the delivery or performance\rdates and/or the contract price, and any other contractual term affected by the delay.\r(H)  The contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the First Article during any First Article test.\r(I)  Before First Article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the contractor.  Before First Article approval, the costs thereof shall not be\rallocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government\r(J)  The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to this effect with each First Article.\r(K)  The contractor shall provide specific written notification to the procuring contracting officer informing him/her of the shipment of any article(s) furnished in accordance with this clause.  Such notification must be addressed to the attention of the\rNAVICP code specified in Block 10.a  of the SF33, with copies to NAVICP code 072 and to the testing activity.  Failure to provide  such notification shall excuse the Government from any delay in performing First Article Testing and informing the contractor of\rthe results thereof.\r(L)  Fourteen (14) days prior to shipment of First Article Samples, the contractor shall notify the designated test facility in writing of the anticipated shipping date, with an information copy to the PCO, NAVICP Philadelphia, Attn: (Cite code found in Block\r10.a of the SF33).  The contractor shall also arrange for preliminary inspection of test samples by the DCMC/QAR.\r4.8 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate)\r(A)  Unless otherwise specified in the solicitation, the Naval Inventory Control Point reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the\rGovernment or the Original Equipment Manufacturer/Prime Manufacturer.  An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that:\r(I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and\r(II) the production location to be used for this requirement is the same as used for the previous production run\rAdditionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that:\r(I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer,\rand\r(II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause.\r(NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section\r1001.)\r(B)  Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one\rthat is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article\rApproval Requirements\r(C)  In the event of the First Article Approval Requirement is granted, the   delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the\rgovernment notification of conditional approval or approval.  These requirements are specified in the quality assurance section of this solicitation.  If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule\rhe offers to the government.\r              Offeror's Proposed Alternate Delivery Schedule\r         (Based on Waiver of First Article Approval Requirements)\rWithin Days:\rItem No. _______________  Quantity:_______   After Date of Contract:__________\r4.9  100% PRODUCTION LEAK TEST.  Each container shall be prepared for testing by sealing all breathing devices and inserting suitable pressurized fittings and gauges.  The container shall be closed and sealed in a normal manner. Each container, uninstrumented\rand without dummy load, shall then be subjected to a single 18 inch flat drop.  The Pneumatic-Pressure Technique of Method 5008 of Federal Test Method Standard No. 101C shall be used to detect leakage. An initial setting equal to 0.5 + 0.1 - 0 PSIG shall be\rused.  After          stabilization, pressure shall be monitored for thirty minutes.  Any loss in pressure over a 30 minute period that exceeds 25% of the stabilized pressure shall be cause for rejection; tests shall be conducted to ascertain sources of leaks\rand corrective action taken.  Any deformation of the container shell while pressurized which is greater than three-quarters of an inch beyond its point at ambient pressure shall also be cause for rejection.\r                            WARNING\rContainer may explode or fasteners may fail during test.  Use protective barriers to avoid injury to personnel.\r100% Production Leak Tests.  Each container shall be prepared for testing by sealing all breathing devices and inserting pressurizing fittings and       gauges.  The container shall be closed and sealed in a normal manner.  The Pneumatic - Pressure Technique of\rMethod 5009 of Federal Test Method Standard NO. 101C shall be used to detect leakage.  An initial pressure setting equal to 0.50 + 0.1-0 PSIG shall be used.  After stabilization, pressure shall be monitored for thirty minutes.  Any loss in pressure in excess of\r0.05 PSIG (adjusted for changes in temperature and barometric pressure) shall be cause for rejection.  Any deformation of the container shell, while pressurized, which is greater than three quarters of an inch beyond its point at ambient pressure shall also be\rcause for rejection.\rALL COSTS AND RESPONSIBILITIES RELATED TO THE FIRST ARTICLE TEST SUBMISSION CONTAINER SHIPMENT TO AND FROM THE FIRST ARTICLE TEST FACILITY ARE TO BE BORNE BY THE CONTRACTOR.\rFirst Article Testing (FAT) performed by the designated test facility shall include:\r - A visual and dimensional inspection performed in accordance with drawing package (CAGE) PART NUMBER.\r - Initial Leak Test: An air pressure fitting shall be installed in place of oneof the container's inspection ports. The container shall be pressurized to 0.50 +.01-0.0 psig. Allow the container to stabilize for 30 minutes. After the stabilization period, the\rpressure shall be monitored for 30 minute. Any pressure loss in excess of 0.05 psi shall be cause for rejection.\r - 18-inch Free Fall Drop Test: The loaded container shall be raised to a heightof 18 inches in a horizontal attitude. It shall be released from a drop hook, free falling flat on the base to an unyielding surface. Any cracked welds, deformation, or damage to\rthe container shall be cause for rejection.\r - Final Leak Test: This test to be performed in the same manner as previously described in \"Initial leak Test\" paragraph above.\r- Form and Fit Check (actual item): The end-item shall be placed in the container using the installation instructions provided. Any inadequacies, fit issues or interferences shall be noted and recorded. The government is responsible to provide an item to\rperform the form and fit test. An item may be shipped to the FAT facility location or, if the end-item cannot be moved, the FAT container may be shipped to an external location.\r(NIIN:01-554-4255) or equivalent (F condition is preferred) to the assigned First Article Test site upon request from N241 Engineering in order to complete First Article Testing in accordance with the terms of this contract. If item is unable to be sent to the\rtest site, the container may be sent to item location with proper coordination. NAVSUP Supply Planner should contact NAVSUP WSS N241 Engineering for test site Point of Contact.\r5.  PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6.  NOTES - NOT APPLICABLE","text":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||||||||\rTIME OF DELIVERY (JUNE 1997)|20|0001AA|4 EA|365 DAYS AFTER FAT APPROVAL|0001AB|1 LO|180 DAYS ADO|||||||||||||||\rSTOP-WORK ORDER (AUG 1989)|1||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|TBD|TBD|TBD|TBD|TBD|||||||||\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||\rVALUE ENGINEERING (JUN 2020)|3||||\rEQUAL OPPORTUNITY (SEP 2016)|2|||\rINTEGRITY OF UNIT PRICES (NOV 2021)|1||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rLIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1||\rNOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1||\rROYALTY INFORMATION (APR 1984)|1||\rANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|12|332439|500|||||||||||\rFACSIMILE PROPOSALS (OCT 1997)|1||\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|\rTHIS PROCUREMENT HAS BEEN SET-ASIDE FOR SMALL BUSINESS.\rTHIS ITEM REQUIRES ENGINEERING SOURCE APPROVAL BY THE DESIGN ACTIVITY IN ORDERTO MAINTAIN THE QUALITY OF THE PART. IF YOU HAVE NOT MANUFACTURED THIS ITEMBEFORE FOR DLA AVIATION PHILADELPHIA AND WANT TO BECOME AN APPROVED SOURCE OFSUPPLY, PLEASE CONTACT THE BUYER\rTO INQUIRE ABOUT SOURCE APPROVAL REQUESTPROCEDURES.\r\\\r1. SCOPE\r1.1 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.2 Container shell material is ;linear low density polyethylene(Plastic); .\r1.3 Manufacturing process is ;Rotomolding; .\r1.4 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;Container Research Corporation; drawing number ( ;05259; ) ;774E001; , Revision ;latest; and all details and specifications referenced therein.\r1.5 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be\rprovided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.\r1.6 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r1.7 When discrepancies exist between these requirements and those on current\rmanufacturer's drawings,contact code ;Contact Buyer on Page 1 of Contract; or code N241.10\r2. APPLICABLE DOCUMENTS\rDRAWING DATA=DL774E001 |05259| | |D| | | |\rDRAWING DATA=15930 |80132| C| |D| | | |\r3. REQUIREMENTS\r3.1 One third (1/3) unit of desiccant (MIL-D-3464, Type II nondusting) per cubic foot of container interior volume shall be placed in desiccant holder of each container at time of shipment.\r3.2 Reference to Cadmium plating shall be deleted and the following substituted: \"Finish shall be electrodeposited alkaline Zinc-Nickel Alloy in accordance with ASTM B 841 Class 1, Type B, Grade 3.\"\r3.3 The shock mount listed in the drawing package (whether identified as sole source, recommended, or suggested) has been tested and approved for the shock mitigation system of this container. No other shock mount may be substituted without written permission\rof Naval Inventory Control Point, Philadelphia unless an alternate is specifically indentified in this contract. ;no other mount; is an approved alternate mount.\rAll containers must be affixed with a nameplate that includes a\rUnique Identification (UID) marking as referenced in the drawing package\rDrawing ;(80132) 15930; and IAW Mil-STD-130 latest revision. The contractor\rshall contact NAVICP code ;Buyer on Page One; or code 0771.10 for the alphanumeric\rsequential serial number group that makes up part of the UID.\rThe UIDwill be included on the nameplate in data matrix format.\r3.4 Welding and welder qualifications shall be in accordance with AWS D1.1\rfor steel, AWS D1.2 or MIL-W-22248,Class 4 for aluminum, AWS D1.3\rfor sheet steel and AWS D1.6 for stainless steel. Proper controls shall be used to prevent melt through or burn through. For aluminum, filler for welding 6061 alloy shall be 4043: filler for welding 5000 series alloys\rto themselves or to 6061 shall be 5356 or 5556. In addition,welding and\rweld inspection shall include:\r(1) Visual inspection shall include 5X (5power) magnification when a suspect\rcondition is to be examined beyond the capability of normal vision.\r(2) Critical and major welds may be subjected to further non destructive\rtesting (such as dye penetrant inspection)as prescribed by the buying activity.\r(3) Proper documentation shall be available for review by Government personnel.\r3.5 WORK INSTRUCTIONS. Work instructions shall be posted at theoperator's work station giving procedures to control the welding process, i.e., filler material, weld size, electrical and gas characteristics, including flow rate.\r3.6 MATERIALS AND MATERIALS CONTROL. The quality program shall assure that the materials used in fabrication or processing, i.e., base metals and weld filler material, be inspected and conform to the applicable physical, chemical and other technical\rrequirements (supplier's certification is sufficient).\r3.7 CONTROLS. Weld filler materials shall be clearly identified and segregated from each other both when in storage and at the work station. Work station environment shall be controlled to prevent conditions adverse to proper gas shielding.\r3.8 CLEANING. Parts to be welded shall be cleaned to remove surface soils such as oils, waxes, grease, inks, etc. except that uninhibited alkaline solutions such as sodium hydroxide shall NOT be used.\r3.9 DEOXIDIZING. The cleaned parts shall be chemically deoxidized NO MORE THAN 10 DAYS PRIOR TO WELDING to remove thick surface oxide films. (If the material or work is exposed to an outdoor environment, this time limit shall be reduced to a maximum of 3 days,\rto account for atmospheric effects.) Mechanical cleaning methods shall be applied just prior to the actual start of welding, to remove any reoxidation or residual thin oxide films.\r3.9.1 CHEMICAL TREATMENT. An acid deoxidizing treatment shall be applied by either immersion or brushing/wiping. Deoxidizers acceptable for use shall include nitric acid, sulfuric chromic, phosphoric chromic, or equivalent solutions. Sodium hydroxide\rsolutions shall not be used. Care shall be taken to assure 100% solution coverage of the area to be welded. To allow an adequately sized deoxidized area for good welding, the solution shall be applied to an area extending at least 2 inches from the weld site,\ror ending at any closer adjacent edge.\r3.9.2 MECHANICAL MEANS. Immediately prior to welding, mechanical cleaning methods shall be applied to the weld areas previously chemically treated to assure removal of residual or reformed oxides, if any. Acceptable methods of mechanical cleaning include\rstainless steel wire brushing, scraping, filing, or sanding. However, abrasives containing iron and its oxides, steel wool and wire, and copper alloy based wire, which may become embedded with galvanically active metals and accelerate corrosion of aluminum\ralloys shall NOT be used. Mechanical methods shall be vigorous enough to adequately remove any residual oxide films, but gentle enough to avoid forming an excessively rough surface in the comparatively soft metal underneath.\rContact code ;Buyer on page 1 of the contract; or code N241.10 to arrange for First Article Test location\rWhen a First Article is required, the contractor shall submit a paper copy of the drawings (size 11\" X 17\"), contracts and approved ECP's ECO's, deviations waivers, and modifications in the records recepticle or inside the container submitted for the First\rArticle.\r4. QUALITY ASSURANCE\r4.1 The tests to be performed under the First Article approval clause (FAR 52.209-4) of the contract are listed below.\r4.1.1 Dimensional test (special)\r ;to drawing (05259) 774E001 and sub-drawings is applicable;\r4.1.2 Requirements of:\r ;to drawing (05259) 774E001 and sub-drawings applicable;\r4.1.3 Form:\r ;applies;\r4.1.4 Fit:\r ;applies;\r4.1.5 Function\r ;per 100% production leak test;\r4.1.6 Compliance with drawing ( ;05259; ) ;774E001; , Revision ;latest; and specifications referenced therein.\r4.2 In addition to the above tests, the First Article(s) to be delivered hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with contract requirements requirements.\r4.3 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during testing.\r4.4 The cost of the Government testing effort set forth in this solicitation is estimated to be $ ;10,000; for the first article testing. This cost factor will be added, for solicitation purposes, to the price of all offerors for whom the government will\rrequire such testing.\r4.5 Disposition of FAT samples\r4.5.1 ;zero; Sample(s) shall not be returned to the contractor because they shall be destroyed during testing.\r4.5.2 ;all; Unless otherwise provided for in the contract, sample(s) shall be returned to the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the\rsample(s) have inspection approval from the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.\r;N/A; Sample(s) shall be returned to the contractor but shall not be considered as production due.\r4.6 Test Sample Coating Instructions\r4.6.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative.\r4.7 FAT Approval Criteria\r4.7.1 FAR 52.209-4 applies\r(A) The contractors shall deliver ;one(1); ; unit(s) of the following CAGE ( ;05259; ; ) Part Number ;774E001; ; , Revision ;latest; ; within ;90; ; calendar days from the date of this contract to the Government at\r; TEST FACILITY ADDRESSES\rNaval Air Warfare Center Aircraft Division\rHighway 547, Building 271\rLakehurst, NJ 08733\rNSWC Indian Head Division,\r Detachment Picatinny\rBuilding 458, Whittemore Ave.\rPicatinny Arsenal, NJ 07806-5000; ;\rMarking of test sample(s) shipping container shall be as follows, citing this contract number: \"FOR FIRST ARTICLE TESTING. NOT RFI MATERIAL. DO NOT TAKE UP IN STOCK CONTRACT NUMBER:____________\"\rFor First Article Test, the shipping documentation shall contain this contract number and lot/item identification. The characteristics that the First Article must meet and the testing requirements are specified elsewhere in this contract.\r(B) Upon shipment of First Article sample(s), two (2) copies of the Material Inspection and Receiving Report (DD Form 250) bearing the QAR's signature and indication of preliminary inspection shall be forwarded to the NAVICP- Philadelphia code cited in Block\r10.a of SF33, with duplicate copies to NAVICP code 072 and to the designated test facility. The envelopes shall be clearly marked: \"DO NOT OPEN IN MAIL ROOM\".\rWithin ;60; ; days after receipt of the samples, the test site shall complete testing/evaluation and submit two (2) copies of their test report with conclusions and recommendations to the NAVICP code cited in Block 10.a of the SF33.\r(C) Within ;90; ; calendar days after the Government receives the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional\rapproval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor.\rA notice of disapproval shall cite reasons for disapproval.\r(D) If the First Article is disapproved, the contractor, upon Government request, shall submit an additional First Article for testing. After each request, the contractor shall make any necessary changes, modifications, or repairs to the First Article or\rselect another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall furnish any additional First Article to the\rGovernment under the terms and conditions and within the time specified by the Government. The Government shall act on this First Article within the time limit specified in paragraph (B) above. The Government reserves the right to require an equitable\radjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.\r(E) If the contractor fails to deliver any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract\r(F) Unless otherwise provided in the contract, the contractor -\r(1) May deliver the approved First Article as part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing: and\r(2) Shall remove and dispose of any First Article from the Government test facility at the contractors expense.\r(G) If the Government does not act within the time specified in paragraph (B) or (C) above the contracting officer shall, upon timely written request from the contractor, equitably adjust under the changes clause of this contract the delivery or performance\rdates and/or the contract price, and any other contractual term affected by the delay.\r(H) The contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the First Article during any First Article test.\r(I) Before First Article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be\rallocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government\r(J) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to this effect with each First Article.\r(K) The contractor shall provide specific written notification to the procuring contracting officer informing him/her of the shipment of any article(s) furnished in accordance with this clause. Such notification must be addressed to the attention of the\rNAVICP code specified in Block 10.a of the SF33, with copies to NAVICP code 072 and to the testing activity. Failure to provide such notification shall excuse the Government from any delay in performing First Article Testing and informing the contractor of\rthe results thereof.\r(L) Fourteen (14) days prior to shipment of First Article Samples, the contractor shall notify the designated test facility in writing of the anticipated shipping date, with an information copy to the PCO, NAVICP Philadelphia, Attn: (Cite code found in Block\r10.a of the SF33). The contractor shall also arrange for preliminary inspection of test samples by the DCMC/QAR.\r4.8 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate)\r(A) Unless otherwise specified in the solicitation, the Naval Inventory Control Point reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the\rGovernment or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that:\r(I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and\r(II) the production location to be used for this requirement is the same as used for the previous production run\rAdditionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that:\r(I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer,\rand\r(II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause.\r(NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section\r1001.)\r(B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one\rthat is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article\rApproval Requirements\r(C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the\rgovernment notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule\rhe offers to the government.\r Offeror's Proposed Alternate Delivery Schedule\r (Based on Waiver of First Article Approval Requirements)\rWithin Days:\rItem No. _______________ Quantity:_______ After Date of Contract:__________\r4.9 100% PRODUCTION LEAK TEST. Each container shall be prepared for testing by sealing all breathing devices and inserting suitable pressurized fittings and gauges. The container shall be closed and sealed in a normal manner. Each container, uninstrumented\rand without dummy load, shall then be subjected to a single 18 inch flat drop. The Pneumatic-Pressure Technique of Method 5008 of Federal Test Method Standard No. 101C shall be used to detect leakage. An initial setting equal to 0.5 + 0.1 - 0 PSIG shall be\rused. After stabilization, pressure shall be monitored for thirty minutes. Any loss in pressure over a 30 minute period that exceeds 25% of the stabilized pressure shall be cause for rejection; tests shall be conducted to ascertain sources of leaks\rand corrective action taken. Any deformation of the container shell while pressurized which is greater than three-quarters of an inch beyond its point at ambient pressure shall also be cause for rejection.\r WARNING\rContainer may explode or fasteners may fail during test. Use protective barriers to avoid injury to personnel.\r100% Production Leak Tests. Each container shall be prepared for testing by sealing all breathing devices and inserting pressurizing fittings and gauges. The container shall be closed and sealed in a normal manner. The Pneumatic - Pressure Technique of\rMethod 5009 of Federal Test Method Standard NO. 101C shall be used to detect leakage. An initial pressure setting equal to 0.50 + 0.1-0 PSIG shall be used. After stabilization, pressure shall be monitored for thirty minutes. Any loss in pressure in excess of\r0.05 PSIG (adjusted for changes in temperature and barometric pressure) shall be cause for rejection. Any deformation of the container shell, while pressurized, which is greater than three quarters of an inch beyond its point at ambient pressure shall also be\rcause for rejection.\rALL COSTS AND RESPONSIBILITIES RELATED TO THE FIRST ARTICLE TEST SUBMISSION CONTAINER SHIPMENT TO AND FROM THE FIRST ARTICLE TEST FACILITY ARE TO BE BORNE BY THE CONTRACTOR.\rFirst Article Testing (FAT) performed by the designated test facility shall include:\r - A visual and dimensional inspection performed in accordance with drawing package (CAGE) PART NUMBER.\r - Initial Leak Test: An air pressure fitting shall be installed in place of oneof the container's inspection ports. The container shall be pressurized to 0.50 +.01-0.0 psig. Allow the container to stabilize for 30 minutes. After the stabilization period, the\rpressure shall be monitored for 30 minute. Any pressure loss in excess of 0.05 psi shall be cause for rejection.\r - 18-inch Free Fall Drop Test: The loaded container shall be raised to a heightof 18 inches in a horizontal attitude. It shall be released from a drop hook, free falling flat on the base to an unyielding surface. Any cracked welds, deformation, or damage to\rthe container shall be cause for rejection.\r - Final Leak Test: This test to be performed in the same manner as previously described in \"Initial leak Test\" paragraph above.\r- Form and Fit Check (actual item): The end-item shall be placed in the container using the installation instructions provided. Any inadequacies, fit issues or interferences shall be noted and recorded. The government is responsible to provide an item to\rperform the form and fit test. An item may be shipped to the FAT facility location or, if the end-item cannot be moved, the FAT container may be shipped to an external location.\r(NIIN:01-554-4255) or equivalent (F condition is preferred) to the assigned First Article Test site upon request from N241 Engineering in order to complete First Article Testing in accordance with the terms of this contract. If item is unable to be sent to the\rtest site, the container may be sent to item location with proper coordination. NAVSUP Supply Planner should contact NAVSUP WSS N241 Engineering for test site Point of Contact.\r5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6. NOTES - NOT APPLICABLE","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"SPRPA125REG64","product_service_code":"8145"}],"due_at":"2025-04-14T18:00:00Z","due_date":"2025-04-14","closes_at":"2025-04-14T18:00:00Z","awardable":true,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"state_source":null,"state_evidence":"Product purchase (PSC 8145)","site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-20T04:00:16.622230Z","principal_notice_id":"966b98115883433292abb2153d17dfab","description":{"text":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||||||||\rTIME OF DELIVERY (JUNE 1997)|20|0001AA|4 EA|365 DAYS AFTER FAT APPROVAL|0001AB|1 LO|180 DAYS ADO|||||||||||||||\rSTOP-WORK ORDER (AUG 1989)|1||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|TBD|TBD|TBD|TBD|TBD|||||||||\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||\rVALUE ENGINEERING (JUN 2020)|3||||\rEQUAL OPPORTUNITY (SEP 2016)|2|||\rINTEGRITY OF UNIT PRICES (NOV 2021)|1||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rLIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1||\rNOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1||\rROYALTY INFORMATION (APR 1984)|1||\rANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|12|332439|500|||||||||||\rFACSIMILE PROPOSALS (OCT 1997)|1||\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|\rTHIS PROCUREMENT HAS BEEN SET-ASIDE FOR SMALL BUSINESS.\rTHIS ITEM REQUIRES ENGINEERING SOURCE APPROVAL BY THE DESIGN ACTIVITY IN ORDERTO MAINTAIN THE QUALITY OF THE PART. IF YOU HAVE NOT MANUFACTURED THIS ITEMBEFORE FOR DLA AVIATION PHILADELPHIA AND WANT TO BECOME AN APPROVED SOURCE OFSUPPLY, PLEASE CONTACT THE BUYER\rTO INQUIRE ABOUT SOURCE APPROVAL REQUESTPROCEDURES.\r\\\r1. SCOPE\r1.1 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.2 Container shell material is ;linear low density polyethylene(Plastic); .\r1.3 Manufacturing process is ;Rotomolding; .\r1.4 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;Container Research Corporation; drawing number ( ;05259; ) ;774E001; , Revision ;latest; and all details and specifications referenced therein.\r1.5 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be\rprovided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.\r1.6 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r1.7 When discrepancies exist between these requirements and those on current\rmanufacturer's drawings,contact code ;Contact Buyer on Page 1 of Contract; or code N241.10\r2. APPLICABLE DOCUMENTS\rDRAWING DATA=DL774E001 |05259| | |D| | | |\rDRAWING DATA=15930 |80132| C| |D| | | |\r3. REQUIREMENTS\r3.1 One third (1/3) unit of desiccant (MIL-D-3464, Type II nondusting) per cubic foot of container interior volume shall be placed in desiccant holder of each container at time of shipment.\r3.2 Reference to Cadmium plating shall be deleted and the following substituted: \"Finish shall be electrodeposited alkaline Zinc-Nickel Alloy in accordance with ASTM B 841 Class 1, Type B, Grade 3.\"\r3.3 The shock mount listed in the drawing package (whether identified as sole source, recommended, or suggested) has been tested and approved for the shock mitigation system of this container. No other shock mount may be substituted without written permission\rof Naval Inventory Control Point, Philadelphia unless an alternate is specifically indentified in this contract. ;no other mount; is an approved alternate mount.\rAll containers must be affixed with a nameplate that includes a\rUnique Identification (UID) marking as referenced in the drawing package\rDrawing ;(80132) 15930; and IAW Mil-STD-130 latest revision. The contractor\rshall contact NAVICP code ;Buyer on Page One; or code 0771.10 for the alphanumeric\rsequential serial number group that makes up part of the UID.\rThe UIDwill be included on the nameplate in data matrix format.\r3.4 Welding and welder qualifications shall be in accordance with AWS D1.1\rfor steel, AWS D1.2 or MIL-W-22248,Class 4 for aluminum, AWS D1.3\rfor sheet steel and AWS D1.6 for stainless steel. Proper controls shall be used to prevent melt through or burn through. For aluminum, filler for welding 6061 alloy shall be 4043: filler for welding 5000 series alloys\rto themselves or to 6061 shall be 5356 or 5556. In addition,welding and\rweld inspection shall include:\r(1) Visual inspection shall include 5X (5power) magnification when a suspect\rcondition is to be examined beyond the capability of normal vision.\r(2) Critical and major welds may be subjected to further non destructive\rtesting (such as dye penetrant inspection)as prescribed by the buying activity.\r(3) Proper documentation shall be available for review by Government personnel.\r3.5 WORK INSTRUCTIONS. Work instructions shall be posted at theoperator's work station giving procedures to control the welding process, i.e., filler material, weld size, electrical and gas characteristics, including flow rate.\r3.6 MATERIALS AND MATERIALS CONTROL. The quality program shall assure that the materials used in fabrication or processing, i.e., base metals and weld filler material, be inspected and conform to the applicable physical, chemical and other technical\rrequirements (supplier's certification is sufficient).\r3.7 CONTROLS. Weld filler materials shall be clearly identified and segregated from each other both when in storage and at the work station. Work station environment shall be controlled to prevent conditions adverse to proper gas shielding.\r3.8 CLEANING. Parts to be welded shall be cleaned to remove surface soils such as oils, waxes, grease, inks, etc. except that uninhibited alkaline solutions such as sodium hydroxide shall NOT be used.\r3.9 DEOXIDIZING. The cleaned parts shall be chemically deoxidized NO MORE THAN 10 DAYS PRIOR TO WELDING to remove thick surface oxide films. (If the material or work is exposed to an outdoor environment, this time limit shall be reduced to a maximum of 3 days,\rto account for atmospheric effects.) Mechanical cleaning methods shall be applied just prior to the actual start of welding, to remove any reoxidation or residual thin oxide films.\r3.9.1 CHEMICAL TREATMENT. An acid deoxidizing treatment shall be applied by either immersion or brushing/wiping. Deoxidizers acceptable for use shall include nitric acid, sulfuric chromic, phosphoric chromic, or equivalent solutions. Sodium hydroxide\rsolutions shall not be used. Care shall be taken to assure 100% solution coverage of the area to be welded. To allow an adequately sized deoxidized area for good welding, the solution shall be applied to an area extending at least 2 inches from the weld site,\ror ending at any closer adjacent edge.\r3.9.2 MECHANICAL MEANS. Immediately prior to welding, mechanical cleaning methods shall be applied to the weld areas previously chemically treated to assure removal of residual or reformed oxides, if any. Acceptable methods of mechanical cleaning include\rstainless steel wire brushing, scraping, filing, or sanding. However, abrasives containing iron and its oxides, steel wool and wire, and copper alloy based wire, which may become embedded with galvanically active metals and accelerate corrosion of aluminum\ralloys shall NOT be used. Mechanical methods shall be vigorous enough to adequately remove any residual oxide films, but gentle enough to avoid forming an excessively rough surface in the comparatively soft metal underneath.\rContact code ;Buyer on page 1 of the contract; or code N241.10 to arrange for First Article Test location\rWhen a First Article is required, the contractor shall submit a paper copy of the drawings (size 11\" X 17\"), contracts and approved ECP's ECO's, deviations waivers, and modifications in the records recepticle or inside the container submitted for the First\rArticle.\r4. QUALITY ASSURANCE\r4.1 The tests to be performed under the First Article approval clause (FAR 52.209-4) of the contract are listed below.\r4.1.1 Dimensional test (special)\r ;to drawing (05259) 774E001 and sub-drawings is applicable;\r4.1.2 Requirements of:\r ;to drawing (05259) 774E001 and sub-drawings applicable;\r4.1.3 Form:\r ;applies;\r4.1.4 Fit:\r ;applies;\r4.1.5 Function\r ;per 100% production leak test;\r4.1.6 Compliance with drawing ( ;05259; ) ;774E001; , Revision ;latest; and specifications referenced therein.\r4.2 In addition to the above tests, the First Article(s) to be delivered hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with contract requirements requirements.\r4.3 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during testing.\r4.4 The cost of the Government testing effort set forth in this solicitation is estimated to be $ ;10,000; for the first article testing. This cost factor will be added, for solicitation purposes, to the price of all offerors for whom the government will\rrequire such testing.\r4.5 Disposition of FAT samples\r4.5.1 ;zero; Sample(s) shall not be returned to the contractor because they shall be destroyed during testing.\r4.5.2 ;all; Unless otherwise provided for in the contract, sample(s) shall be returned to the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the\rsample(s) have inspection approval from the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.\r;N/A; Sample(s) shall be returned to the contractor but shall not be considered as production due.\r4.6 Test Sample Coating Instructions\r4.6.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative.\r4.7 FAT Approval Criteria\r4.7.1 FAR 52.209-4 applies\r(A) The contractors shall deliver ;one(1); ; unit(s) of the following CAGE ( ;05259; ; ) Part Number ;774E001; ; , Revision ;latest; ; within ;90; ; calendar days from the date of this contract to the Government at\r; TEST FACILITY ADDRESSES\rNaval Air Warfare Center Aircraft Division\rHighway 547, Building 271\rLakehurst, NJ 08733\rNSWC Indian Head Division,\r Detachment Picatinny\rBuilding 458, Whittemore Ave.\rPicatinny Arsenal, NJ 07806-5000; ;\rMarking of test sample(s) shipping container shall be as follows, citing this contract number: \"FOR FIRST ARTICLE TESTING. NOT RFI MATERIAL. DO NOT TAKE UP IN STOCK CONTRACT NUMBER:____________\"\rFor First Article Test, the shipping documentation shall contain this contract number and lot/item identification. The characteristics that the First Article must meet and the testing requirements are specified elsewhere in this contract.\r(B) Upon shipment of First Article sample(s), two (2) copies of the Material Inspection and Receiving Report (DD Form 250) bearing the QAR's signature and indication of preliminary inspection shall be forwarded to the NAVICP- Philadelphia code cited in Block\r10.a of SF33, with duplicate copies to NAVICP code 072 and to the designated test facility. The envelopes shall be clearly marked: \"DO NOT OPEN IN MAIL ROOM\".\rWithin ;60; ; days after receipt of the samples, the test site shall complete testing/evaluation and submit two (2) copies of their test report with conclusions and recommendations to the NAVICP code cited in Block 10.a of the SF33.\r(C) Within ;90; ; calendar days after the Government receives the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional\rapproval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor.\rA notice of disapproval shall cite reasons for disapproval.\r(D) If the First Article is disapproved, the contractor, upon Government request, shall submit an additional First Article for testing. After each request, the contractor shall make any necessary changes, modifications, or repairs to the First Article or\rselect another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall furnish any additional First Article to the\rGovernment under the terms and conditions and within the time specified by the Government. The Government shall act on this First Article within the time limit specified in paragraph (B) above. The Government reserves the right to require an equitable\radjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.\r(E) If the contractor fails to deliver any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract\r(F) Unless otherwise provided in the contract, the contractor -\r(1) May deliver the approved First Article as part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing: and\r(2) Shall remove and dispose of any First Article from the Government test facility at the contractors expense.\r(G) If the Government does not act within the time specified in paragraph (B) or (C) above the contracting officer shall, upon timely written request from the contractor, equitably adjust under the changes clause of this contract the delivery or performance\rdates and/or the contract price, and any other contractual term affected by the delay.\r(H) The contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the First Article during any First Article test.\r(I) Before First Article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be\rallocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government\r(J) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to this effect with each First Article.\r(K) The contractor shall provide specific written notification to the procuring contracting officer informing him/her of the shipment of any article(s) furnished in accordance with this clause. Such notification must be addressed to the attention of the\rNAVICP code specified in Block 10.a of the SF33, with copies to NAVICP code 072 and to the testing activity. Failure to provide such notification shall excuse the Government from any delay in performing First Article Testing and informing the contractor of\rthe results thereof.\r(L) Fourteen (14) days prior to shipment of First Article Samples, the contractor shall notify the designated test facility in writing of the anticipated shipping date, with an information copy to the PCO, NAVICP Philadelphia, Attn: (Cite code found in Block\r10.a of the SF33). The contractor shall also arrange for preliminary inspection of test samples by the DCMC/QAR.\r4.8 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate)\r(A) Unless otherwise specified in the solicitation, the Naval Inventory Control Point reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the\rGovernment or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that:\r(I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and\r(II) the production location to be used for this requirement is the same as used for the previous production run\rAdditionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that:\r(I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer,\rand\r(II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause.\r(NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section\r1001.)\r(B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one\rthat is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article\rApproval Requirements\r(C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the\rgovernment notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule\rhe offers to the government.\r Offeror's Proposed Alternate Delivery Schedule\r (Based on Waiver of First Article Approval Requirements)\rWithin Days:\rItem No. _______________ Quantity:_______ After Date of Contract:__________\r4.9 100% PRODUCTION LEAK TEST. Each container shall be prepared for testing by sealing all breathing devices and inserting suitable pressurized fittings and gauges. The container shall be closed and sealed in a normal manner. Each container, uninstrumented\rand without dummy load, shall then be subjected to a single 18 inch flat drop. The Pneumatic-Pressure Technique of Method 5008 of Federal Test Method Standard No. 101C shall be used to detect leakage. An initial setting equal to 0.5 + 0.1 - 0 PSIG shall be\rused. After stabilization, pressure shall be monitored for thirty minutes. Any loss in pressure over a 30 minute period that exceeds 25% of the stabilized pressure shall be cause for rejection; tests shall be conducted to ascertain sources of leaks\rand corrective action taken. Any deformation of the container shell while pressurized which is greater than three-quarters of an inch beyond its point at ambient pressure shall also be cause for rejection.\r WARNING\rContainer may explode or fasteners may fail during test. Use protective barriers to avoid injury to personnel.\r100% Production Leak Tests. Each container shall be prepared for testing by sealing all breathing devices and inserting pressurizing fittings and gauges. The container shall be closed and sealed in a normal manner. The Pneumatic - Pressure Technique of\rMethod 5009 of Federal Test Method Standard NO. 101C shall be used to detect leakage. An initial pressure setting equal to 0.50 + 0.1-0 PSIG shall be used. After stabilization, pressure shall be monitored for thirty minutes. Any loss in pressure in excess of\r0.05 PSIG (adjusted for changes in temperature and barometric pressure) shall be cause for rejection. Any deformation of the container shell, while pressurized, which is greater than three quarters of an inch beyond its point at ambient pressure shall also be\rcause for rejection.\rALL COSTS AND RESPONSIBILITIES RELATED TO THE FIRST ARTICLE TEST SUBMISSION CONTAINER SHIPMENT TO AND FROM THE FIRST ARTICLE TEST FACILITY ARE TO BE BORNE BY THE CONTRACTOR.\rFirst Article Testing (FAT) performed by the designated test facility shall include:\r - A visual and dimensional inspection performed in accordance with drawing package (CAGE) PART NUMBER.\r - Initial Leak Test: An air pressure fitting shall be installed in place of oneof the container's inspection ports. The container shall be pressurized to 0.50 +.01-0.0 psig. Allow the container to stabilize for 30 minutes. After the stabilization period, the\rpressure shall be monitored for 30 minute. Any pressure loss in excess of 0.05 psi shall be cause for rejection.\r - 18-inch Free Fall Drop Test: The loaded container shall be raised to a heightof 18 inches in a horizontal attitude. It shall be released from a drop hook, free falling flat on the base to an unyielding surface. Any cracked welds, deformation, or damage to\rthe container shall be cause for rejection.\r - Final Leak Test: This test to be performed in the same manner as previously described in \"Initial leak Test\" paragraph above.\r- Form and Fit Check (actual item): The end-item shall be placed in the container using the installation instructions provided. Any inadequacies, fit issues or interferences shall be noted and recorded. The government is responsible to provide an item to\rperform the form and fit test. An item may be shipped to the FAT facility location or, if the end-item cannot be moved, the FAT container may be shipped to an external location.\r(NIIN:01-554-4255) or equivalent (F condition is preferred) to the assigned First Article Test site upon request from N241 Engineering in order to complete First Article Testing in accordance with the terms of this contract. If item is unable to be sent to the\rtest site, the container may be sent to item location with proper coordination. NAVSUP Supply Planner should contact NAVSUP WSS N241 Engineering for test site Point of Contact.\r5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6. NOTES - NOT APPLICABLE","html":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||||||||\rTIME OF DELIVERY (JUNE 1997)|20|0001AA|4 EA|365 DAYS AFTER FAT APPROVAL|0001AB|1 LO|180 DAYS ADO|||||||||||||||\rSTOP-WORK ORDER (AUG 1989)|1||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|TBD|TBD|TBD|TBD|TBD|||||||||\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||\rVALUE ENGINEERING (JUN 2020)|3||||\rEQUAL OPPORTUNITY (SEP 2016)|2|||\rINTEGRITY OF UNIT PRICES (NOV 2021)|1||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rLIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1||\rNOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1||\rROYALTY INFORMATION (APR 1984)|1||\rANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|12|332439|500|||||||||||\rFACSIMILE PROPOSALS (OCT 1997)|1||\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|\rTHIS PROCUREMENT HAS BEEN SET-ASIDE FOR SMALL BUSINESS.\rTHIS ITEM REQUIRES ENGINEERING SOURCE APPROVAL BY THE DESIGN ACTIVITY IN ORDERTO MAINTAIN THE QUALITY OF THE PART.  IF YOU HAVE NOT MANUFACTURED THIS ITEMBEFORE FOR DLA AVIATION PHILADELPHIA AND WANT TO BECOME AN APPROVED SOURCE OFSUPPLY, PLEASE CONTACT THE BUYER\rTO INQUIRE ABOUT SOURCE APPROVAL REQUESTPROCEDURES.\r\\\r1.  SCOPE\r1.1 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.2 Container shell material is ;linear low density polyethylene(Plastic); .\r1.3  Manufacturing process is ;Rotomolding; .\r1.4 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;Container Research Corporation; drawing number ( ;05259; ) ;774E001;      , Revision ;latest; and all details and specifications referenced therein.\r1.5  Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be\rprovided by the Government or any other source and is the sole responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.\r1.6  If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r1.7 When discrepancies exist between these requirements and those on current\rmanufacturer's drawings,contact code ;Contact Buyer on Page 1 of Contract; or code N241.10\r2.  APPLICABLE DOCUMENTS\rDRAWING DATA=DL774E001                               |05259|  |   |D|            |  |     |\rDRAWING DATA=15930                                   |80132| C|   |D|            |  |     |\r3.  REQUIREMENTS\r3.1  One third (1/3) unit of desiccant (MIL-D-3464, Type II nondusting) per cubic foot of container interior volume shall be placed in desiccant holder of each container at time of shipment.\r3.2  Reference to Cadmium plating shall be deleted and the following substituted:  \"Finish shall be electrodeposited alkaline Zinc-Nickel Alloy in accordance with ASTM B 841 Class 1, Type B, Grade 3.\"\r3.3 The shock mount listed in the drawing package (whether identified as sole source, recommended, or suggested) has been tested and approved for the shock mitigation system of this container. No other shock mount may be substituted without written permission\rof Naval Inventory Control Point, Philadelphia unless an alternate is specifically indentified in this contract. ;no other mount; is an approved alternate mount.\rAll containers must be affixed with a nameplate that includes a\rUnique Identification (UID) marking as referenced in the drawing package\rDrawing ;(80132) 15930;  and IAW Mil-STD-130 latest revision. The contractor\rshall contact NAVICP code ;Buyer on Page One; or code 0771.10 for the alphanumeric\rsequential serial number group that makes up part of the UID.\rThe UIDwill be included on the nameplate in data matrix format.\r3.4 Welding and welder qualifications shall be in accordance with AWS D1.1\rfor steel, AWS D1.2 or MIL-W-22248,Class 4 for aluminum, AWS D1.3\rfor sheet steel and AWS D1.6 for stainless steel. Proper controls shall be used to prevent melt through or burn through. For aluminum, filler for welding 6061 alloy shall be 4043: filler for welding 5000 series alloys\rto themselves or to 6061 shall be 5356 or 5556. In addition,welding and\rweld inspection shall include:\r(1) Visual inspection shall include 5X (5power) magnification when a suspect\rcondition is to be examined beyond the capability of normal vision.\r(2) Critical and major welds may be subjected to further non destructive\rtesting (such as dye penetrant inspection)as prescribed by the buying         activity.\r(3) Proper documentation shall be available for review by Government personnel.\r3.5  WORK INSTRUCTIONS.  Work instructions shall be posted at theoperator's  work station giving procedures to control the welding process,   i.e., filler material, weld size, electrical and gas characteristics,      including flow rate.\r3.6  MATERIALS AND MATERIALS CONTROL.  The quality program shall assure that the materials used in fabrication or processing, i.e., base metals and weld filler material, be inspected and conform to the applicable physical, chemical and other technical\rrequirements (supplier's certification is sufficient).\r3.7  CONTROLS.  Weld filler materials shall be clearly identified and segregated from each other both when in storage and at the work station.  Work station environment shall be controlled to prevent conditions adverse to proper gas shielding.\r3.8 CLEANING.  Parts to be welded shall be cleaned to remove surface soils such as oils, waxes, grease, inks, etc. except that uninhibited  alkaline solutions such as sodium hydroxide shall NOT be used.\r3.9 DEOXIDIZING.  The cleaned parts shall be chemically deoxidized NO MORE THAN 10 DAYS PRIOR TO WELDING to remove thick surface oxide films. (If the material or work is exposed to an outdoor environment, this time limit shall be reduced to a maximum of 3 days,\rto account for atmospheric effects.)  Mechanical cleaning methods shall be applied just prior to the actual start of welding, to remove any reoxidation or residual thin oxide films.\r3.9.1  CHEMICAL TREATMENT.  An acid deoxidizing treatment shall be applied  by either immersion or brushing/wiping.  Deoxidizers acceptable for use shall include nitric acid, sulfuric chromic, phosphoric chromic, or equivalent solutions.  Sodium hydroxide\rsolutions shall not be used.  Care shall be taken to assure 100% solution coverage of the area to be welded.  To allow an adequately sized deoxidized area for good welding, the solution shall be applied to an area extending at least 2 inches from the weld site,\ror ending at any closer adjacent edge.\r3.9.2  MECHANICAL MEANS.  Immediately prior to welding, mechanical cleaning methods shall be applied to the weld areas previously chemically treated to assure removal of residual or reformed oxides, if any.  Acceptable methods of mechanical cleaning include\rstainless steel wire brushing, scraping, filing, or sanding. However, abrasives containing iron and its oxides, steel wool and wire, and copper alloy based wire, which may become embedded with galvanically active metals and accelerate corrosion of aluminum\ralloys shall NOT be used.  Mechanical methods shall be vigorous enough to adequately remove any residual oxide films, but gentle enough to avoid forming an excessively rough surface  in the comparatively soft metal underneath.\rContact code ;Buyer on page 1 of the contract; or code N241.10 to arrange for First Article Test location\rWhen a First Article is required, the contractor shall submit a paper copy of the drawings (size 11\" X 17\"), contracts and approved ECP's ECO's, deviations waivers, and modifications in the records recepticle or inside the container submitted for the First\rArticle.\r4.  QUALITY ASSURANCE\r4.1 The tests to be performed under the First Article approval clause (FAR 52.209-4) of the contract are listed below.\r4.1.1  Dimensional test (special)\r     ;to drawing (05259) 774E001 and sub-drawings is applicable;\r4.1.2  Requirements of:\r     ;to drawing (05259) 774E001 and sub-drawings applicable;\r4.1.3  Form:\r     ;applies;\r4.1.4  Fit:\r     ;applies;\r4.1.5  Function\r      ;per 100% production leak test;\r4.1.6  Compliance with drawing ( ;05259; ) ;774E001; , Revision ;latest;  and specifications referenced therein.\r4.2  In addition to the above tests, the First Article(s) to be delivered hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with contract requirements requirements.\r4.3  The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during testing.\r4.4 The cost of the Government testing effort set forth in this solicitation is estimated to be $ ;10,000; for the first article testing.  This cost factor will be added, for solicitation purposes, to the price of all offerors for whom the government will\rrequire such testing.\r4.5 Disposition of FAT samples\r4.5.1 ;zero;  Sample(s) shall not be returned to the contractor because they shall be destroyed during testing.\r4.5.2 ;all;  Unless otherwise provided for in the contract, sample(s) shall be returned to the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the\rsample(s) have inspection approval from the cognizant DCMC QAR.  Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.\r;N/A;  Sample(s) shall be returned to the contractor but shall not be considered as production due.\r4.6  Test Sample Coating Instructions\r4.6.1  Samples are to be unpainted. Corrosive areas are to be coated with a light preservative.\r4.7  FAT Approval Criteria\r4.7.1  FAR 52.209-4 applies\r(A)  The contractors shall deliver ;one(1); ;  unit(s) of the following CAGE   ( ;05259; ; ) Part Number ;774E001; ; , Revision ;latest; ;  within ;90; ;  calendar days from the date of this contract to the Government at\r; TEST FACILITY ADDRESSES\rNaval Air Warfare Center Aircraft Division\rHighway 547, Building 271\rLakehurst, NJ 08733\rNSWC Indian Head Division,\r Detachment Picatinny\rBuilding 458, Whittemore Ave.\rPicatinny Arsenal, NJ 07806-5000; ;\rMarking of test sample(s) shipping container shall be as follows, citing this contract number: \"FOR FIRST ARTICLE TESTING.  NOT RFI MATERIAL.  DO NOT TAKE UP IN STOCK CONTRACT NUMBER:____________\"\rFor First Article Test, the shipping documentation shall contain this contract number and lot/item identification.  The characteristics that the First Article must meet and the testing requirements are specified elsewhere in this contract.\r(B)  Upon shipment of First Article sample(s), two (2) copies of the Material Inspection and Receiving Report (DD Form 250) bearing the QAR's signature and indication of preliminary inspection shall be forwarded to the NAVICP- Philadelphia code cited in Block\r10.a of SF33, with duplicate copies to NAVICP code 072 and to the designated test facility.  The envelopes shall be clearly marked: \"DO NOT OPEN IN MAIL ROOM\".\rWithin ;60; ; days after receipt of the samples, the test site shall complete testing/evaluation and submit two (2) copies of their test report with conclusions and recommendations to the NAVICP code cited in Block 10.a of the SF33.\r(C) Within ;90; ; calendar days after the Government receives the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article.  The notice of approval, conditional\rapproval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor.\rA notice of disapproval shall cite reasons for disapproval.\r(D)  If the First Article is disapproved, the contractor, upon Government request, shall submit an additional First Article for testing.  After each request, the contractor shall make any necessary changes, modifications, or repairs to the First Article or\rselect another First Article for testing.  All costs related to these tests are to be borne by the contractor,  including any and all costs for additional tests following a disapproval.  The contractor shall furnish any additional First Article to the\rGovernment under the terms and conditions and within the time specified by the Government.  The Government shall act on this First Article within the time limit specified in paragraph (B) above.  The Government reserves the right to require an equitable\radjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.\r(E)  If the contractor fails to deliver any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract\r(F)  Unless otherwise provided in the contract, the contractor -\r(1)  May deliver the approved First Article as part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing: and\r(2) Shall remove and dispose of any First Article from the Government test facility at the contractors expense.\r(G)  If the Government does not act within the time specified in paragraph (B) or (C) above the contracting officer shall, upon timely written request from the contractor, equitably adjust under the changes clause of this contract the delivery or performance\rdates and/or the contract price, and any other contractual term affected by the delay.\r(H)  The contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the First Article during any First Article test.\r(I)  Before First Article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the contractor.  Before First Article approval, the costs thereof shall not be\rallocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government\r(J)  The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to this effect with each First Article.\r(K)  The contractor shall provide specific written notification to the procuring contracting officer informing him/her of the shipment of any article(s) furnished in accordance with this clause.  Such notification must be addressed to the attention of the\rNAVICP code specified in Block 10.a  of the SF33, with copies to NAVICP code 072 and to the testing activity.  Failure to provide  such notification shall excuse the Government from any delay in performing First Article Testing and informing the contractor of\rthe results thereof.\r(L)  Fourteen (14) days prior to shipment of First Article Samples, the contractor shall notify the designated test facility in writing of the anticipated shipping date, with an information copy to the PCO, NAVICP Philadelphia, Attn: (Cite code found in Block\r10.a of the SF33).  The contractor shall also arrange for preliminary inspection of test samples by the DCMC/QAR.\r4.8 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate)\r(A)  Unless otherwise specified in the solicitation, the Naval Inventory Control Point reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the\rGovernment or the Original Equipment Manufacturer/Prime Manufacturer.  An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that:\r(I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and\r(II) the production location to be used for this requirement is the same as used for the previous production run\rAdditionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that:\r(I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer,\rand\r(II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause.\r(NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section\r1001.)\r(B)  Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one\rthat is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article\rApproval Requirements\r(C)  In the event of the First Article Approval Requirement is granted, the   delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the\rgovernment notification of conditional approval or approval.  These requirements are specified in the quality assurance section of this solicitation.  If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule\rhe offers to the government.\r              Offeror's Proposed Alternate Delivery Schedule\r         (Based on Waiver of First Article Approval Requirements)\rWithin Days:\rItem No. _______________  Quantity:_______   After Date of Contract:__________\r4.9  100% PRODUCTION LEAK TEST.  Each container shall be prepared for testing by sealing all breathing devices and inserting suitable pressurized fittings and gauges.  The container shall be closed and sealed in a normal manner. Each container, uninstrumented\rand without dummy load, shall then be subjected to a single 18 inch flat drop.  The Pneumatic-Pressure Technique of Method 5008 of Federal Test Method Standard No. 101C shall be used to detect leakage. An initial setting equal to 0.5 + 0.1 - 0 PSIG shall be\rused.  After          stabilization, pressure shall be monitored for thirty minutes.  Any loss in pressure over a 30 minute period that exceeds 25% of the stabilized pressure shall be cause for rejection; tests shall be conducted to ascertain sources of leaks\rand corrective action taken.  Any deformation of the container shell while pressurized which is greater than three-quarters of an inch beyond its point at ambient pressure shall also be cause for rejection.\r                            WARNING\rContainer may explode or fasteners may fail during test.  Use protective barriers to avoid injury to personnel.\r100% Production Leak Tests.  Each container shall be prepared for testing by sealing all breathing devices and inserting pressurizing fittings and       gauges.  The container shall be closed and sealed in a normal manner.  The Pneumatic - Pressure Technique of\rMethod 5009 of Federal Test Method Standard NO. 101C shall be used to detect leakage.  An initial pressure setting equal to 0.50 + 0.1-0 PSIG shall be used.  After stabilization, pressure shall be monitored for thirty minutes.  Any loss in pressure in excess of\r0.05 PSIG (adjusted for changes in temperature and barometric pressure) shall be cause for rejection.  Any deformation of the container shell, while pressurized, which is greater than three quarters of an inch beyond its point at ambient pressure shall also be\rcause for rejection.\rALL COSTS AND RESPONSIBILITIES RELATED TO THE FIRST ARTICLE TEST SUBMISSION CONTAINER SHIPMENT TO AND FROM THE FIRST ARTICLE TEST FACILITY ARE TO BE BORNE BY THE CONTRACTOR.\rFirst Article Testing (FAT) performed by the designated test facility shall include:\r - A visual and dimensional inspection performed in accordance with drawing package (CAGE) PART NUMBER.\r - Initial Leak Test: An air pressure fitting shall be installed in place of oneof the container's inspection ports. The container shall be pressurized to 0.50 +.01-0.0 psig. Allow the container to stabilize for 30 minutes. After the stabilization period, the\rpressure shall be monitored for 30 minute. Any pressure loss in excess of 0.05 psi shall be cause for rejection.\r - 18-inch Free Fall Drop Test: The loaded container shall be raised to a heightof 18 inches in a horizontal attitude. It shall be released from a drop hook, free falling flat on the base to an unyielding surface. Any cracked welds, deformation, or damage to\rthe container shall be cause for rejection.\r - Final Leak Test: This test to be performed in the same manner as previously described in \"Initial leak Test\" paragraph above.\r- Form and Fit Check (actual item): The end-item shall be placed in the container using the installation instructions provided. Any inadequacies, fit issues or interferences shall be noted and recorded. The government is responsible to provide an item to\rperform the form and fit test. An item may be shipped to the FAT facility location or, if the end-item cannot be moved, the FAT container may be shipped to an external location.\r(NIIN:01-554-4255) or equivalent (F condition is preferred) to the assigned First Article Test site upon request from N241 Engineering in order to complete First Article Testing in accordance with the terms of this contract. If item is unable to be sent to the\rtest site, the container may be sent to item location with proper coordination. NAVSUP Supply Planner should contact NAVSUP WSS N241 Engineering for test site Point of Contact.\r5.  PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6.  NOTES - NOT APPLICABLE","origin":"detail"},"contacts":[{"name":"Telephone: 2157372249","role":"primary","email":"GIA.PANTALEO@DLA.MIL"}],"place_of_performance":null,"office_address":{"zip":"19111-5098","city":"PHILADELPHIA","state":"PA","country":"USA"},"naics_codes":["332439"],"award":null,"attachments":[{"resource_id":"228dde35f5014edfbe3e301e2a734ebb","name":"Drawings_H1TRGcan.pdf","kind":"file","mime_type":".pdf","size_bytes":10300395,"posted_at":"2025-03-18T14:40:51.408Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/228dde35f5014edfbe3e301e2a734ebb/download","mirrored":false},{"resource_id":"8d386c74363048c49fa63e3254a098ad","name":"See Solicitation SPRPA125REG64","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2025-03-14T13:07:11.047Z","export_controlled":false,"sha256":null,"url":"https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=SPRPA125REG64","mirrored":false}],"awards":[],"related":[{"key":"SPRPA127RWA06","latest_notice_id":"62027fdd1ec0472296a914565dd09ba8","title":"16--DRIVE UNIT,HYDRAULI","solicitation_number":"SPRPA127RWA06","notice_type":"o","first_type":"p","first_posted":"2026-10-22","last_posted":"2026-11-10","notices":2,"due_at":"2026-11-25T18:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"336413","psc":"1650","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1650)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"SPRPA127QVA05","latest_notice_id":"f3bde6b5580d4dbead00d33fc462c395","title":"DISTRIBUTING SYSTEM","solicitation_number":"SPRPA127QVA05","notice_type":"o","first_type":"o","first_posted":"2026-10-20","last_posted":"2026-11-17","notices":3,"due_at":"2026-11-25T20:30:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"335311","psc":"6150","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6150)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"SPRPA127QRA38","latest_notice_id":"886537c7eaa6460daea352da2ed74210","title":"MISC RELAY PANEL,AI","solicitation_number":"SPRPA127QRA38","notice_type":"o","first_type":"o","first_posted":"2026-11-10","last_posted":"2026-11-10","notices":1,"due_at":"2026-11-25T20:30:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"336413","psc":"1680","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1680)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"SPRPA126RUX02","latest_notice_id":"5acedf5132b34461953e3b0dd7398fe8","title":"Performance Based Support (PB Follow-On) Consumable Item Requirements","solicitation_number":"SPRPA1-26-R-UX02","notice_type":"r","first_type":"r","first_posted":"2026-11-10","last_posted":"2026-11-10","notices":2,"due_at":"2026-11-25T21:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"336413","psc":"1560","set_aside":null,"state":"MO","county":"29189","county_name":"St. Louis County","city":"2931276","city_name":"Hazelwood","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"SPRPA126QYA91","latest_notice_id":"f99daa3ef7b744428be58f3ea9fafa58","title":"6615 - Procurement of NIIN 01-660-5102, Qty 12 each, SERVOCYLINDER","solicitation_number":"SPRPA126QYA91","notice_type":"p","first_type":"o","first_posted":"2026-01-08","last_posted":"2026-11-10","notices":2,"due_at":"2026-11-26T04:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T04:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"334511","psc":"6615","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6615)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"}],"similar_open":[{"key":"SPRRA127QA015","latest_notice_id":"d84f7ffb33cf4e93a3a8f4026aaa76a9","title":"SHIPPING AND STORAG","solicitation_number":"SPRRA1-27-Q-A015","notice_type":"p","first_type":"p","first_posted":"2026-11-10","last_posted":"2026-11-10","notices":2,"due_at":"2026-11-26T21:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRRA1","office_name":"DLA AVIATION AT HUNTSVILLE, AL","naics":"332439","psc":"8145","set_aside":"WOSB","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 8145)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"SPE7LX27U0832","latest_notice_id":"c6931b2138b3408ea59c117b1fc3121c","title":"49--BREAKOUT BOX ASSEMB","solicitation_number":"SPE7LX27U0832","notice_type":"k","first_type":"k","first_posted":"2026-11-12","last_posted":"2026-11-12","notices":1,"due_at":null,"due_date":"2026-11-27","closes_at":"2026-11-28T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPE7LX","office_name":"DLA WEAPONS SUPPORT","naics":"332439","psc":"49","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"NTITY WILL BE 7. ITEMS WILL BE SHIPPED TO VARIOUS CONUS AND OCONUS","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"},{"key":"SPE7LX27U0929","latest_notice_id":"1834a9df23eb42d49b3e3ac8d959eaa3","title":"53--TRACK,SLIDING DOOR","solicitation_number":"SPE7LX27U0929","notice_type":"k","first_type":"k","first_posted":"2026-11-12","last_posted":"2026-11-12","notices":1,"due_at":null,"due_date":"2026-11-27","closes_at":"2026-11-28T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPE7LX","office_name":"DLA WEAPONS SUPPORT","naics":"332439","psc":"53","set_aside":"SDVOSBC","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"TITY WILL BE 20. ITEMS WILL BE SHIPPED TO VARIOUS CONUS AND OCONUS","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"}],"similar_open_total":26,"indexable":false}