{"canonical":"https://sealedbidder.com/opportunities/sprpa125qer84","key":"SPRPA125QER84","url":"https://sealedbidder.com/opportunities/sprpa125qer84","title":"BRAKE ACTUATOR ASSE","solicitation_number":"SPRPA125QER84","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-05-13T20:30:00Z","first_posted":"2025-04-15","last_posted":"2025-04-15","department":"DEPT OF DEFENSE","subagency":"DEFENSE LOGISTICS AGENCY","office":"DLA AVIATION AT PHILADELPHIA, PA","naics":"336413","psc":"1710","set_aside":null,"place_state":null,"place_scope":"nationwide","site":null,"place_state_source":null,"place_evidence":"Product purchase (PSC 1710)","place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"c0babb1828b746ffa95970a5f271990a","title":"BRAKE ACTUATOR ASSE","solicitation_number":"SPRPA125QER84","notice_type":"o","base_type":"o","posted":"2025-04-15","posted_at":"2025-04-16T01:36:11.148Z","due_at":"2025-05-13T20:30:00Z","due_date":"2025-05-13","cancelled":false,"archived":true,"archive_date":"2025-05-28","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c0babb1828b746ffa95970a5f271990a/view","enriched":true,"history":[{"index":3,"title":"BRAKE ACTUATOR ASSE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T01:36:11.148Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c0babb1828b746ffa95970a5f271990a","solicitation_number":"SPRPA125QER84"}]}],"latest_notice_id":"c0babb1828b746ffa95970a5f271990a","first_type":"o","notices":[{"dates":{"posted":"2025-04-15","posted_at":"2025-04-16T01:36:11.148Z","created_at":"2025-04-16T01:36:11.099Z","modified_at":"2025-05-29T04:00:11.136Z","response_deadline":{"raw":"2025-05-13T16:30:00-04:00","utc":"2025-05-13T20:30:00Z","date":"2025-05-13","time":"16:30:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c0babb1828b746ffa95970a5f271990a/view"},"naics":{"codes":["336413"],"primary":"336413"},"title":"BRAKE ACTUATOR ASSE","agency":{"office":{"code":"SPRPA1","name":"DLA AVIATION AT PHILADELPHIA, PA"},"subtier":{"code":"97AS","name":"DEFENSE LOGISTICS AGENCY"},"department":{"code":"097","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19111-5098","city":"PHILADELPHIA","state":"PA","country":"USA"},"organization_id":"500044424","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-28","archive_type":"auto15"},"history":[{"index":3,"title":"BRAKE ACTUATOR ASSE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T01:36:11.148Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c0babb1828b746ffa95970a5f271990a","solicitation_number":"SPRPA125QER84"}],"contacts":[{"name":"Telephone: 2157373794","role":"primary","email":"SHAWN.FRANK@DLA.MIL"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"c0babb1828b746ffa95970a5f271990a","lineage_id":"c0babb1828b746ffa95970a5f271990a","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-17T13:01:17.601253383Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"bbb30f899c2e2fe121170e0ede69a49e7e90f1d8744ed8410e2b79be80ee18af","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-17T13:01:17.601253383Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|x|Invoice 2in1|See Block 15|See Block 6|See Block 7|See Section B|See Section B|See Section B|||||||||\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1||\rROYALTY INFORMATION (APR 1984)|1||\rFACSIMILE PROPOSALS (OCT 1997)|1||\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2|||\rThis Solicitation is being issued under Emergency Acquisition Flexibilities\r(EAF) Authority formally known as Special Emergency Procurement Authority\r(SEPA).\r1.  SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.3 .  The contractor shall include on the detailed process/operation sheets developed, (1) all in house manufacturing processes and (2) the identity of all manufacturing sources performing processes/operations outside their facility.  These sheets shall not be\rrevised or altered after the successful completion of First Article or Production Lot Testing without approval from the Basic Design Engineering activity, via the PCO.\r1.4 . Unless otherwise specified, for fabricated parts, the Inspection\rMethod Sheets/ Final Inspection Sheets shall list the characteristics\rof each item produced under the contract.\rThe manufacturer shall be required to provide certifications of all raw\rmaterial including castings and forgings. the material source shall be\ridentified and the documentation shall be able to identify the customer\rand/or contract number. The manufacturer shall maintain all raw material\rdocumentation for a minimum of ten (10) years.\rThe contractor  is responsible for providing completed Inspection Method Sheets/Final Inspection Sheets showing the actual dimensions taken for\rALL Characteristics,in addition, critical characteristics shall be\rannotated.\r1.5 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.6 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.7 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.8 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.9 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.10 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.11 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;6543E122-1; ) ;80020;      , Revision ;REV N; and all details and specifications referenced therein.\r1.12  Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.13  If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r2.  APPLICABLE DOCUMENTS - NOT APPLICABLE\r3.  REQUIREMENTS\rBRAKE ACTUATOR ASSE , ;(36334) ;  , ;6543E122-1; , 7RH 1710-01-184-9746 EY\r3.1 Applicable Documents\r3.1.1 The contractor shall perform the necessary work to return the subject item to Ready-For-Issue (RFI) serviceable operating condition and insure compliance with the requirements of the following drawings and specifications:\r         1. BRAKE ACTUATOR ASSE Drawing ( ;80020; ) ;6543E122;  Rev ;latest revision;  .\r         2.  All inspections, evaluations, repair/overhaul, and testing functions shall be in compliance with:\r ;meets the technical specifications of the original report;\r3.2  Work Requirements:\r3.2.1  All units determined by the contractor to be beyond economical repair (cost of repair/rework not to exceed ;80%; of the original cost of the item) shall bear a confirmation by DCMC and shall accompany the contract evaluation and quote to the Contracting\rOfficer.  In the event that an item is received with one or more subassemblies missing, the contractor shall promptly obtain confirmation of such finding from the DCMC (QAR) and upon confirmation notify the PCO\r3.2.2  Acceptance testing shall be conducted under the surveillance of the DCMC (QAR).  These tests shall include all tests necessary to assure that the material serviced conforms to the performance required to provide Ready-For-Issue material.  The DCMC shall\rretain the authority to conduct or reconduct any tests deemed necessary to insure compliance with the applicable documents and specifications that are cited in paragraph 1 of the requirements section.\r3.2.3  A copy of the DD Form 250 shall be packed with each unit processed under this contract.  One copy of the DD Form 250 shall be forwarded to the Procurement Contracting Officer.\r3.2.4  The contractor shall perform Testing and Evaluation (T&E) of all units submitted for work.  T&E shall be conducted in accordance with the repair manual or specifications stated in section 1 of this statement of work.  Based on the results of the T&E,\rseverity of the failure, and total operational hours accumulated since the last repair/overhaul, the contractor shall make its recommendations to either repair or overhaul the unit to the DCMC (QAR).  The contractor shall not begin work before receiving\rapproval from the DCMC (QAR).\r3.2.5  Upon receiving DCMC (QAR) approval, the contractor shall overhaul or repair the subject item to a Ready-For-Issue (RFI), serviceable operating     condition and insure compliance with the requirements of the documents and specifications listed in\rparagraph 1 of the requirement's section.\r3.2.6  For the purpose of the statement of work, \"Overhaul\" is defined as follows:  All items regardless of their condition shall be subjected to all of actions outlined in the documents and specifications listed in section 1.  The contractor shall inspect all\rcomponents and repair/refurbish/replace those components that fail to meet the limits specified in the documents and specifications listed in paragraph 1 of the requirement's section. Parts exceeding the dimensional limits shall be scrapped or repaired in\raccordance with documents and specifications listed in section 1 of this SOW.  Parts that cannot be repaired/refurbished shall be scrapped and material review (MRB) will not be granted on these components/parts.\r3.2.7  For the purposes of this statement of work, \"REPAIR\" is defined as follows:  Items deemed repairable shall be subjected only to the actions necessary to correct the failed/non-operational condition.  All work shall be performed as outlined in the\rdocuments and specifications listed in section 1 of this SOW.  The contractor shall inspect only those components/areas identified in the Testing and Evaluation phase as being defective, and repair, replace and or refurbish those failing to meet the limits\rspecified in the documents and specifications listed in section 1 of this SOW. Parts exceeding the dimensional limits shall be scrapped or repaired in accordance with the documents and specifications listed in section 1. Parts that cannot be\rrepaired/refurbished shall be scrapped and material review (MRB) will not be granted for these items.\r3.2.8  Services required to accomplish the above objectives shall be in accordance with the contractor's established industrial shop methods and existing special tools and test equipment.\r3.2.9 ;applies;  Service change bulletins or modifications, except as specified herein, shall not be incorporated by the contractor without prior approval from the contracting officer.\r3.2.10 ; ;  Change modifications ; ;  shall be incorporated for the items under this contract.  Reworked/upgraded items will be reidentified as follows: ; ;\r3.3  In the event that the contractor requests a waiver, deviation or modification for parts/subassemblies, all Engineering Change Proposals, waivers, and deviations shall be prepared in accordance with MIL-STD-973.\r3.4  Quality Assurance:\r3.4.1  During the performance of this contract, the contractor shall maintain a Quality Assurance System in accordance with MIL-I-45208, or equivalent (e.g. ISO-9001,  ISO-9002, MIL-Q-95208)\r4.  QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.\r5.  PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6.  NOTES - NOT APPLICABLE","text":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|x|Invoice 2in1|See Block 15|See Block 6|See Block 7|See Section B|See Section B|See Section B|||||||||\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1||\rROYALTY INFORMATION (APR 1984)|1||\rFACSIMILE PROPOSALS (OCT 1997)|1||\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2|||\rThis Solicitation is being issued under Emergency Acquisition Flexibilities\r(EAF) Authority formally known as Special Emergency Procurement Authority\r(SEPA).\r1. SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.3 . The contractor shall include on the detailed process/operation sheets developed, (1) all in house manufacturing processes and (2) the identity of all manufacturing sources performing processes/operations outside their facility. These sheets shall not be\rrevised or altered after the successful completion of First Article or Production Lot Testing without approval from the Basic Design Engineering activity, via the PCO.\r1.4 . Unless otherwise specified, for fabricated parts, the Inspection\rMethod Sheets/ Final Inspection Sheets shall list the characteristics\rof each item produced under the contract.\rThe manufacturer shall be required to provide certifications of all raw\rmaterial including castings and forgings. the material source shall be\ridentified and the documentation shall be able to identify the customer\rand/or contract number. The manufacturer shall maintain all raw material\rdocumentation for a minimum of ten (10) years.\rThe contractor is responsible for providing completed Inspection Method Sheets/Final Inspection Sheets showing the actual dimensions taken for\rALL Characteristics,in addition, critical characteristics shall be\rannotated.\r1.5 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.6 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.7 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.8 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.9 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.10 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.11 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;6543E122-1; ) ;80020; , Revision ;REV N; and all details and specifications referenced therein.\r1.12 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.13 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r2. APPLICABLE DOCUMENTS - NOT APPLICABLE\r3. REQUIREMENTS\rBRAKE ACTUATOR ASSE , ;(36334) ; , ;6543E122-1; , 7RH 1710-01-184-9746 EY\r3.1 Applicable Documents\r3.1.1 The contractor shall perform the necessary work to return the subject item to Ready-For-Issue (RFI) serviceable operating condition and insure compliance with the requirements of the following drawings and specifications:\r 1. BRAKE ACTUATOR ASSE Drawing ( ;80020; ) ;6543E122; Rev ;latest revision; .\r 2. All inspections, evaluations, repair/overhaul, and testing functions shall be in compliance with:\r ;meets the technical specifications of the original report;\r3.2 Work Requirements:\r3.2.1 All units determined by the contractor to be beyond economical repair (cost of repair/rework not to exceed ;80%; of the original cost of the item) shall bear a confirmation by DCMC and shall accompany the contract evaluation and quote to the Contracting\rOfficer. In the event that an item is received with one or more subassemblies missing, the contractor shall promptly obtain confirmation of such finding from the DCMC (QAR) and upon confirmation notify the PCO\r3.2.2 Acceptance testing shall be conducted under the surveillance of the DCMC (QAR). These tests shall include all tests necessary to assure that the material serviced conforms to the performance required to provide Ready-For-Issue material. The DCMC shall\rretain the authority to conduct or reconduct any tests deemed necessary to insure compliance with the applicable documents and specifications that are cited in paragraph 1 of the requirements section.\r3.2.3 A copy of the DD Form 250 shall be packed with each unit processed under this contract. One copy of the DD Form 250 shall be forwarded to the Procurement Contracting Officer.\r3.2.4 The contractor shall perform Testing and Evaluation (T&E) of all units submitted for work. T&E shall be conducted in accordance with the repair manual or specifications stated in section 1 of this statement of work. Based on the results of the T&E,\rseverity of the failure, and total operational hours accumulated since the last repair/overhaul, the contractor shall make its recommendations to either repair or overhaul the unit to the DCMC (QAR). The contractor shall not begin work before receiving\rapproval from the DCMC (QAR).\r3.2.5 Upon receiving DCMC (QAR) approval, the contractor shall overhaul or repair the subject item to a Ready-For-Issue (RFI), serviceable operating condition and insure compliance with the requirements of the documents and specifications listed in\rparagraph 1 of the requirement's section.\r3.2.6 For the purpose of the statement of work, \"Overhaul\" is defined as follows: All items regardless of their condition shall be subjected to all of actions outlined in the documents and specifications listed in section 1. The contractor shall inspect all\rcomponents and repair/refurbish/replace those components that fail to meet the limits specified in the documents and specifications listed in paragraph 1 of the requirement's section. Parts exceeding the dimensional limits shall be scrapped or repaired in\raccordance with documents and specifications listed in section 1 of this SOW. Parts that cannot be repaired/refurbished shall be scrapped and material review (MRB) will not be granted on these components/parts.\r3.2.7 For the purposes of this statement of work, \"REPAIR\" is defined as follows: Items deemed repairable shall be subjected only to the actions necessary to correct the failed/non-operational condition. All work shall be performed as outlined in the\rdocuments and specifications listed in section 1 of this SOW. The contractor shall inspect only those components/areas identified in the Testing and Evaluation phase as being defective, and repair, replace and or refurbish those failing to meet the limits\rspecified in the documents and specifications listed in section 1 of this SOW. Parts exceeding the dimensional limits shall be scrapped or repaired in accordance with the documents and specifications listed in section 1. Parts that cannot be\rrepaired/refurbished shall be scrapped and material review (MRB) will not be granted for these items.\r3.2.8 Services required to accomplish the above objectives shall be in accordance with the contractor's established industrial shop methods and existing special tools and test equipment.\r3.2.9 ;applies; Service change bulletins or modifications, except as specified herein, shall not be incorporated by the contractor without prior approval from the contracting officer.\r3.2.10 ; ; Change modifications ; ; shall be incorporated for the items under this contract. Reworked/upgraded items will be reidentified as follows: ; ;\r3.3 In the event that the contractor requests a waiver, deviation or modification for parts/subassemblies, all Engineering Change Proposals, waivers, and deviations shall be prepared in accordance with MIL-STD-973.\r3.4 Quality Assurance:\r3.4.1 During the performance of this contract, the contractor shall maintain a Quality Assurance System in accordance with MIL-I-45208, or equivalent (e.g. ISO-9001, ISO-9002, MIL-Q-95208)\r4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.\r5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6. NOTES - NOT APPLICABLE","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"SPRPA125QER84","product_service_code":"1710"}],"due_at":"2025-05-13T20:30:00Z","due_date":"2025-05-13","closes_at":"2025-05-13T20:30:00Z","awardable":true,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"state_source":null,"state_evidence":"Product purchase (PSC 1710)","site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-17T13:50:06.672734Z","principal_notice_id":"c0babb1828b746ffa95970a5f271990a","description":{"text":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|x|Invoice 2in1|See Block 15|See Block 6|See Block 7|See Section B|See Section B|See Section B|||||||||\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1||\rROYALTY INFORMATION (APR 1984)|1||\rFACSIMILE PROPOSALS (OCT 1997)|1||\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2|||\rThis Solicitation is being issued under Emergency Acquisition Flexibilities\r(EAF) Authority formally known as Special Emergency Procurement Authority\r(SEPA).\r1. SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.3 . The contractor shall include on the detailed process/operation sheets developed, (1) all in house manufacturing processes and (2) the identity of all manufacturing sources performing processes/operations outside their facility. These sheets shall not be\rrevised or altered after the successful completion of First Article or Production Lot Testing without approval from the Basic Design Engineering activity, via the PCO.\r1.4 . Unless otherwise specified, for fabricated parts, the Inspection\rMethod Sheets/ Final Inspection Sheets shall list the characteristics\rof each item produced under the contract.\rThe manufacturer shall be required to provide certifications of all raw\rmaterial including castings and forgings. the material source shall be\ridentified and the documentation shall be able to identify the customer\rand/or contract number. The manufacturer shall maintain all raw material\rdocumentation for a minimum of ten (10) years.\rThe contractor is responsible for providing completed Inspection Method Sheets/Final Inspection Sheets showing the actual dimensions taken for\rALL Characteristics,in addition, critical characteristics shall be\rannotated.\r1.5 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.6 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.7 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.8 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.9 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.10 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.11 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;6543E122-1; ) ;80020; , Revision ;REV N; and all details and specifications referenced therein.\r1.12 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.13 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r2. APPLICABLE DOCUMENTS - NOT APPLICABLE\r3. REQUIREMENTS\rBRAKE ACTUATOR ASSE , ;(36334) ; , ;6543E122-1; , 7RH 1710-01-184-9746 EY\r3.1 Applicable Documents\r3.1.1 The contractor shall perform the necessary work to return the subject item to Ready-For-Issue (RFI) serviceable operating condition and insure compliance with the requirements of the following drawings and specifications:\r 1. BRAKE ACTUATOR ASSE Drawing ( ;80020; ) ;6543E122; Rev ;latest revision; .\r 2. All inspections, evaluations, repair/overhaul, and testing functions shall be in compliance with:\r ;meets the technical specifications of the original report;\r3.2 Work Requirements:\r3.2.1 All units determined by the contractor to be beyond economical repair (cost of repair/rework not to exceed ;80%; of the original cost of the item) shall bear a confirmation by DCMC and shall accompany the contract evaluation and quote to the Contracting\rOfficer. In the event that an item is received with one or more subassemblies missing, the contractor shall promptly obtain confirmation of such finding from the DCMC (QAR) and upon confirmation notify the PCO\r3.2.2 Acceptance testing shall be conducted under the surveillance of the DCMC (QAR). These tests shall include all tests necessary to assure that the material serviced conforms to the performance required to provide Ready-For-Issue material. The DCMC shall\rretain the authority to conduct or reconduct any tests deemed necessary to insure compliance with the applicable documents and specifications that are cited in paragraph 1 of the requirements section.\r3.2.3 A copy of the DD Form 250 shall be packed with each unit processed under this contract. One copy of the DD Form 250 shall be forwarded to the Procurement Contracting Officer.\r3.2.4 The contractor shall perform Testing and Evaluation (T&E) of all units submitted for work. T&E shall be conducted in accordance with the repair manual or specifications stated in section 1 of this statement of work. Based on the results of the T&E,\rseverity of the failure, and total operational hours accumulated since the last repair/overhaul, the contractor shall make its recommendations to either repair or overhaul the unit to the DCMC (QAR). The contractor shall not begin work before receiving\rapproval from the DCMC (QAR).\r3.2.5 Upon receiving DCMC (QAR) approval, the contractor shall overhaul or repair the subject item to a Ready-For-Issue (RFI), serviceable operating condition and insure compliance with the requirements of the documents and specifications listed in\rparagraph 1 of the requirement's section.\r3.2.6 For the purpose of the statement of work, \"Overhaul\" is defined as follows: All items regardless of their condition shall be subjected to all of actions outlined in the documents and specifications listed in section 1. The contractor shall inspect all\rcomponents and repair/refurbish/replace those components that fail to meet the limits specified in the documents and specifications listed in paragraph 1 of the requirement's section. Parts exceeding the dimensional limits shall be scrapped or repaired in\raccordance with documents and specifications listed in section 1 of this SOW. Parts that cannot be repaired/refurbished shall be scrapped and material review (MRB) will not be granted on these components/parts.\r3.2.7 For the purposes of this statement of work, \"REPAIR\" is defined as follows: Items deemed repairable shall be subjected only to the actions necessary to correct the failed/non-operational condition. All work shall be performed as outlined in the\rdocuments and specifications listed in section 1 of this SOW. The contractor shall inspect only those components/areas identified in the Testing and Evaluation phase as being defective, and repair, replace and or refurbish those failing to meet the limits\rspecified in the documents and specifications listed in section 1 of this SOW. Parts exceeding the dimensional limits shall be scrapped or repaired in accordance with the documents and specifications listed in section 1. Parts that cannot be\rrepaired/refurbished shall be scrapped and material review (MRB) will not be granted for these items.\r3.2.8 Services required to accomplish the above objectives shall be in accordance with the contractor's established industrial shop methods and existing special tools and test equipment.\r3.2.9 ;applies; Service change bulletins or modifications, except as specified herein, shall not be incorporated by the contractor without prior approval from the contracting officer.\r3.2.10 ; ; Change modifications ; ; shall be incorporated for the items under this contract. Reworked/upgraded items will be reidentified as follows: ; ;\r3.3 In the event that the contractor requests a waiver, deviation or modification for parts/subassemblies, all Engineering Change Proposals, waivers, and deviations shall be prepared in accordance with MIL-STD-973.\r3.4 Quality Assurance:\r3.4.1 During the performance of this contract, the contractor shall maintain a Quality Assurance System in accordance with MIL-I-45208, or equivalent (e.g. ISO-9001, ISO-9002, MIL-Q-95208)\r4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.\r5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6. NOTES - NOT APPLICABLE","html":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|x|Invoice 2in1|See Block 15|See Block 6|See Block 7|See Section B|See Section B|See Section B|||||||||\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1||\rROYALTY INFORMATION (APR 1984)|1||\rFACSIMILE PROPOSALS (OCT 1997)|1||\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2|||\rThis Solicitation is being issued under Emergency Acquisition Flexibilities\r(EAF) Authority formally known as Special Emergency Procurement Authority\r(SEPA).\r1.  SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.3 .  The contractor shall include on the detailed process/operation sheets developed, (1) all in house manufacturing processes and (2) the identity of all manufacturing sources performing processes/operations outside their facility.  These sheets shall not be\rrevised or altered after the successful completion of First Article or Production Lot Testing without approval from the Basic Design Engineering activity, via the PCO.\r1.4 . Unless otherwise specified, for fabricated parts, the Inspection\rMethod Sheets/ Final Inspection Sheets shall list the characteristics\rof each item produced under the contract.\rThe manufacturer shall be required to provide certifications of all raw\rmaterial including castings and forgings. the material source shall be\ridentified and the documentation shall be able to identify the customer\rand/or contract number. The manufacturer shall maintain all raw material\rdocumentation for a minimum of ten (10) years.\rThe contractor  is responsible for providing completed Inspection Method Sheets/Final Inspection Sheets showing the actual dimensions taken for\rALL Characteristics,in addition, critical characteristics shall be\rannotated.\r1.5 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.6 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.7 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.8 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.9 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.10 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.11 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;6543E122-1; ) ;80020;      , Revision ;REV N; and all details and specifications referenced therein.\r1.12  Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.13  If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r2.  APPLICABLE DOCUMENTS - NOT APPLICABLE\r3.  REQUIREMENTS\rBRAKE ACTUATOR ASSE , ;(36334) ;  , ;6543E122-1; , 7RH 1710-01-184-9746 EY\r3.1 Applicable Documents\r3.1.1 The contractor shall perform the necessary work to return the subject item to Ready-For-Issue (RFI) serviceable operating condition and insure compliance with the requirements of the following drawings and specifications:\r         1. BRAKE ACTUATOR ASSE Drawing ( ;80020; ) ;6543E122;  Rev ;latest revision;  .\r         2.  All inspections, evaluations, repair/overhaul, and testing functions shall be in compliance with:\r ;meets the technical specifications of the original report;\r3.2  Work Requirements:\r3.2.1  All units determined by the contractor to be beyond economical repair (cost of repair/rework not to exceed ;80%; of the original cost of the item) shall bear a confirmation by DCMC and shall accompany the contract evaluation and quote to the Contracting\rOfficer.  In the event that an item is received with one or more subassemblies missing, the contractor shall promptly obtain confirmation of such finding from the DCMC (QAR) and upon confirmation notify the PCO\r3.2.2  Acceptance testing shall be conducted under the surveillance of the DCMC (QAR).  These tests shall include all tests necessary to assure that the material serviced conforms to the performance required to provide Ready-For-Issue material.  The DCMC shall\rretain the authority to conduct or reconduct any tests deemed necessary to insure compliance with the applicable documents and specifications that are cited in paragraph 1 of the requirements section.\r3.2.3  A copy of the DD Form 250 shall be packed with each unit processed under this contract.  One copy of the DD Form 250 shall be forwarded to the Procurement Contracting Officer.\r3.2.4  The contractor shall perform Testing and Evaluation (T&E) of all units submitted for work.  T&E shall be conducted in accordance with the repair manual or specifications stated in section 1 of this statement of work.  Based on the results of the T&E,\rseverity of the failure, and total operational hours accumulated since the last repair/overhaul, the contractor shall make its recommendations to either repair or overhaul the unit to the DCMC (QAR).  The contractor shall not begin work before receiving\rapproval from the DCMC (QAR).\r3.2.5  Upon receiving DCMC (QAR) approval, the contractor shall overhaul or repair the subject item to a Ready-For-Issue (RFI), serviceable operating     condition and insure compliance with the requirements of the documents and specifications listed in\rparagraph 1 of the requirement's section.\r3.2.6  For the purpose of the statement of work, \"Overhaul\" is defined as follows:  All items regardless of their condition shall be subjected to all of actions outlined in the documents and specifications listed in section 1.  The contractor shall inspect all\rcomponents and repair/refurbish/replace those components that fail to meet the limits specified in the documents and specifications listed in paragraph 1 of the requirement's section. Parts exceeding the dimensional limits shall be scrapped or repaired in\raccordance with documents and specifications listed in section 1 of this SOW.  Parts that cannot be repaired/refurbished shall be scrapped and material review (MRB) will not be granted on these components/parts.\r3.2.7  For the purposes of this statement of work, \"REPAIR\" is defined as follows:  Items deemed repairable shall be subjected only to the actions necessary to correct the failed/non-operational condition.  All work shall be performed as outlined in the\rdocuments and specifications listed in section 1 of this SOW.  The contractor shall inspect only those components/areas identified in the Testing and Evaluation phase as being defective, and repair, replace and or refurbish those failing to meet the limits\rspecified in the documents and specifications listed in section 1 of this SOW. Parts exceeding the dimensional limits shall be scrapped or repaired in accordance with the documents and specifications listed in section 1. Parts that cannot be\rrepaired/refurbished shall be scrapped and material review (MRB) will not be granted for these items.\r3.2.8  Services required to accomplish the above objectives shall be in accordance with the contractor's established industrial shop methods and existing special tools and test equipment.\r3.2.9 ;applies;  Service change bulletins or modifications, except as specified herein, shall not be incorporated by the contractor without prior approval from the contracting officer.\r3.2.10 ; ;  Change modifications ; ;  shall be incorporated for the items under this contract.  Reworked/upgraded items will be reidentified as follows: ; ;\r3.3  In the event that the contractor requests a waiver, deviation or modification for parts/subassemblies, all Engineering Change Proposals, waivers, and deviations shall be prepared in accordance with MIL-STD-973.\r3.4  Quality Assurance:\r3.4.1  During the performance of this contract, the contractor shall maintain a Quality Assurance System in accordance with MIL-I-45208, or equivalent (e.g. ISO-9001,  ISO-9002, MIL-Q-95208)\r4.  QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.\r5.  PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6.  NOTES - NOT APPLICABLE","origin":"detail"},"contacts":[{"name":"Telephone: 2157373794","role":"primary","email":"SHAWN.FRANK@DLA.MIL"}],"place_of_performance":null,"office_address":{"zip":"19111-5098","city":"PHILADELPHIA","state":"PA","country":"USA"},"naics_codes":["336413"],"award":null,"attachments":[{"resource_id":"75b7a386c991461e841dcc4915d79f62","name":"See Solicitation SPRPA125QER84","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2025-04-16T01:36:11.148Z","export_controlled":false,"sha256":null,"url":"https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=SPRPA125QER84","mirrored":false}],"awards":[],"related":[{"key":"SPRPA126QYA91","latest_notice_id":"f99daa3ef7b744428be58f3ea9fafa58","title":"6615 - Procurement of NIIN 01-660-5102, Qty 12 each, SERVOCYLINDER","solicitation_number":"SPRPA126QYA91","notice_type":"p","first_type":"o","first_posted":"2026-01-08","last_posted":"2026-11-10","notices":2,"due_at":"2026-11-26T04:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T04:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"334511","psc":"6615","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6615)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"SPRPA126QYB87","latest_notice_id":"8f3d80f66b07489ca4258d47be0de8c4","title":"6615 - Procurement of NIIN 01-660-5102, Qty 14 each, SERVOCYLINDER","solicitation_number":"SPRPA126QYB87","notice_type":"p","first_type":"o","first_posted":"2026-03-24","last_posted":"2026-11-10","notices":2,"due_at":"2026-11-26T04:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T04:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"334511","psc":"6615","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6615)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"SPRPA126QYB86","latest_notice_id":"ee06d584de384f5abb7784a3a51319f7","title":"6615 - Procurement of NIIN 01-660-5102, Qty 13 each, SERVOCYLINDER","solicitation_number":"SPRPA126QYB86","notice_type":"p","first_type":"o","first_posted":"2026-03-24","last_posted":"2026-11-10","notices":2,"due_at":"2026-11-26T04:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T04:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"334511","psc":"6615","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6615)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"SPRPA127QZA20","latest_notice_id":"bff88f37c57840318aaed5d2240d83be","title":"16--PAM,AIRCRAFT,MATERI","solicitation_number":"SPRPA127QZA20","notice_type":"o","first_type":"p","first_posted":"2026-10-22","last_posted":"2026-10-28","notices":2,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"336413","psc":"1680","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1680)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"SPRPA127QRA05","latest_notice_id":"34d2541d80084a6281c21d12120351b3","title":"16--AUX RACK MAINFRAME","solicitation_number":"SPRPA127QRA05","notice_type":"o","first_type":"p","first_posted":"2026-10-08","last_posted":"2026-10-27","notices":2,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"336413","psc":"1680","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1680)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-28T04:01:09.175983Z"}],"similar_open":[{"key":"SPRWA12700145","latest_notice_id":"957173647eb34c72a8ea9c18f3c26c7b","title":"Request for Interested Manufacturers of the C-130 Aft Emergency Exit Door Assembly","solicitation_number":"SPRWA1-27-00145","notice_type":"r","first_type":"r","first_posted":"2026-11-10","last_posted":"2026-11-10","notices":1,"due_at":"2026-11-26T04:59:00Z","due_date":"2026-11-25","closes_at":"2026-11-26T04:59:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRWA1","office_name":"DLA AVIATION AT WARNER ROBINS, GA","naics":"336413","psc":"1560","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1560)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"FD20302700653","latest_notice_id":"1c9dad636a524641bfcac1c2d69f85b3","title":"SUPPORT,STRUCTURAL_End_Item_KC-135_NSN_1560014355553FL_PN_KC3-11000-1","solicitation_number":"FD20302700653","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-26T05:59:00Z","due_date":"2026-11-25","closes_at":"2026-11-26T05:59:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRTA1","office_name":"DLA AVIATION AT OKLAHOMA CITY, OK","naics":"336413","psc":"1560","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1560)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"FD20302700652","latest_notice_id":"fd87090cf675416abf76a7d28c439ddf","title":"STABILIZER,HORIZONT_End_Item_KC-135_NSN_1560009694278FL_PN_KC3-10000-3","solicitation_number":"FD20302700652","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-26T05:59:00Z","due_date":"2026-11-25","closes_at":"2026-11-26T05:59:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRTA1","office_name":"DLA AVIATION AT OKLAHOMA CITY, OK","naics":"336413","psc":"1560","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1560)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"}],"similar_open_total":531,"indexable":false}