# PUMP ASSEMBLY

Canonical: https://sealedbidder.com/opportunities/sprmm125qhf81

- Solicitation number: SPRMM125QHF81
- Notice type: Solicitation
- Status: Closed. Deadline was August 8, 2025 at 4:30 PM EDT
- Department: Department of Defense
- Agency: Defense Logistics Agency
- Contracting office: Sprmm1 DLA Mechanicsburg (SPRMM1)
- NAICS: 333998 All Other Miscellaneous General Purpose Machinery Manufacturing
- Product or service code: 4921 Torpedo Maintenance, Repair, and Checkout Specialized Equipment
- Small business size standard: 700 employees (13 CFR 121.201, NAICS 333998)
- Who can bid, by location: Anywhere in the US. Location does not limit who can bid: a product shipped to the buyer, research at the performer's facility, or work at the contractor's site. A state shown is the delivery point.
- First posted: April 15, 2025
- Last posted: August 4, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/1e1353af7a8d40c48728f96b504c3e4d/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 333998 (all other miscellaneous general purpose machinery manufacturing), means no more than 700 employees, counted with affiliates.
- Time to respond: Bidders had 115 days from the day the solicitation was posted, April 15, 2025, to the deadline. The deadline moved 3 times: it was first May 15, 2025 and ended as August 8, 2025.

## Description

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|iso9001|INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|tbd||tbd|tbd|tbd|tbd|tbd|tbd|tbd|tbd|tbd||||||BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|x|x|x||x|x||||||||ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|333914|750||||||||||||NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x|The purpose of this amendment is to extend the close date to receive quotes.1. The due date is changed from 25 JUL 25 to 08 AUG 25.All other terms and conditions remain unchanged.The purpose of the amendment to to extend the close date to receive quotes.1. The due date is changed from 16 JUN 25 to 25 JUL 25.All other terms and conditions remain unchanged.\The purpose of this amendment is to extend the offer due date for quotes.1. The due date is hereby changed from 15 may 25 to 16 jun 25.All other terms and conditions remain unchanged.\1.  All contractual documents (i.e. contracts, purchase orders, task orders,Delivery orders, and modifications) related to the instant procurement areconsidered to be "issued" by the government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email.  The government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein.2.  No drawings or technical data are available for this item.3.  RFID is only required if the Ship To code identified above is listed at the website with DFARS 252.211-7006 PASSIVE RFID, as the time of shipment.        Currently, there are no locations listed that require passive RFID tagging.4.  Delivery days_________aro.5.  Offer valid for _____ days.6.  Notice to surplus/new surplus/new manufactured surplus suppliers:Submission of your quote without a surplus certificate will null and void yourquote.  A surplus material certificate must accompany all quotes forsurplus/new surplus/new manufactured.  If submitting quote via EDI, a faxed orscanned copy must be sent to the buyer.7.  When submitting quotes via EDI, make sure you specify any exceptions (i.e.Mil specs/standards, packaging, I&A, packaging houses etc) or follow up with ahardcopy of the exceptions.  If nothing is indicated or received, award willbe based upon solicitation requirements.  Changes or requests for changesafter award will have consideration costs deducted on modifications.8.  If supplies will be packaged at a location different from the offeroraddress, the offeror shall provide the name and street address of thepackaging facility.Inspection of material will be at:______________________________________________________________Inspection of packaging and final acceptance of material will be at:______________________________________________________________9.  If you are not the manufacturer of the material you are offering, you muststate who the OEM is (cage code) and the part number you are offering.10.  Please provide an email address for follow up communications.____________________________________________________________It is recommended that vendors provide contact information to NAVSUP WSSMechanicsburg in order to receive automated notifications from Navy ElectronicCommerce Online (NECO) when contracts/modifications are issued by DLA MaritimeMechanicsburg and posted on EDA.  To receive these notifications, contact:NAVSUPWSS code 025, procurement systems design and contract support divisionVia email at NAVSUPWSSITIMPHelpdesk@navy.mil.  Please include the followinginformation with your request:  cage code, company name, address and POC withphone number and email address.Contractors can view their orders, contracts and modifications at theElectronic Document Access (EDA) web tool.  This web tool is located at theProcurement Integrated Enterprise Environment (PIEE) website. It isrecommended that the contractor register for EDA at https://piee.eb.mil/.Click on new user and registration.Any order resulting from this Request for Quotation will require electronicsubmittal of Receiving Report and Invoices through PIEE-WAWF.FOR HIGHER LEVEL INSPECTION REQUIREMENT - This procurement requires Higher Level Inspection.\1.  SCOPE1.1   This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the PUMP ASSEMBLY .2.  APPLICABLE DOCUMENTS2.1   Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.2.1.1   Documents, drawings, and publications supplied are listed under "Drawing Number".  These items should be retained until an award is made.2.1.2   "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.2.2   Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence.  Nothing in this contract/purchase order,however, shall supersede applicable laws and regulations unless a specific exemption has been obtained.DRAWING DATA=2526792                                 |10001| E|   |D|0001        | E|49998|0068012DRAWING DATA=2526904                                 |10001| B|   |D|0001        | B|49998|0072364DRAWING DATA=2571045                                 |10001| G|   |D|0001        | G|49998|0184527DRAWING DATA=2571045                                 |10001| K|LM |D|0001        | K|49998|0241331DRAWING DATA=2571077                                 |10001| D|   |C|0001        | D|49998|0083213DRAWING DATA=2571102                                 |10001| B|   |C|0001        | B|49998|0108597DRAWING DATA=2571113                                 |10001| B|   |C|0001        | B|49998|0110437DRAWING DATA=2571114                                 |10001| C|   |C|0001        | C|49998|0110499DRAWING DATA=2571115                                 |10001| D|   |C|0001        | D|49998|0093690DRAWING DATA=2571116                                 |10001| B|   |C|0001        | B|49998|0110649DRAWING DATA=2571117                                 |10001| D|   |C|0001        | D|49998|0102519DRAWING DATA=2571118                                 |10001| B|   |C|0001        | B|49998|0102502DRAWING DATA=2571119                                 |10001| B|   |C|0001        | B|49998|0086407DRAWING DATA=2571120                                 |10001| D|   |C|0001        | D|49998|0114378DRAWING DATA=2571137                                 |10001| B|   |C|0001        | B|49998|0097539DRAWING DATA=2571138                                 |10001| B|   |C|0001        | B|49998|0089588DRAWING DATA=2571155                                 |10001| B|   |C|0001        | B|49998|0079292DRAWING DATA=2571158                                 |10001| F|   |C|0001        | F|49998|0091297DRAWING DATA=2571175                                 |10001|B1|   |C|0001        |B1|49998|0097820DOCUMENT REF DATA=MIL-STD-129                   |    |  |P  |041029|A|  |03|DOCUMENT REF DATA=ISO9001                       |    |  |   |010417|A|  |  |DOCUMENT REF DATA=MIL-STD-973                   |    |  |   |950113|A|  |03|3.  REQUIREMENTS3.1   Design, Manufacture, and Performance - Except as modified herein,the PUMP ASSEMBLY  furnished under this contract/purchase order shall meet thedesign, manufacture, and performance requirements specified on drawing ;10001       2571045;cage ; .3.2   Marking - This item shall be physically identified in accordancewith ;MIL-STD-129; .3.3   Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated.  The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973,Paragraph 5.4.8.2 and Appendix D.  Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E.  Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E.  (Originaland two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa.  17055-0788.)3.3.1   Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders untilanother drawing revision is approved.  The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted,the date of the granting of the authorization, and the name of the granting authority.        Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below.        The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA  17055-0788.        Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor.3.4   Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination.  Mercury contamination of the materialwill be cause for rejection.       If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture.  Thecontractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape.  Such a request will be forwarded directly to the Procurement ContractingOfficer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part.       The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited.  The most probable causes ofcontamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity.  Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they arelocated so as not to constitute a contamination hazard.       If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective.  Enclose the equipment in apolyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as therequirements of this contract are concerned.       These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements.       Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer.  For background, the following information is provided:       Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys.  Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems.  Accidental trapping of mercury in acomponent could cause serious damage to vital parts.  Mercury is also toxic if inhaled, ingested, or absorbed through the skin.  It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surfaceship atmosphere.4.  QUALITY ASSURANCE4.1   Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein.  Except as otherwise specified in the contract/purchase order,the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government.  The Government reserves the right to perform any of the inspections set forth in thespecification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.4.2   Quality System Requirements - The supplier shall provide and maintain a quality system acceptable to the Government.  The quality system requirements shall be in accordance with ISO 9001.4.2.1    ;Suppliers currently using and maintaining Inspection System Requirements toMIL-I-45208 are granted permission to utilize this if desired.;4.3   Responsibility for Compliance - All items must meet all requirements of this contract/purchase order.  The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program.  The absence of anyinspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order.  Sampling in quality conformancedoes not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.4.4   Records of Inspection - (This requirement is not applicable to Government Purchase Orders)  Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government duringthe performance of the contract and for a period of four years after final delivery of supplies.5.  PACKAGING5.1   Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE6.  NOTES6.1   Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS)(i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products.A.     Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format.  Documents can be requested by phoning the Subscription Services Desk.B.     Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources.  They may be obtained from the publishers of the applicable societies. C.     Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to:             Commander, Indian Head Division, Naval Surface Warfare Center             Code 8410P, 101 Strauss Avenue             Indian Head, MD 20640-5035D.     On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) forcertification of need for the document.  On pre-award actions such requests must be submitted to the PCO for certification of need for the document.E.     NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:             Contracting Officer             NAVICP-MECH             Code 87321             5450 Carlisle Pike             P.O. Box 2020             Mechanicsburg, Pa. 17055-0788F.     Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from:             Commanding Officer             NAVICP-MECH             Code 009             5450 Carlisle Pike             P.O. Box 2020             Mechanicsburg, Pa. 17055-0788G.     Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from:             Naval Inventory Control Point             Code 1 Support Branch             700 Robbins Avenue             Phildelphia, Pa. 19111-5094H.     Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH.

## Attachments

- [009286498-SPRMM125QHF81-DWG-4-30-25.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e292f2b3f9b54e9aa6cdfdd3f4ef12ed/download)
- [See Solicitation SPRMM125QHF81](https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=SPRMM125QHF81) (link)
- [See Solicitation SPRMM125QHF810001](https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=SPRMM125QHF810001) (link)
- [neco.navy.mil](https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=SPRMM125QHF810002) (link)

## Open now in the same industry

115 open in NAICS 333998.

- LEVEL ASSEMBLY, AIRC (SPE4A727R0166), due November 27, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/spe4a727r0166
- SEAL RING,NUCLEAR C (N0010427QBB78), due November 27, 2026 at 3:30 PM EST. https://sealedbidder.com/opportunities/n0010427qbb78
- PIVOT,SUPPORT (N0038327QMA20), due November 27, 2026 at 3:30 PM EST. https://sealedbidder.com/opportunities/n0038327qma20

## Publications

- April 15, 2025: Solicitation, due May 15, 2025 at 4:30 PM EDT. Notice c42a8ddebe174123976c50551fcec3ac. https://sam.gov/workspace/contract/opp/c42a8ddebe174123976c50551fcec3ac/view
- May 1, 2025: Solicitation, due May 15, 2025 at 4:30 PM EDT. Notice bc50d04789a94640b51b7adf919db445. https://sam.gov/workspace/contract/opp/bc50d04789a94640b51b7adf919db445/view
- May 16, 2025: Solicitation, due June 16, 2025 at 4:30 PM EDT. Notice 0c59244aede9449c9ebc3eb7138f2ebb. https://sam.gov/workspace/contract/opp/0c59244aede9449c9ebc3eb7138f2ebb/view
- June 26, 2025: Solicitation, due July 25, 2025 at 4:30 PM EDT. Notice c2955db6970d4f41bebcea30c5256123. https://sam.gov/workspace/contract/opp/c2955db6970d4f41bebcea30c5256123/view
- August 4, 2025: Solicitation, due August 8, 2025 at 4:30 PM EDT. Notice 1e1353af7a8d40c48728f96b504c3e4d. https://sam.gov/workspace/contract/opp/1e1353af7a8d40c48728f96b504c3e4d/view

## Points of contact

- Telephone: 7175503838, QUINTON.CRENSHAW@DLA.MIL

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/sprmm125qhf81.
