{"canonical":"https://sealedbidder.com/opportunities/sprmm125qha53","key":"SPRMM125QHA53","url":"https://sealedbidder.com/opportunities/sprmm125qha53","title":"CABLE ASSEMBLY,SPEC","solicitation_number":"SPRMM125QHA53","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-06-18T20:30:00Z","first_posted":"2025-06-04","last_posted":"2025-07-31","department":"DEPT OF DEFENSE","subagency":"DEFENSE LOGISTICS AGENCY","office":"SPRMM1 DLA MECHANICSBURG","naics":"335311","psc":"6150","set_aside":null,"place_state":null,"place_scope":"nationwide","site":null,"place_state_source":null,"place_evidence":"Product purchase (PSC 6150)","place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"e615d42b88034c3db6ca1cd1ab0b53ca","title":"CABLE ASSEMBLY,SPEC","solicitation_number":"SPRMM125QHA53","notice_type":"o","base_type":"o","posted":"2025-06-04","posted_at":"2025-06-04T09:04:07.569Z","due_at":"2025-06-18T20:30:00Z","due_date":"2025-06-18","cancelled":false,"archived":true,"archive_date":"2025-07-03","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e615d42b88034c3db6ca1cd1ab0b53ca/view","enriched":true,"history":[{"index":6,"title":"CABLE ASSEMBLY,SPEC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T18:23:11.056Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8d90a35e8bcb48b9b87097739cab6a5e","solicitation_number":"SPRMM125QHA53","parent_opportunity_id":"e615d42b88034c3db6ca1cd1ab0b53ca"},{"index":3,"title":"CABLE ASSEMBLY,SPEC","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T09:04:07.569Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e615d42b88034c3db6ca1cd1ab0b53ca","solicitation_number":"SPRMM125QHA53"}]},{"notice_id":"8d90a35e8bcb48b9b87097739cab6a5e","title":"CABLE ASSEMBLY,SPEC","solicitation_number":"SPRMM125QHA53","notice_type":"o","base_type":"o","posted":"2025-07-31","posted_at":"2025-07-31T18:23:11.056Z","due_at":"2025-06-18T20:30:00Z","due_date":"2025-06-18","cancelled":false,"archived":true,"archive_date":"2025-08-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/8d90a35e8bcb48b9b87097739cab6a5e/view","enriched":true,"history":[{"index":6,"title":"CABLE ASSEMBLY,SPEC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T18:23:11.056Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8d90a35e8bcb48b9b87097739cab6a5e","solicitation_number":"SPRMM125QHA53","parent_opportunity_id":"e615d42b88034c3db6ca1cd1ab0b53ca"},{"index":3,"title":"CABLE ASSEMBLY,SPEC","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T09:04:07.569Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e615d42b88034c3db6ca1cd1ab0b53ca","solicitation_number":"SPRMM125QHA53"}]}],"latest_notice_id":"8d90a35e8bcb48b9b87097739cab6a5e","first_type":"o","notices":[{"dates":{"posted":"2025-06-04","posted_at":"2025-06-04T09:04:07.569Z","created_at":"2025-06-04T09:04:07.504Z","modified_at":"2025-08-30T04:04:28.589Z","response_deadline":{"raw":"2025-06-18T16:30:00-04:00","utc":"2025-06-18T20:30:00Z","date":"2025-06-18","time":"16:30:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e615d42b88034c3db6ca1cd1ab0b53ca/view"},"naics":{"codes":["335311"],"primary":"335311"},"title":"CABLE ASSEMBLY,SPEC","agency":{"office":{"code":"SPRMM1","name":"SPRMM1 DLA MECHANICSBURG"},"subtier":{"code":"97AS","name":"DEFENSE LOGISTICS AGENCY"},"department":{"code":"097","name":"DEPT OF DEFENSE"},"office_address":{"zip":"17055-0788","city":"MECHANICSBURG","state":"PA","country":"USA"},"organization_id":"500032510","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-07-03","archive_type":"auto15"},"history":[{"index":6,"title":"CABLE ASSEMBLY,SPEC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T18:23:11.056Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8d90a35e8bcb48b9b87097739cab6a5e","solicitation_number":"SPRMM125QHA53","parent_opportunity_id":"e615d42b88034c3db6ca1cd1ab0b53ca"},{"index":3,"title":"CABLE ASSEMBLY,SPEC","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T09:04:07.569Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e615d42b88034c3db6ca1cd1ab0b53ca","solicitation_number":"SPRMM125QHA53"}],"contacts":[{"name":"Electronic Mail: JENNIFER.ELLIOTT@DLA.MIL","role":"primary","email":"JENNIFER.ELLIOTT@DLA.MIL"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"e615d42b88034c3db6ca1cd1ab0b53ca","lineage_id":"e615d42b88034c3db6ca1cd1ab0b53ca","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-13T04:50:03.517531996Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"91eb7384ef9334cfb1b3ea6d444a48c6a0d56add94093c9fb84425a4c18de695","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-13T04:50:03.517531996Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|ISO 9001|\rINSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||\rPRODUCTION LOT TESTING|1||\rINSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X||||||\rINSPECTION AND ACCEPTANCE OF SUPPLIES|26|||||||||||||||||||||||||||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT|N/A|TBD|SPRMM1|TBD|TBD|TBD|TBD|TBD|TBD|TBD||||||\rNOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3||||\rWARRANTY OF DATA--BASIC (MAR 2014)|2|||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rFIRST ARTICLE APPROVAL--CONTRACTOR TESTING  (SEP 1989)|10|1||||||||||\rFIRST ARTICLE APPROVAL--GOVERNMENT TESTING  (SEP 1989)|7|1|||||||\rFEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-PROHIBITION (DEC 2023)|12||x||x||x||x||x||x|\rNOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|X|X|X|||X||||||||\rANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|335311|800|X|X||||||||||\rEVALUATION OF FIRST ARTICLE TESTING|3||||\r1.  All contractual documents (i.e. contracts, purchase orders, task orders,\rDelivery orders, and modifications) related to the instant procurement are\rconsidered to be \"issued\" by the government when copies are either deposited\rin the mail, transmitted by facsimile, or sent by other electronic commerce\rmethods, such as email.  The government's acceptance of the contractor's\rproposal constitutes bilateral agreement to \"issue\" contractual documents as\rdetailed herein.\r2.  No drawings or technical data are available for this item.\r3.  Delivery days_________aro.\r4.  Offer valid for _____ days.\r5.  When submitting quotes via EDI, make sure you specify any exceptions (i.e.\rMil specs/standards, packaging, I&A, packaging houses etc) or follow up with a\rhardcopy of the exceptions.  If nothing is indicated or received, award will\rbe based upon solicitation requirements.  Changes or requests for changes\rafter award will have consideration costs deducted on modifications.\r6.  If you are not the manufacturer of the material you are offering, you must\rstate who the OEM is (cage code) and the part number you are offering.\r7.  Please provide an email address for follow up communications.\r____________________________________________________________\rIt is recommended that vendors provide contact information to NAVSUP WSS\rMechanicsburg in order to receive automated notifications from Navy Electronic\rCommerce Online (NECO) when contracts/modifications are issued by DLA Maritime\rMechanicsburg and posted on EDA.  To receive these notifications, contact:\rNAVSUPWSS code 025, procurement systems design and contract support division\rVia email at NAVSUPWSSITIMPHelpdesk@navy.mil.  Please include the following\rinformation with your request:  cage code, company name, address and POC with\rphone number and email address.\rContractors can view their orders, contracts and modifications at the\rElectronic Document Access (EDA) web tool.  This web tool is located at the\rProcurement Integrated Enterprise Environment (PIEE) website. It is\rrecommended that the contractor register for EDA at https://piee.eb.mil/.\rClick on new user and registration.\rAny order resulting from this Request for Quotation will require electronicsubmittal of Receiving Report and Invoices through PIEE-WAWF.\rThis procurement requires Higher Level Inspection.\rC02 Manufacturing Phase-Out or Discontinuation of Production, Diminishing\rSources, and Obsolete Materials or Components (DEC 2016)\rThe contractor shall notify the contracting officer immediately upon\rdetermining the unavailability of obsolete materials or components. The\rcontractor may recommend a solution to include the impact on the contract\rprice and delivery. The contractor shall not initiate any item redesign or\rincur any additional costs without the express, written authorization of the\rcontracting officer.\rIn the event that manufacturing phase-out or discontinuance of production of\rsuch items is contemplated, the contractor is required to notify the\rcontracting officer and publish the discontinuance in the Government-Industry\rData Exchange Program (GIDEP), where feasible;\rand to provide immediate advance notice of production phase-out to DLA DMSMS\rat dscc.dmsms@dla.mil.\rC04 Unused Former Government Surplus Property (SEP 2021)\rTo be considered for award, the offeror must complete and submit the\rfollowing representation with their offer. Additional supporting documentation\rto demonstrate the surplus material offered was previously owned by the\rGovernment and meets solicitation requirements must be provided within 24\rhours of request by the contracting officer.\r(1) The material is new, unused, and not of such age or so deteriorated as to\rimpair its usefulness or safety. Yes �__� No �__�\rThe material conforms to the technical requirements cited in the solicitation\r(e.g., Commercial and Government Entity (CAGE) Code and part number,\rspecification, etc.). Yes �__� No �__�\rThe material conforms to the revision letter/number, if any is cited.\rYes �__� No �__� Unknown �__�\rIf No, the revision does not affect form, fit, function, or interface.\rYes__ No __ Unknown __ The material was manufactured by:\r(Name): _____________________________________________________\r(Address): __________________________________________________\r(2) The offeror currently possesses the material Yes __ No __\rIf yes, the offeror purchased the material from a Government selling agency\ror other source.\rYes __ No __ If yes, complete the following:\rGovernment Selling Agency: ________________________________\rContract Number: __________________________________________\rContract Date: (Month, Year): _____________________________\rOther Source: _____________________________________________\rAddress: __________________________________________________\rDate Acquired: (Month/Year) _______________________________\r(3) The material has been altered or modified. Yes __ No __\rIf Yes, complete the following:\rName of the company that performed the alternation or modification:\r____________________________________________________________\r�(Address): _______________________________________________\rComplete description of the alterations or modifications.\r____________________________________________________________________\r____________________________________________________________________\r(4) The material has been reconditioned. Yes __ No __\rIf Yes, complete the following:\r(i) The price offered includes the cost of reconditioning /refurbishment.\rYes __ No __\r(ii) Name of the company that reconditioned the material.\r____________________________________________________________________\r(iii) Description of any work done or to be done, including the components\rto be replaced and the applicable rebuild standard.\r____________________________________________________________________\r____________________________________________________________________\rThe material contains cure-dated components. Yes __ No __\rIf Yes, complete the following:\r(i) The price includes replacement of cure-dated components.\rYes __ No __\r(ii) Cure date: ____________________\r(5) The material has data plates attached. Yes __ No __\rIf Yes, insert all information contained on the data plate.\r____________________________________________________________________\r____________________________________________________________________\r(6) The offered material is in its original package. Yes __ No __\rIf yes, complete the following:\rContract Number_______________________________________________\rNSN___________________________________________________________\rCAGE Code__________________________________________________________\rPart Number __________________________________________________\rOther Markings/Data___________________________________________\r(7) The offeror has supplied this same material (National StockNumber) to\rthe Government before. Yes___ No __\rIf Yes, complete the following:\r(i) The material being offered is from the same original Government contract\rnumber as that provided previously. Yes __ No __\r(ii) State below the Government Agency and contract number under which the\rmaterial was previously provided:\rAgency ___________________________________________________\rContract Number___________________________________________\r(8) The material is manufactured in accordance with a specification or\rdrawing. Yes __ No __ If Yes, complete the following:\r(i) The specification/drawing is in the possession of the offeror.\rYes __ No __\r(ii) The offeror has stated the applicable information below: Yes __ No __\rSpecification/Drawing Number __________________________________\rRevision (if any) _____________________________________________\rDate___________________________________________________________\r(9) The material has been inspected for correct part number and for absence\rof corrosion or any obvious defects. Yes __ No __\rIf Yes, complete the following:\r(i) Material has been re-preserved. Yes __ No __\r(ii) Material has been repackaged. Yes __ No __\r(iii) Percentage of material that has been inspected is ____%; and/or\r(iv) Number of items inspected is _______\r(v) A written report was prepared. Yes __ No __\rThe offeror agrees that in the event of award and notwithstanding the\rprovisions of the solicitation, inspection and acceptance of the surplus\rmaterial will be performed at source or destination subject to all\rapplicable provisions for source or destination inspection.\rThe offeror will forward one of the following, within 24 hours of request\rby the contracting officer, to demonstrate that the material being offered\rwas previously owned by the Government (offeror checkwhich one applies):\r___ For national or local sales, conducted by sealed bid, spot bid or\rauction methods, a solicitation/Invitation For Bid and corresponding DLA\rDisposition Services Form 1427, Notice of Award, Statement and Release\rDocument.\r___ For DLA Disposition Services Commercial Venture (CV) Sales, the shipment\rreceipt/delivery pass document and invoices/receipts used by the original\rpurchaser to resell the material.\r___ When the above documents are not available, or if they do not identify\rthe specific NSN being acquired, a copy or facsimile of all original\rpackage markings and data, including NSN, commercial and Government\rentity (CAGE) code and part number, and original contract number. (This\rinformation has already been provided in paragraph (6) of this procurement\rnote Yes __ No __)\r___ When none of the above are available, other information to demonstrate\rthat the offered material was previously owned by the Government. Describe:\r_______________________________________________________________\rThis procurement note only applies to offers of Government surplus\rmaterial. Offers of commercial surplus, manufacturer's overruns, residual\rinventory resulting from terminated Government contracts, and any\rother material that meets the technical requirements in the solicitation\rbut was not previously owned by the Government will be evaluated in accordance\rwith the DLAD procurement note L04, Offers for Part Numbered Items.\rIf requested by the contracting officer, the offeror shall furnish sample\runits, in the number specified, to the contracting officer or to another\rlocation specified by the contracting officer, within 10 days after the\rcontracting officer's request. The samples will be furnished at no cost to\rthe Government. All such samples not destroyed in evaluation will be\rreturned at the offeror's expense. The samples will be evaluated for form,\rfit, and function with subassembly, assembly, or equipment with which the\ritems are to be used. End items furnished under any contract award to the\rofferor furnishing the samples can include the returned samples, and all\racceptable end items will have a configuration identical to the samples.\rIf specific tests of the samples' performance are made by the Government,\rthe offeror will be furnished the results of such tests prior to a contract\rbeing entered into. In addition to any other inspection examinations and tests\rrequired by the contract, the performance of the end items will be required\rto be as good as that of the samples submitted.\rIn the event of award, the contractor will be responsible for providing\rmaterial that is in full compliance with all requirements in the contract or\rorder. The surplus material to be furnished must meet the requirements of\rthe current contract or order, whether or not the material met Government\rrequirements in existence at the time the material was initially manufactured\ror sold to the Government. If higher-level contract quality requirements apply\rto the material being acquired, those requirements do not apply to surplus\rmaterial furnished under this contract.\rC14 Correction of Nonconforming Packaging or Marking (MAY 2020)\r(1) The Government may correct nonconforming packaging or marking for\rreceipts of DLA-owned materiel if the estimated costs of correction are\r$1,000 or less. The contracting officer will advise the contractor of the\rdiscrepancy and that the Government has corrected the packaging or\rmarking. The contracting officer will make a determination concerning\rappropriate reimbursement by the contractor for the Government's costs to\rcorrect the deficiencies. Upon determining that reimbursement is required, the\rcontracting officer will send a notice to the contractor. Upon receipt of\rnotice from the contracting officer, the contractor shall reimburse the\rGovernment for the costs incurred by the Government to correct the\rdeficiencies.\r(2) If the estimated costs of correction for receipts of DLA-owned materiel\rare more than $1,000, the contracting officer will advise the contractor of\rthe discrepancy and have the materiel returned to the contractor for\rcorrection/resubmittal; or, if there are urgent requirements, have the\rGovernment remediate the discrepancy at the contractor's expense. If the\rGovernment remediates the discrepancy, the contracting officer will make a\rdetermination concerning appropriate reimbursement by the contractor for the\rGovernment's costs to correct the deficiencies. Upon determining that\rreimbursement is required, the contracting officer will send a notice to\rthe contractor. Upon receipt of notice from the contracting officer, the\rcontractor shall reimburse the Government for the costs incurred by the\rGovernment to correct the deficiencies.\rE06 Inspection and Acceptance at Source (JUN 2018)\rInspection and acceptance are at source. The place of acceptance is the\rlocation where the Government conducts the last inspection before shipment,\runless the contractor indicated a different physical location for\racceptance below.\rThe contractor shall indicate the location where supplies will be inspected,\rif different from the production location:\rCommercial and Government Entity (CAGE) code:__\rAddress:____________________________________________\rApplicable to contract line item numbers(s) (CLIN(s)):_____________\rThe contractor shall indicate the location where packaging will be inspected,\rif different from the production location:\rCommercial and Government Entity (CAGE) code:__\rAddress:____________________________________________\rApplicable to contract line item numbers(s) (CLIN(s)):_____________\rThe contractor shall indicate the location where packaging will be inspected,\rif different from the production location:\r( ) Same as for supplies OR\rCAGE code:________________________________________________\rAddress:__________________________________________________\rApplicable to CLIN(s):____________________________________\rThe contractor shall indicate the location where supplies will be accepted,\rif different from the inspection location:\rCommercial and Government Entity (CAGE) code:_____________\rAddress:__________________________________________________\rApplicable to contract line item numbers(s) (CLIN(s)):____\rInterested parties may file an agency level protest with the contracting\rofficer or may request an independent review by the chief of the contracting\roffice (CCO). Independent review by the CCO is an alternative to consideration\rby the contracting officer and is not available as an appellate review of a\rcontracting officer decision on a protest previously filed with the\rcontracting officer. Absent a clear indication of the intent to file an\ragency level protest with the CCO for independent review, protests will be\rpresumed to be protests to the contracting officer.\rE03 Production Lot Testing - Contractor (MAY 2020)(1) The purpose of production lot testing (PLT) is to validate quality\rconformance of products. The contractor shall complete PLT on the\rproduction lot(s) after first article approval, if the contract requires\rfirst article testing. The contractor shall price the PLT CLIN to cover the\rcost of the final test report and any approved samples that are consumed,\rdestroyed, or otherwise rendered unusable during testing. The unit of issue\rfor the PLT CLIN, EACH, is equal to one Production Lot Test (1EA=1PLT).\r(2) For purposes of facilitating PLT, the engineering support activity and/or\rtesting facility has authority to communicate and discuss clarifications\rdirectly with contractors. If the Government and/or the contractor\ridentify changes to contract requirements, the contractor shall contact\rthe post award contracting officer or contract administrator (see the\r\"Issued By\" blocks on the contract award or order) for written approval.\rThe contractor shall not act on any revisions or other changes until the\rcontracting officer issues a written modification approving the proposed\r(3) The contractor shall provide and maintain an inspection system\racceptable to the Government in accordance with FAR Clause 52.246-2 or\r52.246-3, and maintain and make available all records evidencing those\rdetails if requested by the Government. At least fourteen (14) calendar\rdays (or as otherwise specified in the contract) prior to conducting the\rproduction lot test, the contractor shall provide written notice of the time\rand location of the test to the contracting officer and the cognizant DCMA\rfunctional specialist when full administration or quality support\radministration is delegated to DCMA, so the Government may witness sample\rselection and the test.\r(4) Unless otherwise stated, the contractor shall select �contracting officer\rshall insert number of samples identified in material master� samples at\rrandom from the production lot(s) produced. If the quantity stated in the\rprevious sentence equals \"ZZ,\" the contractor shall use the appropriate\rsample size identified in the technical data package or applicable sample\rplan provided by the Government. If the contractor cannot determine the\rsample quantity, the contractor shall obtain written confirmation of the\rsample size from the contracting officer.\r(5) The contractor shall perform all tests on the PLT samples needed to\rverify/validate the items meet the contract technical/quality requirements.\r(6) If a PLT sample fails, the entire production lot from which the contractor\rtook the sample fails. The contractor shall notify the contracting officer and\rpropose corrective action, if appropriate.\r(7) The contractor shall prepare and disseminate the PLT report and\rapplicable traceability documentation as follows:\r(a) Prepare the test report in accordance with data item description\rDI-NDTI-80809B, and mark the test report, \"Production Lot Test Report,\rContract Number �contractor insert� and Lot/Item Number �contractor\rinsert�.\"\r(b) Present the PLT report to the contracting officer for review.\r(c) Include the following documentation with all shipments of PLT Reports:\r(i) DD Form 1222 and system of record receiving report (i.e., WAWF or\rDD Form 250);\r(ii) Copy of the contract/order;\r(iii) Copy of all applicable test reports, showing actual results and\rtolerances specified in the technical data package;\r(iv) Material and process certifications;\r(v) Process operations and inspection method sheets;\r(vi) Copies of drawings used to manufacture the PLT sample, with proper\rmarking to restrict public disclosure (if desired) and from Government use\rother than for evaluation to the extent consistent with the Government's\rdata rights under the contract; and\r(vii) Documents required under a contract deliverables requirements list,\rif applicable.\r(d) Submit all required documentation to the Government activity specified\rin the contract in time to allow for at least �contracting officer shall\rinsert number of days as shown in material master� calendar days for review\rof the PLT report, and for the contracting officer to provide written\rnotification of approval/disapproval to the contractor.\r(i) For awards issued by DLA Troop Support Construction and Equipment\r(SPE8E), email all required documentation to Construction and Equipment\rPLT Monitor at trpsptcandepltmonitor@dla.mil.  If documentation files\rexceed email limitations, submit to the following address: DLA Troop\rSupport, Attention: Production Lot Testing Monitor, Building 3,\r700 Robbins Avenue, Philadelphia, Pennsylvania 19111.\r(e) For PLT, the Government will conduct inspection at source and\racceptance at destination. The FOB point is destination.\r(f) Delivery.\r(i) Ship test report to �contracting officer insert address of the\rGovernment activity to receive the report�.\r(ii) Delivery Schedule Information:\r(A) _____ Total Delivery Days for FAT (If Applicable)\r(B) _____ Days: Completion of Production Units (to include PLT\rsamples), PLT, and Submission of PLT Report\r(C) _____ Days: Government PLT Report Evaluation and Notification\rto Contractor\r(D) _____ Days: Delivery of final production quantity to Government\r(E) _____ Total Delivery Days (Sum of paragraph (ii)(A) through (D) above\rE04 Production Lot Testing - Government (MAY 2020)(1) The purpose of production lot testing (PLT) is to validate quality\rconformance of products. The Government conducts PLT on the production lot(s)\rafter first article approval, when a first article is required. The\rcontractor shall price the PLT CLIN to cover the cost of any approved\rsamples that are consumed, destroyed, or otherwise rendered unusable during\rtesting. The unit of issue for the PLT CLIN, EACH, is equal to one\rProduction Lot Test (1EA=1PLT).\r(2) For purposes of facilitating PLT, the engineering support activity\rand/or testing facility has authority to communicate and conduct\rclarifications directly with contractors. If this results in necessary changes\rto contract requirements, the contractor shall contact the post award\rcontracting officer or contract administrator (see the \"Issued By\" blocks\ron the contract award or order) for written approval. The contractor shall\rnot act on any revisions or other changes until the contracting officer\rissues a written modification approving the proposed revision(s)/change(s).\r(3) The contractor shall provide and maintain an inspection system\racceptable to the Government in accordance with FAR Clause 52.246-2 or\r52.246-3, and maintain and make available all records evidencing those\rdetails if requested by the Government. At least fourteen (14) calendar\rdays (or as otherwise specified in the contract) prior to the date when\rthe contractor will present the production lot for selection of PLT samples,\rthe contractor shall provide written notice to the contracting officer (and\rthe cognizant DCMA functional specialist when full administration or\rquality support administration is delegated to DCMA).\r(4) Unless otherwise stated, the contractor shall select �contracting\rofficer shall insert the number of samples identified in the material\rmaster� samples, at random from the production lot(s) produced. If the\rquantity stated in the previous sentence equals \"ZZ,\" the contractor shall\ruse the appropriate sample size identified in the technical data package\ror applicable sample plan provided by the Government. If the contractor\rcannot determine the sample quantity, the contractor shall obtain written\rconfirmation of the sample size from the contracting officer.\r(5) If a PLT sample fails, the entire production lot from which the\rcontractor took the sample fails.\rThe contractor shall propose corrective action, if appropriate.\r(6) The Government will return PLT samples to the contractor, with a copy\rof the test report, at contractor expense.\r(7) The contractor shall prepare and disseminate the samples as follows:\r(a) Ship the selected PLT samples by traceable means. �Mark the shipment\r\"Production Lot Samples - Do Not Post To Stock,\" Contract Number\r�contractor insert� and Lot/Item Number �contractor insert�\". Place a\rcopy of the system of record receiving report (i.e., WAWF or DD Form 250)\ron the exterior of the shipping container in accordance with DFARS\rAppendix F. Mark the exterior of the shipping container in accordance\rwith MIL-STD-129 (latest revision), paragraph 5.11.(b)Include the following interior documentation:\r(i) DD Form 1222 and system of record receiving report (i.e., WAWF or\rDD Form 250);\r(ii) Copy of contract/order;\r(iii) Copy of test reports, showing actual results and tolerances specified\rin the technical data package;\r(iv) Material and process certifications;\r(v) Process operations and inspection method sheets;\r(vi) Copies of drawings used to manufacture the PLT sample (proper marking\rto assert proprietary or other rights to restrict public disclosure is\rthe contractor's responsibility);\r(vii) Documents required under contract deliverables requirements list; and\r(viii) A prepaid shipping label or document with the information required\rto return the PLT samples to the contractor at no cost to the Government.\r(5) At the time of shipment, the contractor shall sign and provide copies of\rthe DD Form 1222, system of record receiving report (i.e., WAWF or DD Form\r250), transportation tracking information, and information for return of the\rPLT samples to the contracting officer. The Government testing time will be\r�contracting officer insert number of days for test, as shown in the material\rmaster calendar days for the test results to be provided to the contractor.\r(6) For PLT, the Government will conduct inspection at source and acceptance\rat destination. The FOB point is destination.\r(7) Delivery.\r(a)Ship samples to �contracting officer insert address of the Government\ractivity to receive the samples�.\r(b)Delivery Schedule Information:\r(i)___ Total Delivery Days for FAT (If Applicable)\r(ii)___ Days: Completion of Production Units (to include PLT samples), and\rSubmission of samples forGovernment Testing\r(iii)___ Days: Government PLT Report Evaluation and Notification to Contractor\r(iv)___ Days: Delivery of final production quantity to Government\r(v)___ Total Delivery Days (Sum of paragraph (i) through (iv))\rE08 First Article Testing Requirements (MAR 2025)(1) If there is not a separate contract line item number (CLIN) for FAT, the\rofferor shall include all costs and risk associated with completion of the FAT\rrequirement in the production CLIN price.\r(2) If there is a separate FAT CLIN, the offeror shall include all costs and\rrisk associated with completion of the FAT requirement in the FAT CLIN price.\rThe unit of issue for the FAT CLIN, EACH, is equal to one First Article Test\r(1EA=1FAT). To receive payment for any costs associated with FAT, the offeror\rshall propose costs associated with FAT on a separate CLIN. The offeror shall\rbase the production CLIN price solely on all costs associated with completion\rof the production units and shall exclude all FAT-related costs.\r(3) The contracting officer will use the total award price in selecting the\rbest value offer from among all eligible offerors. However, for an offeror\rto be eligible for award, the contracting officer must determine that the FAT\rCLIN price (unless FAT is waived) and the production CLIN price are fair\rand reasonable; and, if set-aside under FAR Part 19, a fair market price.\rThe offeror shall not propose a FAT CLIN price that is materially unbalanced\rin relation to the production CLIN price. In the event an offeror receives a\rwaiver of the FAT requirement, the contracting officer will deduct the FAT\rCLIN price for the waived source in determining the total award price.\r(4)(a) Notwithstanding the conditions for waiving first article, the\rcontracting officer may order an additional first article sample, or portion\rthereof, in writing if there is a-\r(i) Major change to the technical data;\r(ii) Lapse in production for a period in excess of 90 days; or\r(iii) Change in the place of performance (manufacturing facility),\rmanufacturing process, material used,drawing, specification or source of\r(b) When conditions in paragraphs (4)(a)(i), (ii), or (iii) occur, the\rContractor shall notify the contracting officer; who will determine whether\rto order an additional first article sample or portion thereof and provide\rinstructions concerning the submission, inspection, and notification of\rresults. The contractor shall bear the costs of the additional first article\rtesting resulting from any of the causes in paragraphs (4)(a)(i)-(iii)\rinstituted by the contractor and not due to changes directed by the\rGovernment.\r(5) Waivers. The offeror may submit a request for FAT waiver to the\rcontracting officer, who may waive the FAT requirement when all of the\rfollowing criteria apply:\r(a) The offeror requesting waiver has successfully manufactured, delivered\rand the government accepted the item or a similar item. The offeror shall\rprovide the following information and be prepared to provide\rdocumentary evidence upon the contracting officer's request:\r(i) Contract number(s), date(s), and issuing Government agency or agencies.\r(ii) Description of item previously furnished, identified by part number,\rtype, model number and/or other identifying information. If the item\rpreviously furnished is similar but not identical to the item being acquired\runder the current buy, the offeror shall explain why manufacture of the\ritem previously furnished is sufficient to demonstrate its ability to\rmanufacture the item being acquired under the current buy without\rneed for a first article test.\r(iii) Engineering control document/change number of item previously furnished.\r(b) There have been no changes to manufacturing processes, tooling, or\rplace of performance.\r(c) There have been no changes to manufacturing data (e.g., drawing\rrevisions that change materials, dimensions, processes, inspection or\rtesting requirements; or subcontractors used to manufacture the items\rsuccessfully in the past).\r(d) The offeror shall supply an item of the same design and manufactured\rby the same method at the same facilities as the item or similar item\rpreviously furnished and accepted under subparagraph (5)(a).\r(6) Contractor-Performed FAT.\r(a) The contractor shall test the quantities as outlined in paragraph (a)\rof FAR clause 52.209- 3 as specified in the contract. The contractor shall\rsubmit reports in accordance with paragraph (b) of FAR clause 52.209-3,\ras supplemented in this procurement note.\r(b) For test report preparation and delivery of contractor FAT, the\rcontractor shall- (i) Use the data item description DI-NDTI-80809B report\rformat.\r(ii) Mark the test report with the following: \"First article test report -\rContract number: �insert contract number� and lot/item number:\r�insert lot/item number�.\r(iii) Sign the FAT Report, accompanied by the system of record receiving\rreport (i.e., WAWF or� DD Form 250) and contractor confirmation that\rthe same process and facilities used to manufacture the first article units\rwill be used to manufacture the production units, to the contracting officer\rat the applicable address shown below:\r(A) For awards issued by DLA Aviation; or DLA Troop Support Clothing\rand Textile (C&T), Medical Materiel, or Subsistence, submit the report to\rthe procuring activity in Block 6 of the DD Form 1155, Block 7 of\rStandard Form (SF) 33, Block 5 of SF 26, or Block 9 of SF 1449 award.\r(B) For awards issued by DLA Land (SPE7L), submit the report to the\rfollowing address: DLA Land - FLSEB, ATTN: FAT Monitor, P. O. Box 3990,\rColumbus, OH 43218- 3990, or email to: Land.FAT.Monitor@dla.mil.\r(C) For awards issued by DLA Maritime (SPE7M), submit the report to the\rfollowing address: DLA Maritime - FMSE, ATTN: FAT Monitor, P. O. Box\r3990, Columbus, OH 43218-3990, or email to: maritime.fat.monitor@dla.mil.\r(D) For awards issued by DLA Troop Support Construction and Equipment\r(SPE8E), email the report to Construction and Equipment FAT Monitor at\rtrpsptcandefatmonitor@dla.ml. If report file exceeds email limitations,\rsubmit to the following address: DLA Troop Support, Attention: First\rArticle Testing Monitor, Building 3, 700 Robbins Avenue, Philadelphia,\rPennsylvania 19111.\r(7) The contractor shall-\r(a) Provide and maintain an inspection system acceptable to the Government\rin accordance with FAR Clause 52.246-2 or 52.246-3;\r(b) Maintain and make available all records evidencing those details at the\rGovernment's request.\r(c) At least fourteen (14) calendar days (or as otherwise specified in the\rcontract) prior to shipment to the Government, provide written notice\rto the contracting officer and to the cognizant DCMA Functional Specialist\rwhen full administration or Quality Support administration is delegated\rto DCMA.\r(8) Government-performed FAT. The contractor shall-\r(a) For delivery of separately priced Government first article samples for\rGovernment performed FAT ship the units and system of record receiving report\r(i.e., WAWF or DD Form 250) to the test facility specified in paragraph (a) of\rFAR clause 52.209-4.\r(b) For delivery of Government first article samples that are not separately\rpriced, ship the units with a commercial shipping document to the test\rfacility.\r(c) Prepare the shipping container(s) by marking the external packages\rin bold letters, \"First Article Exhibits - Do Not Post to Stock,\" adjacent\rto the MIL-STD-129 (latest revision) identification markings.\r(d) Use a hard copy of the system of record receiving report (i.e., WAWF\rDD Form 250), or commercial shipping document as a packing list, in\raccordance with DFARS Appendix F.\r(e) Mark the exterior of the shipping container in accordance with\rMIL-STD-129 (latest revision), paragraph 5.11.\r(f) In the interior package, include hard copies of the contract, test\rreports, material certifications/process operation sheets, drawings used\rto manufacture the units, and a pre-paid return label or shipping account\rfor payment.\r(g)Send units by traceable means (e.g., certified or registered mail,\rUnited Parcel Service, Federal Express).\r(h)Send an email with subject titled \"Notification of Test Exhibits\r�insert Government Lab DODAAC�\" to the corresponding address in (i)\ror (ii) below and to the contracting officer specified in the contract.\rIn the email, provide the shipment date, contract/purchase order number,\rNational Stock Number, means of transportation, tracking number, and\rsummary of container contents. Attach a copy of the system of record\rreceiving report (i.e., WAWF or DD Form 250) documenting the Government\rhas performed the contract quality assurance within the system or record.\r(i) DLA Land & Maritime - DSCCProdVerif@dla.mil\r(ii) DLA Aviation - DSCR.Test&EvaluationOffice@dla.mil\r(9) At its discretion, the Government may return FAT units to the contractor\rat no cost to the Government. The contractor shall submit the return address\rand pre-paid return label or shipping account for payment.\r(10) If the Government disapproves or conditionally approves\rGovernment-performed FAT units, the Government will take action in\raccordance with FAR 52.209-4.\rE09 Contractor First Article Test (FAT) Information (JUL 2022)\r(1) For FAT requirements, the Government will conduct inspection at source\rand acceptance at destination. The FOB point is destination. Due to known\rsystems limitations, solicitations may contain erroneous inspection,\racceptance, and FOB points. This procurement note takes precedence\rover any conflicting terms.\r(2) CONTRACTOR FAT DELIVERY SCHEDULE\r(a) _____ Days: To Deliver FAT Report to the Government\r(b) _____ Days: Government FAT Report Evaluation and Notification to Contractor(c) _____ Days: To Deliver Final Production Quantity After Approval of FAT\rReport. If PLT applies, this line will be blank; the number of delivery days\rfor final production quantity will appear in procurement note E03, Production\rLot Testing - Contractor, or E04, Production Lot Testing - Government, as\rapplicable\r(d)_____Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c))\rE10 Government First Article Test (FAT) Information (JUL 2022)\r(1) For FAT requirements, the Government will conduct inspection at source\rand acceptance at destination. The FOB point is destination. Due to known\rsystems limitations, solicitations may contain erroneous inspection,\racceptance, and FOB points. This procurement note takes precedence\rover any conflicting terms.\r(2) GOVERNMENT FAT DELIVERY SCHEDULE\r(a) ___ Days: To Deliver FAT Units to the Government\r(b) ___ Days: Government FAT Evaluation and Notification to Contractor\r(c) ___ Days: To Deliver Final Production Quantity After Approval of FAT.\rIf PLT applies, this line will be blank; the number of delivery days for final\rproduction quantity will appear in procurement note E03, Production Lot\rTesting - Contractor, or E04, Production Lot Testing - Government, as\rapplicable�\r(d) ___ Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c))�\rIf there are any conflicts with PLT or FAT, the Navy procedures supersede, as\rthe Navy owns the process.\r\\\r1.  SCOPE\r1.1   This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the CABLE ASSEMBLY,SPEC .\r2.  APPLICABLE DOCUMENTS\r2.1   Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.\r2.1.1   Documents, drawings, and publications supplied are listed under \"Drawing Number\".  These items should be retained until an award is made.\r2.1.2   \"Document References\" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.\r2.2   Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence.  Nothing in this contract/purchase order,\rhowever, shall supersede applicable laws and regulations unless a specific exemption has been obtained.\rDRAWING DATA=FVLS-2057R1-010                         |53711| -|1N |D|            |  |     |\rDRAWING DATA=FVLS-2065-011                           |53711| -|1N |D|            |  |     |\rDRAWING DATA=FVLS-2069R1-013                         |53711| -|1N |D|            |  |     |\rDRAWING DATA=FVLS-2077-012                           |53711| -|1N |D|            |  |     |\rDRAWING DATA=FVLS2-2186-014                          |53711| -|1N |D|            |  |     |\rDRAWING DATA=19179                                   |53711| E|WS |D|            |  |     |\rDRAWING DATA=19199                                   |53711| A|WS |D|            |  |     |\rDRAWING DATA=19202                                   |53711| -|WS |D|            |  |     |\rDRAWING DATA=5497120                                 |53711| A|   |D|            |  |     |\rDRAWING DATA=5497120                                 |53711| 2|1N |D|            |  |     |\rDRAWING DATA=5497120                                 |53711| 3|1N |D|            |  |     |\rDRAWING DATA=5497160                                 |53711| 4|1N |A|            |  |     |\rDRAWING DATA=5497459                                 |53711| B|   |D|            |  |     |\rDRAWING DATA=5497459                                 |53711| B|FN |D|            |  |     |\rDRAWING DATA=5497459                                 |53711| A|SD |D|            |  |     |\rDRAWING DATA=5497459                                 |53711| 3|1N |D|            |  |     |\rDRAWING DATA=5497459                                 |53711| 4|1N |D|            |  |     |\rDRAWING DATA=6387574                                 |53711| -|   |D|            |  |     |\rDRAWING DATA=6387659                                 |53711| B|   |D|            |  |     |\rDRAWING DATA=6387659                                 |53711| B|PL |D|            |  |     |\rDRAWING DATA=6387659                                 |53711|13|1N |D|            |  |     |\rDRAWING DATA=7251146                                 |53711| -|   |D|            |  |     |\rDOCUMENT REF DATA=MIL-STD-130                   |    |  |N  |121116|A|  |01|\rDOCUMENT REF DATA=ISO9001                       |    |  |   |010417|A|  |  |\r3.  REQUIREMENTS\r3.1   Design, Manufacture, and Performance - Except as modified herein,\rthe CABLE ASSEMBLY,SPEC  furnished under this contract/purchase order shall meet the\rdesign, manufacture, and performance requirements specified on drawing ;53711       6387659-69;\rcage ;53711       6387659-69; .\r3.2   First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required.\r3.3   First Article Approval (Government Testing) - First Article Test (FAT) and approval is required.\r3.4   Production Lot Approval (Contractor Testing) - Production Lot Test and approval is required.\r3.5   Marking - This item shall be physically identified in accordance with MIL-STD-130.\r3.6   Configuration Control - MIL-STD-973 entitled \"Configuration Management\", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated.  The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973,\rParagraph 5.4.8.2 and Appendix D.  Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E.  Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E.  (Original\rand two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa.  17055-0788.)\r3.6.1   Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until\ranother drawing revision is approved.  The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted,\rthe date of the granting of the authorization, and the name of the granting authority.\r        Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below.\r        The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA  17055-0788.\r        Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor.\r3.7   Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination.  Mercury contamination of the material\rwill be cause for rejection.\r       If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture.  The\rcontractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape.  Such a request will be forwarded directly to the Procurement Contracting\rOfficer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a \"Warning Plate\" stating that metallic mercury is a functional part of the item and will include name and location of that part.\r       The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited.  The most probable causes of\rcontamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity.  Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are\rlocated so as not to constitute a contamination hazard.\r       If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective.  Enclose the equipment in a\rpolyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the\rrequirements of this contract are concerned.\r       These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements.\r       Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer.  For background, the following information is provided:\r       Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys.  Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems.  Accidental trapping of mercury in a\rcomponent could cause serious damage to vital parts.  Mercury is also toxic if inhaled, ingested, or absorbed through the skin.  It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface\rship atmosphere.\r3.8   Soldering - The requirements for soldered electrical and electronic assemblies shall conform to IPC J-STD-001, Class ;3; .\r4.  QUALITY ASSURANCE\r4.1   Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein.  Except as otherwise specified in the contract/purchase order,\rthe Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government.  The Government reserves the right to perform any of the inspections set forth in the\rspecification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.\r4.2   First Article Test/Inspection (Contractor) - The Contractor shall conduct ;NON-DESTRUCTIVE; First Article Test/Inspection on ;one      ; unit(s) in accordance with requirements ;WS19202; .\r4.3   First Article Compatibility Test (Government) - Upon satisfactory completion of the First Article Test/Inspection by the Contractor, ;1; unit(s) shall be shipped to ;NSWC PORT HUENEME; for compatibility test to assure satisfactory, form, fit and function\rwithin the applicable end item or system.\r  Government First Article Compatibility Test shall consist of ;SYSTEM COMPATIBILITY;  testing.   If the testing is nondestructive, the first article sample ;SHALL;  be returned.//\r4.4   Inspection System Requirements - The supplier shall provide and maintain an inspection/quality system acceptable to the Government.  The inspection system requirements for this contract/purchase order shall be in accordance with MIL-I-45208.  Suppliers\rcertified to perform under ISO 9001 or ISO 9002 are granted permission to utilize the one desired in lieu of MIL-I-45208.\r4.5   Responsibility for Compliance - All items must meet all requirements of this contract/purchase order.  The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program.  The absence of any\rinspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order.  Sampling in quality conformance\rdoes not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.\r4.6   Records of Inspection - (This requirement is not applicable to Government Purchase Orders)  Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during\rthe performance of the contract and for a period of four years after final delivery of supplies.\r4.7   Responsibility for Compliance - All items must meet all requirements of this contract/purchase order.  The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program.  The absence of any\rinspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order.  Sampling in quality conformance\rdoes not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.\r4.8   Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies.\r4.9    ;First Article Test/inspection report- the contractor shall prepare and submit a report in accordance with the Contract data Requirements List (DD Form 1423) The report shall be approved prior to production.;\r5.  PACKAGING\r5.1   Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.\rMIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6.  NOTES\r6.1  Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS)\r(i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products.  Most Specifications can obtained directly from http://quicksearch.dla.mil/\rA.  Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format.  Documents can be requested by phoning the Subscription Services Desk.\rB.  Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources.  Theymay be obtained from the publishers of the applicable societies.\rC.  Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to:\rCommander, Indian Head Division, Naval Surface Warfare Center\rCode 8410P, 101 Strauss Avenue\rIndian Head, MD 20640-5035\rD.  On post-award actions, requests for \"Official Use Only\" and \"NOFORN\" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for\rcertification of need for the document.  On pre-award actions such requests must be submitted to the PCO for certification of need for the document.\rE.  NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:\rContracting Officer\rNAVSUP-WSS\rCode 87321\r5450 Carlisle Pike\rP.O. Box 2020\rMechanicsburg, Pa. 17055-0788\rF.  Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue:\rCommanding Officer\rNAVSUP-WSS\rCode 009\r5450 Carlisle Pike\rP.O. Box 2020\rMechanicsburg, Pa. 17055-0788\rG.  Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from:\rCommanding Officer\rNAVSUP-WSS\rCode 1 Support Branch\r700 Robbins Avenue\rPhiladelphia, Pa. 19111-5094\rH.  Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS.\rManufacturing sources interested in becoming qualified for support of future requirements for this item should submit their interest in writing to the    Contract Officer, to include a summary of the company's applicable           capabilities. This will be\rforwarded to the appropriate point of contact at  NSWC, PHD for evaluation.\r6.2   Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation.  If you desire to be considered as a potential source for award of\rthis contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer.\r6.3  In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a \"Distribution Statement\" to inform the contractor of the limits of distribution, and the safeguarding of the information\rcontained on those documents and drawings.\r  There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings.  The definition for each is as follows:\rA... approved for public release; distribution is unlimited.\rB... distribution authorized to US Governments agencies only.\rC... distribution authorized to US Government agencies and their contractors.\rD... distribution authorized to DoD and DoD contractors only.\rE... distribution authorized to DoD Components only.\rF... further distribution only as directed by Commander, Naval Sea\r     Systems Command, code 09T.\rX... distribution is authorized to US Government agencies and private      individuals or enterprises eligible to obtain export controlled technical\r     data in accordance with OPNAVINST 5510.161.\r\rDATE OF FIRST SUBMISSION=ASREQ\rBlock 12 - Submit for approval prior to production.\rBlock 14A - The deliverable item specified as information copy shall be boldly marked as \"Information Only\".\rBlock 14 - Port Hueneme Division, Naval Surface Warfare Center, ;Code A66;  ,Port Hueneme, CA 93043-5007.\rBlock 10 - Note:  If this data has been previously approved by the Navy, submittal of the original approval letter in lieu of the data is acceptable.\r\rDATE OF FIRST SUBMISSION=045 DAC\rBlock 12 - Submit for approval prior to production.\rBlock 14A - The deliverable item specified as information copy shall be boldly marked as \"Information Only\".\rBlock 14 - Port Hueneme Division, Naval Surface Warfare Center, ;Code A66;  ,Port Hueneme, CA 93043-5007.\r\rDATE OF FIRST SUBMISSION=ASREQ\r100% INSPECTION IS REQUIRED\r\rDATE OF FIRST SUBMISSION=ASREQ\r;GOVERNMENT COMPATIBILITY TESTING TO BE COMPLETED 45 DAYS FROM RECEIPT OF FAT UNIT / TEST REPORT FROM CONTRACTOR.                                         ;\rBlock 10 - Note:  If this data has been previously approved by the Navy, submittal of the original approval letter in lieu of the data is acceptable.","text":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|ISO 9001|\rINSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||\rPRODUCTION LOT TESTING|1||\rINSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X||||||\rINSPECTION AND ACCEPTANCE OF SUPPLIES|26|||||||||||||||||||||||||||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT|N/A|TBD|SPRMM1|TBD|TBD|TBD|TBD|TBD|TBD|TBD||||||\rNOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3||||\rWARRANTY OF DATA--BASIC (MAR 2014)|2|||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rFIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|1||||||||||\rFIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)|7|1|||||||\rFEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-PROHIBITION (DEC 2023)|12||x||x||x||x||x||x|\rNOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|X|X|X|||X||||||||\rANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|335311|800|X|X||||||||||\rEVALUATION OF FIRST ARTICLE TESTING|3||||\r1. All contractual documents (i.e. contracts, purchase orders, task orders,\rDelivery orders, and modifications) related to the instant procurement are\rconsidered to be \"issued\" by the government when copies are either deposited\rin the mail, transmitted by facsimile, or sent by other electronic commerce\rmethods, such as email. The government's acceptance of the contractor's\rproposal constitutes bilateral agreement to \"issue\" contractual documents as\rdetailed herein.\r2. No drawings or technical data are available for this item.\r3. Delivery days_________aro.\r4. Offer valid for _____ days.\r5. When submitting quotes via EDI, make sure you specify any exceptions (i.e.\rMil specs/standards, packaging, I&A, packaging houses etc) or follow up with a\rhardcopy of the exceptions. If nothing is indicated or received, award will\rbe based upon solicitation requirements. Changes or requests for changes\rafter award will have consideration costs deducted on modifications.\r6. If you are not the manufacturer of the material you are offering, you must\rstate who the OEM is (cage code) and the part number you are offering.\r7. Please provide an email address for follow up communications.\r____________________________________________________________\rIt is recommended that vendors provide contact information to NAVSUP WSS\rMechanicsburg in order to receive automated notifications from Navy Electronic\rCommerce Online (NECO) when contracts/modifications are issued by DLA Maritime\rMechanicsburg and posted on EDA. To receive these notifications, contact:\rNAVSUPWSS code 025, procurement systems design and contract support division\rVia email at NAVSUPWSSITIMPHelpdesk@navy.mil. Please include the following\rinformation with your request: cage code, company name, address and POC with\rphone number and email address.\rContractors can view their orders, contracts and modifications at the\rElectronic Document Access (EDA) web tool. This web tool is located at the\rProcurement Integrated Enterprise Environment (PIEE) website. It is\rrecommended that the contractor register for EDA at https://piee.eb.mil/.\rClick on new user and registration.\rAny order resulting from this Request for Quotation will require electronicsubmittal of Receiving Report and Invoices through PIEE-WAWF.\rThis procurement requires Higher Level Inspection.\rC02 Manufacturing Phase-Out or Discontinuation of Production, Diminishing\rSources, and Obsolete Materials or Components (DEC 2016)\rThe contractor shall notify the contracting officer immediately upon\rdetermining the unavailability of obsolete materials or components. The\rcontractor may recommend a solution to include the impact on the contract\rprice and delivery. The contractor shall not initiate any item redesign or\rincur any additional costs without the express, written authorization of the\rcontracting officer.\rIn the event that manufacturing phase-out or discontinuance of production of\rsuch items is contemplated, the contractor is required to notify the\rcontracting officer and publish the discontinuance in the Government-Industry\rData Exchange Program (GIDEP), where feasible;\rand to provide immediate advance notice of production phase-out to DLA DMSMS\rat dscc.dmsms@dla.mil.\rC04 Unused Former Government Surplus Property (SEP 2021)\rTo be considered for award, the offeror must complete and submit the\rfollowing representation with their offer. Additional supporting documentation\rto demonstrate the surplus material offered was previously owned by the\rGovernment and meets solicitation requirements must be provided within 24\rhours of request by the contracting officer.\r(1) The material is new, unused, and not of such age or so deteriorated as to\rimpair its usefulness or safety. Yes �__� No �__�\rThe material conforms to the technical requirements cited in the solicitation\r(e.g., Commercial and Government Entity (CAGE) Code and part number,\rspecification, etc.). Yes �__� No �__�\rThe material conforms to the revision letter/number, if any is cited.\rYes �__� No �__� Unknown �__�\rIf No, the revision does not affect form, fit, function, or interface.\rYes__ No __ Unknown __ The material was manufactured by:\r(Name): _____________________________________________________\r(Address): __________________________________________________\r(2) The offeror currently possesses the material Yes __ No __\rIf yes, the offeror purchased the material from a Government selling agency\ror other source.\rYes __ No __ If yes, complete the following:\rGovernment Selling Agency: ________________________________\rContract Number: __________________________________________\rContract Date: (Month, Year): _____________________________\rOther Source: _____________________________________________\rAddress: __________________________________________________\rDate Acquired: (Month/Year) _______________________________\r(3) The material has been altered or modified. Yes __ No __\rIf Yes, complete the following:\rName of the company that performed the alternation or modification:\r____________________________________________________________\r�(Address): _______________________________________________\rComplete description of the alterations or modifications.\r____________________________________________________________________\r____________________________________________________________________\r(4) The material has been reconditioned. Yes __ No __\rIf Yes, complete the following:\r(i) The price offered includes the cost of reconditioning /refurbishment.\rYes __ No __\r(ii) Name of the company that reconditioned the material.\r____________________________________________________________________\r(iii) Description of any work done or to be done, including the components\rto be replaced and the applicable rebuild standard.\r____________________________________________________________________\r____________________________________________________________________\rThe material contains cure-dated components. Yes __ No __\rIf Yes, complete the following:\r(i) The price includes replacement of cure-dated components.\rYes __ No __\r(ii) Cure date: ____________________\r(5) The material has data plates attached. Yes __ No __\rIf Yes, insert all information contained on the data plate.\r____________________________________________________________________\r____________________________________________________________________\r(6) The offered material is in its original package. Yes __ No __\rIf yes, complete the following:\rContract Number_______________________________________________\rNSN___________________________________________________________\rCAGE Code__________________________________________________________\rPart Number __________________________________________________\rOther Markings/Data___________________________________________\r(7) The offeror has supplied this same material (National StockNumber) to\rthe Government before. Yes___ No __\rIf Yes, complete the following:\r(i) The material being offered is from the same original Government contract\rnumber as that provided previously. Yes __ No __\r(ii) State below the Government Agency and contract number under which the\rmaterial was previously provided:\rAgency ___________________________________________________\rContract Number___________________________________________\r(8) The material is manufactured in accordance with a specification or\rdrawing. Yes __ No __ If Yes, complete the following:\r(i) The specification/drawing is in the possession of the offeror.\rYes __ No __\r(ii) The offeror has stated the applicable information below: Yes __ No __\rSpecification/Drawing Number __________________________________\rRevision (if any) _____________________________________________\rDate___________________________________________________________\r(9) The material has been inspected for correct part number and for absence\rof corrosion or any obvious defects. Yes __ No __\rIf Yes, complete the following:\r(i) Material has been re-preserved. Yes __ No __\r(ii) Material has been repackaged. Yes __ No __\r(iii) Percentage of material that has been inspected is ____%; and/or\r(iv) Number of items inspected is _______\r(v) A written report was prepared. Yes __ No __\rThe offeror agrees that in the event of award and notwithstanding the\rprovisions of the solicitation, inspection and acceptance of the surplus\rmaterial will be performed at source or destination subject to all\rapplicable provisions for source or destination inspection.\rThe offeror will forward one of the following, within 24 hours of request\rby the contracting officer, to demonstrate that the material being offered\rwas previously owned by the Government (offeror checkwhich one applies):\r___ For national or local sales, conducted by sealed bid, spot bid or\rauction methods, a solicitation/Invitation For Bid and corresponding DLA\rDisposition Services Form 1427, Notice of Award, Statement and Release\rDocument.\r___ For DLA Disposition Services Commercial Venture (CV) Sales, the shipment\rreceipt/delivery pass document and invoices/receipts used by the original\rpurchaser to resell the material.\r___ When the above documents are not available, or if they do not identify\rthe specific NSN being acquired, a copy or facsimile of all original\rpackage markings and data, including NSN, commercial and Government\rentity (CAGE) code and part number, and original contract number. (This\rinformation has already been provided in paragraph (6) of this procurement\rnote Yes __ No __)\r___ When none of the above are available, other information to demonstrate\rthat the offered material was previously owned by the Government. Describe:\r_______________________________________________________________\rThis procurement note only applies to offers of Government surplus\rmaterial. Offers of commercial surplus, manufacturer's overruns, residual\rinventory resulting from terminated Government contracts, and any\rother material that meets the technical requirements in the solicitation\rbut was not previously owned by the Government will be evaluated in accordance\rwith the DLAD procurement note L04, Offers for Part Numbered Items.\rIf requested by the contracting officer, the offeror shall furnish sample\runits, in the number specified, to the contracting officer or to another\rlocation specified by the contracting officer, within 10 days after the\rcontracting officer's request. The samples will be furnished at no cost to\rthe Government. All such samples not destroyed in evaluation will be\rreturned at the offeror's expense. The samples will be evaluated for form,\rfit, and function with subassembly, assembly, or equipment with which the\ritems are to be used. End items furnished under any contract award to the\rofferor furnishing the samples can include the returned samples, and all\racceptable end items will have a configuration identical to the samples.\rIf specific tests of the samples' performance are made by the Government,\rthe offeror will be furnished the results of such tests prior to a contract\rbeing entered into. In addition to any other inspection examinations and tests\rrequired by the contract, the performance of the end items will be required\rto be as good as that of the samples submitted.\rIn the event of award, the contractor will be responsible for providing\rmaterial that is in full compliance with all requirements in the contract or\rorder. The surplus material to be furnished must meet the requirements of\rthe current contract or order, whether or not the material met Government\rrequirements in existence at the time the material was initially manufactured\ror sold to the Government. If higher-level contract quality requirements apply\rto the material being acquired, those requirements do not apply to surplus\rmaterial furnished under this contract.\rC14 Correction of Nonconforming Packaging or Marking (MAY 2020)\r(1) The Government may correct nonconforming packaging or marking for\rreceipts of DLA-owned materiel if the estimated costs of correction are\r$1,000 or less. The contracting officer will advise the contractor of the\rdiscrepancy and that the Government has corrected the packaging or\rmarking. The contracting officer will make a determination concerning\rappropriate reimbursement by the contractor for the Government's costs to\rcorrect the deficiencies. Upon determining that reimbursement is required, the\rcontracting officer will send a notice to the contractor. Upon receipt of\rnotice from the contracting officer, the contractor shall reimburse the\rGovernment for the costs incurred by the Government to correct the\rdeficiencies.\r(2) If the estimated costs of correction for receipts of DLA-owned materiel\rare more than $1,000, the contracting officer will advise the contractor of\rthe discrepancy and have the materiel returned to the contractor for\rcorrection/resubmittal; or, if there are urgent requirements, have the\rGovernment remediate the discrepancy at the contractor's expense. If the\rGovernment remediates the discrepancy, the contracting officer will make a\rdetermination concerning appropriate reimbursement by the contractor for the\rGovernment's costs to correct the deficiencies. Upon determining that\rreimbursement is required, the contracting officer will send a notice to\rthe contractor. Upon receipt of notice from the contracting officer, the\rcontractor shall reimburse the Government for the costs incurred by the\rGovernment to correct the deficiencies.\rE06 Inspection and Acceptance at Source (JUN 2018)\rInspection and acceptance are at source. The place of acceptance is the\rlocation where the Government conducts the last inspection before shipment,\runless the contractor indicated a different physical location for\racceptance below.\rThe contractor shall indicate the location where supplies will be inspected,\rif different from the production location:\rCommercial and Government Entity (CAGE) code:__\rAddress:____________________________________________\rApplicable to contract line item numbers(s) (CLIN(s)):_____________\rThe contractor shall indicate the location where packaging will be inspected,\rif different from the production location:\rCommercial and Government Entity (CAGE) code:__\rAddress:____________________________________________\rApplicable to contract line item numbers(s) (CLIN(s)):_____________\rThe contractor shall indicate the location where packaging will be inspected,\rif different from the production location:\r( ) Same as for supplies OR\rCAGE code:________________________________________________\rAddress:__________________________________________________\rApplicable to CLIN(s):____________________________________\rThe contractor shall indicate the location where supplies will be accepted,\rif different from the inspection location:\rCommercial and Government Entity (CAGE) code:_____________\rAddress:__________________________________________________\rApplicable to contract line item numbers(s) (CLIN(s)):____\rInterested parties may file an agency level protest with the contracting\rofficer or may request an independent review by the chief of the contracting\roffice (CCO). Independent review by the CCO is an alternative to consideration\rby the contracting officer and is not available as an appellate review of a\rcontracting officer decision on a protest previously filed with the\rcontracting officer. Absent a clear indication of the intent to file an\ragency level protest with the CCO for independent review, protests will be\rpresumed to be protests to the contracting officer.\rE03 Production Lot Testing - Contractor (MAY 2020)(1) The purpose of production lot testing (PLT) is to validate quality\rconformance of products. The contractor shall complete PLT on the\rproduction lot(s) after first article approval, if the contract requires\rfirst article testing. The contractor shall price the PLT CLIN to cover the\rcost of the final test report and any approved samples that are consumed,\rdestroyed, or otherwise rendered unusable during testing. The unit of issue\rfor the PLT CLIN, EACH, is equal to one Production Lot Test (1EA=1PLT).\r(2) For purposes of facilitating PLT, the engineering support activity and/or\rtesting facility has authority to communicate and discuss clarifications\rdirectly with contractors. If the Government and/or the contractor\ridentify changes to contract requirements, the contractor shall contact\rthe post award contracting officer or contract administrator (see the\r\"Issued By\" blocks on the contract award or order) for written approval.\rThe contractor shall not act on any revisions or other changes until the\rcontracting officer issues a written modification approving the proposed\r(3) The contractor shall provide and maintain an inspection system\racceptable to the Government in accordance with FAR Clause 52.246-2 or\r52.246-3, and maintain and make available all records evidencing those\rdetails if requested by the Government. At least fourteen (14) calendar\rdays (or as otherwise specified in the contract) prior to conducting the\rproduction lot test, the contractor shall provide written notice of the time\rand location of the test to the contracting officer and the cognizant DCMA\rfunctional specialist when full administration or quality support\radministration is delegated to DCMA, so the Government may witness sample\rselection and the test.\r(4) Unless otherwise stated, the contractor shall select �contracting officer\rshall insert number of samples identified in material master� samples at\rrandom from the production lot(s) produced. If the quantity stated in the\rprevious sentence equals \"ZZ,\" the contractor shall use the appropriate\rsample size identified in the technical data package or applicable sample\rplan provided by the Government. If the contractor cannot determine the\rsample quantity, the contractor shall obtain written confirmation of the\rsample size from the contracting officer.\r(5) The contractor shall perform all tests on the PLT samples needed to\rverify/validate the items meet the contract technical/quality requirements.\r(6) If a PLT sample fails, the entire production lot from which the contractor\rtook the sample fails. The contractor shall notify the contracting officer and\rpropose corrective action, if appropriate.\r(7) The contractor shall prepare and disseminate the PLT report and\rapplicable traceability documentation as follows:\r(a) Prepare the test report in accordance with data item description\rDI-NDTI-80809B, and mark the test report, \"Production Lot Test Report,\rContract Number �contractor insert� and Lot/Item Number �contractor\rinsert�.\"\r(b) Present the PLT report to the contracting officer for review.\r(c) Include the following documentation with all shipments of PLT Reports:\r(i) DD Form 1222 and system of record receiving report (i.e., WAWF or\rDD Form 250);\r(ii) Copy of the contract/order;\r(iii) Copy of all applicable test reports, showing actual results and\rtolerances specified in the technical data package;\r(iv) Material and process certifications;\r(v) Process operations and inspection method sheets;\r(vi) Copies of drawings used to manufacture the PLT sample, with proper\rmarking to restrict public disclosure (if desired) and from Government use\rother than for evaluation to the extent consistent with the Government's\rdata rights under the contract; and\r(vii) Documents required under a contract deliverables requirements list,\rif applicable.\r(d) Submit all required documentation to the Government activity specified\rin the contract in time to allow for at least �contracting officer shall\rinsert number of days as shown in material master� calendar days for review\rof the PLT report, and for the contracting officer to provide written\rnotification of approval/disapproval to the contractor.\r(i) For awards issued by DLA Troop Support Construction and Equipment\r(SPE8E), email all required documentation to Construction and Equipment\rPLT Monitor at trpsptcandepltmonitor@dla.mil. If documentation files\rexceed email limitations, submit to the following address: DLA Troop\rSupport, Attention: Production Lot Testing Monitor, Building 3,\r700 Robbins Avenue, Philadelphia, Pennsylvania 19111.\r(e) For PLT, the Government will conduct inspection at source and\racceptance at destination. The FOB point is destination.\r(f) Delivery.\r(i) Ship test report to �contracting officer insert address of the\rGovernment activity to receive the report�.\r(ii) Delivery Schedule Information:\r(A) _____ Total Delivery Days for FAT (If Applicable)\r(B) _____ Days: Completion of Production Units (to include PLT\rsamples), PLT, and Submission of PLT Report\r(C) _____ Days: Government PLT Report Evaluation and Notification\rto Contractor\r(D) _____ Days: Delivery of final production quantity to Government\r(E) _____ Total Delivery Days (Sum of paragraph (ii)(A) through (D) above\rE04 Production Lot Testing - Government (MAY 2020)(1) The purpose of production lot testing (PLT) is to validate quality\rconformance of products. The Government conducts PLT on the production lot(s)\rafter first article approval, when a first article is required. The\rcontractor shall price the PLT CLIN to cover the cost of any approved\rsamples that are consumed, destroyed, or otherwise rendered unusable during\rtesting. The unit of issue for the PLT CLIN, EACH, is equal to one\rProduction Lot Test (1EA=1PLT).\r(2) For purposes of facilitating PLT, the engineering support activity\rand/or testing facility has authority to communicate and conduct\rclarifications directly with contractors. If this results in necessary changes\rto contract requirements, the contractor shall contact the post award\rcontracting officer or contract administrator (see the \"Issued By\" blocks\ron the contract award or order) for written approval. The contractor shall\rnot act on any revisions or other changes until the contracting officer\rissues a written modification approving the proposed revision(s)/change(s).\r(3) The contractor shall provide and maintain an inspection system\racceptable to the Government in accordance with FAR Clause 52.246-2 or\r52.246-3, and maintain and make available all records evidencing those\rdetails if requested by the Government. At least fourteen (14) calendar\rdays (or as otherwise specified in the contract) prior to the date when\rthe contractor will present the production lot for selection of PLT samples,\rthe contractor shall provide written notice to the contracting officer (and\rthe cognizant DCMA functional specialist when full administration or\rquality support administration is delegated to DCMA).\r(4) Unless otherwise stated, the contractor shall select �contracting\rofficer shall insert the number of samples identified in the material\rmaster� samples, at random from the production lot(s) produced. If the\rquantity stated in the previous sentence equals \"ZZ,\" the contractor shall\ruse the appropriate sample size identified in the technical data package\ror applicable sample plan provided by the Government. If the contractor\rcannot determine the sample quantity, the contractor shall obtain written\rconfirmation of the sample size from the contracting officer.\r(5) If a PLT sample fails, the entire production lot from which the\rcontractor took the sample fails.\rThe contractor shall propose corrective action, if appropriate.\r(6) The Government will return PLT samples to the contractor, with a copy\rof the test report, at contractor expense.\r(7) The contractor shall prepare and disseminate the samples as follows:\r(a) Ship the selected PLT samples by traceable means. �Mark the shipment\r\"Production Lot Samples - Do Not Post To Stock,\" Contract Number\r�contractor insert� and Lot/Item Number �contractor insert�\". Place a\rcopy of the system of record receiving report (i.e., WAWF or DD Form 250)\ron the exterior of the shipping container in accordance with DFARS\rAppendix F. Mark the exterior of the shipping container in accordance\rwith MIL-STD-129 (latest revision), paragraph 5.11.(b)Include the following interior documentation:\r(i) DD Form 1222 and system of record receiving report (i.e., WAWF or\rDD Form 250);\r(ii) Copy of contract/order;\r(iii) Copy of test reports, showing actual results and tolerances specified\rin the technical data package;\r(iv) Material and process certifications;\r(v) Process operations and inspection method sheets;\r(vi) Copies of drawings used to manufacture the PLT sample (proper marking\rto assert proprietary or other rights to restrict public disclosure is\rthe contractor's responsibility);\r(vii) Documents required under contract deliverables requirements list; and\r(viii) A prepaid shipping label or document with the information required\rto return the PLT samples to the contractor at no cost to the Government.\r(5) At the time of shipment, the contractor shall sign and provide copies of\rthe DD Form 1222, system of record receiving report (i.e., WAWF or DD Form\r250), transportation tracking information, and information for return of the\rPLT samples to the contracting officer. The Government testing time will be\r�contracting officer insert number of days for test, as shown in the material\rmaster calendar days for the test results to be provided to the contractor.\r(6) For PLT, the Government will conduct inspection at source and acceptance\rat destination. The FOB point is destination.\r(7) Delivery.\r(a)Ship samples to �contracting officer insert address of the Government\ractivity to receive the samples�.\r(b)Delivery Schedule Information:\r(i)___ Total Delivery Days for FAT (If Applicable)\r(ii)___ Days: Completion of Production Units (to include PLT samples), and\rSubmission of samples forGovernment Testing\r(iii)___ Days: Government PLT Report Evaluation and Notification to Contractor\r(iv)___ Days: Delivery of final production quantity to Government\r(v)___ Total Delivery Days (Sum of paragraph (i) through (iv))\rE08 First Article Testing Requirements (MAR 2025)(1) If there is not a separate contract line item number (CLIN) for FAT, the\rofferor shall include all costs and risk associated with completion of the FAT\rrequirement in the production CLIN price.\r(2) If there is a separate FAT CLIN, the offeror shall include all costs and\rrisk associated with completion of the FAT requirement in the FAT CLIN price.\rThe unit of issue for the FAT CLIN, EACH, is equal to one First Article Test\r(1EA=1FAT). To receive payment for any costs associated with FAT, the offeror\rshall propose costs associated with FAT on a separate CLIN. The offeror shall\rbase the production CLIN price solely on all costs associated with completion\rof the production units and shall exclude all FAT-related costs.\r(3) The contracting officer will use the total award price in selecting the\rbest value offer from among all eligible offerors. However, for an offeror\rto be eligible for award, the contracting officer must determine that the FAT\rCLIN price (unless FAT is waived) and the production CLIN price are fair\rand reasonable; and, if set-aside under FAR Part 19, a fair market price.\rThe offeror shall not propose a FAT CLIN price that is materially unbalanced\rin relation to the production CLIN price. In the event an offeror receives a\rwaiver of the FAT requirement, the contracting officer will deduct the FAT\rCLIN price for the waived source in determining the total award price.\r(4)(a) Notwithstanding the conditions for waiving first article, the\rcontracting officer may order an additional first article sample, or portion\rthereof, in writing if there is a-\r(i) Major change to the technical data;\r(ii) Lapse in production for a period in excess of 90 days; or\r(iii) Change in the place of performance (manufacturing facility),\rmanufacturing process, material used,drawing, specification or source of\r(b) When conditions in paragraphs (4)(a)(i), (ii), or (iii) occur, the\rContractor shall notify the contracting officer; who will determine whether\rto order an additional first article sample or portion thereof and provide\rinstructions concerning the submission, inspection, and notification of\rresults. The contractor shall bear the costs of the additional first article\rtesting resulting from any of the causes in paragraphs (4)(a)(i)-(iii)\rinstituted by the contractor and not due to changes directed by the\rGovernment.\r(5) Waivers. The offeror may submit a request for FAT waiver to the\rcontracting officer, who may waive the FAT requirement when all of the\rfollowing criteria apply:\r(a) The offeror requesting waiver has successfully manufactured, delivered\rand the government accepted the item or a similar item. The offeror shall\rprovide the following information and be prepared to provide\rdocumentary evidence upon the contracting officer's request:\r(i) Contract number(s), date(s), and issuing Government agency or agencies.\r(ii) Description of item previously furnished, identified by part number,\rtype, model number and/or other identifying information. If the item\rpreviously furnished is similar but not identical to the item being acquired\runder the current buy, the offeror shall explain why manufacture of the\ritem previously furnished is sufficient to demonstrate its ability to\rmanufacture the item being acquired under the current buy without\rneed for a first article test.\r(iii) Engineering control document/change number of item previously furnished.\r(b) There have been no changes to manufacturing processes, tooling, or\rplace of performance.\r(c) There have been no changes to manufacturing data (e.g., drawing\rrevisions that change materials, dimensions, processes, inspection or\rtesting requirements; or subcontractors used to manufacture the items\rsuccessfully in the past).\r(d) The offeror shall supply an item of the same design and manufactured\rby the same method at the same facilities as the item or similar item\rpreviously furnished and accepted under subparagraph (5)(a).\r(6) Contractor-Performed FAT.\r(a) The contractor shall test the quantities as outlined in paragraph (a)\rof FAR clause 52.209- 3 as specified in the contract. The contractor shall\rsubmit reports in accordance with paragraph (b) of FAR clause 52.209-3,\ras supplemented in this procurement note.\r(b) For test report preparation and delivery of contractor FAT, the\rcontractor shall- (i) Use the data item description DI-NDTI-80809B report\rformat.\r(ii) Mark the test report with the following: \"First article test report -\rContract number: �insert contract number� and lot/item number:\r�insert lot/item number�.\r(iii) Sign the FAT Report, accompanied by the system of record receiving\rreport (i.e., WAWF or� DD Form 250) and contractor confirmation that\rthe same process and facilities used to manufacture the first article units\rwill be used to manufacture the production units, to the contracting officer\rat the applicable address shown below:\r(A) For awards issued by DLA Aviation; or DLA Troop Support Clothing\rand Textile (C&T), Medical Materiel, or Subsistence, submit the report to\rthe procuring activity in Block 6 of the DD Form 1155, Block 7 of\rStandard Form (SF) 33, Block 5 of SF 26, or Block 9 of SF 1449 award.\r(B) For awards issued by DLA Land (SPE7L), submit the report to the\rfollowing address: DLA Land - FLSEB, ATTN: FAT Monitor, P. O. Box 3990,\rColumbus, OH 43218- 3990, or email to: Land.FAT.Monitor@dla.mil.\r(C) For awards issued by DLA Maritime (SPE7M), submit the report to the\rfollowing address: DLA Maritime - FMSE, ATTN: FAT Monitor, P. O. Box\r3990, Columbus, OH 43218-3990, or email to: maritime.fat.monitor@dla.mil.\r(D) For awards issued by DLA Troop Support Construction and Equipment\r(SPE8E), email the report to Construction and Equipment FAT Monitor at\rtrpsptcandefatmonitor@dla.ml. If report file exceeds email limitations,\rsubmit to the following address: DLA Troop Support, Attention: First\rArticle Testing Monitor, Building 3, 700 Robbins Avenue, Philadelphia,\rPennsylvania 19111.\r(7) The contractor shall-\r(a) Provide and maintain an inspection system acceptable to the Government\rin accordance with FAR Clause 52.246-2 or 52.246-3;\r(b) Maintain and make available all records evidencing those details at the\rGovernment's request.\r(c) At least fourteen (14) calendar days (or as otherwise specified in the\rcontract) prior to shipment to the Government, provide written notice\rto the contracting officer and to the cognizant DCMA Functional Specialist\rwhen full administration or Quality Support administration is delegated\rto DCMA.\r(8) Government-performed FAT. The contractor shall-\r(a) For delivery of separately priced Government first article samples for\rGovernment performed FAT ship the units and system of record receiving report\r(i.e., WAWF or DD Form 250) to the test facility specified in paragraph (a) of\rFAR clause 52.209-4.\r(b) For delivery of Government first article samples that are not separately\rpriced, ship the units with a commercial shipping document to the test\rfacility.\r(c) Prepare the shipping container(s) by marking the external packages\rin bold letters, \"First Article Exhibits - Do Not Post to Stock,\" adjacent\rto the MIL-STD-129 (latest revision) identification markings.\r(d) Use a hard copy of the system of record receiving report (i.e., WAWF\rDD Form 250), or commercial shipping document as a packing list, in\raccordance with DFARS Appendix F.\r(e) Mark the exterior of the shipping container in accordance with\rMIL-STD-129 (latest revision), paragraph 5.11.\r(f) In the interior package, include hard copies of the contract, test\rreports, material certifications/process operation sheets, drawings used\rto manufacture the units, and a pre-paid return label or shipping account\rfor payment.\r(g)Send units by traceable means (e.g., certified or registered mail,\rUnited Parcel Service, Federal Express).\r(h)Send an email with subject titled \"Notification of Test Exhibits\r�insert Government Lab DODAAC�\" to the corresponding address in (i)\ror (ii) below and to the contracting officer specified in the contract.\rIn the email, provide the shipment date, contract/purchase order number,\rNational Stock Number, means of transportation, tracking number, and\rsummary of container contents. Attach a copy of the system of record\rreceiving report (i.e., WAWF or DD Form 250) documenting the Government\rhas performed the contract quality assurance within the system or record.\r(i) DLA Land & Maritime - DSCCProdVerif@dla.mil\r(ii) DLA Aviation - DSCR.Test&EvaluationOffice@dla.mil\r(9) At its discretion, the Government may return FAT units to the contractor\rat no cost to the Government. The contractor shall submit the return address\rand pre-paid return label or shipping account for payment.\r(10) If the Government disapproves or conditionally approves\rGovernment-performed FAT units, the Government will take action in\raccordance with FAR 52.209-4.\rE09 Contractor First Article Test (FAT) Information (JUL 2022)\r(1) For FAT requirements, the Government will conduct inspection at source\rand acceptance at destination. The FOB point is destination. Due to known\rsystems limitations, solicitations may contain erroneous inspection,\racceptance, and FOB points. This procurement note takes precedence\rover any conflicting terms.\r(2) CONTRACTOR FAT DELIVERY SCHEDULE\r(a) _____ Days: To Deliver FAT Report to the Government\r(b) _____ Days: Government FAT Report Evaluation and Notification to Contractor(c) _____ Days: To Deliver Final Production Quantity After Approval of FAT\rReport. If PLT applies, this line will be blank; the number of delivery days\rfor final production quantity will appear in procurement note E03, Production\rLot Testing - Contractor, or E04, Production Lot Testing - Government, as\rapplicable\r(d)_____Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c))\rE10 Government First Article Test (FAT) Information (JUL 2022)\r(1) For FAT requirements, the Government will conduct inspection at source\rand acceptance at destination. The FOB point is destination. Due to known\rsystems limitations, solicitations may contain erroneous inspection,\racceptance, and FOB points. This procurement note takes precedence\rover any conflicting terms.\r(2) GOVERNMENT FAT DELIVERY SCHEDULE\r(a) ___ Days: To Deliver FAT Units to the Government\r(b) ___ Days: Government FAT Evaluation and Notification to Contractor\r(c) ___ Days: To Deliver Final Production Quantity After Approval of FAT.\rIf PLT applies, this line will be blank; the number of delivery days for final\rproduction quantity will appear in procurement note E03, Production Lot\rTesting - Contractor, or E04, Production Lot Testing - Government, as\rapplicable�\r(d) ___ Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c))�\rIf there are any conflicts with PLT or FAT, the Navy procedures supersede, as\rthe Navy owns the process.\r\\\r1. SCOPE\r1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the CABLE ASSEMBLY,SPEC .\r2. APPLICABLE DOCUMENTS\r2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.\r2.1.1 Documents, drawings, and publications supplied are listed under \"Drawing Number\". These items should be retained until an award is made.\r2.1.2 \"Document References\" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.\r2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order,\rhowever, shall supersede applicable laws and regulations unless a specific exemption has been obtained.\rDRAWING DATA=FVLS-2057R1-010 |53711| -|1N |D| | | |\rDRAWING DATA=FVLS-2065-011 |53711| -|1N |D| | | |\rDRAWING DATA=FVLS-2069R1-013 |53711| -|1N |D| | | |\rDRAWING DATA=FVLS-2077-012 |53711| -|1N |D| | | |\rDRAWING DATA=FVLS2-2186-014 |53711| -|1N |D| | | |\rDRAWING DATA=19179 |53711| E|WS |D| | | |\rDRAWING DATA=19199 |53711| A|WS |D| | | |\rDRAWING DATA=19202 |53711| -|WS |D| | | |\rDRAWING DATA=5497120 |53711| A| |D| | | |\rDRAWING DATA=5497120 |53711| 2|1N |D| | | |\rDRAWING DATA=5497120 |53711| 3|1N |D| | | |\rDRAWING DATA=5497160 |53711| 4|1N |A| | | |\rDRAWING DATA=5497459 |53711| B| |D| | | |\rDRAWING DATA=5497459 |53711| B|FN |D| | | |\rDRAWING DATA=5497459 |53711| A|SD |D| | | |\rDRAWING DATA=5497459 |53711| 3|1N |D| | | |\rDRAWING DATA=5497459 |53711| 4|1N |D| | | |\rDRAWING DATA=6387574 |53711| -| |D| | | |\rDRAWING DATA=6387659 |53711| B| |D| | | |\rDRAWING DATA=6387659 |53711| B|PL |D| | | |\rDRAWING DATA=6387659 |53711|13|1N |D| | | |\rDRAWING DATA=7251146 |53711| -| |D| | | |\rDOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| |01|\rDOCUMENT REF DATA=ISO9001 | | | |010417|A| | |\r3. REQUIREMENTS\r3.1 Design, Manufacture, and Performance - Except as modified herein,\rthe CABLE ASSEMBLY,SPEC furnished under this contract/purchase order shall meet the\rdesign, manufacture, and performance requirements specified on drawing ;53711 6387659-69;\rcage ;53711 6387659-69; .\r3.2 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required.\r3.3 First Article Approval (Government Testing) - First Article Test (FAT) and approval is required.\r3.4 Production Lot Approval (Contractor Testing) - Production Lot Test and approval is required.\r3.5 Marking - This item shall be physically identified in accordance with MIL-STD-130.\r3.6 Configuration Control - MIL-STD-973 entitled \"Configuration Management\", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973,\rParagraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original\rand two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)\r3.6.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until\ranother drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted,\rthe date of the granting of the authorization, and the name of the granting authority.\r Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below.\r The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788.\r Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor.\r3.7 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material\rwill be cause for rejection.\r If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The\rcontractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting\rOfficer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a \"Warning Plate\" stating that metallic mercury is a functional part of the item and will include name and location of that part.\r The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of\rcontamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are\rlocated so as not to constitute a contamination hazard.\r If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a\rpolyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the\rrequirements of this contract are concerned.\r These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements.\r Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided:\r Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a\rcomponent could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface\rship atmosphere.\r3.8 Soldering - The requirements for soldered electrical and electronic assemblies shall conform to IPC J-STD-001, Class ;3; .\r4. QUALITY ASSURANCE\r4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order,\rthe Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the\rspecification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.\r4.2 First Article Test/Inspection (Contractor) - The Contractor shall conduct ;NON-DESTRUCTIVE; First Article Test/Inspection on ;one ; unit(s) in accordance with requirements ;WS19202; .\r4.3 First Article Compatibility Test (Government) - Upon satisfactory completion of the First Article Test/Inspection by the Contractor, ;1; unit(s) shall be shipped to ;NSWC PORT HUENEME; for compatibility test to assure satisfactory, form, fit and function\rwithin the applicable end item or system.\r Government First Article Compatibility Test shall consist of ;SYSTEM COMPATIBILITY; testing. If the testing is nondestructive, the first article sample ;SHALL; be returned.//\r4.4 Inspection System Requirements - The supplier shall provide and maintain an inspection/quality system acceptable to the Government. The inspection system requirements for this contract/purchase order shall be in accordance with MIL-I-45208. Suppliers\rcertified to perform under ISO 9001 or ISO 9002 are granted permission to utilize the one desired in lieu of MIL-I-45208.\r4.5 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any\rinspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance\rdoes not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.\r4.6 Records of Inspection - (This requirement is not applicable to Government Purchase Orders) Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during\rthe performance of the contract and for a period of four years after final delivery of supplies.\r4.7 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any\rinspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance\rdoes not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.\r4.8 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies.\r4.9 ;First Article Test/inspection report- the contractor shall prepare and submit a report in accordance with the Contract data Requirements List (DD Form 1423) The report shall be approved prior to production.;\r5. PACKAGING\r5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.\rMIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6. NOTES\r6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS)\r(i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/\rA. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk.\rB. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies.\rC. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to:\rCommander, Indian Head Division, Naval Surface Warfare Center\rCode 8410P, 101 Strauss Avenue\rIndian Head, MD 20640-5035\rD. On post-award actions, requests for \"Official Use Only\" and \"NOFORN\" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for\rcertification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document.\rE. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:\rContracting Officer\rNAVSUP-WSS\rCode 87321\r5450 Carlisle Pike\rP.O. Box 2020\rMechanicsburg, Pa. 17055-0788\rF. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue:\rCommanding Officer\rNAVSUP-WSS\rCode 009\r5450 Carlisle Pike\rP.O. Box 2020\rMechanicsburg, Pa. 17055-0788\rG. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from:\rCommanding Officer\rNAVSUP-WSS\rCode 1 Support Branch\r700 Robbins Avenue\rPhiladelphia, Pa. 19111-5094\rH. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS.\rManufacturing sources interested in becoming qualified for support of future requirements for this item should submit their interest in writing to the Contract Officer, to include a summary of the company's applicable capabilities. This will be\rforwarded to the appropriate point of contact at NSWC, PHD for evaluation.\r6.2 Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation. If you desire to be considered as a potential source for award of\rthis contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer.\r6.3 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a \"Distribution Statement\" to inform the contractor of the limits of distribution, and the safeguarding of the information\rcontained on those documents and drawings.\r There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows:\rA... approved for public release; distribution is unlimited.\rB... distribution authorized to US Governments agencies only.\rC... distribution authorized to US Government agencies and their contractors.\rD... distribution authorized to DoD and DoD contractors only.\rE... distribution authorized to DoD Components only.\rF... further distribution only as directed by Commander, Naval Sea\r Systems Command, code 09T.\rX... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical\r data in accordance with OPNAVINST 5510.161.\r\rDATE OF FIRST SUBMISSION=ASREQ\rBlock 12 - Submit for approval prior to production.\rBlock 14A - The deliverable item specified as information copy shall be boldly marked as \"Information Only\".\rBlock 14 - Port Hueneme Division, Naval Surface Warfare Center, ;Code A66; ,Port Hueneme, CA 93043-5007.\rBlock 10 - Note: If this data has been previously approved by the Navy, submittal of the original approval letter in lieu of the data is acceptable.\r\rDATE OF FIRST SUBMISSION=045 DAC\rBlock 12 - Submit for approval prior to production.\rBlock 14A - The deliverable item specified as information copy shall be boldly marked as \"Information Only\".\rBlock 14 - Port Hueneme Division, Naval Surface Warfare Center, ;Code A66; ,Port Hueneme, CA 93043-5007.\r\rDATE OF FIRST SUBMISSION=ASREQ\r100% INSPECTION IS REQUIRED\r\rDATE OF FIRST SUBMISSION=ASREQ\r;GOVERNMENT COMPATIBILITY TESTING TO BE COMPLETED 45 DAYS FROM RECEIPT OF FAT UNIT / TEST REPORT FROM CONTRACTOR. ;\rBlock 10 - Note: If this data has been previously approved by the Navy, submittal of the original approval letter in lieu of the data is acceptable.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"SPRMM125QHA53","product_service_code":"6150"},{"dates":{"posted":"2025-07-31","posted_at":"2025-07-31T18:23:11.056Z","created_at":"2025-07-31T18:23:11.056Z","modified_at":"2025-08-30T04:04:28.589Z","response_deadline":{"raw":"2025-06-18T16:30:00-04:00","utc":"2025-06-18T20:30:00Z","date":"2025-06-18","time":"16:30:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/8d90a35e8bcb48b9b87097739cab6a5e/view"},"naics":{"codes":["335311"],"primary":"335311"},"title":"CABLE ASSEMBLY,SPEC","agency":{"office":{"code":"SPRMM1","name":"SPRMM1 DLA MECHANICSBURG"},"subtier":{"code":"97AS","name":"DEFENSE LOGISTICS AGENCY"},"department":{"code":"097","name":"DEPT OF DEFENSE"},"office_address":{"zip":"17055-0788","city":"MECHANICSBURG","state":"PA","country":"USA"},"organization_id":"500032510","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-30","archive_type":"auto_custom"},"history":[{"index":6,"title":"CABLE ASSEMBLY,SPEC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T18:23:11.056Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8d90a35e8bcb48b9b87097739cab6a5e","solicitation_number":"SPRMM125QHA53","parent_opportunity_id":"e615d42b88034c3db6ca1cd1ab0b53ca"},{"index":3,"title":"CABLE ASSEMBLY,SPEC","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T09:04:07.569Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e615d42b88034c3db6ca1cd1ab0b53ca","solicitation_number":"SPRMM125QHA53"}],"contacts":[{"name":"Electronic Mail: JENNIFER.ELLIOTT@DLA.MIL","role":"primary","email":"JENNIFER.ELLIOTT@DLA.MIL"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"8d90a35e8bcb48b9b87097739cab6a5e","lineage_id":"e615d42b88034c3db6ca1cd1ab0b53ca","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-06T04:14:51.964861924Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"7bc51852c25ea04f09b32bd1be3442351a393fa777b8323d25150c4e7e38c1ab","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-06T04:14:51.964861924Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|ISO 9001|\rINSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||\rPRODUCTION LOT TESTING|1||\rINSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X||||||\rINSPECTION AND ACCEPTANCE OF SUPPLIES|26|||||||||||||||||||||||||||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT|N/A|TBD|SPRMM1|TBD|TBD|TBD|TBD|TBD|TBD|TBD||||||\rNOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3||||\rWARRANTY OF DATA--BASIC (MAR 2014)|2|||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rFIRST ARTICLE APPROVAL--CONTRACTOR TESTING  (SEP 1989)|10|1||||||||||\rFIRST ARTICLE APPROVAL--GOVERNMENT TESTING  (SEP 1989)|7|1|||||||\rFEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-PROHIBITION (DEC 2023)|12||x||x||x||x||x||x|\rNOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|X|X|X|||X||||||||\rANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|335311|800|X|X||||||||||\rEVALUATION OF FIRST ARTICLE TESTING|3||||\r1.  All contractual documents (i.e. contracts, purchase orders, task orders,\rDelivery orders, and modifications) related to the instant procurement are\rconsidered to be \"issued\" by the government when copies are either deposited\rin the mail, transmitted by facsimile, or sent by other electronic commerce\rmethods, such as email.  The government's acceptance of the contractor's\rproposal constitutes bilateral agreement to \"issue\" contractual documents as\rdetailed herein.\r2.  No drawings or technical data are available for this item.\r3.  Delivery days_________aro.\r4.  Offer valid for _____ days.\r5.  When submitting quotes via EDI, make sure you specify any exceptions (i.e.\rMil specs/standards, packaging, I&A, packaging houses etc) or follow up with a\rhardcopy of the exceptions.  If nothing is indicated or received, award will\rbe based upon solicitation requirements.  Changes or requests for changes\rafter award will have consideration costs deducted on modifications.\r6.  If you are not the manufacturer of the material you are offering, you must\rstate who the OEM is (cage code) and the part number you are offering.\r7.  Please provide an email address for follow up communications.\r____________________________________________________________\rIt is recommended that vendors provide contact information to NAVSUP WSS\rMechanicsburg in order to receive automated notifications from Navy Electronic\rCommerce Online (NECO) when contracts/modifications are issued by DLA Maritime\rMechanicsburg and posted on EDA.  To receive these notifications, contact:\rNAVSUPWSS code 025, procurement systems design and contract support division\rVia email at NAVSUPWSSITIMPHelpdesk@navy.mil.  Please include the following\rinformation with your request:  cage code, company name, address and POC with\rphone number and email address.\rContractors can view their orders, contracts and modifications at the\rElectronic Document Access (EDA) web tool.  This web tool is located at the\rProcurement Integrated Enterprise Environment (PIEE) website. It is\rrecommended that the contractor register for EDA at https://piee.eb.mil/.\rClick on new user and registration.\rAny order resulting from this Request for Quotation will require electronicsubmittal of Receiving Report and Invoices through PIEE-WAWF.\rThis procurement requires Higher Level Inspection.\rC02 Manufacturing Phase-Out or Discontinuation of Production, Diminishing\rSources, and Obsolete Materials or Components (DEC 2016)\rThe contractor shall notify the contracting officer immediately upon\rdetermining the unavailability of obsolete materials or components. The\rcontractor may recommend a solution to include the impact on the contract\rprice and delivery. The contractor shall not initiate any item redesign or\rincur any additional costs without the express, written authorization of the\rcontracting officer.\rIn the event that manufacturing phase-out or discontinuance of production of\rsuch items is contemplated, the contractor is required to notify the\rcontracting officer and publish the discontinuance in the Government-Industry\rData Exchange Program (GIDEP), where feasible;\rand to provide immediate advance notice of production phase-out to DLA DMSMS\rat dscc.dmsms@dla.mil.\rC04 Unused Former Government Surplus Property (SEP 2021)\rTo be considered for award, the offeror must complete and submit the\rfollowing representation with their offer. Additional supporting documentation\rto demonstrate the surplus material offered was previously owned by the\rGovernment and meets solicitation requirements must be provided within 24\rhours of request by the contracting officer.\r(1) The material is new, unused, and not of such age or so deteriorated as to\rimpair its usefulness or safety. Yes �__� No �__�\rThe material conforms to the technical requirements cited in the solicitation\r(e.g., Commercial and Government Entity (CAGE) Code and part number,\rspecification, etc.). Yes �__� No �__�\rThe material conforms to the revision letter/number, if any is cited.\rYes �__� No �__� Unknown �__�\rIf No, the revision does not affect form, fit, function, or interface.\rYes__ No __ Unknown __ The material was manufactured by:\r(Name): _____________________________________________________\r(Address): __________________________________________________\r(2) The offeror currently possesses the material Yes __ No __\rIf yes, the offeror purchased the material from a Government selling agency\ror other source.\rYes __ No __ If yes, complete the following:\rGovernment Selling Agency: ________________________________\rContract Number: __________________________________________\rContract Date: (Month, Year): _____________________________\rOther Source: _____________________________________________\rAddress: __________________________________________________\rDate Acquired: (Month/Year) _______________________________\r(3) The material has been altered or modified. Yes __ No __\rIf Yes, complete the following:\rName of the company that performed the alternation or modification:\r____________________________________________________________\r�(Address): _______________________________________________\rComplete description of the alterations or modifications.\r____________________________________________________________________\r____________________________________________________________________\r(4) The material has been reconditioned. Yes __ No __\rIf Yes, complete the following:\r(i) The price offered includes the cost of reconditioning /refurbishment.\rYes __ No __\r(ii) Name of the company that reconditioned the material.\r____________________________________________________________________\r(iii) Description of any work done or to be done, including the components\rto be replaced and the applicable rebuild standard.\r____________________________________________________________________\r____________________________________________________________________\rThe material contains cure-dated components. Yes __ No __\rIf Yes, complete the following:\r(i) The price includes replacement of cure-dated components.\rYes __ No __\r(ii) Cure date: ____________________\r(5) The material has data plates attached. Yes __ No __\rIf Yes, insert all information contained on the data plate.\r____________________________________________________________________\r____________________________________________________________________\r(6) The offered material is in its original package. Yes __ No __\rIf yes, complete the following:\rContract Number_______________________________________________\rNSN___________________________________________________________\rCAGE Code__________________________________________________________\rPart Number __________________________________________________\rOther Markings/Data___________________________________________\r(7) The offeror has supplied this same material (National StockNumber) to\rthe Government before. Yes___ No __\rIf Yes, complete the following:\r(i) The material being offered is from the same original Government contract\rnumber as that provided previously. Yes __ No __\r(ii) State below the Government Agency and contract number under which the\rmaterial was previously provided:\rAgency ___________________________________________________\rContract Number___________________________________________\r(8) The material is manufactured in accordance with a specification or\rdrawing. Yes __ No __ If Yes, complete the following:\r(i) The specification/drawing is in the possession of the offeror.\rYes __ No __\r(ii) The offeror has stated the applicable information below: Yes __ No __\rSpecification/Drawing Number __________________________________\rRevision (if any) _____________________________________________\rDate___________________________________________________________\r(9) The material has been inspected for correct part number and for absence\rof corrosion or any obvious defects. Yes __ No __\rIf Yes, complete the following:\r(i) Material has been re-preserved. Yes __ No __\r(ii) Material has been repackaged. Yes __ No __\r(iii) Percentage of material that has been inspected is ____%; and/or\r(iv) Number of items inspected is _______\r(v) A written report was prepared. Yes __ No __\rThe offeror agrees that in the event of award and notwithstanding the\rprovisions of the solicitation, inspection and acceptance of the surplus\rmaterial will be performed at source or destination subject to all\rapplicable provisions for source or destination inspection.\rThe offeror will forward one of the following, within 24 hours of request\rby the contracting officer, to demonstrate that the material being offered\rwas previously owned by the Government (offeror checkwhich one applies):\r___ For national or local sales, conducted by sealed bid, spot bid or\rauction methods, a solicitation/Invitation For Bid and corresponding DLA\rDisposition Services Form 1427, Notice of Award, Statement and Release\rDocument.\r___ For DLA Disposition Services Commercial Venture (CV) Sales, the shipment\rreceipt/delivery pass document and invoices/receipts used by the original\rpurchaser to resell the material.\r___ When the above documents are not available, or if they do not identify\rthe specific NSN being acquired, a copy or facsimile of all original\rpackage markings and data, including NSN, commercial and Government\rentity (CAGE) code and part number, and original contract number. (This\rinformation has already been provided in paragraph (6) of this procurement\rnote Yes __ No __)\r___ When none of the above are available, other information to demonstrate\rthat the offered material was previously owned by the Government. Describe:\r_______________________________________________________________\rThis procurement note only applies to offers of Government surplus\rmaterial. Offers of commercial surplus, manufacturer's overruns, residual\rinventory resulting from terminated Government contracts, and any\rother material that meets the technical requirements in the solicitation\rbut was not previously owned by the Government will be evaluated in accordance\rwith the DLAD procurement note L04, Offers for Part Numbered Items.\rIf requested by the contracting officer, the offeror shall furnish sample\runits, in the number specified, to the contracting officer or to another\rlocation specified by the contracting officer, within 10 days after the\rcontracting officer's request. The samples will be furnished at no cost to\rthe Government. All such samples not destroyed in evaluation will be\rreturned at the offeror's expense. The samples will be evaluated for form,\rfit, and function with subassembly, assembly, or equipment with which the\ritems are to be used. End items furnished under any contract award to the\rofferor furnishing the samples can include the returned samples, and all\racceptable end items will have a configuration identical to the samples.\rIf specific tests of the samples' performance are made by the Government,\rthe offeror will be furnished the results of such tests prior to a contract\rbeing entered into. In addition to any other inspection examinations and tests\rrequired by the contract, the performance of the end items will be required\rto be as good as that of the samples submitted.\rIn the event of award, the contractor will be responsible for providing\rmaterial that is in full compliance with all requirements in the contract or\rorder. The surplus material to be furnished must meet the requirements of\rthe current contract or order, whether or not the material met Government\rrequirements in existence at the time the material was initially manufactured\ror sold to the Government. If higher-level contract quality requirements apply\rto the material being acquired, those requirements do not apply to surplus\rmaterial furnished under this contract.\rC14 Correction of Nonconforming Packaging or Marking (MAY 2020)\r(1) The Government may correct nonconforming packaging or marking for\rreceipts of DLA-owned materiel if the estimated costs of correction are\r$1,000 or less. The contracting officer will advise the contractor of the\rdiscrepancy and that the Government has corrected the packaging or\rmarking. The contracting officer will make a determination concerning\rappropriate reimbursement by the contractor for the Government's costs to\rcorrect the deficiencies. Upon determining that reimbursement is required, the\rcontracting officer will send a notice to the contractor. Upon receipt of\rnotice from the contracting officer, the contractor shall reimburse the\rGovernment for the costs incurred by the Government to correct the\rdeficiencies.\r(2) If the estimated costs of correction for receipts of DLA-owned materiel\rare more than $1,000, the contracting officer will advise the contractor of\rthe discrepancy and have the materiel returned to the contractor for\rcorrection/resubmittal; or, if there are urgent requirements, have the\rGovernment remediate the discrepancy at the contractor's expense. If the\rGovernment remediates the discrepancy, the contracting officer will make a\rdetermination concerning appropriate reimbursement by the contractor for the\rGovernment's costs to correct the deficiencies. Upon determining that\rreimbursement is required, the contracting officer will send a notice to\rthe contractor. Upon receipt of notice from the contracting officer, the\rcontractor shall reimburse the Government for the costs incurred by the\rGovernment to correct the deficiencies.\rE06 Inspection and Acceptance at Source (JUN 2018)\rInspection and acceptance are at source. The place of acceptance is the\rlocation where the Government conducts the last inspection before shipment,\runless the contractor indicated a different physical location for\racceptance below.\rThe contractor shall indicate the location where supplies will be inspected,\rif different from the production location:\rCommercial and Government Entity (CAGE) code:__\rAddress:____________________________________________\rApplicable to contract line item numbers(s) (CLIN(s)):_____________\rThe contractor shall indicate the location where packaging will be inspected,\rif different from the production location:\rCommercial and Government Entity (CAGE) code:__\rAddress:____________________________________________\rApplicable to contract line item numbers(s) (CLIN(s)):_____________\rThe contractor shall indicate the location where packaging will be inspected,\rif different from the production location:\r( ) Same as for supplies OR\rCAGE code:________________________________________________\rAddress:__________________________________________________\rApplicable to CLIN(s):____________________________________\rThe contractor shall indicate the location where supplies will be accepted,\rif different from the inspection location:\rCommercial and Government Entity (CAGE) code:_____________\rAddress:__________________________________________________\rApplicable to contract line item numbers(s) (CLIN(s)):____\rInterested parties may file an agency level protest with the contracting\rofficer or may request an independent review by the chief of the contracting\roffice (CCO). Independent review by the CCO is an alternative to consideration\rby the contracting officer and is not available as an appellate review of a\rcontracting officer decision on a protest previously filed with the\rcontracting officer. Absent a clear indication of the intent to file an\ragency level protest with the CCO for independent review, protests will be\rpresumed to be protests to the contracting officer.\rE03 Production Lot Testing - Contractor (MAY 2020)(1) The purpose of production lot testing (PLT) is to validate quality\rconformance of products. The contractor shall complete PLT on the\rproduction lot(s) after first article approval, if the contract requires\rfirst article testing. The contractor shall price the PLT CLIN to cover the\rcost of the final test report and any approved samples that are consumed,\rdestroyed, or otherwise rendered unusable during testing. The unit of issue\rfor the PLT CLIN, EACH, is equal to one Production Lot Test (1EA=1PLT).\r(2) For purposes of facilitating PLT, the engineering support activity and/or\rtesting facility has authority to communicate and discuss clarifications\rdirectly with contractors. If the Government and/or the contractor\ridentify changes to contract requirements, the contractor shall contact\rthe post award contracting officer or contract administrator (see the\r\"Issued By\" blocks on the contract award or order) for written approval.\rThe contractor shall not act on any revisions or other changes until the\rcontracting officer issues a written modification approving the proposed\r(3) The contractor shall provide and maintain an inspection system\racceptable to the Government in accordance with FAR Clause 52.246-2 or\r52.246-3, and maintain and make available all records evidencing those\rdetails if requested by the Government. At least fourteen (14) calendar\rdays (or as otherwise specified in the contract) prior to conducting the\rproduction lot test, the contractor shall provide written notice of the time\rand location of the test to the contracting officer and the cognizant DCMA\rfunctional specialist when full administration or quality support\radministration is delegated to DCMA, so the Government may witness sample\rselection and the test.\r(4) Unless otherwise stated, the contractor shall select �contracting officer\rshall insert number of samples identified in material master� samples at\rrandom from the production lot(s) produced. If the quantity stated in the\rprevious sentence equals \"ZZ,\" the contractor shall use the appropriate\rsample size identified in the technical data package or applicable sample\rplan provided by the Government. If the contractor cannot determine the\rsample quantity, the contractor shall obtain written confirmation of the\rsample size from the contracting officer.\r(5) The contractor shall perform all tests on the PLT samples needed to\rverify/validate the items meet the contract technical/quality requirements.\r(6) If a PLT sample fails, the entire production lot from which the contractor\rtook the sample fails. The contractor shall notify the contracting officer and\rpropose corrective action, if appropriate.\r(7) The contractor shall prepare and disseminate the PLT report and\rapplicable traceability documentation as follows:\r(a) Prepare the test report in accordance with data item description\rDI-NDTI-80809B, and mark the test report, \"Production Lot Test Report,\rContract Number �contractor insert� and Lot/Item Number �contractor\rinsert�.\"\r(b) Present the PLT report to the contracting officer for review.\r(c) Include the following documentation with all shipments of PLT Reports:\r(i) DD Form 1222 and system of record receiving report (i.e., WAWF or\rDD Form 250);\r(ii) Copy of the contract/order;\r(iii) Copy of all applicable test reports, showing actual results and\rtolerances specified in the technical data package;\r(iv) Material and process certifications;\r(v) Process operations and inspection method sheets;\r(vi) Copies of drawings used to manufacture the PLT sample, with proper\rmarking to restrict public disclosure (if desired) and from Government use\rother than for evaluation to the extent consistent with the Government's\rdata rights under the contract; and\r(vii) Documents required under a contract deliverables requirements list,\rif applicable.\r(d) Submit all required documentation to the Government activity specified\rin the contract in time to allow for at least �contracting officer shall\rinsert number of days as shown in material master� calendar days for review\rof the PLT report, and for the contracting officer to provide written\rnotification of approval/disapproval to the contractor.\r(i) For awards issued by DLA Troop Support Construction and Equipment\r(SPE8E), email all required documentation to Construction and Equipment\rPLT Monitor at trpsptcandepltmonitor@dla.mil.  If documentation files\rexceed email limitations, submit to the following address: DLA Troop\rSupport, Attention: Production Lot Testing Monitor, Building 3,\r700 Robbins Avenue, Philadelphia, Pennsylvania 19111.\r(e) For PLT, the Government will conduct inspection at source and\racceptance at destination. The FOB point is destination.\r(f) Delivery.\r(i) Ship test report to �contracting officer insert address of the\rGovernment activity to receive the report�.\r(ii) Delivery Schedule Information:\r(A) _____ Total Delivery Days for FAT (If Applicable)\r(B) _____ Days: Completion of Production Units (to include PLT\rsamples), PLT, and Submission of PLT Report\r(C) _____ Days: Government PLT Report Evaluation and Notification\rto Contractor\r(D) _____ Days: Delivery of final production quantity to Government\r(E) _____ Total Delivery Days (Sum of paragraph (ii)(A) through (D) above\rE04 Production Lot Testing - Government (MAY 2020)(1) The purpose of production lot testing (PLT) is to validate quality\rconformance of products. The Government conducts PLT on the production lot(s)\rafter first article approval, when a first article is required. The\rcontractor shall price the PLT CLIN to cover the cost of any approved\rsamples that are consumed, destroyed, or otherwise rendered unusable during\rtesting. The unit of issue for the PLT CLIN, EACH, is equal to one\rProduction Lot Test (1EA=1PLT).\r(2) For purposes of facilitating PLT, the engineering support activity\rand/or testing facility has authority to communicate and conduct\rclarifications directly with contractors. If this results in necessary changes\rto contract requirements, the contractor shall contact the post award\rcontracting officer or contract administrator (see the \"Issued By\" blocks\ron the contract award or order) for written approval. The contractor shall\rnot act on any revisions or other changes until the contracting officer\rissues a written modification approving the proposed revision(s)/change(s).\r(3) The contractor shall provide and maintain an inspection system\racceptable to the Government in accordance with FAR Clause 52.246-2 or\r52.246-3, and maintain and make available all records evidencing those\rdetails if requested by the Government. At least fourteen (14) calendar\rdays (or as otherwise specified in the contract) prior to the date when\rthe contractor will present the production lot for selection of PLT samples,\rthe contractor shall provide written notice to the contracting officer (and\rthe cognizant DCMA functional specialist when full administration or\rquality support administration is delegated to DCMA).\r(4) Unless otherwise stated, the contractor shall select �contracting\rofficer shall insert the number of samples identified in the material\rmaster� samples, at random from the production lot(s) produced. If the\rquantity stated in the previous sentence equals \"ZZ,\" the contractor shall\ruse the appropriate sample size identified in the technical data package\ror applicable sample plan provided by the Government. If the contractor\rcannot determine the sample quantity, the contractor shall obtain written\rconfirmation of the sample size from the contracting officer.\r(5) If a PLT sample fails, the entire production lot from which the\rcontractor took the sample fails.\rThe contractor shall propose corrective action, if appropriate.\r(6) The Government will return PLT samples to the contractor, with a copy\rof the test report, at contractor expense.\r(7) The contractor shall prepare and disseminate the samples as follows:\r(a) Ship the selected PLT samples by traceable means. �Mark the shipment\r\"Production Lot Samples - Do Not Post To Stock,\" Contract Number\r�contractor insert� and Lot/Item Number �contractor insert�\". Place a\rcopy of the system of record receiving report (i.e., WAWF or DD Form 250)\ron the exterior of the shipping container in accordance with DFARS\rAppendix F. Mark the exterior of the shipping container in accordance\rwith MIL-STD-129 (latest revision), paragraph 5.11.(b)Include the following interior documentation:\r(i) DD Form 1222 and system of record receiving report (i.e., WAWF or\rDD Form 250);\r(ii) Copy of contract/order;\r(iii) Copy of test reports, showing actual results and tolerances specified\rin the technical data package;\r(iv) Material and process certifications;\r(v) Process operations and inspection method sheets;\r(vi) Copies of drawings used to manufacture the PLT sample (proper marking\rto assert proprietary or other rights to restrict public disclosure is\rthe contractor's responsibility);\r(vii) Documents required under contract deliverables requirements list; and\r(viii) A prepaid shipping label or document with the information required\rto return the PLT samples to the contractor at no cost to the Government.\r(5) At the time of shipment, the contractor shall sign and provide copies of\rthe DD Form 1222, system of record receiving report (i.e., WAWF or DD Form\r250), transportation tracking information, and information for return of the\rPLT samples to the contracting officer. The Government testing time will be\r�contracting officer insert number of days for test, as shown in the material\rmaster calendar days for the test results to be provided to the contractor.\r(6) For PLT, the Government will conduct inspection at source and acceptance\rat destination. The FOB point is destination.\r(7) Delivery.\r(a)Ship samples to �contracting officer insert address of the Government\ractivity to receive the samples�.\r(b)Delivery Schedule Information:\r(i)___ Total Delivery Days for FAT (If Applicable)\r(ii)___ Days: Completion of Production Units (to include PLT samples), and\rSubmission of samples forGovernment Testing\r(iii)___ Days: Government PLT Report Evaluation and Notification to Contractor\r(iv)___ Days: Delivery of final production quantity to Government\r(v)___ Total Delivery Days (Sum of paragraph (i) through (iv))\rE08 First Article Testing Requirements (MAR 2025)(1) If there is not a separate contract line item number (CLIN) for FAT, the\rofferor shall include all costs and risk associated with completion of the FAT\rrequirement in the production CLIN price.\r(2) If there is a separate FAT CLIN, the offeror shall include all costs and\rrisk associated with completion of the FAT requirement in the FAT CLIN price.\rThe unit of issue for the FAT CLIN, EACH, is equal to one First Article Test\r(1EA=1FAT). To receive payment for any costs associated with FAT, the offeror\rshall propose costs associated with FAT on a separate CLIN. The offeror shall\rbase the production CLIN price solely on all costs associated with completion\rof the production units and shall exclude all FAT-related costs.\r(3) The contracting officer will use the total award price in selecting the\rbest value offer from among all eligible offerors. However, for an offeror\rto be eligible for award, the contracting officer must determine that the FAT\rCLIN price (unless FAT is waived) and the production CLIN price are fair\rand reasonable; and, if set-aside under FAR Part 19, a fair market price.\rThe offeror shall not propose a FAT CLIN price that is materially unbalanced\rin relation to the production CLIN price. In the event an offeror receives a\rwaiver of the FAT requirement, the contracting officer will deduct the FAT\rCLIN price for the waived source in determining the total award price.\r(4)(a) Notwithstanding the conditions for waiving first article, the\rcontracting officer may order an additional first article sample, or portion\rthereof, in writing if there is a-\r(i) Major change to the technical data;\r(ii) Lapse in production for a period in excess of 90 days; or\r(iii) Change in the place of performance (manufacturing facility),\rmanufacturing process, material used,drawing, specification or source of\r(b) When conditions in paragraphs (4)(a)(i), (ii), or (iii) occur, the\rContractor shall notify the contracting officer; who will determine whether\rto order an additional first article sample or portion thereof and provide\rinstructions concerning the submission, inspection, and notification of\rresults. The contractor shall bear the costs of the additional first article\rtesting resulting from any of the causes in paragraphs (4)(a)(i)-(iii)\rinstituted by the contractor and not due to changes directed by the\rGovernment.\r(5) Waivers. The offeror may submit a request for FAT waiver to the\rcontracting officer, who may waive the FAT requirement when all of the\rfollowing criteria apply:\r(a) The offeror requesting waiver has successfully manufactured, delivered\rand the government accepted the item or a similar item. The offeror shall\rprovide the following information and be prepared to provide\rdocumentary evidence upon the contracting officer's request:\r(i) Contract number(s), date(s), and issuing Government agency or agencies.\r(ii) Description of item previously furnished, identified by part number,\rtype, model number and/or other identifying information. If the item\rpreviously furnished is similar but not identical to the item being acquired\runder the current buy, the offeror shall explain why manufacture of the\ritem previously furnished is sufficient to demonstrate its ability to\rmanufacture the item being acquired under the current buy without\rneed for a first article test.\r(iii) Engineering control document/change number of item previously furnished.\r(b) There have been no changes to manufacturing processes, tooling, or\rplace of performance.\r(c) There have been no changes to manufacturing data (e.g., drawing\rrevisions that change materials, dimensions, processes, inspection or\rtesting requirements; or subcontractors used to manufacture the items\rsuccessfully in the past).\r(d) The offeror shall supply an item of the same design and manufactured\rby the same method at the same facilities as the item or similar item\rpreviously furnished and accepted under subparagraph (5)(a).\r(6) Contractor-Performed FAT.\r(a) The contractor shall test the quantities as outlined in paragraph (a)\rof FAR clause 52.209- 3 as specified in the contract. The contractor shall\rsubmit reports in accordance with paragraph (b) of FAR clause 52.209-3,\ras supplemented in this procurement note.\r(b) For test report preparation and delivery of contractor FAT, the\rcontractor shall- (i) Use the data item description DI-NDTI-80809B report\rformat.\r(ii) Mark the test report with the following: \"First article test report -\rContract number: �insert contract number� and lot/item number:\r�insert lot/item number�.\r(iii) Sign the FAT Report, accompanied by the system of record receiving\rreport (i.e., WAWF or� DD Form 250) and contractor confirmation that\rthe same process and facilities used to manufacture the first article units\rwill be used to manufacture the production units, to the contracting officer\rat the applicable address shown below:\r(A) For awards issued by DLA Aviation; or DLA Troop Support Clothing\rand Textile (C&T), Medical Materiel, or Subsistence, submit the report to\rthe procuring activity in Block 6 of the DD Form 1155, Block 7 of\rStandard Form (SF) 33, Block 5 of SF 26, or Block 9 of SF 1449 award.\r(B) For awards issued by DLA Land (SPE7L), submit the report to the\rfollowing address: DLA Land - FLSEB, ATTN: FAT Monitor, P. O. Box 3990,\rColumbus, OH 43218- 3990, or email to: Land.FAT.Monitor@dla.mil.\r(C) For awards issued by DLA Maritime (SPE7M), submit the report to the\rfollowing address: DLA Maritime - FMSE, ATTN: FAT Monitor, P. O. Box\r3990, Columbus, OH 43218-3990, or email to: maritime.fat.monitor@dla.mil.\r(D) For awards issued by DLA Troop Support Construction and Equipment\r(SPE8E), email the report to Construction and Equipment FAT Monitor at\rtrpsptcandefatmonitor@dla.ml. If report file exceeds email limitations,\rsubmit to the following address: DLA Troop Support, Attention: First\rArticle Testing Monitor, Building 3, 700 Robbins Avenue, Philadelphia,\rPennsylvania 19111.\r(7) The contractor shall-\r(a) Provide and maintain an inspection system acceptable to the Government\rin accordance with FAR Clause 52.246-2 or 52.246-3;\r(b) Maintain and make available all records evidencing those details at the\rGovernment's request.\r(c) At least fourteen (14) calendar days (or as otherwise specified in the\rcontract) prior to shipment to the Government, provide written notice\rto the contracting officer and to the cognizant DCMA Functional Specialist\rwhen full administration or Quality Support administration is delegated\rto DCMA.\r(8) Government-performed FAT. The contractor shall-\r(a) For delivery of separately priced Government first article samples for\rGovernment performed FAT ship the units and system of record receiving report\r(i.e., WAWF or DD Form 250) to the test facility specified in paragraph (a) of\rFAR clause 52.209-4.\r(b) For delivery of Government first article samples that are not separately\rpriced, ship the units with a commercial shipping document to the test\rfacility.\r(c) Prepare the shipping container(s) by marking the external packages\rin bold letters, \"First Article Exhibits - Do Not Post to Stock,\" adjacent\rto the MIL-STD-129 (latest revision) identification markings.\r(d) Use a hard copy of the system of record receiving report (i.e., WAWF\rDD Form 250), or commercial shipping document as a packing list, in\raccordance with DFARS Appendix F.\r(e) Mark the exterior of the shipping container in accordance with\rMIL-STD-129 (latest revision), paragraph 5.11.\r(f) In the interior package, include hard copies of the contract, test\rreports, material certifications/process operation sheets, drawings used\rto manufacture the units, and a pre-paid return label or shipping account\rfor payment.\r(g)Send units by traceable means (e.g., certified or registered mail,\rUnited Parcel Service, Federal Express).\r(h)Send an email with subject titled \"Notification of Test Exhibits\r�insert Government Lab DODAAC�\" to the corresponding address in (i)\ror (ii) below and to the contracting officer specified in the contract.\rIn the email, provide the shipment date, contract/purchase order number,\rNational Stock Number, means of transportation, tracking number, and\rsummary of container contents. Attach a copy of the system of record\rreceiving report (i.e., WAWF or DD Form 250) documenting the Government\rhas performed the contract quality assurance within the system or record.\r(i) DLA Land & Maritime - DSCCProdVerif@dla.mil\r(ii) DLA Aviation - DSCR.Test&EvaluationOffice@dla.mil\r(9) At its discretion, the Government may return FAT units to the contractor\rat no cost to the Government. The contractor shall submit the return address\rand pre-paid return label or shipping account for payment.\r(10) If the Government disapproves or conditionally approves\rGovernment-performed FAT units, the Government will take action in\raccordance with FAR 52.209-4.\rE09 Contractor First Article Test (FAT) Information (JUL 2022)\r(1) For FAT requirements, the Government will conduct inspection at source\rand acceptance at destination. The FOB point is destination. Due to known\rsystems limitations, solicitations may contain erroneous inspection,\racceptance, and FOB points. This procurement note takes precedence\rover any conflicting terms.\r(2) CONTRACTOR FAT DELIVERY SCHEDULE\r(a) _____ Days: To Deliver FAT Report to the Government\r(b) _____ Days: Government FAT Report Evaluation and Notification to Contractor(c) _____ Days: To Deliver Final Production Quantity After Approval of FAT\rReport. If PLT applies, this line will be blank; the number of delivery days\rfor final production quantity will appear in procurement note E03, Production\rLot Testing - Contractor, or E04, Production Lot Testing - Government, as\rapplicable\r(d)_____Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c))\rE10 Government First Article Test (FAT) Information (JUL 2022)\r(1) For FAT requirements, the Government will conduct inspection at source\rand acceptance at destination. The FOB point is destination. Due to known\rsystems limitations, solicitations may contain erroneous inspection,\racceptance, and FOB points. This procurement note takes precedence\rover any conflicting terms.\r(2) GOVERNMENT FAT DELIVERY SCHEDULE\r(a) ___ Days: To Deliver FAT Units to the Government\r(b) ___ Days: Government FAT Evaluation and Notification to Contractor\r(c) ___ Days: To Deliver Final Production Quantity After Approval of FAT.\rIf PLT applies, this line will be blank; the number of delivery days for final\rproduction quantity will appear in procurement note E03, Production Lot\rTesting - Contractor, or E04, Production Lot Testing - Government, as\rapplicable�\r(d) ___ Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c))�\rIf there are any conflicts with PLT or FAT, the Navy procedures supersede, as\rthe Navy owns the process.\r\\\r1.  SCOPE\r1.1   This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the CABLE ASSEMBLY,SPEC .\r2.  APPLICABLE DOCUMENTS\r2.1   Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.\r2.1.1   Documents, drawings, and publications supplied are listed under \"Drawing Number\".  These items should be retained until an award is made.\r2.1.2   \"Document References\" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.\r2.2   Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence.  Nothing in this contract/purchase order,\rhowever, shall supersede applicable laws and regulations unless a specific exemption has been obtained.\rDRAWING DATA=FVLS-2057R1-010                         |53711| -|1N |D|            |  |     |\rDRAWING DATA=FVLS-2065-011                           |53711| -|1N |D|            |  |     |\rDRAWING DATA=FVLS-2069R1-013                         |53711| -|1N |D|            |  |     |\rDRAWING DATA=FVLS-2077-012                           |53711| -|1N |D|            |  |     |\rDRAWING DATA=FVLS2-2186-014                          |53711| -|1N |D|            |  |     |\rDRAWING DATA=19179                                   |53711| E|WS |D|            |  |     |\rDRAWING DATA=19199                                   |53711| A|WS |D|            |  |     |\rDRAWING DATA=19202                                   |53711| -|WS |D|            |  |     |\rDRAWING DATA=5497120                                 |53711| A|   |D|            |  |     |\rDRAWING DATA=5497120                                 |53711| 2|1N |D|            |  |     |\rDRAWING DATA=5497120                                 |53711| 3|1N |D|            |  |     |\rDRAWING DATA=5497160                                 |53711| 4|1N |A|            |  |     |\rDRAWING DATA=5497459                                 |53711| B|   |D|            |  |     |\rDRAWING DATA=5497459                                 |53711| B|FN |D|            |  |     |\rDRAWING DATA=5497459                                 |53711| A|SD |D|            |  |     |\rDRAWING DATA=5497459                                 |53711| 3|1N |D|            |  |     |\rDRAWING DATA=5497459                                 |53711| 4|1N |D|            |  |     |\rDRAWING DATA=6387574                                 |53711| -|   |D|            |  |     |\rDRAWING DATA=6387659                                 |53711| B|   |D|            |  |     |\rDRAWING DATA=6387659                                 |53711| B|PL |D|            |  |     |\rDRAWING DATA=6387659                                 |53711|13|1N |D|            |  |     |\rDRAWING DATA=7251146                                 |53711| -|   |D|            |  |     |\rDOCUMENT REF DATA=MIL-STD-130                   |    |  |N  |121116|A|  |01|\rDOCUMENT REF DATA=ISO9001                       |    |  |   |010417|A|  |  |\r3.  REQUIREMENTS\r3.1   Design, Manufacture, and Performance - Except as modified herein,\rthe CABLE ASSEMBLY,SPEC  furnished under this contract/purchase order shall meet the\rdesign, manufacture, and performance requirements specified on drawing ;53711       6387659-69;\rcage ;53711       6387659-69; .\r3.2   First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required.\r3.3   First Article Approval (Government Testing) - First Article Test (FAT) and approval is required.\r3.4   Production Lot Approval (Contractor Testing) - Production Lot Test and approval is required.\r3.5   Marking - This item shall be physically identified in accordance with MIL-STD-130.\r3.6   Configuration Control - MIL-STD-973 entitled \"Configuration Management\", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated.  The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973,\rParagraph 5.4.8.2 and Appendix D.  Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E.  Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E.  (Original\rand two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa.  17055-0788.)\r3.6.1   Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until\ranother drawing revision is approved.  The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted,\rthe date of the granting of the authorization, and the name of the granting authority.\r        Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below.\r        The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA  17055-0788.\r        Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor.\r3.7   Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination.  Mercury contamination of the material\rwill be cause for rejection.\r       If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture.  The\rcontractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape.  Such a request will be forwarded directly to the Procurement Contracting\rOfficer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a \"Warning Plate\" stating that metallic mercury is a functional part of the item and will include name and location of that part.\r       The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited.  The most probable causes of\rcontamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity.  Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are\rlocated so as not to constitute a contamination hazard.\r       If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective.  Enclose the equipment in a\rpolyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the\rrequirements of this contract are concerned.\r       These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements.\r       Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer.  For background, the following information is provided:\r       Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys.  Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems.  Accidental trapping of mercury in a\rcomponent could cause serious damage to vital parts.  Mercury is also toxic if inhaled, ingested, or absorbed through the skin.  It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface\rship atmosphere.\r3.8   Soldering - The requirements for soldered electrical and electronic assemblies shall conform to IPC J-STD-001, Class ;3; .\r4.  QUALITY ASSURANCE\r4.1   Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein.  Except as otherwise specified in the contract/purchase order,\rthe Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government.  The Government reserves the right to perform any of the inspections set forth in the\rspecification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.\r4.2   First Article Test/Inspection (Contractor) - The Contractor shall conduct ;NON-DESTRUCTIVE; First Article Test/Inspection on ;one      ; unit(s) in accordance with requirements ;WS19202; .\r4.3   First Article Compatibility Test (Government) - Upon satisfactory completion of the First Article Test/Inspection by the Contractor, ;1; unit(s) shall be shipped to ;NSWC PORT HUENEME; for compatibility test to assure satisfactory, form, fit and function\rwithin the applicable end item or system.\r  Government First Article Compatibility Test shall consist of ;SYSTEM COMPATIBILITY;  testing.   If the testing is nondestructive, the first article sample ;SHALL;  be returned.//\r4.4   Inspection System Requirements - The supplier shall provide and maintain an inspection/quality system acceptable to the Government.  The inspection system requirements for this contract/purchase order shall be in accordance with MIL-I-45208.  Suppliers\rcertified to perform under ISO 9001 or ISO 9002 are granted permission to utilize the one desired in lieu of MIL-I-45208.\r4.5   Responsibility for Compliance - All items must meet all requirements of this contract/purchase order.  The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program.  The absence of any\rinspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order.  Sampling in quality conformance\rdoes not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.\r4.6   Records of Inspection - (This requirement is not applicable to Government Purchase Orders)  Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during\rthe performance of the contract and for a period of four years after final delivery of supplies.\r4.7   Responsibility for Compliance - All items must meet all requirements of this contract/purchase order.  The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program.  The absence of any\rinspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order.  Sampling in quality conformance\rdoes not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.\r4.8   Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies.\r4.9    ;First Article Test/inspection report- the contractor shall prepare and submit a report in accordance with the Contract data Requirements List (DD Form 1423) The report shall be approved prior to production.;\r5.  PACKAGING\r5.1   Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.\rMIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6.  NOTES\r6.1  Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS)\r(i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products.  Most Specifications can obtained directly from http://quicksearch.dla.mil/\rA.  Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format.  Documents can be requested by phoning the Subscription Services Desk.\rB.  Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources.  Theymay be obtained from the publishers of the applicable societies.\rC.  Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to:\rCommander, Indian Head Division, Naval Surface Warfare Center\rCode 8410P, 101 Strauss Avenue\rIndian Head, MD 20640-5035\rD.  On post-award actions, requests for \"Official Use Only\" and \"NOFORN\" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for\rcertification of need for the document.  On pre-award actions such requests must be submitted to the PCO for certification of need for the document.\rE.  NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:\rContracting Officer\rNAVSUP-WSS\rCode 87321\r5450 Carlisle Pike\rP.O. Box 2020\rMechanicsburg, Pa. 17055-0788\rF.  Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue:\rCommanding Officer\rNAVSUP-WSS\rCode 009\r5450 Carlisle Pike\rP.O. Box 2020\rMechanicsburg, Pa. 17055-0788\rG.  Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from:\rCommanding Officer\rNAVSUP-WSS\rCode 1 Support Branch\r700 Robbins Avenue\rPhiladelphia, Pa. 19111-5094\rH.  Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS.\rManufacturing sources interested in becoming qualified for support of future requirements for this item should submit their interest in writing to the    Contract Officer, to include a summary of the company's applicable           capabilities. This will be\rforwarded to the appropriate point of contact at  NSWC, PHD for evaluation.\r6.2   Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation.  If you desire to be considered as a potential source for award of\rthis contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer.\r6.3  In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a \"Distribution Statement\" to inform the contractor of the limits of distribution, and the safeguarding of the information\rcontained on those documents and drawings.\r  There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings.  The definition for each is as follows:\rA... approved for public release; distribution is unlimited.\rB... distribution authorized to US Governments agencies only.\rC... distribution authorized to US Government agencies and their contractors.\rD... distribution authorized to DoD and DoD contractors only.\rE... distribution authorized to DoD Components only.\rF... further distribution only as directed by Commander, Naval Sea\r     Systems Command, code 09T.\rX... distribution is authorized to US Government agencies and private      individuals or enterprises eligible to obtain export controlled technical\r     data in accordance with OPNAVINST 5510.161.\r\rDATE OF FIRST SUBMISSION=ASREQ\rBlock 12 - Submit for approval prior to production.\rBlock 14A - The deliverable item specified as information copy shall be boldly marked as \"Information Only\".\rBlock 14 - Port Hueneme Division, Naval Surface Warfare Center, ;Code A66;  ,Port Hueneme, CA 93043-5007.\rBlock 10 - Note:  If this data has been previously approved by the Navy, submittal of the original approval letter in lieu of the data is acceptable.\r\rDATE OF FIRST SUBMISSION=045 DAC\rBlock 12 - Submit for approval prior to production.\rBlock 14A - The deliverable item specified as information copy shall be boldly marked as \"Information Only\".\rBlock 14 - Port Hueneme Division, Naval Surface Warfare Center, ;Code A66;  ,Port Hueneme, CA 93043-5007.\r\rDATE OF FIRST SUBMISSION=ASREQ\r100% INSPECTION IS REQUIRED\r\rDATE OF FIRST SUBMISSION=ASREQ\r;GOVERNMENT COMPATIBILITY TESTING TO BE COMPLETED 45 DAYS FROM RECEIPT OF FAT UNIT / TEST REPORT FROM CONTRACTOR.                                         ;\rBlock 10 - Note:  If this data has been previously approved by the Navy, submittal of the original approval letter in lieu of the data is acceptable.","text":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|ISO 9001|\rINSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||\rPRODUCTION LOT TESTING|1||\rINSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X||||||\rINSPECTION AND ACCEPTANCE OF SUPPLIES|26|||||||||||||||||||||||||||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT|N/A|TBD|SPRMM1|TBD|TBD|TBD|TBD|TBD|TBD|TBD||||||\rNOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3||||\rWARRANTY OF DATA--BASIC (MAR 2014)|2|||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rFIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|1||||||||||\rFIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)|7|1|||||||\rFEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-PROHIBITION (DEC 2023)|12||x||x||x||x||x||x|\rNOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|X|X|X|||X||||||||\rANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|335311|800|X|X||||||||||\rEVALUATION OF FIRST ARTICLE TESTING|3||||\r1. All contractual documents (i.e. contracts, purchase orders, task orders,\rDelivery orders, and modifications) related to the instant procurement are\rconsidered to be \"issued\" by the government when copies are either deposited\rin the mail, transmitted by facsimile, or sent by other electronic commerce\rmethods, such as email. The government's acceptance of the contractor's\rproposal constitutes bilateral agreement to \"issue\" contractual documents as\rdetailed herein.\r2. No drawings or technical data are available for this item.\r3. Delivery days_________aro.\r4. Offer valid for _____ days.\r5. When submitting quotes via EDI, make sure you specify any exceptions (i.e.\rMil specs/standards, packaging, I&A, packaging houses etc) or follow up with a\rhardcopy of the exceptions. If nothing is indicated or received, award will\rbe based upon solicitation requirements. Changes or requests for changes\rafter award will have consideration costs deducted on modifications.\r6. If you are not the manufacturer of the material you are offering, you must\rstate who the OEM is (cage code) and the part number you are offering.\r7. Please provide an email address for follow up communications.\r____________________________________________________________\rIt is recommended that vendors provide contact information to NAVSUP WSS\rMechanicsburg in order to receive automated notifications from Navy Electronic\rCommerce Online (NECO) when contracts/modifications are issued by DLA Maritime\rMechanicsburg and posted on EDA. To receive these notifications, contact:\rNAVSUPWSS code 025, procurement systems design and contract support division\rVia email at NAVSUPWSSITIMPHelpdesk@navy.mil. Please include the following\rinformation with your request: cage code, company name, address and POC with\rphone number and email address.\rContractors can view their orders, contracts and modifications at the\rElectronic Document Access (EDA) web tool. This web tool is located at the\rProcurement Integrated Enterprise Environment (PIEE) website. It is\rrecommended that the contractor register for EDA at https://piee.eb.mil/.\rClick on new user and registration.\rAny order resulting from this Request for Quotation will require electronicsubmittal of Receiving Report and Invoices through PIEE-WAWF.\rThis procurement requires Higher Level Inspection.\rC02 Manufacturing Phase-Out or Discontinuation of Production, Diminishing\rSources, and Obsolete Materials or Components (DEC 2016)\rThe contractor shall notify the contracting officer immediately upon\rdetermining the unavailability of obsolete materials or components. The\rcontractor may recommend a solution to include the impact on the contract\rprice and delivery. The contractor shall not initiate any item redesign or\rincur any additional costs without the express, written authorization of the\rcontracting officer.\rIn the event that manufacturing phase-out or discontinuance of production of\rsuch items is contemplated, the contractor is required to notify the\rcontracting officer and publish the discontinuance in the Government-Industry\rData Exchange Program (GIDEP), where feasible;\rand to provide immediate advance notice of production phase-out to DLA DMSMS\rat dscc.dmsms@dla.mil.\rC04 Unused Former Government Surplus Property (SEP 2021)\rTo be considered for award, the offeror must complete and submit the\rfollowing representation with their offer. Additional supporting documentation\rto demonstrate the surplus material offered was previously owned by the\rGovernment and meets solicitation requirements must be provided within 24\rhours of request by the contracting officer.\r(1) The material is new, unused, and not of such age or so deteriorated as to\rimpair its usefulness or safety. Yes �__� No �__�\rThe material conforms to the technical requirements cited in the solicitation\r(e.g., Commercial and Government Entity (CAGE) Code and part number,\rspecification, etc.). Yes �__� No �__�\rThe material conforms to the revision letter/number, if any is cited.\rYes �__� No �__� Unknown �__�\rIf No, the revision does not affect form, fit, function, or interface.\rYes__ No __ Unknown __ The material was manufactured by:\r(Name): _____________________________________________________\r(Address): __________________________________________________\r(2) The offeror currently possesses the material Yes __ No __\rIf yes, the offeror purchased the material from a Government selling agency\ror other source.\rYes __ No __ If yes, complete the following:\rGovernment Selling Agency: ________________________________\rContract Number: __________________________________________\rContract Date: (Month, Year): _____________________________\rOther Source: _____________________________________________\rAddress: __________________________________________________\rDate Acquired: (Month/Year) _______________________________\r(3) The material has been altered or modified. Yes __ No __\rIf Yes, complete the following:\rName of the company that performed the alternation or modification:\r____________________________________________________________\r�(Address): _______________________________________________\rComplete description of the alterations or modifications.\r____________________________________________________________________\r____________________________________________________________________\r(4) The material has been reconditioned. Yes __ No __\rIf Yes, complete the following:\r(i) The price offered includes the cost of reconditioning /refurbishment.\rYes __ No __\r(ii) Name of the company that reconditioned the material.\r____________________________________________________________________\r(iii) Description of any work done or to be done, including the components\rto be replaced and the applicable rebuild standard.\r____________________________________________________________________\r____________________________________________________________________\rThe material contains cure-dated components. Yes __ No __\rIf Yes, complete the following:\r(i) The price includes replacement of cure-dated components.\rYes __ No __\r(ii) Cure date: ____________________\r(5) The material has data plates attached. Yes __ No __\rIf Yes, insert all information contained on the data plate.\r____________________________________________________________________\r____________________________________________________________________\r(6) The offered material is in its original package. Yes __ No __\rIf yes, complete the following:\rContract Number_______________________________________________\rNSN___________________________________________________________\rCAGE Code__________________________________________________________\rPart Number __________________________________________________\rOther Markings/Data___________________________________________\r(7) The offeror has supplied this same material (National StockNumber) to\rthe Government before. Yes___ No __\rIf Yes, complete the following:\r(i) The material being offered is from the same original Government contract\rnumber as that provided previously. Yes __ No __\r(ii) State below the Government Agency and contract number under which the\rmaterial was previously provided:\rAgency ___________________________________________________\rContract Number___________________________________________\r(8) The material is manufactured in accordance with a specification or\rdrawing. Yes __ No __ If Yes, complete the following:\r(i) The specification/drawing is in the possession of the offeror.\rYes __ No __\r(ii) The offeror has stated the applicable information below: Yes __ No __\rSpecification/Drawing Number __________________________________\rRevision (if any) _____________________________________________\rDate___________________________________________________________\r(9) The material has been inspected for correct part number and for absence\rof corrosion or any obvious defects. Yes __ No __\rIf Yes, complete the following:\r(i) Material has been re-preserved. Yes __ No __\r(ii) Material has been repackaged. Yes __ No __\r(iii) Percentage of material that has been inspected is ____%; and/or\r(iv) Number of items inspected is _______\r(v) A written report was prepared. Yes __ No __\rThe offeror agrees that in the event of award and notwithstanding the\rprovisions of the solicitation, inspection and acceptance of the surplus\rmaterial will be performed at source or destination subject to all\rapplicable provisions for source or destination inspection.\rThe offeror will forward one of the following, within 24 hours of request\rby the contracting officer, to demonstrate that the material being offered\rwas previously owned by the Government (offeror checkwhich one applies):\r___ For national or local sales, conducted by sealed bid, spot bid or\rauction methods, a solicitation/Invitation For Bid and corresponding DLA\rDisposition Services Form 1427, Notice of Award, Statement and Release\rDocument.\r___ For DLA Disposition Services Commercial Venture (CV) Sales, the shipment\rreceipt/delivery pass document and invoices/receipts used by the original\rpurchaser to resell the material.\r___ When the above documents are not available, or if they do not identify\rthe specific NSN being acquired, a copy or facsimile of all original\rpackage markings and data, including NSN, commercial and Government\rentity (CAGE) code and part number, and original contract number. (This\rinformation has already been provided in paragraph (6) of this procurement\rnote Yes __ No __)\r___ When none of the above are available, other information to demonstrate\rthat the offered material was previously owned by the Government. Describe:\r_______________________________________________________________\rThis procurement note only applies to offers of Government surplus\rmaterial. Offers of commercial surplus, manufacturer's overruns, residual\rinventory resulting from terminated Government contracts, and any\rother material that meets the technical requirements in the solicitation\rbut was not previously owned by the Government will be evaluated in accordance\rwith the DLAD procurement note L04, Offers for Part Numbered Items.\rIf requested by the contracting officer, the offeror shall furnish sample\runits, in the number specified, to the contracting officer or to another\rlocation specified by the contracting officer, within 10 days after the\rcontracting officer's request. The samples will be furnished at no cost to\rthe Government. All such samples not destroyed in evaluation will be\rreturned at the offeror's expense. The samples will be evaluated for form,\rfit, and function with subassembly, assembly, or equipment with which the\ritems are to be used. End items furnished under any contract award to the\rofferor furnishing the samples can include the returned samples, and all\racceptable end items will have a configuration identical to the samples.\rIf specific tests of the samples' performance are made by the Government,\rthe offeror will be furnished the results of such tests prior to a contract\rbeing entered into. In addition to any other inspection examinations and tests\rrequired by the contract, the performance of the end items will be required\rto be as good as that of the samples submitted.\rIn the event of award, the contractor will be responsible for providing\rmaterial that is in full compliance with all requirements in the contract or\rorder. The surplus material to be furnished must meet the requirements of\rthe current contract or order, whether or not the material met Government\rrequirements in existence at the time the material was initially manufactured\ror sold to the Government. If higher-level contract quality requirements apply\rto the material being acquired, those requirements do not apply to surplus\rmaterial furnished under this contract.\rC14 Correction of Nonconforming Packaging or Marking (MAY 2020)\r(1) The Government may correct nonconforming packaging or marking for\rreceipts of DLA-owned materiel if the estimated costs of correction are\r$1,000 or less. The contracting officer will advise the contractor of the\rdiscrepancy and that the Government has corrected the packaging or\rmarking. The contracting officer will make a determination concerning\rappropriate reimbursement by the contractor for the Government's costs to\rcorrect the deficiencies. Upon determining that reimbursement is required, the\rcontracting officer will send a notice to the contractor. Upon receipt of\rnotice from the contracting officer, the contractor shall reimburse the\rGovernment for the costs incurred by the Government to correct the\rdeficiencies.\r(2) If the estimated costs of correction for receipts of DLA-owned materiel\rare more than $1,000, the contracting officer will advise the contractor of\rthe discrepancy and have the materiel returned to the contractor for\rcorrection/resubmittal; or, if there are urgent requirements, have the\rGovernment remediate the discrepancy at the contractor's expense. If the\rGovernment remediates the discrepancy, the contracting officer will make a\rdetermination concerning appropriate reimbursement by the contractor for the\rGovernment's costs to correct the deficiencies. Upon determining that\rreimbursement is required, the contracting officer will send a notice to\rthe contractor. Upon receipt of notice from the contracting officer, the\rcontractor shall reimburse the Government for the costs incurred by the\rGovernment to correct the deficiencies.\rE06 Inspection and Acceptance at Source (JUN 2018)\rInspection and acceptance are at source. The place of acceptance is the\rlocation where the Government conducts the last inspection before shipment,\runless the contractor indicated a different physical location for\racceptance below.\rThe contractor shall indicate the location where supplies will be inspected,\rif different from the production location:\rCommercial and Government Entity (CAGE) code:__\rAddress:____________________________________________\rApplicable to contract line item numbers(s) (CLIN(s)):_____________\rThe contractor shall indicate the location where packaging will be inspected,\rif different from the production location:\rCommercial and Government Entity (CAGE) code:__\rAddress:____________________________________________\rApplicable to contract line item numbers(s) (CLIN(s)):_____________\rThe contractor shall indicate the location where packaging will be inspected,\rif different from the production location:\r( ) Same as for supplies OR\rCAGE code:________________________________________________\rAddress:__________________________________________________\rApplicable to CLIN(s):____________________________________\rThe contractor shall indicate the location where supplies will be accepted,\rif different from the inspection location:\rCommercial and Government Entity (CAGE) code:_____________\rAddress:__________________________________________________\rApplicable to contract line item numbers(s) (CLIN(s)):____\rInterested parties may file an agency level protest with the contracting\rofficer or may request an independent review by the chief of the contracting\roffice (CCO). Independent review by the CCO is an alternative to consideration\rby the contracting officer and is not available as an appellate review of a\rcontracting officer decision on a protest previously filed with the\rcontracting officer. Absent a clear indication of the intent to file an\ragency level protest with the CCO for independent review, protests will be\rpresumed to be protests to the contracting officer.\rE03 Production Lot Testing - Contractor (MAY 2020)(1) The purpose of production lot testing (PLT) is to validate quality\rconformance of products. The contractor shall complete PLT on the\rproduction lot(s) after first article approval, if the contract requires\rfirst article testing. The contractor shall price the PLT CLIN to cover the\rcost of the final test report and any approved samples that are consumed,\rdestroyed, or otherwise rendered unusable during testing. The unit of issue\rfor the PLT CLIN, EACH, is equal to one Production Lot Test (1EA=1PLT).\r(2) For purposes of facilitating PLT, the engineering support activity and/or\rtesting facility has authority to communicate and discuss clarifications\rdirectly with contractors. If the Government and/or the contractor\ridentify changes to contract requirements, the contractor shall contact\rthe post award contracting officer or contract administrator (see the\r\"Issued By\" blocks on the contract award or order) for written approval.\rThe contractor shall not act on any revisions or other changes until the\rcontracting officer issues a written modification approving the proposed\r(3) The contractor shall provide and maintain an inspection system\racceptable to the Government in accordance with FAR Clause 52.246-2 or\r52.246-3, and maintain and make available all records evidencing those\rdetails if requested by the Government. At least fourteen (14) calendar\rdays (or as otherwise specified in the contract) prior to conducting the\rproduction lot test, the contractor shall provide written notice of the time\rand location of the test to the contracting officer and the cognizant DCMA\rfunctional specialist when full administration or quality support\radministration is delegated to DCMA, so the Government may witness sample\rselection and the test.\r(4) Unless otherwise stated, the contractor shall select �contracting officer\rshall insert number of samples identified in material master� samples at\rrandom from the production lot(s) produced. If the quantity stated in the\rprevious sentence equals \"ZZ,\" the contractor shall use the appropriate\rsample size identified in the technical data package or applicable sample\rplan provided by the Government. If the contractor cannot determine the\rsample quantity, the contractor shall obtain written confirmation of the\rsample size from the contracting officer.\r(5) The contractor shall perform all tests on the PLT samples needed to\rverify/validate the items meet the contract technical/quality requirements.\r(6) If a PLT sample fails, the entire production lot from which the contractor\rtook the sample fails. The contractor shall notify the contracting officer and\rpropose corrective action, if appropriate.\r(7) The contractor shall prepare and disseminate the PLT report and\rapplicable traceability documentation as follows:\r(a) Prepare the test report in accordance with data item description\rDI-NDTI-80809B, and mark the test report, \"Production Lot Test Report,\rContract Number �contractor insert� and Lot/Item Number �contractor\rinsert�.\"\r(b) Present the PLT report to the contracting officer for review.\r(c) Include the following documentation with all shipments of PLT Reports:\r(i) DD Form 1222 and system of record receiving report (i.e., WAWF or\rDD Form 250);\r(ii) Copy of the contract/order;\r(iii) Copy of all applicable test reports, showing actual results and\rtolerances specified in the technical data package;\r(iv) Material and process certifications;\r(v) Process operations and inspection method sheets;\r(vi) Copies of drawings used to manufacture the PLT sample, with proper\rmarking to restrict public disclosure (if desired) and from Government use\rother than for evaluation to the extent consistent with the Government's\rdata rights under the contract; and\r(vii) Documents required under a contract deliverables requirements list,\rif applicable.\r(d) Submit all required documentation to the Government activity specified\rin the contract in time to allow for at least �contracting officer shall\rinsert number of days as shown in material master� calendar days for review\rof the PLT report, and for the contracting officer to provide written\rnotification of approval/disapproval to the contractor.\r(i) For awards issued by DLA Troop Support Construction and Equipment\r(SPE8E), email all required documentation to Construction and Equipment\rPLT Monitor at trpsptcandepltmonitor@dla.mil. If documentation files\rexceed email limitations, submit to the following address: DLA Troop\rSupport, Attention: Production Lot Testing Monitor, Building 3,\r700 Robbins Avenue, Philadelphia, Pennsylvania 19111.\r(e) For PLT, the Government will conduct inspection at source and\racceptance at destination. The FOB point is destination.\r(f) Delivery.\r(i) Ship test report to �contracting officer insert address of the\rGovernment activity to receive the report�.\r(ii) Delivery Schedule Information:\r(A) _____ Total Delivery Days for FAT (If Applicable)\r(B) _____ Days: Completion of Production Units (to include PLT\rsamples), PLT, and Submission of PLT Report\r(C) _____ Days: Government PLT Report Evaluation and Notification\rto Contractor\r(D) _____ Days: Delivery of final production quantity to Government\r(E) _____ Total Delivery Days (Sum of paragraph (ii)(A) through (D) above\rE04 Production Lot Testing - Government (MAY 2020)(1) The purpose of production lot testing (PLT) is to validate quality\rconformance of products. The Government conducts PLT on the production lot(s)\rafter first article approval, when a first article is required. The\rcontractor shall price the PLT CLIN to cover the cost of any approved\rsamples that are consumed, destroyed, or otherwise rendered unusable during\rtesting. The unit of issue for the PLT CLIN, EACH, is equal to one\rProduction Lot Test (1EA=1PLT).\r(2) For purposes of facilitating PLT, the engineering support activity\rand/or testing facility has authority to communicate and conduct\rclarifications directly with contractors. If this results in necessary changes\rto contract requirements, the contractor shall contact the post award\rcontracting officer or contract administrator (see the \"Issued By\" blocks\ron the contract award or order) for written approval. The contractor shall\rnot act on any revisions or other changes until the contracting officer\rissues a written modification approving the proposed revision(s)/change(s).\r(3) The contractor shall provide and maintain an inspection system\racceptable to the Government in accordance with FAR Clause 52.246-2 or\r52.246-3, and maintain and make available all records evidencing those\rdetails if requested by the Government. At least fourteen (14) calendar\rdays (or as otherwise specified in the contract) prior to the date when\rthe contractor will present the production lot for selection of PLT samples,\rthe contractor shall provide written notice to the contracting officer (and\rthe cognizant DCMA functional specialist when full administration or\rquality support administration is delegated to DCMA).\r(4) Unless otherwise stated, the contractor shall select �contracting\rofficer shall insert the number of samples identified in the material\rmaster� samples, at random from the production lot(s) produced. If the\rquantity stated in the previous sentence equals \"ZZ,\" the contractor shall\ruse the appropriate sample size identified in the technical data package\ror applicable sample plan provided by the Government. If the contractor\rcannot determine the sample quantity, the contractor shall obtain written\rconfirmation of the sample size from the contracting officer.\r(5) If a PLT sample fails, the entire production lot from which the\rcontractor took the sample fails.\rThe contractor shall propose corrective action, if appropriate.\r(6) The Government will return PLT samples to the contractor, with a copy\rof the test report, at contractor expense.\r(7) The contractor shall prepare and disseminate the samples as follows:\r(a) Ship the selected PLT samples by traceable means. �Mark the shipment\r\"Production Lot Samples - Do Not Post To Stock,\" Contract Number\r�contractor insert� and Lot/Item Number �contractor insert�\". Place a\rcopy of the system of record receiving report (i.e., WAWF or DD Form 250)\ron the exterior of the shipping container in accordance with DFARS\rAppendix F. Mark the exterior of the shipping container in accordance\rwith MIL-STD-129 (latest revision), paragraph 5.11.(b)Include the following interior documentation:\r(i) DD Form 1222 and system of record receiving report (i.e., WAWF or\rDD Form 250);\r(ii) Copy of contract/order;\r(iii) Copy of test reports, showing actual results and tolerances specified\rin the technical data package;\r(iv) Material and process certifications;\r(v) Process operations and inspection method sheets;\r(vi) Copies of drawings used to manufacture the PLT sample (proper marking\rto assert proprietary or other rights to restrict public disclosure is\rthe contractor's responsibility);\r(vii) Documents required under contract deliverables requirements list; and\r(viii) A prepaid shipping label or document with the information required\rto return the PLT samples to the contractor at no cost to the Government.\r(5) At the time of shipment, the contractor shall sign and provide copies of\rthe DD Form 1222, system of record receiving report (i.e., WAWF or DD Form\r250), transportation tracking information, and information for return of the\rPLT samples to the contracting officer. The Government testing time will be\r�contracting officer insert number of days for test, as shown in the material\rmaster calendar days for the test results to be provided to the contractor.\r(6) For PLT, the Government will conduct inspection at source and acceptance\rat destination. The FOB point is destination.\r(7) Delivery.\r(a)Ship samples to �contracting officer insert address of the Government\ractivity to receive the samples�.\r(b)Delivery Schedule Information:\r(i)___ Total Delivery Days for FAT (If Applicable)\r(ii)___ Days: Completion of Production Units (to include PLT samples), and\rSubmission of samples forGovernment Testing\r(iii)___ Days: Government PLT Report Evaluation and Notification to Contractor\r(iv)___ Days: Delivery of final production quantity to Government\r(v)___ Total Delivery Days (Sum of paragraph (i) through (iv))\rE08 First Article Testing Requirements (MAR 2025)(1) If there is not a separate contract line item number (CLIN) for FAT, the\rofferor shall include all costs and risk associated with completion of the FAT\rrequirement in the production CLIN price.\r(2) If there is a separate FAT CLIN, the offeror shall include all costs and\rrisk associated with completion of the FAT requirement in the FAT CLIN price.\rThe unit of issue for the FAT CLIN, EACH, is equal to one First Article Test\r(1EA=1FAT). To receive payment for any costs associated with FAT, the offeror\rshall propose costs associated with FAT on a separate CLIN. The offeror shall\rbase the production CLIN price solely on all costs associated with completion\rof the production units and shall exclude all FAT-related costs.\r(3) The contracting officer will use the total award price in selecting the\rbest value offer from among all eligible offerors. However, for an offeror\rto be eligible for award, the contracting officer must determine that the FAT\rCLIN price (unless FAT is waived) and the production CLIN price are fair\rand reasonable; and, if set-aside under FAR Part 19, a fair market price.\rThe offeror shall not propose a FAT CLIN price that is materially unbalanced\rin relation to the production CLIN price. In the event an offeror receives a\rwaiver of the FAT requirement, the contracting officer will deduct the FAT\rCLIN price for the waived source in determining the total award price.\r(4)(a) Notwithstanding the conditions for waiving first article, the\rcontracting officer may order an additional first article sample, or portion\rthereof, in writing if there is a-\r(i) Major change to the technical data;\r(ii) Lapse in production for a period in excess of 90 days; or\r(iii) Change in the place of performance (manufacturing facility),\rmanufacturing process, material used,drawing, specification or source of\r(b) When conditions in paragraphs (4)(a)(i), (ii), or (iii) occur, the\rContractor shall notify the contracting officer; who will determine whether\rto order an additional first article sample or portion thereof and provide\rinstructions concerning the submission, inspection, and notification of\rresults. The contractor shall bear the costs of the additional first article\rtesting resulting from any of the causes in paragraphs (4)(a)(i)-(iii)\rinstituted by the contractor and not due to changes directed by the\rGovernment.\r(5) Waivers. The offeror may submit a request for FAT waiver to the\rcontracting officer, who may waive the FAT requirement when all of the\rfollowing criteria apply:\r(a) The offeror requesting waiver has successfully manufactured, delivered\rand the government accepted the item or a similar item. The offeror shall\rprovide the following information and be prepared to provide\rdocumentary evidence upon the contracting officer's request:\r(i) Contract number(s), date(s), and issuing Government agency or agencies.\r(ii) Description of item previously furnished, identified by part number,\rtype, model number and/or other identifying information. If the item\rpreviously furnished is similar but not identical to the item being acquired\runder the current buy, the offeror shall explain why manufacture of the\ritem previously furnished is sufficient to demonstrate its ability to\rmanufacture the item being acquired under the current buy without\rneed for a first article test.\r(iii) Engineering control document/change number of item previously furnished.\r(b) There have been no changes to manufacturing processes, tooling, or\rplace of performance.\r(c) There have been no changes to manufacturing data (e.g., drawing\rrevisions that change materials, dimensions, processes, inspection or\rtesting requirements; or subcontractors used to manufacture the items\rsuccessfully in the past).\r(d) The offeror shall supply an item of the same design and manufactured\rby the same method at the same facilities as the item or similar item\rpreviously furnished and accepted under subparagraph (5)(a).\r(6) Contractor-Performed FAT.\r(a) The contractor shall test the quantities as outlined in paragraph (a)\rof FAR clause 52.209- 3 as specified in the contract. The contractor shall\rsubmit reports in accordance with paragraph (b) of FAR clause 52.209-3,\ras supplemented in this procurement note.\r(b) For test report preparation and delivery of contractor FAT, the\rcontractor shall- (i) Use the data item description DI-NDTI-80809B report\rformat.\r(ii) Mark the test report with the following: \"First article test report -\rContract number: �insert contract number� and lot/item number:\r�insert lot/item number�.\r(iii) Sign the FAT Report, accompanied by the system of record receiving\rreport (i.e., WAWF or� DD Form 250) and contractor confirmation that\rthe same process and facilities used to manufacture the first article units\rwill be used to manufacture the production units, to the contracting officer\rat the applicable address shown below:\r(A) For awards issued by DLA Aviation; or DLA Troop Support Clothing\rand Textile (C&T), Medical Materiel, or Subsistence, submit the report to\rthe procuring activity in Block 6 of the DD Form 1155, Block 7 of\rStandard Form (SF) 33, Block 5 of SF 26, or Block 9 of SF 1449 award.\r(B) For awards issued by DLA Land (SPE7L), submit the report to the\rfollowing address: DLA Land - FLSEB, ATTN: FAT Monitor, P. O. Box 3990,\rColumbus, OH 43218- 3990, or email to: Land.FAT.Monitor@dla.mil.\r(C) For awards issued by DLA Maritime (SPE7M), submit the report to the\rfollowing address: DLA Maritime - FMSE, ATTN: FAT Monitor, P. O. Box\r3990, Columbus, OH 43218-3990, or email to: maritime.fat.monitor@dla.mil.\r(D) For awards issued by DLA Troop Support Construction and Equipment\r(SPE8E), email the report to Construction and Equipment FAT Monitor at\rtrpsptcandefatmonitor@dla.ml. If report file exceeds email limitations,\rsubmit to the following address: DLA Troop Support, Attention: First\rArticle Testing Monitor, Building 3, 700 Robbins Avenue, Philadelphia,\rPennsylvania 19111.\r(7) The contractor shall-\r(a) Provide and maintain an inspection system acceptable to the Government\rin accordance with FAR Clause 52.246-2 or 52.246-3;\r(b) Maintain and make available all records evidencing those details at the\rGovernment's request.\r(c) At least fourteen (14) calendar days (or as otherwise specified in the\rcontract) prior to shipment to the Government, provide written notice\rto the contracting officer and to the cognizant DCMA Functional Specialist\rwhen full administration or Quality Support administration is delegated\rto DCMA.\r(8) Government-performed FAT. The contractor shall-\r(a) For delivery of separately priced Government first article samples for\rGovernment performed FAT ship the units and system of record receiving report\r(i.e., WAWF or DD Form 250) to the test facility specified in paragraph (a) of\rFAR clause 52.209-4.\r(b) For delivery of Government first article samples that are not separately\rpriced, ship the units with a commercial shipping document to the test\rfacility.\r(c) Prepare the shipping container(s) by marking the external packages\rin bold letters, \"First Article Exhibits - Do Not Post to Stock,\" adjacent\rto the MIL-STD-129 (latest revision) identification markings.\r(d) Use a hard copy of the system of record receiving report (i.e., WAWF\rDD Form 250), or commercial shipping document as a packing list, in\raccordance with DFARS Appendix F.\r(e) Mark the exterior of the shipping container in accordance with\rMIL-STD-129 (latest revision), paragraph 5.11.\r(f) In the interior package, include hard copies of the contract, test\rreports, material certifications/process operation sheets, drawings used\rto manufacture the units, and a pre-paid return label or shipping account\rfor payment.\r(g)Send units by traceable means (e.g., certified or registered mail,\rUnited Parcel Service, Federal Express).\r(h)Send an email with subject titled \"Notification of Test Exhibits\r�insert Government Lab DODAAC�\" to the corresponding address in (i)\ror (ii) below and to the contracting officer specified in the contract.\rIn the email, provide the shipment date, contract/purchase order number,\rNational Stock Number, means of transportation, tracking number, and\rsummary of container contents. Attach a copy of the system of record\rreceiving report (i.e., WAWF or DD Form 250) documenting the Government\rhas performed the contract quality assurance within the system or record.\r(i) DLA Land & Maritime - DSCCProdVerif@dla.mil\r(ii) DLA Aviation - DSCR.Test&EvaluationOffice@dla.mil\r(9) At its discretion, the Government may return FAT units to the contractor\rat no cost to the Government. The contractor shall submit the return address\rand pre-paid return label or shipping account for payment.\r(10) If the Government disapproves or conditionally approves\rGovernment-performed FAT units, the Government will take action in\raccordance with FAR 52.209-4.\rE09 Contractor First Article Test (FAT) Information (JUL 2022)\r(1) For FAT requirements, the Government will conduct inspection at source\rand acceptance at destination. The FOB point is destination. Due to known\rsystems limitations, solicitations may contain erroneous inspection,\racceptance, and FOB points. This procurement note takes precedence\rover any conflicting terms.\r(2) CONTRACTOR FAT DELIVERY SCHEDULE\r(a) _____ Days: To Deliver FAT Report to the Government\r(b) _____ Days: Government FAT Report Evaluation and Notification to Contractor(c) _____ Days: To Deliver Final Production Quantity After Approval of FAT\rReport. If PLT applies, this line will be blank; the number of delivery days\rfor final production quantity will appear in procurement note E03, Production\rLot Testing - Contractor, or E04, Production Lot Testing - Government, as\rapplicable\r(d)_____Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c))\rE10 Government First Article Test (FAT) Information (JUL 2022)\r(1) For FAT requirements, the Government will conduct inspection at source\rand acceptance at destination. The FOB point is destination. Due to known\rsystems limitations, solicitations may contain erroneous inspection,\racceptance, and FOB points. This procurement note takes precedence\rover any conflicting terms.\r(2) GOVERNMENT FAT DELIVERY SCHEDULE\r(a) ___ Days: To Deliver FAT Units to the Government\r(b) ___ Days: Government FAT Evaluation and Notification to Contractor\r(c) ___ Days: To Deliver Final Production Quantity After Approval of FAT.\rIf PLT applies, this line will be blank; the number of delivery days for final\rproduction quantity will appear in procurement note E03, Production Lot\rTesting - Contractor, or E04, Production Lot Testing - Government, as\rapplicable�\r(d) ___ Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c))�\rIf there are any conflicts with PLT or FAT, the Navy procedures supersede, as\rthe Navy owns the process.\r\\\r1. SCOPE\r1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the CABLE ASSEMBLY,SPEC .\r2. APPLICABLE DOCUMENTS\r2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.\r2.1.1 Documents, drawings, and publications supplied are listed under \"Drawing Number\". These items should be retained until an award is made.\r2.1.2 \"Document References\" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.\r2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order,\rhowever, shall supersede applicable laws and regulations unless a specific exemption has been obtained.\rDRAWING DATA=FVLS-2057R1-010 |53711| -|1N |D| | | |\rDRAWING DATA=FVLS-2065-011 |53711| -|1N |D| | | |\rDRAWING DATA=FVLS-2069R1-013 |53711| -|1N |D| | | |\rDRAWING DATA=FVLS-2077-012 |53711| -|1N |D| | | |\rDRAWING DATA=FVLS2-2186-014 |53711| -|1N |D| | | |\rDRAWING DATA=19179 |53711| E|WS |D| | | |\rDRAWING DATA=19199 |53711| A|WS |D| | | |\rDRAWING DATA=19202 |53711| -|WS |D| | | |\rDRAWING DATA=5497120 |53711| A| |D| | | |\rDRAWING DATA=5497120 |53711| 2|1N |D| | | |\rDRAWING DATA=5497120 |53711| 3|1N |D| | | |\rDRAWING DATA=5497160 |53711| 4|1N |A| | | |\rDRAWING DATA=5497459 |53711| B| |D| | | |\rDRAWING DATA=5497459 |53711| B|FN |D| | | |\rDRAWING DATA=5497459 |53711| A|SD |D| | | |\rDRAWING DATA=5497459 |53711| 3|1N |D| | | |\rDRAWING DATA=5497459 |53711| 4|1N |D| | | |\rDRAWING DATA=6387574 |53711| -| |D| | | |\rDRAWING DATA=6387659 |53711| B| |D| | | |\rDRAWING DATA=6387659 |53711| B|PL |D| | | |\rDRAWING DATA=6387659 |53711|13|1N |D| | | |\rDRAWING DATA=7251146 |53711| -| |D| | | |\rDOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| |01|\rDOCUMENT REF DATA=ISO9001 | | | |010417|A| | |\r3. REQUIREMENTS\r3.1 Design, Manufacture, and Performance - Except as modified herein,\rthe CABLE ASSEMBLY,SPEC furnished under this contract/purchase order shall meet the\rdesign, manufacture, and performance requirements specified on drawing ;53711 6387659-69;\rcage ;53711 6387659-69; .\r3.2 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required.\r3.3 First Article Approval (Government Testing) - First Article Test (FAT) and approval is required.\r3.4 Production Lot Approval (Contractor Testing) - Production Lot Test and approval is required.\r3.5 Marking - This item shall be physically identified in accordance with MIL-STD-130.\r3.6 Configuration Control - MIL-STD-973 entitled \"Configuration Management\", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973,\rParagraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original\rand two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)\r3.6.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until\ranother drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted,\rthe date of the granting of the authorization, and the name of the granting authority.\r Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below.\r The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788.\r Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor.\r3.7 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material\rwill be cause for rejection.\r If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The\rcontractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting\rOfficer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a \"Warning Plate\" stating that metallic mercury is a functional part of the item and will include name and location of that part.\r The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of\rcontamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are\rlocated so as not to constitute a contamination hazard.\r If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a\rpolyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the\rrequirements of this contract are concerned.\r These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements.\r Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided:\r Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a\rcomponent could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface\rship atmosphere.\r3.8 Soldering - The requirements for soldered electrical and electronic assemblies shall conform to IPC J-STD-001, Class ;3; .\r4. QUALITY ASSURANCE\r4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order,\rthe Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the\rspecification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.\r4.2 First Article Test/Inspection (Contractor) - The Contractor shall conduct ;NON-DESTRUCTIVE; First Article Test/Inspection on ;one ; unit(s) in accordance with requirements ;WS19202; .\r4.3 First Article Compatibility Test (Government) - Upon satisfactory completion of the First Article Test/Inspection by the Contractor, ;1; unit(s) shall be shipped to ;NSWC PORT HUENEME; for compatibility test to assure satisfactory, form, fit and function\rwithin the applicable end item or system.\r Government First Article Compatibility Test shall consist of ;SYSTEM COMPATIBILITY; testing. If the testing is nondestructive, the first article sample ;SHALL; be returned.//\r4.4 Inspection System Requirements - The supplier shall provide and maintain an inspection/quality system acceptable to the Government. The inspection system requirements for this contract/purchase order shall be in accordance with MIL-I-45208. Suppliers\rcertified to perform under ISO 9001 or ISO 9002 are granted permission to utilize the one desired in lieu of MIL-I-45208.\r4.5 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any\rinspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance\rdoes not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.\r4.6 Records of Inspection - (This requirement is not applicable to Government Purchase Orders) Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during\rthe performance of the contract and for a period of four years after final delivery of supplies.\r4.7 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any\rinspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance\rdoes not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.\r4.8 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies.\r4.9 ;First Article Test/inspection report- the contractor shall prepare and submit a report in accordance with the Contract data Requirements List (DD Form 1423) The report shall be approved prior to production.;\r5. PACKAGING\r5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.\rMIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6. NOTES\r6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS)\r(i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/\rA. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk.\rB. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies.\rC. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to:\rCommander, Indian Head Division, Naval Surface Warfare Center\rCode 8410P, 101 Strauss Avenue\rIndian Head, MD 20640-5035\rD. On post-award actions, requests for \"Official Use Only\" and \"NOFORN\" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for\rcertification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document.\rE. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:\rContracting Officer\rNAVSUP-WSS\rCode 87321\r5450 Carlisle Pike\rP.O. Box 2020\rMechanicsburg, Pa. 17055-0788\rF. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue:\rCommanding Officer\rNAVSUP-WSS\rCode 009\r5450 Carlisle Pike\rP.O. Box 2020\rMechanicsburg, Pa. 17055-0788\rG. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from:\rCommanding Officer\rNAVSUP-WSS\rCode 1 Support Branch\r700 Robbins Avenue\rPhiladelphia, Pa. 19111-5094\rH. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS.\rManufacturing sources interested in becoming qualified for support of future requirements for this item should submit their interest in writing to the Contract Officer, to include a summary of the company's applicable capabilities. This will be\rforwarded to the appropriate point of contact at NSWC, PHD for evaluation.\r6.2 Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation. If you desire to be considered as a potential source for award of\rthis contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer.\r6.3 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a \"Distribution Statement\" to inform the contractor of the limits of distribution, and the safeguarding of the information\rcontained on those documents and drawings.\r There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows:\rA... approved for public release; distribution is unlimited.\rB... distribution authorized to US Governments agencies only.\rC... distribution authorized to US Government agencies and their contractors.\rD... distribution authorized to DoD and DoD contractors only.\rE... distribution authorized to DoD Components only.\rF... further distribution only as directed by Commander, Naval Sea\r Systems Command, code 09T.\rX... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical\r data in accordance with OPNAVINST 5510.161.\r\rDATE OF FIRST SUBMISSION=ASREQ\rBlock 12 - Submit for approval prior to production.\rBlock 14A - The deliverable item specified as information copy shall be boldly marked as \"Information Only\".\rBlock 14 - Port Hueneme Division, Naval Surface Warfare Center, ;Code A66; ,Port Hueneme, CA 93043-5007.\rBlock 10 - Note: If this data has been previously approved by the Navy, submittal of the original approval letter in lieu of the data is acceptable.\r\rDATE OF FIRST SUBMISSION=045 DAC\rBlock 12 - Submit for approval prior to production.\rBlock 14A - The deliverable item specified as information copy shall be boldly marked as \"Information Only\".\rBlock 14 - Port Hueneme Division, Naval Surface Warfare Center, ;Code A66; ,Port Hueneme, CA 93043-5007.\r\rDATE OF FIRST SUBMISSION=ASREQ\r100% INSPECTION IS REQUIRED\r\rDATE OF FIRST SUBMISSION=ASREQ\r;GOVERNMENT COMPATIBILITY TESTING TO BE COMPLETED 45 DAYS FROM RECEIPT OF FAT UNIT / TEST REPORT FROM CONTRACTOR. ;\rBlock 10 - Note: If this data has been previously approved by the Navy, submittal of the original approval letter in lieu of the data is acceptable.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"SPRMM125QHA53","product_service_code":"6150"}],"due_at":"2025-06-18T20:30:00Z","due_date":"2025-06-18","closes_at":"2025-06-18T20:30:00Z","awardable":true,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRMM1","office_name":"SPRMM1 DLA MECHANICSBURG","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"state_source":null,"state_evidence":"Product purchase (PSC 6150)","site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-06T04:28:41.894858Z","principal_notice_id":"8d90a35e8bcb48b9b87097739cab6a5e","description":{"text":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|ISO 9001|\rINSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||\rPRODUCTION LOT TESTING|1||\rINSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X||||||\rINSPECTION AND ACCEPTANCE OF SUPPLIES|26|||||||||||||||||||||||||||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT|N/A|TBD|SPRMM1|TBD|TBD|TBD|TBD|TBD|TBD|TBD||||||\rNOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3||||\rWARRANTY OF DATA--BASIC (MAR 2014)|2|||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rFIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|1||||||||||\rFIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)|7|1|||||||\rFEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-PROHIBITION (DEC 2023)|12||x||x||x||x||x||x|\rNOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|X|X|X|||X||||||||\rANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|335311|800|X|X||||||||||\rEVALUATION OF FIRST ARTICLE TESTING|3||||\r1. All contractual documents (i.e. contracts, purchase orders, task orders,\rDelivery orders, and modifications) related to the instant procurement are\rconsidered to be \"issued\" by the government when copies are either deposited\rin the mail, transmitted by facsimile, or sent by other electronic commerce\rmethods, such as email. The government's acceptance of the contractor's\rproposal constitutes bilateral agreement to \"issue\" contractual documents as\rdetailed herein.\r2. No drawings or technical data are available for this item.\r3. Delivery days_________aro.\r4. Offer valid for _____ days.\r5. When submitting quotes via EDI, make sure you specify any exceptions (i.e.\rMil specs/standards, packaging, I&A, packaging houses etc) or follow up with a\rhardcopy of the exceptions. If nothing is indicated or received, award will\rbe based upon solicitation requirements. Changes or requests for changes\rafter award will have consideration costs deducted on modifications.\r6. If you are not the manufacturer of the material you are offering, you must\rstate who the OEM is (cage code) and the part number you are offering.\r7. Please provide an email address for follow up communications.\r____________________________________________________________\rIt is recommended that vendors provide contact information to NAVSUP WSS\rMechanicsburg in order to receive automated notifications from Navy Electronic\rCommerce Online (NECO) when contracts/modifications are issued by DLA Maritime\rMechanicsburg and posted on EDA. To receive these notifications, contact:\rNAVSUPWSS code 025, procurement systems design and contract support division\rVia email at NAVSUPWSSITIMPHelpdesk@navy.mil. Please include the following\rinformation with your request: cage code, company name, address and POC with\rphone number and email address.\rContractors can view their orders, contracts and modifications at the\rElectronic Document Access (EDA) web tool. This web tool is located at the\rProcurement Integrated Enterprise Environment (PIEE) website. It is\rrecommended that the contractor register for EDA at https://piee.eb.mil/.\rClick on new user and registration.\rAny order resulting from this Request for Quotation will require electronicsubmittal of Receiving Report and Invoices through PIEE-WAWF.\rThis procurement requires Higher Level Inspection.\rC02 Manufacturing Phase-Out or Discontinuation of Production, Diminishing\rSources, and Obsolete Materials or Components (DEC 2016)\rThe contractor shall notify the contracting officer immediately upon\rdetermining the unavailability of obsolete materials or components. The\rcontractor may recommend a solution to include the impact on the contract\rprice and delivery. The contractor shall not initiate any item redesign or\rincur any additional costs without the express, written authorization of the\rcontracting officer.\rIn the event that manufacturing phase-out or discontinuance of production of\rsuch items is contemplated, the contractor is required to notify the\rcontracting officer and publish the discontinuance in the Government-Industry\rData Exchange Program (GIDEP), where feasible;\rand to provide immediate advance notice of production phase-out to DLA DMSMS\rat dscc.dmsms@dla.mil.\rC04 Unused Former Government Surplus Property (SEP 2021)\rTo be considered for award, the offeror must complete and submit the\rfollowing representation with their offer. Additional supporting documentation\rto demonstrate the surplus material offered was previously owned by the\rGovernment and meets solicitation requirements must be provided within 24\rhours of request by the contracting officer.\r(1) The material is new, unused, and not of such age or so deteriorated as to\rimpair its usefulness or safety. Yes �__� No �__�\rThe material conforms to the technical requirements cited in the solicitation\r(e.g., Commercial and Government Entity (CAGE) Code and part number,\rspecification, etc.). Yes �__� No �__�\rThe material conforms to the revision letter/number, if any is cited.\rYes �__� No �__� Unknown �__�\rIf No, the revision does not affect form, fit, function, or interface.\rYes__ No __ Unknown __ The material was manufactured by:\r(Name): _____________________________________________________\r(Address): __________________________________________________\r(2) The offeror currently possesses the material Yes __ No __\rIf yes, the offeror purchased the material from a Government selling agency\ror other source.\rYes __ No __ If yes, complete the following:\rGovernment Selling Agency: ________________________________\rContract Number: __________________________________________\rContract Date: (Month, Year): _____________________________\rOther Source: _____________________________________________\rAddress: __________________________________________________\rDate Acquired: (Month/Year) _______________________________\r(3) The material has been altered or modified. Yes __ No __\rIf Yes, complete the following:\rName of the company that performed the alternation or modification:\r____________________________________________________________\r�(Address): _______________________________________________\rComplete description of the alterations or modifications.\r____________________________________________________________________\r____________________________________________________________________\r(4) The material has been reconditioned. Yes __ No __\rIf Yes, complete the following:\r(i) The price offered includes the cost of reconditioning /refurbishment.\rYes __ No __\r(ii) Name of the company that reconditioned the material.\r____________________________________________________________________\r(iii) Description of any work done or to be done, including the components\rto be replaced and the applicable rebuild standard.\r____________________________________________________________________\r____________________________________________________________________\rThe material contains cure-dated components. Yes __ No __\rIf Yes, complete the following:\r(i) The price includes replacement of cure-dated components.\rYes __ No __\r(ii) Cure date: ____________________\r(5) The material has data plates attached. Yes __ No __\rIf Yes, insert all information contained on the data plate.\r____________________________________________________________________\r____________________________________________________________________\r(6) The offered material is in its original package. Yes __ No __\rIf yes, complete the following:\rContract Number_______________________________________________\rNSN___________________________________________________________\rCAGE Code__________________________________________________________\rPart Number __________________________________________________\rOther Markings/Data___________________________________________\r(7) The offeror has supplied this same material (National StockNumber) to\rthe Government before. Yes___ No __\rIf Yes, complete the following:\r(i) The material being offered is from the same original Government contract\rnumber as that provided previously. Yes __ No __\r(ii) State below the Government Agency and contract number under which the\rmaterial was previously provided:\rAgency ___________________________________________________\rContract Number___________________________________________\r(8) The material is manufactured in accordance with a specification or\rdrawing. Yes __ No __ If Yes, complete the following:\r(i) The specification/drawing is in the possession of the offeror.\rYes __ No __\r(ii) The offeror has stated the applicable information below: Yes __ No __\rSpecification/Drawing Number __________________________________\rRevision (if any) _____________________________________________\rDate___________________________________________________________\r(9) The material has been inspected for correct part number and for absence\rof corrosion or any obvious defects. Yes __ No __\rIf Yes, complete the following:\r(i) Material has been re-preserved. Yes __ No __\r(ii) Material has been repackaged. Yes __ No __\r(iii) Percentage of material that has been inspected is ____%; and/or\r(iv) Number of items inspected is _______\r(v) A written report was prepared. Yes __ No __\rThe offeror agrees that in the event of award and notwithstanding the\rprovisions of the solicitation, inspection and acceptance of the surplus\rmaterial will be performed at source or destination subject to all\rapplicable provisions for source or destination inspection.\rThe offeror will forward one of the following, within 24 hours of request\rby the contracting officer, to demonstrate that the material being offered\rwas previously owned by the Government (offeror checkwhich one applies):\r___ For national or local sales, conducted by sealed bid, spot bid or\rauction methods, a solicitation/Invitation For Bid and corresponding DLA\rDisposition Services Form 1427, Notice of Award, Statement and Release\rDocument.\r___ For DLA Disposition Services Commercial Venture (CV) Sales, the shipment\rreceipt/delivery pass document and invoices/receipts used by the original\rpurchaser to resell the material.\r___ When the above documents are not available, or if they do not identify\rthe specific NSN being acquired, a copy or facsimile of all original\rpackage markings and data, including NSN, commercial and Government\rentity (CAGE) code and part number, and original contract number. (This\rinformation has already been provided in paragraph (6) of this procurement\rnote Yes __ No __)\r___ When none of the above are available, other information to demonstrate\rthat the offered material was previously owned by the Government. Describe:\r_______________________________________________________________\rThis procurement note only applies to offers of Government surplus\rmaterial. Offers of commercial surplus, manufacturer's overruns, residual\rinventory resulting from terminated Government contracts, and any\rother material that meets the technical requirements in the solicitation\rbut was not previously owned by the Government will be evaluated in accordance\rwith the DLAD procurement note L04, Offers for Part Numbered Items.\rIf requested by the contracting officer, the offeror shall furnish sample\runits, in the number specified, to the contracting officer or to another\rlocation specified by the contracting officer, within 10 days after the\rcontracting officer's request. The samples will be furnished at no cost to\rthe Government. All such samples not destroyed in evaluation will be\rreturned at the offeror's expense. The samples will be evaluated for form,\rfit, and function with subassembly, assembly, or equipment with which the\ritems are to be used. End items furnished under any contract award to the\rofferor furnishing the samples can include the returned samples, and all\racceptable end items will have a configuration identical to the samples.\rIf specific tests of the samples' performance are made by the Government,\rthe offeror will be furnished the results of such tests prior to a contract\rbeing entered into. In addition to any other inspection examinations and tests\rrequired by the contract, the performance of the end items will be required\rto be as good as that of the samples submitted.\rIn the event of award, the contractor will be responsible for providing\rmaterial that is in full compliance with all requirements in the contract or\rorder. The surplus material to be furnished must meet the requirements of\rthe current contract or order, whether or not the material met Government\rrequirements in existence at the time the material was initially manufactured\ror sold to the Government. If higher-level contract quality requirements apply\rto the material being acquired, those requirements do not apply to surplus\rmaterial furnished under this contract.\rC14 Correction of Nonconforming Packaging or Marking (MAY 2020)\r(1) The Government may correct nonconforming packaging or marking for\rreceipts of DLA-owned materiel if the estimated costs of correction are\r$1,000 or less. The contracting officer will advise the contractor of the\rdiscrepancy and that the Government has corrected the packaging or\rmarking. The contracting officer will make a determination concerning\rappropriate reimbursement by the contractor for the Government's costs to\rcorrect the deficiencies. Upon determining that reimbursement is required, the\rcontracting officer will send a notice to the contractor. Upon receipt of\rnotice from the contracting officer, the contractor shall reimburse the\rGovernment for the costs incurred by the Government to correct the\rdeficiencies.\r(2) If the estimated costs of correction for receipts of DLA-owned materiel\rare more than $1,000, the contracting officer will advise the contractor of\rthe discrepancy and have the materiel returned to the contractor for\rcorrection/resubmittal; or, if there are urgent requirements, have the\rGovernment remediate the discrepancy at the contractor's expense. If the\rGovernment remediates the discrepancy, the contracting officer will make a\rdetermination concerning appropriate reimbursement by the contractor for the\rGovernment's costs to correct the deficiencies. Upon determining that\rreimbursement is required, the contracting officer will send a notice to\rthe contractor. Upon receipt of notice from the contracting officer, the\rcontractor shall reimburse the Government for the costs incurred by the\rGovernment to correct the deficiencies.\rE06 Inspection and Acceptance at Source (JUN 2018)\rInspection and acceptance are at source. The place of acceptance is the\rlocation where the Government conducts the last inspection before shipment,\runless the contractor indicated a different physical location for\racceptance below.\rThe contractor shall indicate the location where supplies will be inspected,\rif different from the production location:\rCommercial and Government Entity (CAGE) code:__\rAddress:____________________________________________\rApplicable to contract line item numbers(s) (CLIN(s)):_____________\rThe contractor shall indicate the location where packaging will be inspected,\rif different from the production location:\rCommercial and Government Entity (CAGE) code:__\rAddress:____________________________________________\rApplicable to contract line item numbers(s) (CLIN(s)):_____________\rThe contractor shall indicate the location where packaging will be inspected,\rif different from the production location:\r( ) Same as for supplies OR\rCAGE code:________________________________________________\rAddress:__________________________________________________\rApplicable to CLIN(s):____________________________________\rThe contractor shall indicate the location where supplies will be accepted,\rif different from the inspection location:\rCommercial and Government Entity (CAGE) code:_____________\rAddress:__________________________________________________\rApplicable to contract line item numbers(s) (CLIN(s)):____\rInterested parties may file an agency level protest with the contracting\rofficer or may request an independent review by the chief of the contracting\roffice (CCO). Independent review by the CCO is an alternative to consideration\rby the contracting officer and is not available as an appellate review of a\rcontracting officer decision on a protest previously filed with the\rcontracting officer. Absent a clear indication of the intent to file an\ragency level protest with the CCO for independent review, protests will be\rpresumed to be protests to the contracting officer.\rE03 Production Lot Testing - Contractor (MAY 2020)(1) The purpose of production lot testing (PLT) is to validate quality\rconformance of products. The contractor shall complete PLT on the\rproduction lot(s) after first article approval, if the contract requires\rfirst article testing. The contractor shall price the PLT CLIN to cover the\rcost of the final test report and any approved samples that are consumed,\rdestroyed, or otherwise rendered unusable during testing. The unit of issue\rfor the PLT CLIN, EACH, is equal to one Production Lot Test (1EA=1PLT).\r(2) For purposes of facilitating PLT, the engineering support activity and/or\rtesting facility has authority to communicate and discuss clarifications\rdirectly with contractors. If the Government and/or the contractor\ridentify changes to contract requirements, the contractor shall contact\rthe post award contracting officer or contract administrator (see the\r\"Issued By\" blocks on the contract award or order) for written approval.\rThe contractor shall not act on any revisions or other changes until the\rcontracting officer issues a written modification approving the proposed\r(3) The contractor shall provide and maintain an inspection system\racceptable to the Government in accordance with FAR Clause 52.246-2 or\r52.246-3, and maintain and make available all records evidencing those\rdetails if requested by the Government. At least fourteen (14) calendar\rdays (or as otherwise specified in the contract) prior to conducting the\rproduction lot test, the contractor shall provide written notice of the time\rand location of the test to the contracting officer and the cognizant DCMA\rfunctional specialist when full administration or quality support\radministration is delegated to DCMA, so the Government may witness sample\rselection and the test.\r(4) Unless otherwise stated, the contractor shall select �contracting officer\rshall insert number of samples identified in material master� samples at\rrandom from the production lot(s) produced. If the quantity stated in the\rprevious sentence equals \"ZZ,\" the contractor shall use the appropriate\rsample size identified in the technical data package or applicable sample\rplan provided by the Government. If the contractor cannot determine the\rsample quantity, the contractor shall obtain written confirmation of the\rsample size from the contracting officer.\r(5) The contractor shall perform all tests on the PLT samples needed to\rverify/validate the items meet the contract technical/quality requirements.\r(6) If a PLT sample fails, the entire production lot from which the contractor\rtook the sample fails. The contractor shall notify the contracting officer and\rpropose corrective action, if appropriate.\r(7) The contractor shall prepare and disseminate the PLT report and\rapplicable traceability documentation as follows:\r(a) Prepare the test report in accordance with data item description\rDI-NDTI-80809B, and mark the test report, \"Production Lot Test Report,\rContract Number �contractor insert� and Lot/Item Number �contractor\rinsert�.\"\r(b) Present the PLT report to the contracting officer for review.\r(c) Include the following documentation with all shipments of PLT Reports:\r(i) DD Form 1222 and system of record receiving report (i.e., WAWF or\rDD Form 250);\r(ii) Copy of the contract/order;\r(iii) Copy of all applicable test reports, showing actual results and\rtolerances specified in the technical data package;\r(iv) Material and process certifications;\r(v) Process operations and inspection method sheets;\r(vi) Copies of drawings used to manufacture the PLT sample, with proper\rmarking to restrict public disclosure (if desired) and from Government use\rother than for evaluation to the extent consistent with the Government's\rdata rights under the contract; and\r(vii) Documents required under a contract deliverables requirements list,\rif applicable.\r(d) Submit all required documentation to the Government activity specified\rin the contract in time to allow for at least �contracting officer shall\rinsert number of days as shown in material master� calendar days for review\rof the PLT report, and for the contracting officer to provide written\rnotification of approval/disapproval to the contractor.\r(i) For awards issued by DLA Troop Support Construction and Equipment\r(SPE8E), email all required documentation to Construction and Equipment\rPLT Monitor at trpsptcandepltmonitor@dla.mil. If documentation files\rexceed email limitations, submit to the following address: DLA Troop\rSupport, Attention: Production Lot Testing Monitor, Building 3,\r700 Robbins Avenue, Philadelphia, Pennsylvania 19111.\r(e) For PLT, the Government will conduct inspection at source and\racceptance at destination. The FOB point is destination.\r(f) Delivery.\r(i) Ship test report to �contracting officer insert address of the\rGovernment activity to receive the report�.\r(ii) Delivery Schedule Information:\r(A) _____ Total Delivery Days for FAT (If Applicable)\r(B) _____ Days: Completion of Production Units (to include PLT\rsamples), PLT, and Submission of PLT Report\r(C) _____ Days: Government PLT Report Evaluation and Notification\rto Contractor\r(D) _____ Days: Delivery of final production quantity to Government\r(E) _____ Total Delivery Days (Sum of paragraph (ii)(A) through (D) above\rE04 Production Lot Testing - Government (MAY 2020)(1) The purpose of production lot testing (PLT) is to validate quality\rconformance of products. The Government conducts PLT on the production lot(s)\rafter first article approval, when a first article is required. The\rcontractor shall price the PLT CLIN to cover the cost of any approved\rsamples that are consumed, destroyed, or otherwise rendered unusable during\rtesting. The unit of issue for the PLT CLIN, EACH, is equal to one\rProduction Lot Test (1EA=1PLT).\r(2) For purposes of facilitating PLT, the engineering support activity\rand/or testing facility has authority to communicate and conduct\rclarifications directly with contractors. If this results in necessary changes\rto contract requirements, the contractor shall contact the post award\rcontracting officer or contract administrator (see the \"Issued By\" blocks\ron the contract award or order) for written approval. The contractor shall\rnot act on any revisions or other changes until the contracting officer\rissues a written modification approving the proposed revision(s)/change(s).\r(3) The contractor shall provide and maintain an inspection system\racceptable to the Government in accordance with FAR Clause 52.246-2 or\r52.246-3, and maintain and make available all records evidencing those\rdetails if requested by the Government. At least fourteen (14) calendar\rdays (or as otherwise specified in the contract) prior to the date when\rthe contractor will present the production lot for selection of PLT samples,\rthe contractor shall provide written notice to the contracting officer (and\rthe cognizant DCMA functional specialist when full administration or\rquality support administration is delegated to DCMA).\r(4) Unless otherwise stated, the contractor shall select �contracting\rofficer shall insert the number of samples identified in the material\rmaster� samples, at random from the production lot(s) produced. If the\rquantity stated in the previous sentence equals \"ZZ,\" the contractor shall\ruse the appropriate sample size identified in the technical data package\ror applicable sample plan provided by the Government. If the contractor\rcannot determine the sample quantity, the contractor shall obtain written\rconfirmation of the sample size from the contracting officer.\r(5) If a PLT sample fails, the entire production lot from which the\rcontractor took the sample fails.\rThe contractor shall propose corrective action, if appropriate.\r(6) The Government will return PLT samples to the contractor, with a copy\rof the test report, at contractor expense.\r(7) The contractor shall prepare and disseminate the samples as follows:\r(a) Ship the selected PLT samples by traceable means. �Mark the shipment\r\"Production Lot Samples - Do Not Post To Stock,\" Contract Number\r�contractor insert� and Lot/Item Number �contractor insert�\". Place a\rcopy of the system of record receiving report (i.e., WAWF or DD Form 250)\ron the exterior of the shipping container in accordance with DFARS\rAppendix F. Mark the exterior of the shipping container in accordance\rwith MIL-STD-129 (latest revision), paragraph 5.11.(b)Include the following interior documentation:\r(i) DD Form 1222 and system of record receiving report (i.e., WAWF or\rDD Form 250);\r(ii) Copy of contract/order;\r(iii) Copy of test reports, showing actual results and tolerances specified\rin the technical data package;\r(iv) Material and process certifications;\r(v) Process operations and inspection method sheets;\r(vi) Copies of drawings used to manufacture the PLT sample (proper marking\rto assert proprietary or other rights to restrict public disclosure is\rthe contractor's responsibility);\r(vii) Documents required under contract deliverables requirements list; and\r(viii) A prepaid shipping label or document with the information required\rto return the PLT samples to the contractor at no cost to the Government.\r(5) At the time of shipment, the contractor shall sign and provide copies of\rthe DD Form 1222, system of record receiving report (i.e., WAWF or DD Form\r250), transportation tracking information, and information for return of the\rPLT samples to the contracting officer. The Government testing time will be\r�contracting officer insert number of days for test, as shown in the material\rmaster calendar days for the test results to be provided to the contractor.\r(6) For PLT, the Government will conduct inspection at source and acceptance\rat destination. The FOB point is destination.\r(7) Delivery.\r(a)Ship samples to �contracting officer insert address of the Government\ractivity to receive the samples�.\r(b)Delivery Schedule Information:\r(i)___ Total Delivery Days for FAT (If Applicable)\r(ii)___ Days: Completion of Production Units (to include PLT samples), and\rSubmission of samples forGovernment Testing\r(iii)___ Days: Government PLT Report Evaluation and Notification to Contractor\r(iv)___ Days: Delivery of final production quantity to Government\r(v)___ Total Delivery Days (Sum of paragraph (i) through (iv))\rE08 First Article Testing Requirements (MAR 2025)(1) If there is not a separate contract line item number (CLIN) for FAT, the\rofferor shall include all costs and risk associated with completion of the FAT\rrequirement in the production CLIN price.\r(2) If there is a separate FAT CLIN, the offeror shall include all costs and\rrisk associated with completion of the FAT requirement in the FAT CLIN price.\rThe unit of issue for the FAT CLIN, EACH, is equal to one First Article Test\r(1EA=1FAT). To receive payment for any costs associated with FAT, the offeror\rshall propose costs associated with FAT on a separate CLIN. The offeror shall\rbase the production CLIN price solely on all costs associated with completion\rof the production units and shall exclude all FAT-related costs.\r(3) The contracting officer will use the total award price in selecting the\rbest value offer from among all eligible offerors. However, for an offeror\rto be eligible for award, the contracting officer must determine that the FAT\rCLIN price (unless FAT is waived) and the production CLIN price are fair\rand reasonable; and, if set-aside under FAR Part 19, a fair market price.\rThe offeror shall not propose a FAT CLIN price that is materially unbalanced\rin relation to the production CLIN price. In the event an offeror receives a\rwaiver of the FAT requirement, the contracting officer will deduct the FAT\rCLIN price for the waived source in determining the total award price.\r(4)(a) Notwithstanding the conditions for waiving first article, the\rcontracting officer may order an additional first article sample, or portion\rthereof, in writing if there is a-\r(i) Major change to the technical data;\r(ii) Lapse in production for a period in excess of 90 days; or\r(iii) Change in the place of performance (manufacturing facility),\rmanufacturing process, material used,drawing, specification or source of\r(b) When conditions in paragraphs (4)(a)(i), (ii), or (iii) occur, the\rContractor shall notify the contracting officer; who will determine whether\rto order an additional first article sample or portion thereof and provide\rinstructions concerning the submission, inspection, and notification of\rresults. The contractor shall bear the costs of the additional first article\rtesting resulting from any of the causes in paragraphs (4)(a)(i)-(iii)\rinstituted by the contractor and not due to changes directed by the\rGovernment.\r(5) Waivers. The offeror may submit a request for FAT waiver to the\rcontracting officer, who may waive the FAT requirement when all of the\rfollowing criteria apply:\r(a) The offeror requesting waiver has successfully manufactured, delivered\rand the government accepted the item or a similar item. The offeror shall\rprovide the following information and be prepared to provide\rdocumentary evidence upon the contracting officer's request:\r(i) Contract number(s), date(s), and issuing Government agency or agencies.\r(ii) Description of item previously furnished, identified by part number,\rtype, model number and/or other identifying information. If the item\rpreviously furnished is similar but not identical to the item being acquired\runder the current buy, the offeror shall explain why manufacture of the\ritem previously furnished is sufficient to demonstrate its ability to\rmanufacture the item being acquired under the current buy without\rneed for a first article test.\r(iii) Engineering control document/change number of item previously furnished.\r(b) There have been no changes to manufacturing processes, tooling, or\rplace of performance.\r(c) There have been no changes to manufacturing data (e.g., drawing\rrevisions that change materials, dimensions, processes, inspection or\rtesting requirements; or subcontractors used to manufacture the items\rsuccessfully in the past).\r(d) The offeror shall supply an item of the same design and manufactured\rby the same method at the same facilities as the item or similar item\rpreviously furnished and accepted under subparagraph (5)(a).\r(6) Contractor-Performed FAT.\r(a) The contractor shall test the quantities as outlined in paragraph (a)\rof FAR clause 52.209- 3 as specified in the contract. The contractor shall\rsubmit reports in accordance with paragraph (b) of FAR clause 52.209-3,\ras supplemented in this procurement note.\r(b) For test report preparation and delivery of contractor FAT, the\rcontractor shall- (i) Use the data item description DI-NDTI-80809B report\rformat.\r(ii) Mark the test report with the following: \"First article test report -\rContract number: �insert contract number� and lot/item number:\r�insert lot/item number�.\r(iii) Sign the FAT Report, accompanied by the system of record receiving\rreport (i.e., WAWF or� DD Form 250) and contractor confirmation that\rthe same process and facilities used to manufacture the first article units\rwill be used to manufacture the production units, to the contracting officer\rat the applicable address shown below:\r(A) For awards issued by DLA Aviation; or DLA Troop Support Clothing\rand Textile (C&T), Medical Materiel, or Subsistence, submit the report to\rthe procuring activity in Block 6 of the DD Form 1155, Block 7 of\rStandard Form (SF) 33, Block 5 of SF 26, or Block 9 of SF 1449 award.\r(B) For awards issued by DLA Land (SPE7L), submit the report to the\rfollowing address: DLA Land - FLSEB, ATTN: FAT Monitor, P. O. Box 3990,\rColumbus, OH 43218- 3990, or email to: Land.FAT.Monitor@dla.mil.\r(C) For awards issued by DLA Maritime (SPE7M), submit the report to the\rfollowing address: DLA Maritime - FMSE, ATTN: FAT Monitor, P. O. Box\r3990, Columbus, OH 43218-3990, or email to: maritime.fat.monitor@dla.mil.\r(D) For awards issued by DLA Troop Support Construction and Equipment\r(SPE8E), email the report to Construction and Equipment FAT Monitor at\rtrpsptcandefatmonitor@dla.ml. If report file exceeds email limitations,\rsubmit to the following address: DLA Troop Support, Attention: First\rArticle Testing Monitor, Building 3, 700 Robbins Avenue, Philadelphia,\rPennsylvania 19111.\r(7) The contractor shall-\r(a) Provide and maintain an inspection system acceptable to the Government\rin accordance with FAR Clause 52.246-2 or 52.246-3;\r(b) Maintain and make available all records evidencing those details at the\rGovernment's request.\r(c) At least fourteen (14) calendar days (or as otherwise specified in the\rcontract) prior to shipment to the Government, provide written notice\rto the contracting officer and to the cognizant DCMA Functional Specialist\rwhen full administration or Quality Support administration is delegated\rto DCMA.\r(8) Government-performed FAT. The contractor shall-\r(a) For delivery of separately priced Government first article samples for\rGovernment performed FAT ship the units and system of record receiving report\r(i.e., WAWF or DD Form 250) to the test facility specified in paragraph (a) of\rFAR clause 52.209-4.\r(b) For delivery of Government first article samples that are not separately\rpriced, ship the units with a commercial shipping document to the test\rfacility.\r(c) Prepare the shipping container(s) by marking the external packages\rin bold letters, \"First Article Exhibits - Do Not Post to Stock,\" adjacent\rto the MIL-STD-129 (latest revision) identification markings.\r(d) Use a hard copy of the system of record receiving report (i.e., WAWF\rDD Form 250), or commercial shipping document as a packing list, in\raccordance with DFARS Appendix F.\r(e) Mark the exterior of the shipping container in accordance with\rMIL-STD-129 (latest revision), paragraph 5.11.\r(f) In the interior package, include hard copies of the contract, test\rreports, material certifications/process operation sheets, drawings used\rto manufacture the units, and a pre-paid return label or shipping account\rfor payment.\r(g)Send units by traceable means (e.g., certified or registered mail,\rUnited Parcel Service, Federal Express).\r(h)Send an email with subject titled \"Notification of Test Exhibits\r�insert Government Lab DODAAC�\" to the corresponding address in (i)\ror (ii) below and to the contracting officer specified in the contract.\rIn the email, provide the shipment date, contract/purchase order number,\rNational Stock Number, means of transportation, tracking number, and\rsummary of container contents. Attach a copy of the system of record\rreceiving report (i.e., WAWF or DD Form 250) documenting the Government\rhas performed the contract quality assurance within the system or record.\r(i) DLA Land & Maritime - DSCCProdVerif@dla.mil\r(ii) DLA Aviation - DSCR.Test&EvaluationOffice@dla.mil\r(9) At its discretion, the Government may return FAT units to the contractor\rat no cost to the Government. The contractor shall submit the return address\rand pre-paid return label or shipping account for payment.\r(10) If the Government disapproves or conditionally approves\rGovernment-performed FAT units, the Government will take action in\raccordance with FAR 52.209-4.\rE09 Contractor First Article Test (FAT) Information (JUL 2022)\r(1) For FAT requirements, the Government will conduct inspection at source\rand acceptance at destination. The FOB point is destination. Due to known\rsystems limitations, solicitations may contain erroneous inspection,\racceptance, and FOB points. This procurement note takes precedence\rover any conflicting terms.\r(2) CONTRACTOR FAT DELIVERY SCHEDULE\r(a) _____ Days: To Deliver FAT Report to the Government\r(b) _____ Days: Government FAT Report Evaluation and Notification to Contractor(c) _____ Days: To Deliver Final Production Quantity After Approval of FAT\rReport. If PLT applies, this line will be blank; the number of delivery days\rfor final production quantity will appear in procurement note E03, Production\rLot Testing - Contractor, or E04, Production Lot Testing - Government, as\rapplicable\r(d)_____Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c))\rE10 Government First Article Test (FAT) Information (JUL 2022)\r(1) For FAT requirements, the Government will conduct inspection at source\rand acceptance at destination. The FOB point is destination. Due to known\rsystems limitations, solicitations may contain erroneous inspection,\racceptance, and FOB points. This procurement note takes precedence\rover any conflicting terms.\r(2) GOVERNMENT FAT DELIVERY SCHEDULE\r(a) ___ Days: To Deliver FAT Units to the Government\r(b) ___ Days: Government FAT Evaluation and Notification to Contractor\r(c) ___ Days: To Deliver Final Production Quantity After Approval of FAT.\rIf PLT applies, this line will be blank; the number of delivery days for final\rproduction quantity will appear in procurement note E03, Production Lot\rTesting - Contractor, or E04, Production Lot Testing - Government, as\rapplicable�\r(d) ___ Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c))�\rIf there are any conflicts with PLT or FAT, the Navy procedures supersede, as\rthe Navy owns the process.\r\\\r1. SCOPE\r1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the CABLE ASSEMBLY,SPEC .\r2. APPLICABLE DOCUMENTS\r2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.\r2.1.1 Documents, drawings, and publications supplied are listed under \"Drawing Number\". These items should be retained until an award is made.\r2.1.2 \"Document References\" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.\r2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order,\rhowever, shall supersede applicable laws and regulations unless a specific exemption has been obtained.\rDRAWING DATA=FVLS-2057R1-010 |53711| -|1N |D| | | |\rDRAWING DATA=FVLS-2065-011 |53711| -|1N |D| | | |\rDRAWING DATA=FVLS-2069R1-013 |53711| -|1N |D| | | |\rDRAWING DATA=FVLS-2077-012 |53711| -|1N |D| | | |\rDRAWING DATA=FVLS2-2186-014 |53711| -|1N |D| | | |\rDRAWING DATA=19179 |53711| E|WS |D| | | |\rDRAWING DATA=19199 |53711| A|WS |D| | | |\rDRAWING DATA=19202 |53711| -|WS |D| | | |\rDRAWING DATA=5497120 |53711| A| |D| | | |\rDRAWING DATA=5497120 |53711| 2|1N |D| | | |\rDRAWING DATA=5497120 |53711| 3|1N |D| | | |\rDRAWING DATA=5497160 |53711| 4|1N |A| | | |\rDRAWING DATA=5497459 |53711| B| |D| | | |\rDRAWING DATA=5497459 |53711| B|FN |D| | | |\rDRAWING DATA=5497459 |53711| A|SD |D| | | |\rDRAWING DATA=5497459 |53711| 3|1N |D| | | |\rDRAWING DATA=5497459 |53711| 4|1N |D| | | |\rDRAWING DATA=6387574 |53711| -| |D| | | |\rDRAWING DATA=6387659 |53711| B| |D| | | |\rDRAWING DATA=6387659 |53711| B|PL |D| | | |\rDRAWING DATA=6387659 |53711|13|1N |D| | | |\rDRAWING DATA=7251146 |53711| -| |D| | | |\rDOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| |01|\rDOCUMENT REF DATA=ISO9001 | | | |010417|A| | |\r3. REQUIREMENTS\r3.1 Design, Manufacture, and Performance - Except as modified herein,\rthe CABLE ASSEMBLY,SPEC furnished under this contract/purchase order shall meet the\rdesign, manufacture, and performance requirements specified on drawing ;53711 6387659-69;\rcage ;53711 6387659-69; .\r3.2 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required.\r3.3 First Article Approval (Government Testing) - First Article Test (FAT) and approval is required.\r3.4 Production Lot Approval (Contractor Testing) - Production Lot Test and approval is required.\r3.5 Marking - This item shall be physically identified in accordance with MIL-STD-130.\r3.6 Configuration Control - MIL-STD-973 entitled \"Configuration Management\", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973,\rParagraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original\rand two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)\r3.6.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until\ranother drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted,\rthe date of the granting of the authorization, and the name of the granting authority.\r Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below.\r The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788.\r Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor.\r3.7 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material\rwill be cause for rejection.\r If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The\rcontractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting\rOfficer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a \"Warning Plate\" stating that metallic mercury is a functional part of the item and will include name and location of that part.\r The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of\rcontamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are\rlocated so as not to constitute a contamination hazard.\r If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a\rpolyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the\rrequirements of this contract are concerned.\r These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements.\r Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided:\r Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a\rcomponent could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface\rship atmosphere.\r3.8 Soldering - The requirements for soldered electrical and electronic assemblies shall conform to IPC J-STD-001, Class ;3; .\r4. QUALITY ASSURANCE\r4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order,\rthe Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the\rspecification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.\r4.2 First Article Test/Inspection (Contractor) - The Contractor shall conduct ;NON-DESTRUCTIVE; First Article Test/Inspection on ;one ; unit(s) in accordance with requirements ;WS19202; .\r4.3 First Article Compatibility Test (Government) - Upon satisfactory completion of the First Article Test/Inspection by the Contractor, ;1; unit(s) shall be shipped to ;NSWC PORT HUENEME; for compatibility test to assure satisfactory, form, fit and function\rwithin the applicable end item or system.\r Government First Article Compatibility Test shall consist of ;SYSTEM COMPATIBILITY; testing. If the testing is nondestructive, the first article sample ;SHALL; be returned.//\r4.4 Inspection System Requirements - The supplier shall provide and maintain an inspection/quality system acceptable to the Government. The inspection system requirements for this contract/purchase order shall be in accordance with MIL-I-45208. Suppliers\rcertified to perform under ISO 9001 or ISO 9002 are granted permission to utilize the one desired in lieu of MIL-I-45208.\r4.5 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any\rinspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance\rdoes not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.\r4.6 Records of Inspection - (This requirement is not applicable to Government Purchase Orders) Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during\rthe performance of the contract and for a period of four years after final delivery of supplies.\r4.7 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any\rinspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance\rdoes not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.\r4.8 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies.\r4.9 ;First Article Test/inspection report- the contractor shall prepare and submit a report in accordance with the Contract data Requirements List (DD Form 1423) The report shall be approved prior to production.;\r5. PACKAGING\r5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.\rMIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6. NOTES\r6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS)\r(i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/\rA. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk.\rB. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies.\rC. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to:\rCommander, Indian Head Division, Naval Surface Warfare Center\rCode 8410P, 101 Strauss Avenue\rIndian Head, MD 20640-5035\rD. On post-award actions, requests for \"Official Use Only\" and \"NOFORN\" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for\rcertification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document.\rE. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:\rContracting Officer\rNAVSUP-WSS\rCode 87321\r5450 Carlisle Pike\rP.O. Box 2020\rMechanicsburg, Pa. 17055-0788\rF. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue:\rCommanding Officer\rNAVSUP-WSS\rCode 009\r5450 Carlisle Pike\rP.O. Box 2020\rMechanicsburg, Pa. 17055-0788\rG. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from:\rCommanding Officer\rNAVSUP-WSS\rCode 1 Support Branch\r700 Robbins Avenue\rPhiladelphia, Pa. 19111-5094\rH. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS.\rManufacturing sources interested in becoming qualified for support of future requirements for this item should submit their interest in writing to the Contract Officer, to include a summary of the company's applicable capabilities. This will be\rforwarded to the appropriate point of contact at NSWC, PHD for evaluation.\r6.2 Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation. If you desire to be considered as a potential source for award of\rthis contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer.\r6.3 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a \"Distribution Statement\" to inform the contractor of the limits of distribution, and the safeguarding of the information\rcontained on those documents and drawings.\r There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows:\rA... approved for public release; distribution is unlimited.\rB... distribution authorized to US Governments agencies only.\rC... distribution authorized to US Government agencies and their contractors.\rD... distribution authorized to DoD and DoD contractors only.\rE... distribution authorized to DoD Components only.\rF... further distribution only as directed by Commander, Naval Sea\r Systems Command, code 09T.\rX... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical\r data in accordance with OPNAVINST 5510.161.\r\rDATE OF FIRST SUBMISSION=ASREQ\rBlock 12 - Submit for approval prior to production.\rBlock 14A - The deliverable item specified as information copy shall be boldly marked as \"Information Only\".\rBlock 14 - Port Hueneme Division, Naval Surface Warfare Center, ;Code A66; ,Port Hueneme, CA 93043-5007.\rBlock 10 - Note: If this data has been previously approved by the Navy, submittal of the original approval letter in lieu of the data is acceptable.\r\rDATE OF FIRST SUBMISSION=045 DAC\rBlock 12 - Submit for approval prior to production.\rBlock 14A - The deliverable item specified as information copy shall be boldly marked as \"Information Only\".\rBlock 14 - Port Hueneme Division, Naval Surface Warfare Center, ;Code A66; ,Port Hueneme, CA 93043-5007.\r\rDATE OF FIRST SUBMISSION=ASREQ\r100% INSPECTION IS REQUIRED\r\rDATE OF FIRST SUBMISSION=ASREQ\r;GOVERNMENT COMPATIBILITY TESTING TO BE COMPLETED 45 DAYS FROM RECEIPT OF FAT UNIT / TEST REPORT FROM CONTRACTOR. ;\rBlock 10 - Note: If this data has been previously approved by the Navy, submittal of the original approval letter in lieu of the data is acceptable.","html":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|ISO 9001|\rINSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||\rPRODUCTION LOT TESTING|1||\rINSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X||||||\rINSPECTION AND ACCEPTANCE OF SUPPLIES|26|||||||||||||||||||||||||||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT|N/A|TBD|SPRMM1|TBD|TBD|TBD|TBD|TBD|TBD|TBD||||||\rNOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3||||\rWARRANTY OF DATA--BASIC (MAR 2014)|2|||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rFIRST ARTICLE APPROVAL--CONTRACTOR TESTING  (SEP 1989)|10|1||||||||||\rFIRST ARTICLE APPROVAL--GOVERNMENT TESTING  (SEP 1989)|7|1|||||||\rFEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-PROHIBITION (DEC 2023)|12||x||x||x||x||x||x|\rNOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|X|X|X|||X||||||||\rANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|335311|800|X|X||||||||||\rEVALUATION OF FIRST ARTICLE TESTING|3||||\r1.  All contractual documents (i.e. contracts, purchase orders, task orders,\rDelivery orders, and modifications) related to the instant procurement are\rconsidered to be \"issued\" by the government when copies are either deposited\rin the mail, transmitted by facsimile, or sent by other electronic commerce\rmethods, such as email.  The government's acceptance of the contractor's\rproposal constitutes bilateral agreement to \"issue\" contractual documents as\rdetailed herein.\r2.  No drawings or technical data are available for this item.\r3.  Delivery days_________aro.\r4.  Offer valid for _____ days.\r5.  When submitting quotes via EDI, make sure you specify any exceptions (i.e.\rMil specs/standards, packaging, I&A, packaging houses etc) or follow up with a\rhardcopy of the exceptions.  If nothing is indicated or received, award will\rbe based upon solicitation requirements.  Changes or requests for changes\rafter award will have consideration costs deducted on modifications.\r6.  If you are not the manufacturer of the material you are offering, you must\rstate who the OEM is (cage code) and the part number you are offering.\r7.  Please provide an email address for follow up communications.\r____________________________________________________________\rIt is recommended that vendors provide contact information to NAVSUP WSS\rMechanicsburg in order to receive automated notifications from Navy Electronic\rCommerce Online (NECO) when contracts/modifications are issued by DLA Maritime\rMechanicsburg and posted on EDA.  To receive these notifications, contact:\rNAVSUPWSS code 025, procurement systems design and contract support division\rVia email at NAVSUPWSSITIMPHelpdesk@navy.mil.  Please include the following\rinformation with your request:  cage code, company name, address and POC with\rphone number and email address.\rContractors can view their orders, contracts and modifications at the\rElectronic Document Access (EDA) web tool.  This web tool is located at the\rProcurement Integrated Enterprise Environment (PIEE) website. It is\rrecommended that the contractor register for EDA at https://piee.eb.mil/.\rClick on new user and registration.\rAny order resulting from this Request for Quotation will require electronicsubmittal of Receiving Report and Invoices through PIEE-WAWF.\rThis procurement requires Higher Level Inspection.\rC02 Manufacturing Phase-Out or Discontinuation of Production, Diminishing\rSources, and Obsolete Materials or Components (DEC 2016)\rThe contractor shall notify the contracting officer immediately upon\rdetermining the unavailability of obsolete materials or components. The\rcontractor may recommend a solution to include the impact on the contract\rprice and delivery. The contractor shall not initiate any item redesign or\rincur any additional costs without the express, written authorization of the\rcontracting officer.\rIn the event that manufacturing phase-out or discontinuance of production of\rsuch items is contemplated, the contractor is required to notify the\rcontracting officer and publish the discontinuance in the Government-Industry\rData Exchange Program (GIDEP), where feasible;\rand to provide immediate advance notice of production phase-out to DLA DMSMS\rat dscc.dmsms@dla.mil.\rC04 Unused Former Government Surplus Property (SEP 2021)\rTo be considered for award, the offeror must complete and submit the\rfollowing representation with their offer. Additional supporting documentation\rto demonstrate the surplus material offered was previously owned by the\rGovernment and meets solicitation requirements must be provided within 24\rhours of request by the contracting officer.\r(1) The material is new, unused, and not of such age or so deteriorated as to\rimpair its usefulness or safety. Yes �__� No �__�\rThe material conforms to the technical requirements cited in the solicitation\r(e.g., Commercial and Government Entity (CAGE) Code and part number,\rspecification, etc.). Yes �__� No �__�\rThe material conforms to the revision letter/number, if any is cited.\rYes �__� No �__� Unknown �__�\rIf No, the revision does not affect form, fit, function, or interface.\rYes__ No __ Unknown __ The material was manufactured by:\r(Name): _____________________________________________________\r(Address): __________________________________________________\r(2) The offeror currently possesses the material Yes __ No __\rIf yes, the offeror purchased the material from a Government selling agency\ror other source.\rYes __ No __ If yes, complete the following:\rGovernment Selling Agency: ________________________________\rContract Number: __________________________________________\rContract Date: (Month, Year): _____________________________\rOther Source: _____________________________________________\rAddress: __________________________________________________\rDate Acquired: (Month/Year) _______________________________\r(3) The material has been altered or modified. Yes __ No __\rIf Yes, complete the following:\rName of the company that performed the alternation or modification:\r____________________________________________________________\r�(Address): _______________________________________________\rComplete description of the alterations or modifications.\r____________________________________________________________________\r____________________________________________________________________\r(4) The material has been reconditioned. Yes __ No __\rIf Yes, complete the following:\r(i) The price offered includes the cost of reconditioning /refurbishment.\rYes __ No __\r(ii) Name of the company that reconditioned the material.\r____________________________________________________________________\r(iii) Description of any work done or to be done, including the components\rto be replaced and the applicable rebuild standard.\r____________________________________________________________________\r____________________________________________________________________\rThe material contains cure-dated components. Yes __ No __\rIf Yes, complete the following:\r(i) The price includes replacement of cure-dated components.\rYes __ No __\r(ii) Cure date: ____________________\r(5) The material has data plates attached. Yes __ No __\rIf Yes, insert all information contained on the data plate.\r____________________________________________________________________\r____________________________________________________________________\r(6) The offered material is in its original package. Yes __ No __\rIf yes, complete the following:\rContract Number_______________________________________________\rNSN___________________________________________________________\rCAGE Code__________________________________________________________\rPart Number __________________________________________________\rOther Markings/Data___________________________________________\r(7) The offeror has supplied this same material (National StockNumber) to\rthe Government before. Yes___ No __\rIf Yes, complete the following:\r(i) The material being offered is from the same original Government contract\rnumber as that provided previously. Yes __ No __\r(ii) State below the Government Agency and contract number under which the\rmaterial was previously provided:\rAgency ___________________________________________________\rContract Number___________________________________________\r(8) The material is manufactured in accordance with a specification or\rdrawing. Yes __ No __ If Yes, complete the following:\r(i) The specification/drawing is in the possession of the offeror.\rYes __ No __\r(ii) The offeror has stated the applicable information below: Yes __ No __\rSpecification/Drawing Number __________________________________\rRevision (if any) _____________________________________________\rDate___________________________________________________________\r(9) The material has been inspected for correct part number and for absence\rof corrosion or any obvious defects. Yes __ No __\rIf Yes, complete the following:\r(i) Material has been re-preserved. Yes __ No __\r(ii) Material has been repackaged. Yes __ No __\r(iii) Percentage of material that has been inspected is ____%; and/or\r(iv) Number of items inspected is _______\r(v) A written report was prepared. Yes __ No __\rThe offeror agrees that in the event of award and notwithstanding the\rprovisions of the solicitation, inspection and acceptance of the surplus\rmaterial will be performed at source or destination subject to all\rapplicable provisions for source or destination inspection.\rThe offeror will forward one of the following, within 24 hours of request\rby the contracting officer, to demonstrate that the material being offered\rwas previously owned by the Government (offeror checkwhich one applies):\r___ For national or local sales, conducted by sealed bid, spot bid or\rauction methods, a solicitation/Invitation For Bid and corresponding DLA\rDisposition Services Form 1427, Notice of Award, Statement and Release\rDocument.\r___ For DLA Disposition Services Commercial Venture (CV) Sales, the shipment\rreceipt/delivery pass document and invoices/receipts used by the original\rpurchaser to resell the material.\r___ When the above documents are not available, or if they do not identify\rthe specific NSN being acquired, a copy or facsimile of all original\rpackage markings and data, including NSN, commercial and Government\rentity (CAGE) code and part number, and original contract number. (This\rinformation has already been provided in paragraph (6) of this procurement\rnote Yes __ No __)\r___ When none of the above are available, other information to demonstrate\rthat the offered material was previously owned by the Government. Describe:\r_______________________________________________________________\rThis procurement note only applies to offers of Government surplus\rmaterial. Offers of commercial surplus, manufacturer's overruns, residual\rinventory resulting from terminated Government contracts, and any\rother material that meets the technical requirements in the solicitation\rbut was not previously owned by the Government will be evaluated in accordance\rwith the DLAD procurement note L04, Offers for Part Numbered Items.\rIf requested by the contracting officer, the offeror shall furnish sample\runits, in the number specified, to the contracting officer or to another\rlocation specified by the contracting officer, within 10 days after the\rcontracting officer's request. The samples will be furnished at no cost to\rthe Government. All such samples not destroyed in evaluation will be\rreturned at the offeror's expense. The samples will be evaluated for form,\rfit, and function with subassembly, assembly, or equipment with which the\ritems are to be used. End items furnished under any contract award to the\rofferor furnishing the samples can include the returned samples, and all\racceptable end items will have a configuration identical to the samples.\rIf specific tests of the samples' performance are made by the Government,\rthe offeror will be furnished the results of such tests prior to a contract\rbeing entered into. In addition to any other inspection examinations and tests\rrequired by the contract, the performance of the end items will be required\rto be as good as that of the samples submitted.\rIn the event of award, the contractor will be responsible for providing\rmaterial that is in full compliance with all requirements in the contract or\rorder. The surplus material to be furnished must meet the requirements of\rthe current contract or order, whether or not the material met Government\rrequirements in existence at the time the material was initially manufactured\ror sold to the Government. If higher-level contract quality requirements apply\rto the material being acquired, those requirements do not apply to surplus\rmaterial furnished under this contract.\rC14 Correction of Nonconforming Packaging or Marking (MAY 2020)\r(1) The Government may correct nonconforming packaging or marking for\rreceipts of DLA-owned materiel if the estimated costs of correction are\r$1,000 or less. The contracting officer will advise the contractor of the\rdiscrepancy and that the Government has corrected the packaging or\rmarking. The contracting officer will make a determination concerning\rappropriate reimbursement by the contractor for the Government's costs to\rcorrect the deficiencies. Upon determining that reimbursement is required, the\rcontracting officer will send a notice to the contractor. Upon receipt of\rnotice from the contracting officer, the contractor shall reimburse the\rGovernment for the costs incurred by the Government to correct the\rdeficiencies.\r(2) If the estimated costs of correction for receipts of DLA-owned materiel\rare more than $1,000, the contracting officer will advise the contractor of\rthe discrepancy and have the materiel returned to the contractor for\rcorrection/resubmittal; or, if there are urgent requirements, have the\rGovernment remediate the discrepancy at the contractor's expense. If the\rGovernment remediates the discrepancy, the contracting officer will make a\rdetermination concerning appropriate reimbursement by the contractor for the\rGovernment's costs to correct the deficiencies. Upon determining that\rreimbursement is required, the contracting officer will send a notice to\rthe contractor. Upon receipt of notice from the contracting officer, the\rcontractor shall reimburse the Government for the costs incurred by the\rGovernment to correct the deficiencies.\rE06 Inspection and Acceptance at Source (JUN 2018)\rInspection and acceptance are at source. The place of acceptance is the\rlocation where the Government conducts the last inspection before shipment,\runless the contractor indicated a different physical location for\racceptance below.\rThe contractor shall indicate the location where supplies will be inspected,\rif different from the production location:\rCommercial and Government Entity (CAGE) code:__\rAddress:____________________________________________\rApplicable to contract line item numbers(s) (CLIN(s)):_____________\rThe contractor shall indicate the location where packaging will be inspected,\rif different from the production location:\rCommercial and Government Entity (CAGE) code:__\rAddress:____________________________________________\rApplicable to contract line item numbers(s) (CLIN(s)):_____________\rThe contractor shall indicate the location where packaging will be inspected,\rif different from the production location:\r( ) Same as for supplies OR\rCAGE code:________________________________________________\rAddress:__________________________________________________\rApplicable to CLIN(s):____________________________________\rThe contractor shall indicate the location where supplies will be accepted,\rif different from the inspection location:\rCommercial and Government Entity (CAGE) code:_____________\rAddress:__________________________________________________\rApplicable to contract line item numbers(s) (CLIN(s)):____\rInterested parties may file an agency level protest with the contracting\rofficer or may request an independent review by the chief of the contracting\roffice (CCO). Independent review by the CCO is an alternative to consideration\rby the contracting officer and is not available as an appellate review of a\rcontracting officer decision on a protest previously filed with the\rcontracting officer. Absent a clear indication of the intent to file an\ragency level protest with the CCO for independent review, protests will be\rpresumed to be protests to the contracting officer.\rE03 Production Lot Testing - Contractor (MAY 2020)(1) The purpose of production lot testing (PLT) is to validate quality\rconformance of products. The contractor shall complete PLT on the\rproduction lot(s) after first article approval, if the contract requires\rfirst article testing. The contractor shall price the PLT CLIN to cover the\rcost of the final test report and any approved samples that are consumed,\rdestroyed, or otherwise rendered unusable during testing. The unit of issue\rfor the PLT CLIN, EACH, is equal to one Production Lot Test (1EA=1PLT).\r(2) For purposes of facilitating PLT, the engineering support activity and/or\rtesting facility has authority to communicate and discuss clarifications\rdirectly with contractors. If the Government and/or the contractor\ridentify changes to contract requirements, the contractor shall contact\rthe post award contracting officer or contract administrator (see the\r\"Issued By\" blocks on the contract award or order) for written approval.\rThe contractor shall not act on any revisions or other changes until the\rcontracting officer issues a written modification approving the proposed\r(3) The contractor shall provide and maintain an inspection system\racceptable to the Government in accordance with FAR Clause 52.246-2 or\r52.246-3, and maintain and make available all records evidencing those\rdetails if requested by the Government. At least fourteen (14) calendar\rdays (or as otherwise specified in the contract) prior to conducting the\rproduction lot test, the contractor shall provide written notice of the time\rand location of the test to the contracting officer and the cognizant DCMA\rfunctional specialist when full administration or quality support\radministration is delegated to DCMA, so the Government may witness sample\rselection and the test.\r(4) Unless otherwise stated, the contractor shall select �contracting officer\rshall insert number of samples identified in material master� samples at\rrandom from the production lot(s) produced. If the quantity stated in the\rprevious sentence equals \"ZZ,\" the contractor shall use the appropriate\rsample size identified in the technical data package or applicable sample\rplan provided by the Government. If the contractor cannot determine the\rsample quantity, the contractor shall obtain written confirmation of the\rsample size from the contracting officer.\r(5) The contractor shall perform all tests on the PLT samples needed to\rverify/validate the items meet the contract technical/quality requirements.\r(6) If a PLT sample fails, the entire production lot from which the contractor\rtook the sample fails. The contractor shall notify the contracting officer and\rpropose corrective action, if appropriate.\r(7) The contractor shall prepare and disseminate the PLT report and\rapplicable traceability documentation as follows:\r(a) Prepare the test report in accordance with data item description\rDI-NDTI-80809B, and mark the test report, \"Production Lot Test Report,\rContract Number �contractor insert� and Lot/Item Number �contractor\rinsert�.\"\r(b) Present the PLT report to the contracting officer for review.\r(c) Include the following documentation with all shipments of PLT Reports:\r(i) DD Form 1222 and system of record receiving report (i.e., WAWF or\rDD Form 250);\r(ii) Copy of the contract/order;\r(iii) Copy of all applicable test reports, showing actual results and\rtolerances specified in the technical data package;\r(iv) Material and process certifications;\r(v) Process operations and inspection method sheets;\r(vi) Copies of drawings used to manufacture the PLT sample, with proper\rmarking to restrict public disclosure (if desired) and from Government use\rother than for evaluation to the extent consistent with the Government's\rdata rights under the contract; and\r(vii) Documents required under a contract deliverables requirements list,\rif applicable.\r(d) Submit all required documentation to the Government activity specified\rin the contract in time to allow for at least �contracting officer shall\rinsert number of days as shown in material master� calendar days for review\rof the PLT report, and for the contracting officer to provide written\rnotification of approval/disapproval to the contractor.\r(i) For awards issued by DLA Troop Support Construction and Equipment\r(SPE8E), email all required documentation to Construction and Equipment\rPLT Monitor at trpsptcandepltmonitor@dla.mil.  If documentation files\rexceed email limitations, submit to the following address: DLA Troop\rSupport, Attention: Production Lot Testing Monitor, Building 3,\r700 Robbins Avenue, Philadelphia, Pennsylvania 19111.\r(e) For PLT, the Government will conduct inspection at source and\racceptance at destination. The FOB point is destination.\r(f) Delivery.\r(i) Ship test report to �contracting officer insert address of the\rGovernment activity to receive the report�.\r(ii) Delivery Schedule Information:\r(A) _____ Total Delivery Days for FAT (If Applicable)\r(B) _____ Days: Completion of Production Units (to include PLT\rsamples), PLT, and Submission of PLT Report\r(C) _____ Days: Government PLT Report Evaluation and Notification\rto Contractor\r(D) _____ Days: Delivery of final production quantity to Government\r(E) _____ Total Delivery Days (Sum of paragraph (ii)(A) through (D) above\rE04 Production Lot Testing - Government (MAY 2020)(1) The purpose of production lot testing (PLT) is to validate quality\rconformance of products. The Government conducts PLT on the production lot(s)\rafter first article approval, when a first article is required. The\rcontractor shall price the PLT CLIN to cover the cost of any approved\rsamples that are consumed, destroyed, or otherwise rendered unusable during\rtesting. The unit of issue for the PLT CLIN, EACH, is equal to one\rProduction Lot Test (1EA=1PLT).\r(2) For purposes of facilitating PLT, the engineering support activity\rand/or testing facility has authority to communicate and conduct\rclarifications directly with contractors. If this results in necessary changes\rto contract requirements, the contractor shall contact the post award\rcontracting officer or contract administrator (see the \"Issued By\" blocks\ron the contract award or order) for written approval. The contractor shall\rnot act on any revisions or other changes until the contracting officer\rissues a written modification approving the proposed revision(s)/change(s).\r(3) The contractor shall provide and maintain an inspection system\racceptable to the Government in accordance with FAR Clause 52.246-2 or\r52.246-3, and maintain and make available all records evidencing those\rdetails if requested by the Government. At least fourteen (14) calendar\rdays (or as otherwise specified in the contract) prior to the date when\rthe contractor will present the production lot for selection of PLT samples,\rthe contractor shall provide written notice to the contracting officer (and\rthe cognizant DCMA functional specialist when full administration or\rquality support administration is delegated to DCMA).\r(4) Unless otherwise stated, the contractor shall select �contracting\rofficer shall insert the number of samples identified in the material\rmaster� samples, at random from the production lot(s) produced. If the\rquantity stated in the previous sentence equals \"ZZ,\" the contractor shall\ruse the appropriate sample size identified in the technical data package\ror applicable sample plan provided by the Government. If the contractor\rcannot determine the sample quantity, the contractor shall obtain written\rconfirmation of the sample size from the contracting officer.\r(5) If a PLT sample fails, the entire production lot from which the\rcontractor took the sample fails.\rThe contractor shall propose corrective action, if appropriate.\r(6) The Government will return PLT samples to the contractor, with a copy\rof the test report, at contractor expense.\r(7) The contractor shall prepare and disseminate the samples as follows:\r(a) Ship the selected PLT samples by traceable means. �Mark the shipment\r\"Production Lot Samples - Do Not Post To Stock,\" Contract Number\r�contractor insert� and Lot/Item Number �contractor insert�\". Place a\rcopy of the system of record receiving report (i.e., WAWF or DD Form 250)\ron the exterior of the shipping container in accordance with DFARS\rAppendix F. Mark the exterior of the shipping container in accordance\rwith MIL-STD-129 (latest revision), paragraph 5.11.(b)Include the following interior documentation:\r(i) DD Form 1222 and system of record receiving report (i.e., WAWF or\rDD Form 250);\r(ii) Copy of contract/order;\r(iii) Copy of test reports, showing actual results and tolerances specified\rin the technical data package;\r(iv) Material and process certifications;\r(v) Process operations and inspection method sheets;\r(vi) Copies of drawings used to manufacture the PLT sample (proper marking\rto assert proprietary or other rights to restrict public disclosure is\rthe contractor's responsibility);\r(vii) Documents required under contract deliverables requirements list; and\r(viii) A prepaid shipping label or document with the information required\rto return the PLT samples to the contractor at no cost to the Government.\r(5) At the time of shipment, the contractor shall sign and provide copies of\rthe DD Form 1222, system of record receiving report (i.e., WAWF or DD Form\r250), transportation tracking information, and information for return of the\rPLT samples to the contracting officer. The Government testing time will be\r�contracting officer insert number of days for test, as shown in the material\rmaster calendar days for the test results to be provided to the contractor.\r(6) For PLT, the Government will conduct inspection at source and acceptance\rat destination. The FOB point is destination.\r(7) Delivery.\r(a)Ship samples to �contracting officer insert address of the Government\ractivity to receive the samples�.\r(b)Delivery Schedule Information:\r(i)___ Total Delivery Days for FAT (If Applicable)\r(ii)___ Days: Completion of Production Units (to include PLT samples), and\rSubmission of samples forGovernment Testing\r(iii)___ Days: Government PLT Report Evaluation and Notification to Contractor\r(iv)___ Days: Delivery of final production quantity to Government\r(v)___ Total Delivery Days (Sum of paragraph (i) through (iv))\rE08 First Article Testing Requirements (MAR 2025)(1) If there is not a separate contract line item number (CLIN) for FAT, the\rofferor shall include all costs and risk associated with completion of the FAT\rrequirement in the production CLIN price.\r(2) If there is a separate FAT CLIN, the offeror shall include all costs and\rrisk associated with completion of the FAT requirement in the FAT CLIN price.\rThe unit of issue for the FAT CLIN, EACH, is equal to one First Article Test\r(1EA=1FAT). To receive payment for any costs associated with FAT, the offeror\rshall propose costs associated with FAT on a separate CLIN. The offeror shall\rbase the production CLIN price solely on all costs associated with completion\rof the production units and shall exclude all FAT-related costs.\r(3) The contracting officer will use the total award price in selecting the\rbest value offer from among all eligible offerors. However, for an offeror\rto be eligible for award, the contracting officer must determine that the FAT\rCLIN price (unless FAT is waived) and the production CLIN price are fair\rand reasonable; and, if set-aside under FAR Part 19, a fair market price.\rThe offeror shall not propose a FAT CLIN price that is materially unbalanced\rin relation to the production CLIN price. In the event an offeror receives a\rwaiver of the FAT requirement, the contracting officer will deduct the FAT\rCLIN price for the waived source in determining the total award price.\r(4)(a) Notwithstanding the conditions for waiving first article, the\rcontracting officer may order an additional first article sample, or portion\rthereof, in writing if there is a-\r(i) Major change to the technical data;\r(ii) Lapse in production for a period in excess of 90 days; or\r(iii) Change in the place of performance (manufacturing facility),\rmanufacturing process, material used,drawing, specification or source of\r(b) When conditions in paragraphs (4)(a)(i), (ii), or (iii) occur, the\rContractor shall notify the contracting officer; who will determine whether\rto order an additional first article sample or portion thereof and provide\rinstructions concerning the submission, inspection, and notification of\rresults. The contractor shall bear the costs of the additional first article\rtesting resulting from any of the causes in paragraphs (4)(a)(i)-(iii)\rinstituted by the contractor and not due to changes directed by the\rGovernment.\r(5) Waivers. The offeror may submit a request for FAT waiver to the\rcontracting officer, who may waive the FAT requirement when all of the\rfollowing criteria apply:\r(a) The offeror requesting waiver has successfully manufactured, delivered\rand the government accepted the item or a similar item. The offeror shall\rprovide the following information and be prepared to provide\rdocumentary evidence upon the contracting officer's request:\r(i) Contract number(s), date(s), and issuing Government agency or agencies.\r(ii) Description of item previously furnished, identified by part number,\rtype, model number and/or other identifying information. If the item\rpreviously furnished is similar but not identical to the item being acquired\runder the current buy, the offeror shall explain why manufacture of the\ritem previously furnished is sufficient to demonstrate its ability to\rmanufacture the item being acquired under the current buy without\rneed for a first article test.\r(iii) Engineering control document/change number of item previously furnished.\r(b) There have been no changes to manufacturing processes, tooling, or\rplace of performance.\r(c) There have been no changes to manufacturing data (e.g., drawing\rrevisions that change materials, dimensions, processes, inspection or\rtesting requirements; or subcontractors used to manufacture the items\rsuccessfully in the past).\r(d) The offeror shall supply an item of the same design and manufactured\rby the same method at the same facilities as the item or similar item\rpreviously furnished and accepted under subparagraph (5)(a).\r(6) Contractor-Performed FAT.\r(a) The contractor shall test the quantities as outlined in paragraph (a)\rof FAR clause 52.209- 3 as specified in the contract. The contractor shall\rsubmit reports in accordance with paragraph (b) of FAR clause 52.209-3,\ras supplemented in this procurement note.\r(b) For test report preparation and delivery of contractor FAT, the\rcontractor shall- (i) Use the data item description DI-NDTI-80809B report\rformat.\r(ii) Mark the test report with the following: \"First article test report -\rContract number: �insert contract number� and lot/item number:\r�insert lot/item number�.\r(iii) Sign the FAT Report, accompanied by the system of record receiving\rreport (i.e., WAWF or� DD Form 250) and contractor confirmation that\rthe same process and facilities used to manufacture the first article units\rwill be used to manufacture the production units, to the contracting officer\rat the applicable address shown below:\r(A) For awards issued by DLA Aviation; or DLA Troop Support Clothing\rand Textile (C&T), Medical Materiel, or Subsistence, submit the report to\rthe procuring activity in Block 6 of the DD Form 1155, Block 7 of\rStandard Form (SF) 33, Block 5 of SF 26, or Block 9 of SF 1449 award.\r(B) For awards issued by DLA Land (SPE7L), submit the report to the\rfollowing address: DLA Land - FLSEB, ATTN: FAT Monitor, P. O. Box 3990,\rColumbus, OH 43218- 3990, or email to: Land.FAT.Monitor@dla.mil.\r(C) For awards issued by DLA Maritime (SPE7M), submit the report to the\rfollowing address: DLA Maritime - FMSE, ATTN: FAT Monitor, P. O. Box\r3990, Columbus, OH 43218-3990, or email to: maritime.fat.monitor@dla.mil.\r(D) For awards issued by DLA Troop Support Construction and Equipment\r(SPE8E), email the report to Construction and Equipment FAT Monitor at\rtrpsptcandefatmonitor@dla.ml. If report file exceeds email limitations,\rsubmit to the following address: DLA Troop Support, Attention: First\rArticle Testing Monitor, Building 3, 700 Robbins Avenue, Philadelphia,\rPennsylvania 19111.\r(7) The contractor shall-\r(a) Provide and maintain an inspection system acceptable to the Government\rin accordance with FAR Clause 52.246-2 or 52.246-3;\r(b) Maintain and make available all records evidencing those details at the\rGovernment's request.\r(c) At least fourteen (14) calendar days (or as otherwise specified in the\rcontract) prior to shipment to the Government, provide written notice\rto the contracting officer and to the cognizant DCMA Functional Specialist\rwhen full administration or Quality Support administration is delegated\rto DCMA.\r(8) Government-performed FAT. The contractor shall-\r(a) For delivery of separately priced Government first article samples for\rGovernment performed FAT ship the units and system of record receiving report\r(i.e., WAWF or DD Form 250) to the test facility specified in paragraph (a) of\rFAR clause 52.209-4.\r(b) For delivery of Government first article samples that are not separately\rpriced, ship the units with a commercial shipping document to the test\rfacility.\r(c) Prepare the shipping container(s) by marking the external packages\rin bold letters, \"First Article Exhibits - Do Not Post to Stock,\" adjacent\rto the MIL-STD-129 (latest revision) identification markings.\r(d) Use a hard copy of the system of record receiving report (i.e., WAWF\rDD Form 250), or commercial shipping document as a packing list, in\raccordance with DFARS Appendix F.\r(e) Mark the exterior of the shipping container in accordance with\rMIL-STD-129 (latest revision), paragraph 5.11.\r(f) In the interior package, include hard copies of the contract, test\rreports, material certifications/process operation sheets, drawings used\rto manufacture the units, and a pre-paid return label or shipping account\rfor payment.\r(g)Send units by traceable means (e.g., certified or registered mail,\rUnited Parcel Service, Federal Express).\r(h)Send an email with subject titled \"Notification of Test Exhibits\r�insert Government Lab DODAAC�\" to the corresponding address in (i)\ror (ii) below and to the contracting officer specified in the contract.\rIn the email, provide the shipment date, contract/purchase order number,\rNational Stock Number, means of transportation, tracking number, and\rsummary of container contents. Attach a copy of the system of record\rreceiving report (i.e., WAWF or DD Form 250) documenting the Government\rhas performed the contract quality assurance within the system or record.\r(i) DLA Land & Maritime - DSCCProdVerif@dla.mil\r(ii) DLA Aviation - DSCR.Test&EvaluationOffice@dla.mil\r(9) At its discretion, the Government may return FAT units to the contractor\rat no cost to the Government. The contractor shall submit the return address\rand pre-paid return label or shipping account for payment.\r(10) If the Government disapproves or conditionally approves\rGovernment-performed FAT units, the Government will take action in\raccordance with FAR 52.209-4.\rE09 Contractor First Article Test (FAT) Information (JUL 2022)\r(1) For FAT requirements, the Government will conduct inspection at source\rand acceptance at destination. The FOB point is destination. Due to known\rsystems limitations, solicitations may contain erroneous inspection,\racceptance, and FOB points. This procurement note takes precedence\rover any conflicting terms.\r(2) CONTRACTOR FAT DELIVERY SCHEDULE\r(a) _____ Days: To Deliver FAT Report to the Government\r(b) _____ Days: Government FAT Report Evaluation and Notification to Contractor(c) _____ Days: To Deliver Final Production Quantity After Approval of FAT\rReport. If PLT applies, this line will be blank; the number of delivery days\rfor final production quantity will appear in procurement note E03, Production\rLot Testing - Contractor, or E04, Production Lot Testing - Government, as\rapplicable\r(d)_____Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c))\rE10 Government First Article Test (FAT) Information (JUL 2022)\r(1) For FAT requirements, the Government will conduct inspection at source\rand acceptance at destination. The FOB point is destination. Due to known\rsystems limitations, solicitations may contain erroneous inspection,\racceptance, and FOB points. This procurement note takes precedence\rover any conflicting terms.\r(2) GOVERNMENT FAT DELIVERY SCHEDULE\r(a) ___ Days: To Deliver FAT Units to the Government\r(b) ___ Days: Government FAT Evaluation and Notification to Contractor\r(c) ___ Days: To Deliver Final Production Quantity After Approval of FAT.\rIf PLT applies, this line will be blank; the number of delivery days for final\rproduction quantity will appear in procurement note E03, Production Lot\rTesting - Contractor, or E04, Production Lot Testing - Government, as\rapplicable�\r(d) ___ Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c))�\rIf there are any conflicts with PLT or FAT, the Navy procedures supersede, as\rthe Navy owns the process.\r\\\r1.  SCOPE\r1.1   This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the CABLE ASSEMBLY,SPEC .\r2.  APPLICABLE DOCUMENTS\r2.1   Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.\r2.1.1   Documents, drawings, and publications supplied are listed under \"Drawing Number\".  These items should be retained until an award is made.\r2.1.2   \"Document References\" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.\r2.2   Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence.  Nothing in this contract/purchase order,\rhowever, shall supersede applicable laws and regulations unless a specific exemption has been obtained.\rDRAWING DATA=FVLS-2057R1-010                         |53711| -|1N |D|            |  |     |\rDRAWING DATA=FVLS-2065-011                           |53711| -|1N |D|            |  |     |\rDRAWING DATA=FVLS-2069R1-013                         |53711| -|1N |D|            |  |     |\rDRAWING DATA=FVLS-2077-012                           |53711| -|1N |D|            |  |     |\rDRAWING DATA=FVLS2-2186-014                          |53711| -|1N |D|            |  |     |\rDRAWING DATA=19179                                   |53711| E|WS |D|            |  |     |\rDRAWING DATA=19199                                   |53711| A|WS |D|            |  |     |\rDRAWING DATA=19202                                   |53711| -|WS |D|            |  |     |\rDRAWING DATA=5497120                                 |53711| A|   |D|            |  |     |\rDRAWING DATA=5497120                                 |53711| 2|1N |D|            |  |     |\rDRAWING DATA=5497120                                 |53711| 3|1N |D|            |  |     |\rDRAWING DATA=5497160                                 |53711| 4|1N |A|            |  |     |\rDRAWING DATA=5497459                                 |53711| B|   |D|            |  |     |\rDRAWING DATA=5497459                                 |53711| B|FN |D|            |  |     |\rDRAWING DATA=5497459                                 |53711| A|SD |D|            |  |     |\rDRAWING DATA=5497459                                 |53711| 3|1N |D|            |  |     |\rDRAWING DATA=5497459                                 |53711| 4|1N |D|            |  |     |\rDRAWING DATA=6387574                                 |53711| -|   |D|            |  |     |\rDRAWING DATA=6387659                                 |53711| B|   |D|            |  |     |\rDRAWING DATA=6387659                                 |53711| B|PL |D|            |  |     |\rDRAWING DATA=6387659                                 |53711|13|1N |D|            |  |     |\rDRAWING DATA=7251146                                 |53711| -|   |D|            |  |     |\rDOCUMENT REF DATA=MIL-STD-130                   |    |  |N  |121116|A|  |01|\rDOCUMENT REF DATA=ISO9001                       |    |  |   |010417|A|  |  |\r3.  REQUIREMENTS\r3.1   Design, Manufacture, and Performance - Except as modified herein,\rthe CABLE ASSEMBLY,SPEC  furnished under this contract/purchase order shall meet the\rdesign, manufacture, and performance requirements specified on drawing ;53711       6387659-69;\rcage ;53711       6387659-69; .\r3.2   First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required.\r3.3   First Article Approval (Government Testing) - First Article Test (FAT) and approval is required.\r3.4   Production Lot Approval (Contractor Testing) - Production Lot Test and approval is required.\r3.5   Marking - This item shall be physically identified in accordance with MIL-STD-130.\r3.6   Configuration Control - MIL-STD-973 entitled \"Configuration Management\", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated.  The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973,\rParagraph 5.4.8.2 and Appendix D.  Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E.  Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E.  (Original\rand two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa.  17055-0788.)\r3.6.1   Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until\ranother drawing revision is approved.  The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted,\rthe date of the granting of the authorization, and the name of the granting authority.\r        Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below.\r        The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA  17055-0788.\r        Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor.\r3.7   Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination.  Mercury contamination of the material\rwill be cause for rejection.\r       If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture.  The\rcontractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape.  Such a request will be forwarded directly to the Procurement Contracting\rOfficer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a \"Warning Plate\" stating that metallic mercury is a functional part of the item and will include name and location of that part.\r       The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited.  The most probable causes of\rcontamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity.  Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are\rlocated so as not to constitute a contamination hazard.\r       If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective.  Enclose the equipment in a\rpolyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the\rrequirements of this contract are concerned.\r       These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements.\r       Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer.  For background, the following information is provided:\r       Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys.  Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems.  Accidental trapping of mercury in a\rcomponent could cause serious damage to vital parts.  Mercury is also toxic if inhaled, ingested, or absorbed through the skin.  It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface\rship atmosphere.\r3.8   Soldering - The requirements for soldered electrical and electronic assemblies shall conform to IPC J-STD-001, Class ;3; .\r4.  QUALITY ASSURANCE\r4.1   Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein.  Except as otherwise specified in the contract/purchase order,\rthe Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government.  The Government reserves the right to perform any of the inspections set forth in the\rspecification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.\r4.2   First Article Test/Inspection (Contractor) - The Contractor shall conduct ;NON-DESTRUCTIVE; First Article Test/Inspection on ;one      ; unit(s) in accordance with requirements ;WS19202; .\r4.3   First Article Compatibility Test (Government) - Upon satisfactory completion of the First Article Test/Inspection by the Contractor, ;1; unit(s) shall be shipped to ;NSWC PORT HUENEME; for compatibility test to assure satisfactory, form, fit and function\rwithin the applicable end item or system.\r  Government First Article Compatibility Test shall consist of ;SYSTEM COMPATIBILITY;  testing.   If the testing is nondestructive, the first article sample ;SHALL;  be returned.//\r4.4   Inspection System Requirements - The supplier shall provide and maintain an inspection/quality system acceptable to the Government.  The inspection system requirements for this contract/purchase order shall be in accordance with MIL-I-45208.  Suppliers\rcertified to perform under ISO 9001 or ISO 9002 are granted permission to utilize the one desired in lieu of MIL-I-45208.\r4.5   Responsibility for Compliance - All items must meet all requirements of this contract/purchase order.  The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program.  The absence of any\rinspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order.  Sampling in quality conformance\rdoes not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.\r4.6   Records of Inspection - (This requirement is not applicable to Government Purchase Orders)  Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during\rthe performance of the contract and for a period of four years after final delivery of supplies.\r4.7   Responsibility for Compliance - All items must meet all requirements of this contract/purchase order.  The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program.  The absence of any\rinspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order.  Sampling in quality conformance\rdoes not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.\r4.8   Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies.\r4.9    ;First Article Test/inspection report- the contractor shall prepare and submit a report in accordance with the Contract data Requirements List (DD Form 1423) The report shall be approved prior to production.;\r5.  PACKAGING\r5.1   Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.\rMIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6.  NOTES\r6.1  Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS)\r(i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products.  Most Specifications can obtained directly from http://quicksearch.dla.mil/\rA.  Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format.  Documents can be requested by phoning the Subscription Services Desk.\rB.  Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources.  Theymay be obtained from the publishers of the applicable societies.\rC.  Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to:\rCommander, Indian Head Division, Naval Surface Warfare Center\rCode 8410P, 101 Strauss Avenue\rIndian Head, MD 20640-5035\rD.  On post-award actions, requests for \"Official Use Only\" and \"NOFORN\" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for\rcertification of need for the document.  On pre-award actions such requests must be submitted to the PCO for certification of need for the document.\rE.  NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:\rContracting Officer\rNAVSUP-WSS\rCode 87321\r5450 Carlisle Pike\rP.O. Box 2020\rMechanicsburg, Pa. 17055-0788\rF.  Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue:\rCommanding Officer\rNAVSUP-WSS\rCode 009\r5450 Carlisle Pike\rP.O. Box 2020\rMechanicsburg, Pa. 17055-0788\rG.  Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from:\rCommanding Officer\rNAVSUP-WSS\rCode 1 Support Branch\r700 Robbins Avenue\rPhiladelphia, Pa. 19111-5094\rH.  Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS.\rManufacturing sources interested in becoming qualified for support of future requirements for this item should submit their interest in writing to the    Contract Officer, to include a summary of the company's applicable           capabilities. This will be\rforwarded to the appropriate point of contact at  NSWC, PHD for evaluation.\r6.2   Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation.  If you desire to be considered as a potential source for award of\rthis contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer.\r6.3  In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a \"Distribution Statement\" to inform the contractor of the limits of distribution, and the safeguarding of the information\rcontained on those documents and drawings.\r  There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings.  The definition for each is as follows:\rA... approved for public release; distribution is unlimited.\rB... distribution authorized to US Governments agencies only.\rC... distribution authorized to US Government agencies and their contractors.\rD... distribution authorized to DoD and DoD contractors only.\rE... distribution authorized to DoD Components only.\rF... further distribution only as directed by Commander, Naval Sea\r     Systems Command, code 09T.\rX... distribution is authorized to US Government agencies and private      individuals or enterprises eligible to obtain export controlled technical\r     data in accordance with OPNAVINST 5510.161.\r\rDATE OF FIRST SUBMISSION=ASREQ\rBlock 12 - Submit for approval prior to production.\rBlock 14A - The deliverable item specified as information copy shall be boldly marked as \"Information Only\".\rBlock 14 - Port Hueneme Division, Naval Surface Warfare Center, ;Code A66;  ,Port Hueneme, CA 93043-5007.\rBlock 10 - Note:  If this data has been previously approved by the Navy, submittal of the original approval letter in lieu of the data is acceptable.\r\rDATE OF FIRST SUBMISSION=045 DAC\rBlock 12 - Submit for approval prior to production.\rBlock 14A - The deliverable item specified as information copy shall be boldly marked as \"Information Only\".\rBlock 14 - Port Hueneme Division, Naval Surface Warfare Center, ;Code A66;  ,Port Hueneme, CA 93043-5007.\r\rDATE OF FIRST SUBMISSION=ASREQ\r100% INSPECTION IS REQUIRED\r\rDATE OF FIRST SUBMISSION=ASREQ\r;GOVERNMENT COMPATIBILITY TESTING TO BE COMPLETED 45 DAYS FROM RECEIPT OF FAT UNIT / TEST REPORT FROM CONTRACTOR.                                         ;\rBlock 10 - Note:  If this data has been previously approved by the Navy, submittal of the original approval letter in lieu of the data is acceptable.","origin":"detail"},"contacts":[{"name":"Electronic Mail: JENNIFER.ELLIOTT@DLA.MIL","role":"primary","email":"JENNIFER.ELLIOTT@DLA.MIL"}],"place_of_performance":null,"office_address":{"zip":"17055-0788","city":"MECHANICSBURG","state":"PA","country":"USA"},"naics_codes":["335311"],"award":null,"attachments":[{"resource_id":"54f268406c0c4bb6a69f4ca40666dd62","name":"See Solicitation SPRMM125QHA53","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2025-06-04T09:04:07.569Z","export_controlled":false,"sha256":null,"url":"https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=SPRMM125QHA53","mirrored":false}],"awards":[],"related":[{"key":"SPRMM127QKA52","latest_notice_id":"182e2ccccb1146f39397391b4ffb1f59","title":"ELECTRONIC COMPONEN","solicitation_number":"SPRMM127QKA52","notice_type":"o","first_type":"o","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":1,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRMM1","office_name":"SPRMM1 DLA MECHANICSBURG","naics":"334412","psc":"5998","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 5998)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"SPRMM127QKA49","latest_notice_id":"ea65d9419a1b42a8b058ac45eba6dcf3","title":"CIRCUIT CARD ASSEMB","solicitation_number":"SPRMM127QKA49","notice_type":"o","first_type":"o","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":1,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRMM1","office_name":"SPRMM1 DLA MECHANICSBURG","naics":"334412","psc":"5998","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 5998)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"SPRMM127QGA13","latest_notice_id":"1971b0d31c204e08bdf1ddad004091aa","title":"POWER DISTRIBUTION","solicitation_number":"SPRMM127QGA13","notice_type":"o","first_type":"o","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":1,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRMM1","office_name":"SPRMM1 DLA MECHANICSBURG","naics":"335311","psc":"6120","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6120)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"SPRMM127QKA05","latest_notice_id":"23b626d7085a4009a009662995634514","title":"CONDITIONER,POWER L","solicitation_number":"SPRMM127QKA05","notice_type":"o","first_type":"o","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":1,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRMM1","office_name":"SPRMM1 DLA MECHANICSBURG","naics":"335312","psc":"6110","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6110)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"SPRMM127QGA21","latest_notice_id":"4bd72056e6504d28aa3ba3280762823b","title":"VALVE ASSEMBLY","solicitation_number":"SPRMM127QGA21","notice_type":"o","first_type":"o","first_posted":"2026-11-06","last_posted":"2026-11-06","notices":1,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRMM1","office_name":"SPRMM1 DLA MECHANICSBURG","naics":"332919","psc":"4820","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 4820)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-07T04:54:53.607561Z"}],"similar_open":[{"key":"SPRMM127QGA13","latest_notice_id":"1971b0d31c204e08bdf1ddad004091aa","title":"POWER DISTRIBUTION","solicitation_number":"SPRMM127QGA13","notice_type":"o","first_type":"o","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":1,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRMM1","office_name":"SPRMM1 DLA MECHANICSBURG","naics":"335311","psc":"6120","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6120)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"SPRPA127QYA43","latest_notice_id":"12ba5124e1d24697b4608bba06c0f4c9","title":"POWER SUPPLY","solicitation_number":"SPRPA127QYA43","notice_type":"o","first_type":"o","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":1,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"335311","psc":"6120","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6120)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"N0010425QNF08","latest_notice_id":"62e391b2571a4e788f598a35f9ac2ee2","title":"CABLE ASSEMBLY,SPEC","solicitation_number":"N0010425QNF08","notice_type":"o","first_type":"o","first_posted":"2025-11-04","last_posted":"2026-10-28","notices":12,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00104","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT MECH","naics":"335311","psc":"6150","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6150)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"}],"similar_open_total":71,"indexable":false}