{"canonical":"https://sealedbidder.com/opportunities/sprha126r0prca","key":"SPRHA126R0PRCA","url":"https://sealedbidder.com/opportunities/sprha126r0prca","title":"F-15 Pitch and Roll Channel Assembly and Aileron Rudder Interconnect","solicitation_number":"SPRHA1-26-R-0PRCA","notice_type":"r","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-03-26T05:59:00Z","first_posted":"2026-02-23","last_posted":"2026-02-23","department":"DEPT OF DEFENSE","subagency":"DEFENSE LOGISTICS AGENCY","office":"DLA AVIATION AT OGDEN, UT","naics":"336413","psc":"1650","set_aside":null,"place_state":null,"place_scope":"nationwide","site":null,"place_state_source":null,"place_evidence":"Product purchase (PSC 1650)","place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"2d28234c6b6e43e5b66f54b7ed1fdb0d","title":"F-15 Pitch and Roll Channel Assembly and Aileron Rudder Interconnect","solicitation_number":"SPRHA1-26-R-0PRCA","notice_type":"r","base_type":"r","posted":"2026-02-23","posted_at":"2026-02-23T15:00:48.917Z","due_at":"2026-03-26T05:59:00Z","due_date":"2026-03-25","cancelled":false,"archived":true,"archive_date":"2026-04-09","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2d28234c6b6e43e5b66f54b7ed1fdb0d/view","enriched":true,"history":[{"index":3,"title":"F-15 Pitch and Roll Channel Assembly and Aileron Rudder Interconnect","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T15:00:48.917Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"2d28234c6b6e43e5b66f54b7ed1fdb0d","solicitation_number":"SPRHA1-26-R-0PRCA","parent_opportunity_id":"f61738ba3dd34429adcf1f38f70c3cd8"},{"index":1,"title":"F-15 Pitch and Roll Channel Assembly and Aileron Rudder Interconnect","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T14:57:06.112Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"f61738ba3dd34429adcf1f38f70c3cd8","solicitation_number":"SPRHA1-26-R-0PRCA"}]},{"notice_id":"f61738ba3dd34429adcf1f38f70c3cd8","title":"F-15 Pitch and Roll Channel Assembly and Aileron Rudder Interconnect","solicitation_number":"SPRHA1-26-R-0PRCA","notice_type":"r","base_type":"r","posted":"2026-02-23","posted_at":"2026-02-23T14:57:06.112Z","due_at":"2026-03-26T05:59:00Z","due_date":"2026-03-25","cancelled":false,"archived":true,"archive_date":"2026-04-09","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f61738ba3dd34429adcf1f38f70c3cd8/view","enriched":true,"history":[{"index":3,"title":"F-15 Pitch and Roll Channel Assembly and Aileron Rudder Interconnect","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T15:00:48.917Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"2d28234c6b6e43e5b66f54b7ed1fdb0d","solicitation_number":"SPRHA1-26-R-0PRCA","parent_opportunity_id":"f61738ba3dd34429adcf1f38f70c3cd8"},{"index":1,"title":"F-15 Pitch and Roll Channel Assembly and Aileron Rudder Interconnect","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T14:57:06.112Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"f61738ba3dd34429adcf1f38f70c3cd8","solicitation_number":"SPRHA1-26-R-0PRCA"}]}],"latest_notice_id":"f61738ba3dd34429adcf1f38f70c3cd8","first_type":"r","notices":[{"dates":{"posted":"2026-02-23","posted_at":"2026-02-23T15:00:48.917Z","created_at":"2026-02-23T14:58:53.400Z","modified_at":"2026-04-10T04:04:31.638Z","response_deadline":{"raw":"2026-03-25T23:59:00-06:00","utc":"2026-03-26T05:59:00Z","date":"2026-03-25","time":"23:59:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2d28234c6b6e43e5b66f54b7ed1fdb0d/view"},"naics":{"codes":["336413"],"primary":"336413"},"title":"F-15 Pitch and Roll Channel Assembly and Aileron Rudder Interconnect","agency":{"office":{"code":"SPRHA1","name":"DLA AVIATION AT OGDEN, UT"},"subtier":{"code":"97AS","name":"DEFENSE LOGISTICS AGENCY"},"department":{"code":"097","name":"DEPT OF DEFENSE"},"office_address":{"zip":"84056-5820","city":"HILL AIR FORCE BASE","state":"UT","country":"USA"},"organization_id":"500042963","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-04-09","archive_type":"auto15"},"history":[{"index":3,"title":"F-15 Pitch and Roll Channel Assembly and Aileron Rudder Interconnect","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T15:00:48.917Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"2d28234c6b6e43e5b66f54b7ed1fdb0d","solicitation_number":"SPRHA1-26-R-0PRCA","parent_opportunity_id":"f61738ba3dd34429adcf1f38f70c3cd8"},{"index":1,"title":"F-15 Pitch and Roll Channel Assembly and Aileron Rudder Interconnect","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T14:57:06.112Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"f61738ba3dd34429adcf1f38f70c3cd8","solicitation_number":"SPRHA1-26-R-0PRCA"}],"contacts":[{"name":"Michelle Mihu","role":"primary","email":"michelle.mihu@us.af.mil"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"2d28234c6b6e43e5b66f54b7ed1fdb0d","lineage_id":"f61738ba3dd34429adcf1f38f70c3cd8","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-12T08:41:14.114689332Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"b7b08a4eb44132b66e44e035f9872b0e11a81202dacc0cfa3ca4a127538b94ca","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-12T08:41:14.114689332Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>This announcement&nbsp;constitutes&nbsp;an official Request for Industry Comments (RFIC).&nbsp;&nbsp;This is not a Request for Proposal (RFP) or an Invitation for Bid (IFB), nor is it to be construed as a commitment by the government.&nbsp;</p>\n\n<ol>\n\t<li><strong>INTRODUCTION &amp; PURPOSE</strong></li>\n</ol>\n\n<p>The 423rd F-15 Supply Chain Management Squadron (423 SCMS), in conjunction with the Enterprise Hill Commodity Council&nbsp;(EHCC)&nbsp;and Defense Logistics Agency (DLA), is conducting market research to inform the development of a requirements-based Performance-Based Logistics&nbsp;(PBL) contract.&nbsp; The Government anticipates a contract structure consisting of one (1) five (5) year base ordering period and one (1) five (5) year option period.&nbsp; This effort is in support of the Air Force Sustainment Center (AFSC) at Tinker Air Force Base (TAFB), Oklahoma.</p>\n\n<p>Initial market research indicates that Moog Inc. is the Original Equipment Manufacturer (OEM) for the systems contemplated herein, and that the Government does not possess a complete and unrestricted technical data package for these items.</p>\n\n<p><strong>2.0&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; SCOPE</strong></p>\n\n<p>The Government is seeking to establish a strategic and adaptable PBL contracting vehicle. The scope is envisioned in two parts: the Base Requirement, which will form the initial scope of the contract, and the Potential Future Requirements, which may be incorporated at a later date through in-scope contract modifications or as separately priced and exercised options.</p>\n\n<p><strong>2.1 Base Requirement: F-15 Pitch and Roll Channel Assembly (PRCA) and Aileron Rudder Interconnect (ARI)</strong></p>\n\n<p>The primary requirement of this PBL is to ensure the sustained availability of serviceable F-15 PRCA and ARI assets, including selected sub-components. The contractor shall be responsible for the full, integrated lifecycle management necessary to meet warfighter demand. This includes, but is not limited to, the manufacture and remanufacture of all field-requisitionable assets, comprehensive supply management, material support, and sustaining engineering functions.</p>\n\n<p>Performance will be measured against Government-defined Key Performance Indicators (KPIs) to incentivize the achievement of critical availability and support goals. The National Stock Numbers (NSNs) currently under consideration for the Base Requirement are listed in TABLE 1. This list is subject to modification prior to the release of a formal solicitation.</p>\n\n<p><strong><u>TABLE 1:</u></strong>&nbsp;<em>See PDF attachment for Table</em></p>\n\n<p><strong>2.2 Potential Future Requirements: Expanded Workload</strong></p>\n\n<p>The Government is highly interested in structuring this PBL contract to accommodate the on-ramping of additional sole-sourced components for which Moog Inc. is the OEM. This framework is intended to provide a flexible and efficient mechanism to add workload as depot activation strategies are finalized or as other sustainment needs are identified.</p>\n\n<p>These potential future items may be added to the contract vehicle at a later point in time, with distinct performance metrics and pricing structures as appropriate. Items currently in consideration for future inclusion are listed in TABLE 2 and may fall into one of two categories:</p>\n\n<ol>\n\t<li>Items pending Depot-level maintenance activation.</li>\n\t<li>Items currently repaired under separate contract by the OEM.</li>\n</ol>\n\n<p>This list is not exhaustive, and the Government is interested in industry feedback on the most effective contractual methods to incorporate this and other potential future work.</p>\n\n<p><strong><u>TABLE 2:&nbsp;</u></strong><em>See PDF attachment for Table</em></p>\n\n<p><strong>3.0&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Background</strong></p>\n\n<p>In its passive state, the PRCA serves as a link between the pilot&rsquo;s control stick and the control surface power servos of the primary flight control system pitch and roll channels. When activated by pilot selection, it provides hydraulic force boost to the unit outputs and modifies the control linkage ratios as a function of a predetermined air data program. In the roll channel, it serves as a function of the pitch channel output. It also introduces a trim displacement. The rate of displacement is proportional to the difference between commanded and measured normal acceleration as determined by stick displacement.</p>\n\n<p>The ARI accepts mechanical roll and yaw commands from the control stick and rudder pedals. The unit adds to the yaw command a series input proportional to the roll command. This input is dependent in size and sign (direction) upon the position of the pitch output from the PRCA. The resulting output is then passed to the rudder servo-actuators via the aircraft mechanical control system.</p>\n\n<p></p>\n\n<p><strong>4.0&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Issues and Constraints</strong></p>\n\n<p>Worldwide PRCA, components and ARI availability are consistently below 448 Supply Chain Management Wing established targets, driving backorders and Mission Capability (MICAPs).&nbsp; Several root causes contribute to low levels of serviceable availability worldwide. &nbsp;It has been determined that the OO-ALC Depot is constrained by material shortages, the absence of engineering services/technical assistance from the OEM, and the obsolescence of test and support equipment.&nbsp; Additionally, the government is requiring kitting support.&nbsp; Improving end item PRCA, ARI, and subcomponent availability is the primary objective of this PBL effort.</p>\n\n<p></p>\n\n<p><strong>5.0 &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Developing Strategy</strong></p>\n\n<p></p>\n\n<p>The Contractor&rsquo;s performance shall include utilizing the Air Force overhaul facility at Hill AFB through a Public Private Partnership (PPP) and Direct Sales Agreement (DSA), through which utilization shall result in maintaining Government core capability IAW Title 10 of the U.S. Code (10 USC 2464) and Department of Defense (DoD)/Air Force Instructions.&nbsp; The touch labor for overhaul/repair of PRCA, ARI, and selected subcomponents shall remain organic to the maximum extent possible.</p>\n\n<p></p>\n\n<p><strong>Intent of RFIC:</strong></p>\n\n<ol>\n\t<li>Identify potential sources that are capable, experienced, and qualified in satisfying the requirement.</li>\n\t<li>Enhance competition by identifying contracting and sub-contracting opportunities.</li>\n\t<li>Request suggestions from Industry regarding the development of this contract.</li>\n</ol>\n\n<p></p>\n\n<p><strong>Responses to this Sources Sought should address the following questions:</strong></p>\n\n<ol>\n\t<li>Please provide the following business information for your company and for any teaming and joint venture programs:\n\t<ol>\n\t\t<li>Company Name</li>\n\t\t<li>Address</li>\n\t\t<li>Point of Contact</li>\n\t\t<li>Cage Code</li>\n\t\t<li>Unique Entity ID</li>\n\t\t<li>Business Unit</li>\n\t\t<li>Phone Number</li>\n\t\t<li>E-mail Address</li>\n\t\t<li>Web Page URL</li>\n\t\t<li>Size of Business and North American Industry Classification (NAICS) Code</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p></p>\n\n<ol>\n\t<li>Describe your experience executing relevant performance-based logistics &amp; supply chain management programs in support of USAF requirements and worldwide aviation customers.</li>\n\t<li>What do you envision as the risks associated with this effort and how would you mitigate them?</li>\n\t<li>Describe your company&rsquo;s ability and experience in sourcing F-15 PRCA and ARI spare parts from Moog and other aviation suppliers.</li>\n\t<li>Does your company possess, or have unassisted access to all necessary technical data to perform under this performance-based supply chain management contract?</li>\n\t<li>Are you qualified to manufacture and/or repair any of the components listed in this announcement?</li>\n\t<li>Describe your test facilities, warehousing, transportation, manufacturing, and workforce capabilities and capacity and inventory management relating to the scope of this project.</li>\n\t<li>Describe your current repair/remanufacture capabilities for the F-15 PRCA and ARI assemblies.</li>\n\t<li>How much transition time would your company require to perform on this contract?</li>\n\t<li>What quality control measures do you currently have in place (ISO 9000, 9001, AS9100, NADCAP (National Aerospace and Defense Contractors Accreditation Program)?</li>\n\t<li>Describe your experience with Government Source Inspection, Hardness Critical Items, and other OSHA standards.</li>\n\t<li>Are you currently registered in the System for Award Management and Wide Area Workflow?</li>\n\t<li>The current F-15 A-D PRCA DSOR (11-256) workload is approved for a workload split of 87% OO-ALC and 13% contract repair.&nbsp; Does your company have any capacity constraints, and if so, what are your mitigation plans?</li>\n</ol>\n\n<p></p>\n\n<p></p>\n\n<p>The government is accepting responses to this request for information via email only.&nbsp; Please provide written responses to the Contracting Officer and Program Managers. The responses are due 30 days after the RFI is posted to the following email addresses:</p>\n\n<p></p>\n\n<p>Michelle Mihu</p>\n\n<p>Contracting Officer</p>\n\n<p>Michelle.mihu@us.af.mil</p>\n\n<p></p>\n\n<p>Anna Bassett</p>\n\n<p>Program Manager</p>\n\n<p>Anna.bassett@us.af.mil</p>\n\n<p></p>\n\n<p>Camilla Zampedri</p>\n\n<p>Program Manager</p>\n\n<p>Camilla.zampedri@us.af.mil</p>\n\n<p></p>","text":"This announcement constitutes an official Request for Industry Comments (RFIC). This is not a Request for Proposal (RFP) or an Invitation for Bid (IFB), nor is it to be construed as a commitment by the government.\n\n• INTRODUCTION & PURPOSE\n\nThe 423rd F-15 Supply Chain Management Squadron (423 SCMS), in conjunction with the Enterprise Hill Commodity Council (EHCC) and Defense Logistics Agency (DLA), is conducting market research to inform the development of a requirements-based Performance-Based Logistics (PBL) contract. The Government anticipates a contract structure consisting of one (1) five (5) year base ordering period and one (1) five (5) year option period. This effort is in support of the Air Force Sustainment Center (AFSC) at Tinker Air Force Base (TAFB), Oklahoma.\n\nInitial market research indicates that Moog Inc. is the Original Equipment Manufacturer (OEM) for the systems contemplated herein, and that the Government does not possess a complete and unrestricted technical data package for these items.\n\n2.0 SCOPE\n\nThe Government is seeking to establish a strategic and adaptable PBL contracting vehicle. The scope is envisioned in two parts: the Base Requirement, which will form the initial scope of the contract, and the Potential Future Requirements, which may be incorporated at a later date through in-scope contract modifications or as separately priced and exercised options.\n\n2.1 Base Requirement: F-15 Pitch and Roll Channel Assembly (PRCA) and Aileron Rudder Interconnect (ARI)\n\nThe primary requirement of this PBL is to ensure the sustained availability of serviceable F-15 PRCA and ARI assets, including selected sub-components. The contractor shall be responsible for the full, integrated lifecycle management necessary to meet warfighter demand. This includes, but is not limited to, the manufacture and remanufacture of all field-requisitionable assets, comprehensive supply management, material support, and sustaining engineering functions.\n\nPerformance will be measured against Government-defined Key Performance Indicators (KPIs) to incentivize the achievement of critical availability and support goals. The National Stock Numbers (NSNs) currently under consideration for the Base Requirement are listed in TABLE 1. This list is subject to modification prior to the release of a formal solicitation.\n\nTABLE 1: See PDF attachment for Table\n\n2.2 Potential Future Requirements: Expanded Workload\n\nThe Government is highly interested in structuring this PBL contract to accommodate the on-ramping of additional sole-sourced components for which Moog Inc. is the OEM. This framework is intended to provide a flexible and efficient mechanism to add workload as depot activation strategies are finalized or as other sustainment needs are identified.\n\nThese potential future items may be added to the contract vehicle at a later point in time, with distinct performance metrics and pricing structures as appropriate. Items currently in consideration for future inclusion are listed in TABLE 2 and may fall into one of two categories:\n\n• Items pending Depot-level maintenance activation.\n\n• Items currently repaired under separate contract by the OEM.\n\nThis list is not exhaustive, and the Government is interested in industry feedback on the most effective contractual methods to incorporate this and other potential future work.\n\nTABLE 2: See PDF attachment for Table\n\n3.0 Background\n\nIn its passive state, the PRCA serves as a link between the pilot’s control stick and the control surface power servos of the primary flight control system pitch and roll channels. When activated by pilot selection, it provides hydraulic force boost to the unit outputs and modifies the control linkage ratios as a function of a predetermined air data program. In the roll channel, it serves as a function of the pitch channel output. It also introduces a trim displacement. The rate of displacement is proportional to the difference between commanded and measured normal acceleration as determined by stick displacement.\n\nThe ARI accepts mechanical roll and yaw commands from the control stick and rudder pedals. The unit adds to the yaw command a series input proportional to the roll command. This input is dependent in size and sign (direction) upon the position of the pitch output from the PRCA. The resulting output is then passed to the rudder servo-actuators via the aircraft mechanical control system.\n\n4.0 Issues and Constraints\n\nWorldwide PRCA, components and ARI availability are consistently below 448 Supply Chain Management Wing established targets, driving backorders and Mission Capability (MICAPs). Several root causes contribute to low levels of serviceable availability worldwide. It has been determined that the OO-ALC Depot is constrained by material shortages, the absence of engineering services/technical assistance from the OEM, and the obsolescence of test and support equipment. Additionally, the government is requiring kitting support. Improving end item PRCA, ARI, and subcomponent availability is the primary objective of this PBL effort.\n\n5.0 Developing Strategy\n\nThe Contractor’s performance shall include utilizing the Air Force overhaul facility at Hill AFB through a Public Private Partnership (PPP) and Direct Sales Agreement (DSA), through which utilization shall result in maintaining Government core capability IAW Title 10 of the U.S. Code (10 USC 2464) and Department of Defense (DoD)/Air Force Instructions. The touch labor for overhaul/repair of PRCA, ARI, and selected subcomponents shall remain organic to the maximum extent possible.\n\nIntent of RFIC:\n\n• Identify potential sources that are capable, experienced, and qualified in satisfying the requirement.\n\n• Enhance competition by identifying contracting and sub-contracting opportunities.\n\n• Request suggestions from Industry regarding the development of this contract.\n\nResponses to this Sources Sought should address the following questions:\n\n• Please provide the following business information for your company and for any teaming and joint venture programs:\n\n• Company Name\n\n• Address\n\n• Point of Contact\n\n• Cage Code\n\n• Unique Entity ID\n\n• Business Unit\n\n• Phone Number\n\n• E-mail Address\n\n• Web Page URL\n\n• Size of Business and North American Industry Classification (NAICS) Code\n\n• Describe your experience executing relevant performance-based logistics & supply chain management programs in support of USAF requirements and worldwide aviation customers.\n\n• What do you envision as the risks associated with this effort and how would you mitigate them?\n\n• Describe your company’s ability and experience in sourcing F-15 PRCA and ARI spare parts from Moog and other aviation suppliers.\n\n• Does your company possess, or have unassisted access to all necessary technical data to perform under this performance-based supply chain management contract?\n\n• Are you qualified to manufacture and/or repair any of the components listed in this announcement?\n\n• Describe your test facilities, warehousing, transportation, manufacturing, and workforce capabilities and capacity and inventory management relating to the scope of this project.\n\n• Describe your current repair/remanufacture capabilities for the F-15 PRCA and ARI assemblies.\n\n• How much transition time would your company require to perform on this contract?\n\n• What quality control measures do you currently have in place (ISO 9000, 9001, AS9100, NADCAP (National Aerospace and Defense Contractors Accreditation Program)?\n\n• Describe your experience with Government Source Inspection, Hardness Critical Items, and other OSHA standards.\n\n• Are you currently registered in the System for Award Management and Wide Area Workflow?\n\n• The current F-15 A-D PRCA DSOR (11-256) workload is approved for a workload split of 87% OO-ALC and 13% contract repair. Does your company have any capacity constraints, and if so, what are your mitigation plans?\n\nThe government is accepting responses to this request for information via email only. Please provide written responses to the Contracting Officer and Program Managers. The responses are due 30 days after the RFI is posted to the following email addresses:\n\nMichelle Mihu\n\nContracting Officer\n\nMichelle.mihu@us.af.mil\n\nAnna Bassett\n\nProgram Manager\n\nAnna.bassett@us.af.mil\n\nCamilla Zampedri\n\nProgram Manager\n\nCamilla.zampedri@us.af.mil","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"SPRHA1-26-R-0PRCA","product_service_code":"1650"},{"dates":{"posted":"2026-02-23","posted_at":"2026-02-23T14:57:06.112Z","created_at":"2026-02-23T14:51:14.248Z","modified_at":"2026-04-10T04:04:31.638Z","response_deadline":{"raw":"2026-03-25T23:59:00-06:00","utc":"2026-03-26T05:59:00Z","date":"2026-03-25","time":"23:59:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f61738ba3dd34429adcf1f38f70c3cd8/view"},"naics":{"codes":["336413"],"primary":"336413"},"title":"F-15 Pitch and Roll Channel Assembly and Aileron Rudder Interconnect","agency":{"office":{"code":"SPRHA1","name":"DLA AVIATION AT OGDEN, UT"},"subtier":{"code":"97AS","name":"DEFENSE LOGISTICS AGENCY"},"department":{"code":"097","name":"DEPT OF DEFENSE"},"office_address":{"zip":"84056-5820","city":"HILL AIR FORCE BASE","state":"UT","country":"USA"},"organization_id":"500042963","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-04-09","archive_type":"auto15"},"history":[{"index":3,"title":"F-15 Pitch and Roll Channel Assembly and Aileron Rudder Interconnect","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T15:00:48.917Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"2d28234c6b6e43e5b66f54b7ed1fdb0d","solicitation_number":"SPRHA1-26-R-0PRCA","parent_opportunity_id":"f61738ba3dd34429adcf1f38f70c3cd8"},{"index":1,"title":"F-15 Pitch and Roll Channel Assembly and Aileron Rudder Interconnect","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T14:57:06.112Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"f61738ba3dd34429adcf1f38f70c3cd8","solicitation_number":"SPRHA1-26-R-0PRCA"}],"contacts":[{"name":"Michelle Mihu","role":"primary","email":"michelle.mihu@us.af.mil"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"f61738ba3dd34429adcf1f38f70c3cd8","lineage_id":"f61738ba3dd34429adcf1f38f70c3cd8","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-12T09:20:55.384075877Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"cb6157f4dce4500e693020c8c0b1d17ab5bf0afa89fca9abf30adfed6d575fb0","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-12T09:20:55.384075877Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>This announcement&nbsp;constitutes&nbsp;an official Request for Industry Comments (RFIC).&nbsp;&nbsp;This is not a Request for Proposal (RFP) or an Invitation for Bid (IFB), nor is it to be construed as a commitment by the government.&nbsp;</p>\n\n<ol>\n\t<li><strong>INTRODUCTION &amp; PURPOSE</strong></li>\n</ol>\n\n<p>The 423rd F-15 Supply Chain Management Squadron (423 SCMS), in conjunction with the Enterprise Hill Commodity Council&nbsp;(EHCC)&nbsp;and Defense Logistics Agency (DLA), is conducting market research to inform the development of a requirements-based Performance-Based Logistics&nbsp;(PBL) contract.&nbsp; The Government anticipates a contract structure consisting of one (1) five (5) year base ordering period and one (1) five (5) year option period.&nbsp; This effort is in support of the Air Force Sustainment Center (AFSC) at Tinker Air Force Base (TAFB), Oklahoma.</p>\n\n<p>Initial market research indicates that Moog Inc. is the Original Equipment Manufacturer (OEM) for the systems contemplated herein, and that the Government does not possess a complete and unrestricted technical data package for these items.</p>\n\n<p><strong>2.0&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; SCOPE</strong></p>\n\n<p>The Government is seeking to establish a strategic and adaptable PBL contracting vehicle. The scope is envisioned in two parts: the Base Requirement, which will form the initial scope of the contract, and the Potential Future Requirements, which may be incorporated at a later date through in-scope contract modifications or as separately priced and exercised options.</p>\n\n<p><strong>2.1 Base Requirement: F-15 Pitch and Roll Channel Assembly (PRCA) and Aileron Rudder Interconnect (ARI)</strong></p>\n\n<p>The primary requirement of this PBL is to ensure the sustained availability of serviceable F-15 PRCA and ARI assets, including selected sub-components. The contractor shall be responsible for the full, integrated lifecycle management necessary to meet warfighter demand. This includes, but is not limited to, the manufacture and remanufacture of all field-requisitionable assets, comprehensive supply management, material support, and sustaining engineering functions.</p>\n\n<p>Performance will be measured against Government-defined Key Performance Indicators (KPIs) to incentivize the achievement of critical availability and support goals. The National Stock Numbers (NSNs) currently under consideration for the Base Requirement are listed in TABLE 1. This list is subject to modification prior to the release of a formal solicitation.</p>\n\n<p><strong><u>TABLE 1:</u></strong></p>\n\n<p><strong><u>Noun</u></strong></p>\n\n<p><strong><u>NSN</u></strong></p>\n\n<p><strong><u>P/N</u></strong></p>\n\n<p>Pitch &amp; Roll Channel Assy (PRCA-E)</p>\n\n<p>1650-01-398-0036</p>\n\n<p>A71500-4</p>\n\n<p>Pitch &amp; Roll Channel Assy (PRCA-E)</p>\n\n<p>1650-01-446-0599</p>\n\n<p>A71500-5</p>\n\n<p>&nbsp;PRCA-E Upgrade</p>\n\n<p>6615-01-702-6785</p>\n\n<p>A71500-007</p>\n\n<p>Pitch &amp; Roll Channel Assy (PRCA-C/D)</p>\n\n<p>1650-01-173-9697</p>\n\n<p>010-63055-22</p>\n\n<p>Pitch &amp; Roll Channel Assy (PRCA-C/D)</p>\n\n<p>1650-01-446-2029</p>\n\n<p>010-63055-24</p>\n\n<p>A-D PRCA Upgrade</p>\n\n<p>1650NCF624975</p>\n\n<p>010-63055-028</p>\n\n<p>Emergency Pressurization Assy (EPA-C/D/E)</p>\n\n<p>1650-00-000-0129</p>\n\n<p>010-65234-1</p>\n\n<p>Mode Select Assy (MSA-C/D)</p>\n\n<p>1650-01-104-9424</p>\n\n<p>010-59751-3</p>\n\n<p>Mode Select Assy (MSA-E)&nbsp;</p>\n\n<p>4810-01-251-8480</p>\n\n<p>A71503-2</p>\n\n<p>Roll Ratio Controller (C/D/E)</p>\n\n<p>1650-01-020-8689</p>\n\n<p>010-63078-7</p>\n\n<p>Roll Ratio Controller (C/D/E)</p>\n\n<p>1650-01-346-6328</p>\n\n<p>010-63078-8</p>\n\n<p>Pitch Ratio Controller (PRC-C/D/E)</p>\n\n<p>1650-00-535-7662</p>\n\n<p>010-63077-7</p>\n\n<p>Pitch Trim Controller (PTC) (F-15C/D)</p>\n\n<p>1650-01-008-7314</p>\n\n<p>010-63089-9</p>\n\n<p>Pitch Trim Controller (PTC) (F-15E)</p>\n\n<p>4810-01-396-3097</p>\n\n<p>A71504-6</p>\n\n<p>Ratio Changer and Booster Assy (F-15E)</p>\n\n<p>1650-01-446-2426</p>\n\n<p>A71502-4</p>\n\n<p>Ratio Changer and Booster Assy (C/D)</p>\n\n<p>1650-01-174-5735</p>\n\n<p>029-69733-3</p>\n\n<p>Ratio Changer and Booster Assy (C/D)</p>\n\n<p>1650-01-446-2030</p>\n\n<p>029-69733-5</p>\n\n<p>Aileron Rudder Interconnect (ARI-C/D/E)</p>\n\n<p>1650-01-050-3491</p>\n\n<p>010-63058-19</p>\n\n<p>Yaw Ratio Controller (F-15C/D/E)</p>\n\n<p>1650-01-015-7858</p>\n\n<p>010-33769-2</p>\n\n<p>Pitch Booster Upgrade</p>\n\n<p>1650-01-702-6827</p>\n\n<p>010-73251-007</p>\n\n<p>Roll Booster Upgrade</p>\n\n<p>1650-01-702-7511</p>\n\n<p>010-70623-003</p>\n\n<p>PRCA Upgrade Kit</p>\n\n<p>1560-01-693-6367</p>\n\n<p>CC12023-001</p>\n\n<p>ARI Upgrade&nbsp;</p>\n\n<p>1650-01-698-8844</p>\n\n<p>010-63058-021</p>\n\n<p>&nbsp; Roll Boost Act Upgrade</p>\n\n<p>1650-01-703-3833</p>\n\n<p>A01791-003</p>\n\n<p>&nbsp; Ratio Changer Upgrade</p>\n\n<p>1650-01-698-9765</p>\n\n<p>010-33778-006</p>\n\n<p>&nbsp; Lock Actuator Upgrade</p>\n\n<p>1650-01-702-3985</p>\n\n<p>029-67722-003</p>\n\n<p>ARI Upgrade kit</p>\n\n<p>1560-01-693-6368</p>\n\n<p>CC12024-001</p>\n\n<p></p>\n\n<p><strong>2.2 Potential Future Requirements: Expanded Workload</strong></p>\n\n<p>The Government is highly interested in structuring this PBL contract to accommodate the on-ramping of additional sole-sourced components for which Moog Inc. is the OEM. This framework is intended to provide a flexible and efficient mechanism to add workload as depot activation strategies are finalized or as other sustainment needs are identified.</p>\n\n<p>These potential future items may be added to the contract vehicle at a later point in time, with distinct performance metrics and pricing structures as appropriate. Items currently in consideration for future inclusion are listed in TABLE 2 and may fall into one of two categories:</p>\n\n<ol>\n\t<li>Items pending Depot-level maintenance activation.</li>\n\t<li>Items currently repaired under separate contract by the OEM.</li>\n</ol>\n\n<p>This list is not exhaustive, and the Government is interested in industry feedback on the most effective contractual methods to incorporate this and other potential future work.</p>\n\n<p><strong><u>TABLE 2:</u></strong></p>\n\n<p><strong><u>Noun</u></strong></p>\n\n<p><strong><u>NSN</u></strong></p>\n\n<p><strong><u>P/N</u></strong></p>\n\n<p><strong><u>Notes</u></strong></p>\n\n<p>F-15EX RUDDER ACTUATOR</p>\n\n<p>1680016289363SA</p>\n\n<p>&nbsp;CB06349-007</p>\n\n<p>Depot Activation processes have begun by the F-15EX System Program Office (SPO)</p>\n\n<p>KC-46 ACTUATOR, ELEVATOR</p>\n\n<p>1650016961146</p>\n\n<p>CB61135-003</p>\n\n<p>424 SCMS activation goal FY31</p>\n\n<p>KC-46 ELEVATOR FEEL COMP</p>\n\n<p>1560016537583</p>\n\n<p>CB23710-001</p>\n\n<p>424 SCMS activation goal FY29</p>\n\n<p>KC-46 TELESCOPE ACTUATOR</p>\n\n<p>1680016856454</p>\n\n<p>CC24576-004</p>\n\n<p>424 SCMS activation goal TBD</p>\n\n<p>KC-46 STAB TRIM CON MOD</p>\n\n<p>1560016541161</p>\n\n<p>160201-103</p>\n\n<p>424 SCMS activation goal FY31</p>\n\n<p>KC-46 RUDDER ACTUATOR</p>\n\n<p>1650016618031</p>\n\n<p>CB61131-001</p>\n\n<p>No current activation goal&nbsp;</p>\n\n<p>KC-46 AUTOPILOT SERVO</p>\n\n<p>1680016535500</p>\n\n<p>A28321-18</p>\n\n<p>424 SCMS activation goal FY31</p>\n\n<p>KC-46 VALVE ASSEMBLY</p>\n\n<p>4820016535507</p>\n\n<p>A28320-15</p>\n\n<p>No current activation goal</p>\n\n<p>KC-46 ACTUATOR,MECHANICAL</p>\n\n<p>1680016536230</p>\n\n<p>A28640-12</p>\n\n<p>424 SCMS activation goal FY28</p>\n\n<p>KC-46 SERVOVALVE,HYDRAULI</p>\n\n<p>1650015892453</p>\n\n<p>A71882-003</p>\n\n<p>No current activation goal</p>\n\n<p>KC-46 VALVE ASSEMBLY</p>\n\n<p>4820016612199</p>\n\n<p>920129-300</p>\n\n<p>No current activation goal</p>\n\n<p>KC-46 VALVE ASSEMBLY</p>\n\n<p>4810016233340</p>\n\n<p>401-09772-03</p>\n\n<p>424 SCMS activation goal FY32</p>\n\n<p>KC-46 BRAKE ASSEMBLY,STAB</p>\n\n<p>1630015210581</p>\n\n<p>160500-101</p>\n\n<p>No current activation goal</p>\n\n<p>F-16 Power Drive Unit, Hydro-Mechanical (PDU)</p>\n\n<p>1650013061268</p>\n\n<p>C36909-001</p>\n\n<p>5-year repair contract with Moog awarded August 2025</p>\n\n<p>F-16 Power Drive Unit, Hydro-Mechanical (PDU)</p>\n\n<p>1650013406328</p>\n\n<p>C36909-002</p>\n\n<p>5-year repair contract with Moog awarded August 2025</p>\n\n<p></p>\n\n<p><strong>3.0&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Background</strong></p>\n\n<p>In its passive state, the PRCA serves as a link between the pilot&rsquo;s control stick and the control surface power servos of the primary flight control system pitch and roll channels. When activated by pilot selection, it provides hydraulic force boost to the unit outputs and modifies the control linkage ratios as a function of a predetermined air data program. In the roll channel, it serves as a function of the pitch channel output. It also introduces a trim displacement. The rate of displacement is proportional to the difference between commanded and measured normal acceleration as determined by stick displacement.</p>\n\n<p>The ARI accepts mechanical roll and yaw commands from the control stick and rudder pedals. The unit adds to the yaw command a series input proportional to the roll command. This input is dependent in size and sign (direction) upon the position of the pitch output from the PRCA. The resulting output is then passed to the rudder servo-actuators via the aircraft mechanical control system.</p>\n\n<p></p>\n\n<p><strong>4.0&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Issues and Constraints</strong></p>\n\n<p>Worldwide PRCA, components and ARI availability are consistently below 448 Supply Chain Management Wing established targets, driving backorders and Mission Capability (MICAPs).&nbsp; Several root causes contribute to low levels of serviceable availability worldwide. &nbsp;It has been determined that the OO-ALC Depot is constrained by material shortages, the absence of engineering services/technical assistance from the OEM, and the obsolescence of test and support equipment.&nbsp; Additionally, the government is requiring kitting support.&nbsp; Improving end item PRCA, ARI, and subcomponent availability is the primary objective of this PBL effort.</p>\n\n<p></p>\n\n<p><strong>5.0 &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Developing Strategy</strong></p>\n\n<p></p>\n\n<p>The Contractor&rsquo;s performance shall include utilizing the Air Force overhaul facility at Hill AFB through a Public Private Partnership (PPP) and Direct Sales Agreement (DSA), through which utilization shall result in maintaining Government core capability IAW Title 10 of the U.S. Code (10 USC 2464) and Department of Defense (DoD)/Air Force Instructions.&nbsp; The touch labor for overhaul/repair of PRCA, ARI, and selected subcomponents shall remain organic to the maximum extent possible.</p>\n\n<p></p>\n\n<p><strong>Intent of RFIC:</strong></p>\n\n<ol>\n\t<li>Identify potential sources that are capable, experienced, and qualified in satisfying the requirement.</li>\n\t<li>Enhance competition by identifying contracting and sub-contracting opportunities.</li>\n\t<li>Request suggestions from Industry regarding the development of this contract.</li>\n</ol>\n\n<p></p>\n\n<p><strong>Responses to this Sources Sought should address the following questions:</strong></p>\n\n<ol>\n\t<li>Please provide the following business information for your company and for any teaming and joint venture programs:\n\t<ol>\n\t\t<li>Company Name</li>\n\t\t<li>Address</li>\n\t\t<li>Point of Contact</li>\n\t\t<li>Cage Code</li>\n\t\t<li>Unique Entity ID</li>\n\t\t<li>Business Unit</li>\n\t\t<li>Phone Number</li>\n\t\t<li>E-mail Address</li>\n\t\t<li>Web Page URL</li>\n\t\t<li>Size of Business and North American Industry Classification (NAICS) Code</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p></p>\n\n<ol>\n\t<li>Describe your experience executing relevant performance-based logistics &amp; supply chain management programs in support of USAF requirements and worldwide aviation customers.</li>\n\t<li>What do you envision as the risks associated with this effort and how would you mitigate them?</li>\n\t<li>Describe your company&rsquo;s ability and experience in sourcing F-15 PRCA and ARI spare parts from Moog and other aviation suppliers.</li>\n\t<li>Does your company possess, or have unassisted access to all necessary technical data to perform under this performance-based supply chain management contract?</li>\n\t<li>Are you qualified to manufacture and/or repair any of the components listed in this announcement?</li>\n\t<li>Describe your test facilities, warehousing, transportation, manufacturing, and workforce capabilities and capacity and inventory management relating to the scope of this project.</li>\n\t<li>Describe your current repair/remanufacture capabilities for the F-15 PRCA and ARI assemblies.</li>\n\t<li>How much transition time would your company require to perform on this contract?</li>\n\t<li>What quality control measures do you currently have in place (ISO 9000, 9001, AS9100, NADCAP (National Aerospace and Defense Contractors Accreditation Program)?</li>\n\t<li>Describe your experience with Government Source Inspection, Hardness Critical Items, and other OSHA standards.</li>\n\t<li>Are you currently registered in the System for Award Management and Wide Area Workflow?</li>\n\t<li>The current F-15 A-D PRCA DSOR (11-256) workload is approved for a workload split of 87% OO-ALC and 13% contract repair.&nbsp; Does your company have any capacity constraints, and if so, what are your mitigation plans?</li>\n</ol>\n\n<p></p>\n\n<p></p>\n\n<p>The government is accepting responses to this request for information via email only.&nbsp; Please provide written responses to the Contracting Officer and Program Managers. The responses are due 30 days after the RFI is posted to the following email addresses:</p>\n\n<p></p>\n\n<p>Michelle Mihu</p>\n\n<p>Contracting Officer</p>\n\n<p>Michelle.mihu@us.af.mil</p>\n\n<p></p>\n\n<p>Anna Bassett</p>\n\n<p>Program Manager</p>\n\n<p>Anna.bassett@us.af.mil</p>\n\n<p></p>\n\n<p>Camilla Zampedri</p>\n\n<p>Program Manager</p>\n\n<p>Camilla.zampedri@us.af.mil</p>\n\n<p></p>","text":"This announcement constitutes an official Request for Industry Comments (RFIC). This is not a Request for Proposal (RFP) or an Invitation for Bid (IFB), nor is it to be construed as a commitment by the government.\n\n• INTRODUCTION & PURPOSE\n\nThe 423rd F-15 Supply Chain Management Squadron (423 SCMS), in conjunction with the Enterprise Hill Commodity Council (EHCC) and Defense Logistics Agency (DLA), is conducting market research to inform the development of a requirements-based Performance-Based Logistics (PBL) contract. The Government anticipates a contract structure consisting of one (1) five (5) year base ordering period and one (1) five (5) year option period. This effort is in support of the Air Force Sustainment Center (AFSC) at Tinker Air Force Base (TAFB), Oklahoma.\n\nInitial market research indicates that Moog Inc. is the Original Equipment Manufacturer (OEM) for the systems contemplated herein, and that the Government does not possess a complete and unrestricted technical data package for these items.\n\n2.0 SCOPE\n\nThe Government is seeking to establish a strategic and adaptable PBL contracting vehicle. The scope is envisioned in two parts: the Base Requirement, which will form the initial scope of the contract, and the Potential Future Requirements, which may be incorporated at a later date through in-scope contract modifications or as separately priced and exercised options.\n\n2.1 Base Requirement: F-15 Pitch and Roll Channel Assembly (PRCA) and Aileron Rudder Interconnect (ARI)\n\nThe primary requirement of this PBL is to ensure the sustained availability of serviceable F-15 PRCA and ARI assets, including selected sub-components. The contractor shall be responsible for the full, integrated lifecycle management necessary to meet warfighter demand. This includes, but is not limited to, the manufacture and remanufacture of all field-requisitionable assets, comprehensive supply management, material support, and sustaining engineering functions.\n\nPerformance will be measured against Government-defined Key Performance Indicators (KPIs) to incentivize the achievement of critical availability and support goals. The National Stock Numbers (NSNs) currently under consideration for the Base Requirement are listed in TABLE 1. This list is subject to modification prior to the release of a formal solicitation.\n\nTABLE 1:\n\nNoun\n\nNSN\n\nP/N\n\nPitch & Roll Channel Assy (PRCA-E)\n\n1650-01-398-0036\n\nA71500-4\n\nPitch & Roll Channel Assy (PRCA-E)\n\n1650-01-446-0599\n\nA71500-5\n\nPRCA-E Upgrade\n\n6615-01-702-6785\n\nA71500-007\n\nPitch & Roll Channel Assy (PRCA-C/D)\n\n1650-01-173-9697\n\n010-63055-22\n\nPitch & Roll Channel Assy (PRCA-C/D)\n\n1650-01-446-2029\n\n010-63055-24\n\nA-D PRCA Upgrade\n\n1650NCF624975\n\n010-63055-028\n\nEmergency Pressurization Assy (EPA-C/D/E)\n\n1650-00-000-0129\n\n010-65234-1\n\nMode Select Assy (MSA-C/D)\n\n1650-01-104-9424\n\n010-59751-3\n\nMode Select Assy (MSA-E)\n\n4810-01-251-8480\n\nA71503-2\n\nRoll Ratio Controller (C/D/E)\n\n1650-01-020-8689\n\n010-63078-7\n\nRoll Ratio Controller (C/D/E)\n\n1650-01-346-6328\n\n010-63078-8\n\nPitch Ratio Controller (PRC-C/D/E)\n\n1650-00-535-7662\n\n010-63077-7\n\nPitch Trim Controller (PTC) (F-15C/D)\n\n1650-01-008-7314\n\n010-63089-9\n\nPitch Trim Controller (PTC) (F-15E)\n\n4810-01-396-3097\n\nA71504-6\n\nRatio Changer and Booster Assy (F-15E)\n\n1650-01-446-2426\n\nA71502-4\n\nRatio Changer and Booster Assy (C/D)\n\n1650-01-174-5735\n\n029-69733-3\n\nRatio Changer and Booster Assy (C/D)\n\n1650-01-446-2030\n\n029-69733-5\n\nAileron Rudder Interconnect (ARI-C/D/E)\n\n1650-01-050-3491\n\n010-63058-19\n\nYaw Ratio Controller (F-15C/D/E)\n\n1650-01-015-7858\n\n010-33769-2\n\nPitch Booster Upgrade\n\n1650-01-702-6827\n\n010-73251-007\n\nRoll Booster Upgrade\n\n1650-01-702-7511\n\n010-70623-003\n\nPRCA Upgrade Kit\n\n1560-01-693-6367\n\nCC12023-001\n\nARI Upgrade\n\n1650-01-698-8844\n\n010-63058-021\n\nRoll Boost Act Upgrade\n\n1650-01-703-3833\n\nA01791-003\n\nRatio Changer Upgrade\n\n1650-01-698-9765\n\n010-33778-006\n\nLock Actuator Upgrade\n\n1650-01-702-3985\n\n029-67722-003\n\nARI Upgrade kit\n\n1560-01-693-6368\n\nCC12024-001\n\n2.2 Potential Future Requirements: Expanded Workload\n\nThe Government is highly interested in structuring this PBL contract to accommodate the on-ramping of additional sole-sourced components for which Moog Inc. is the OEM. This framework is intended to provide a flexible and efficient mechanism to add workload as depot activation strategies are finalized or as other sustainment needs are identified.\n\nThese potential future items may be added to the contract vehicle at a later point in time, with distinct performance metrics and pricing structures as appropriate. Items currently in consideration for future inclusion are listed in TABLE 2 and may fall into one of two categories:\n\n• Items pending Depot-level maintenance activation.\n\n• Items currently repaired under separate contract by the OEM.\n\nThis list is not exhaustive, and the Government is interested in industry feedback on the most effective contractual methods to incorporate this and other potential future work.\n\nTABLE 2:\n\nNoun\n\nNSN\n\nP/N\n\nNotes\n\nF-15EX RUDDER ACTUATOR\n\n1680016289363SA\n\nCB06349-007\n\nDepot Activation processes have begun by the F-15EX System Program Office (SPO)\n\nKC-46 ACTUATOR, ELEVATOR\n\n1650016961146\n\nCB61135-003\n\n424 SCMS activation goal FY31\n\nKC-46 ELEVATOR FEEL COMP\n\n1560016537583\n\nCB23710-001\n\n424 SCMS activation goal FY29\n\nKC-46 TELESCOPE ACTUATOR\n\n1680016856454\n\nCC24576-004\n\n424 SCMS activation goal TBD\n\nKC-46 STAB TRIM CON MOD\n\n1560016541161\n\n160201-103\n\n424 SCMS activation goal FY31\n\nKC-46 RUDDER ACTUATOR\n\n1650016618031\n\nCB61131-001\n\nNo current activation goal\n\nKC-46 AUTOPILOT SERVO\n\n1680016535500\n\nA28321-18\n\n424 SCMS activation goal FY31\n\nKC-46 VALVE ASSEMBLY\n\n4820016535507\n\nA28320-15\n\nNo current activation goal\n\nKC-46 ACTUATOR,MECHANICAL\n\n1680016536230\n\nA28640-12\n\n424 SCMS activation goal FY28\n\nKC-46 SERVOVALVE,HYDRAULI\n\n1650015892453\n\nA71882-003\n\nNo current activation goal\n\nKC-46 VALVE ASSEMBLY\n\n4820016612199\n\n920129-300\n\nNo current activation goal\n\nKC-46 VALVE ASSEMBLY\n\n4810016233340\n\n401-09772-03\n\n424 SCMS activation goal FY32\n\nKC-46 BRAKE ASSEMBLY,STAB\n\n1630015210581\n\n160500-101\n\nNo current activation goal\n\nF-16 Power Drive Unit, Hydro-Mechanical (PDU)\n\n1650013061268\n\nC36909-001\n\n5-year repair contract with Moog awarded August 2025\n\nF-16 Power Drive Unit, Hydro-Mechanical (PDU)\n\n1650013406328\n\nC36909-002\n\n5-year repair contract with Moog awarded August 2025\n\n3.0 Background\n\nIn its passive state, the PRCA serves as a link between the pilot’s control stick and the control surface power servos of the primary flight control system pitch and roll channels. When activated by pilot selection, it provides hydraulic force boost to the unit outputs and modifies the control linkage ratios as a function of a predetermined air data program. In the roll channel, it serves as a function of the pitch channel output. It also introduces a trim displacement. The rate of displacement is proportional to the difference between commanded and measured normal acceleration as determined by stick displacement.\n\nThe ARI accepts mechanical roll and yaw commands from the control stick and rudder pedals. The unit adds to the yaw command a series input proportional to the roll command. This input is dependent in size and sign (direction) upon the position of the pitch output from the PRCA. The resulting output is then passed to the rudder servo-actuators via the aircraft mechanical control system.\n\n4.0 Issues and Constraints\n\nWorldwide PRCA, components and ARI availability are consistently below 448 Supply Chain Management Wing established targets, driving backorders and Mission Capability (MICAPs). Several root causes contribute to low levels of serviceable availability worldwide. It has been determined that the OO-ALC Depot is constrained by material shortages, the absence of engineering services/technical assistance from the OEM, and the obsolescence of test and support equipment. Additionally, the government is requiring kitting support. Improving end item PRCA, ARI, and subcomponent availability is the primary objective of this PBL effort.\n\n5.0 Developing Strategy\n\nThe Contractor’s performance shall include utilizing the Air Force overhaul facility at Hill AFB through a Public Private Partnership (PPP) and Direct Sales Agreement (DSA), through which utilization shall result in maintaining Government core capability IAW Title 10 of the U.S. Code (10 USC 2464) and Department of Defense (DoD)/Air Force Instructions. The touch labor for overhaul/repair of PRCA, ARI, and selected subcomponents shall remain organic to the maximum extent possible.\n\nIntent of RFIC:\n\n• Identify potential sources that are capable, experienced, and qualified in satisfying the requirement.\n\n• Enhance competition by identifying contracting and sub-contracting opportunities.\n\n• Request suggestions from Industry regarding the development of this contract.\n\nResponses to this Sources Sought should address the following questions:\n\n• Please provide the following business information for your company and for any teaming and joint venture programs:\n\n• Company Name\n\n• Address\n\n• Point of Contact\n\n• Cage Code\n\n• Unique Entity ID\n\n• Business Unit\n\n• Phone Number\n\n• E-mail Address\n\n• Web Page URL\n\n• Size of Business and North American Industry Classification (NAICS) Code\n\n• Describe your experience executing relevant performance-based logistics & supply chain management programs in support of USAF requirements and worldwide aviation customers.\n\n• What do you envision as the risks associated with this effort and how would you mitigate them?\n\n• Describe your company’s ability and experience in sourcing F-15 PRCA and ARI spare parts from Moog and other aviation suppliers.\n\n• Does your company possess, or have unassisted access to all necessary technical data to perform under this performance-based supply chain management contract?\n\n• Are you qualified to manufacture and/or repair any of the components listed in this announcement?\n\n• Describe your test facilities, warehousing, transportation, manufacturing, and workforce capabilities and capacity and inventory management relating to the scope of this project.\n\n• Describe your current repair/remanufacture capabilities for the F-15 PRCA and ARI assemblies.\n\n• How much transition time would your company require to perform on this contract?\n\n• What quality control measures do you currently have in place (ISO 9000, 9001, AS9100, NADCAP (National Aerospace and Defense Contractors Accreditation Program)?\n\n• Describe your experience with Government Source Inspection, Hardness Critical Items, and other OSHA standards.\n\n• Are you currently registered in the System for Award Management and Wide Area Workflow?\n\n• The current F-15 A-D PRCA DSOR (11-256) workload is approved for a workload split of 87% OO-ALC and 13% contract repair. Does your company have any capacity constraints, and if so, what are your mitigation plans?\n\nThe government is accepting responses to this request for information via email only. Please provide written responses to the Contracting Officer and Program Managers. The responses are due 30 days after the RFI is posted to the following email addresses:\n\nMichelle Mihu\n\nContracting Officer\n\nMichelle.mihu@us.af.mil\n\nAnna Bassett\n\nProgram Manager\n\nAnna.bassett@us.af.mil\n\nCamilla Zampedri\n\nProgram Manager\n\nCamilla.zampedri@us.af.mil","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"SPRHA1-26-R-0PRCA","product_service_code":"1650"}],"due_at":"2026-03-26T05:59:00Z","due_date":"2026-03-25","closes_at":"2026-03-26T05:59:00Z","awardable":true,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRHA1","office_name":"DLA AVIATION AT OGDEN, UT","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"state_source":null,"state_evidence":"Product purchase (PSC 1650)","site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-12T09:31:51.087805Z","principal_notice_id":"f61738ba3dd34429adcf1f38f70c3cd8","description":{"text":"This announcement constitutes an official Request for Industry Comments (RFIC). This is not a Request for Proposal (RFP) or an Invitation for Bid (IFB), nor is it to be construed as a commitment by the government.\n\n• INTRODUCTION & PURPOSE\n\nThe 423rd F-15 Supply Chain Management Squadron (423 SCMS), in conjunction with the Enterprise Hill Commodity Council (EHCC) and Defense Logistics Agency (DLA), is conducting market research to inform the development of a requirements-based Performance-Based Logistics (PBL) contract. The Government anticipates a contract structure consisting of one (1) five (5) year base ordering period and one (1) five (5) year option period. This effort is in support of the Air Force Sustainment Center (AFSC) at Tinker Air Force Base (TAFB), Oklahoma.\n\nInitial market research indicates that Moog Inc. is the Original Equipment Manufacturer (OEM) for the systems contemplated herein, and that the Government does not possess a complete and unrestricted technical data package for these items.\n\n2.0 SCOPE\n\nThe Government is seeking to establish a strategic and adaptable PBL contracting vehicle. The scope is envisioned in two parts: the Base Requirement, which will form the initial scope of the contract, and the Potential Future Requirements, which may be incorporated at a later date through in-scope contract modifications or as separately priced and exercised options.\n\n2.1 Base Requirement: F-15 Pitch and Roll Channel Assembly (PRCA) and Aileron Rudder Interconnect (ARI)\n\nThe primary requirement of this PBL is to ensure the sustained availability of serviceable F-15 PRCA and ARI assets, including selected sub-components. The contractor shall be responsible for the full, integrated lifecycle management necessary to meet warfighter demand. This includes, but is not limited to, the manufacture and remanufacture of all field-requisitionable assets, comprehensive supply management, material support, and sustaining engineering functions.\n\nPerformance will be measured against Government-defined Key Performance Indicators (KPIs) to incentivize the achievement of critical availability and support goals. The National Stock Numbers (NSNs) currently under consideration for the Base Requirement are listed in TABLE 1. This list is subject to modification prior to the release of a formal solicitation.\n\nTABLE 1:\n\nNoun\n\nNSN\n\nP/N\n\nPitch & Roll Channel Assy (PRCA-E)\n\n1650-01-398-0036\n\nA71500-4\n\nPitch & Roll Channel Assy (PRCA-E)\n\n1650-01-446-0599\n\nA71500-5\n\nPRCA-E Upgrade\n\n6615-01-702-6785\n\nA71500-007\n\nPitch & Roll Channel Assy (PRCA-C/D)\n\n1650-01-173-9697\n\n010-63055-22\n\nPitch & Roll Channel Assy (PRCA-C/D)\n\n1650-01-446-2029\n\n010-63055-24\n\nA-D PRCA Upgrade\n\n1650NCF624975\n\n010-63055-028\n\nEmergency Pressurization Assy (EPA-C/D/E)\n\n1650-00-000-0129\n\n010-65234-1\n\nMode Select Assy (MSA-C/D)\n\n1650-01-104-9424\n\n010-59751-3\n\nMode Select Assy (MSA-E)\n\n4810-01-251-8480\n\nA71503-2\n\nRoll Ratio Controller (C/D/E)\n\n1650-01-020-8689\n\n010-63078-7\n\nRoll Ratio Controller (C/D/E)\n\n1650-01-346-6328\n\n010-63078-8\n\nPitch Ratio Controller (PRC-C/D/E)\n\n1650-00-535-7662\n\n010-63077-7\n\nPitch Trim Controller (PTC) (F-15C/D)\n\n1650-01-008-7314\n\n010-63089-9\n\nPitch Trim Controller (PTC) (F-15E)\n\n4810-01-396-3097\n\nA71504-6\n\nRatio Changer and Booster Assy (F-15E)\n\n1650-01-446-2426\n\nA71502-4\n\nRatio Changer and Booster Assy (C/D)\n\n1650-01-174-5735\n\n029-69733-3\n\nRatio Changer and Booster Assy (C/D)\n\n1650-01-446-2030\n\n029-69733-5\n\nAileron Rudder Interconnect (ARI-C/D/E)\n\n1650-01-050-3491\n\n010-63058-19\n\nYaw Ratio Controller (F-15C/D/E)\n\n1650-01-015-7858\n\n010-33769-2\n\nPitch Booster Upgrade\n\n1650-01-702-6827\n\n010-73251-007\n\nRoll Booster Upgrade\n\n1650-01-702-7511\n\n010-70623-003\n\nPRCA Upgrade Kit\n\n1560-01-693-6367\n\nCC12023-001\n\nARI Upgrade\n\n1650-01-698-8844\n\n010-63058-021\n\nRoll Boost Act Upgrade\n\n1650-01-703-3833\n\nA01791-003\n\nRatio Changer Upgrade\n\n1650-01-698-9765\n\n010-33778-006\n\nLock Actuator Upgrade\n\n1650-01-702-3985\n\n029-67722-003\n\nARI Upgrade kit\n\n1560-01-693-6368\n\nCC12024-001\n\n2.2 Potential Future Requirements: Expanded Workload\n\nThe Government is highly interested in structuring this PBL contract to accommodate the on-ramping of additional sole-sourced components for which Moog Inc. is the OEM. This framework is intended to provide a flexible and efficient mechanism to add workload as depot activation strategies are finalized or as other sustainment needs are identified.\n\nThese potential future items may be added to the contract vehicle at a later point in time, with distinct performance metrics and pricing structures as appropriate. Items currently in consideration for future inclusion are listed in TABLE 2 and may fall into one of two categories:\n\n• Items pending Depot-level maintenance activation.\n\n• Items currently repaired under separate contract by the OEM.\n\nThis list is not exhaustive, and the Government is interested in industry feedback on the most effective contractual methods to incorporate this and other potential future work.\n\nTABLE 2:\n\nNoun\n\nNSN\n\nP/N\n\nNotes\n\nF-15EX RUDDER ACTUATOR\n\n1680016289363SA\n\nCB06349-007\n\nDepot Activation processes have begun by the F-15EX System Program Office (SPO)\n\nKC-46 ACTUATOR, ELEVATOR\n\n1650016961146\n\nCB61135-003\n\n424 SCMS activation goal FY31\n\nKC-46 ELEVATOR FEEL COMP\n\n1560016537583\n\nCB23710-001\n\n424 SCMS activation goal FY29\n\nKC-46 TELESCOPE ACTUATOR\n\n1680016856454\n\nCC24576-004\n\n424 SCMS activation goal TBD\n\nKC-46 STAB TRIM CON MOD\n\n1560016541161\n\n160201-103\n\n424 SCMS activation goal FY31\n\nKC-46 RUDDER ACTUATOR\n\n1650016618031\n\nCB61131-001\n\nNo current activation goal\n\nKC-46 AUTOPILOT SERVO\n\n1680016535500\n\nA28321-18\n\n424 SCMS activation goal FY31\n\nKC-46 VALVE ASSEMBLY\n\n4820016535507\n\nA28320-15\n\nNo current activation goal\n\nKC-46 ACTUATOR,MECHANICAL\n\n1680016536230\n\nA28640-12\n\n424 SCMS activation goal FY28\n\nKC-46 SERVOVALVE,HYDRAULI\n\n1650015892453\n\nA71882-003\n\nNo current activation goal\n\nKC-46 VALVE ASSEMBLY\n\n4820016612199\n\n920129-300\n\nNo current activation goal\n\nKC-46 VALVE ASSEMBLY\n\n4810016233340\n\n401-09772-03\n\n424 SCMS activation goal FY32\n\nKC-46 BRAKE ASSEMBLY,STAB\n\n1630015210581\n\n160500-101\n\nNo current activation goal\n\nF-16 Power Drive Unit, Hydro-Mechanical (PDU)\n\n1650013061268\n\nC36909-001\n\n5-year repair contract with Moog awarded August 2025\n\nF-16 Power Drive Unit, Hydro-Mechanical (PDU)\n\n1650013406328\n\nC36909-002\n\n5-year repair contract with Moog awarded August 2025\n\n3.0 Background\n\nIn its passive state, the PRCA serves as a link between the pilot’s control stick and the control surface power servos of the primary flight control system pitch and roll channels. When activated by pilot selection, it provides hydraulic force boost to the unit outputs and modifies the control linkage ratios as a function of a predetermined air data program. In the roll channel, it serves as a function of the pitch channel output. It also introduces a trim displacement. The rate of displacement is proportional to the difference between commanded and measured normal acceleration as determined by stick displacement.\n\nThe ARI accepts mechanical roll and yaw commands from the control stick and rudder pedals. The unit adds to the yaw command a series input proportional to the roll command. This input is dependent in size and sign (direction) upon the position of the pitch output from the PRCA. The resulting output is then passed to the rudder servo-actuators via the aircraft mechanical control system.\n\n4.0 Issues and Constraints\n\nWorldwide PRCA, components and ARI availability are consistently below 448 Supply Chain Management Wing established targets, driving backorders and Mission Capability (MICAPs). Several root causes contribute to low levels of serviceable availability worldwide. It has been determined that the OO-ALC Depot is constrained by material shortages, the absence of engineering services/technical assistance from the OEM, and the obsolescence of test and support equipment. Additionally, the government is requiring kitting support. Improving end item PRCA, ARI, and subcomponent availability is the primary objective of this PBL effort.\n\n5.0 Developing Strategy\n\nThe Contractor’s performance shall include utilizing the Air Force overhaul facility at Hill AFB through a Public Private Partnership (PPP) and Direct Sales Agreement (DSA), through which utilization shall result in maintaining Government core capability IAW Title 10 of the U.S. Code (10 USC 2464) and Department of Defense (DoD)/Air Force Instructions. The touch labor for overhaul/repair of PRCA, ARI, and selected subcomponents shall remain organic to the maximum extent possible.\n\nIntent of RFIC:\n\n• Identify potential sources that are capable, experienced, and qualified in satisfying the requirement.\n\n• Enhance competition by identifying contracting and sub-contracting opportunities.\n\n• Request suggestions from Industry regarding the development of this contract.\n\nResponses to this Sources Sought should address the following questions:\n\n• Please provide the following business information for your company and for any teaming and joint venture programs:\n\n• Company Name\n\n• Address\n\n• Point of Contact\n\n• Cage Code\n\n• Unique Entity ID\n\n• Business Unit\n\n• Phone Number\n\n• E-mail Address\n\n• Web Page URL\n\n• Size of Business and North American Industry Classification (NAICS) Code\n\n• Describe your experience executing relevant performance-based logistics & supply chain management programs in support of USAF requirements and worldwide aviation customers.\n\n• What do you envision as the risks associated with this effort and how would you mitigate them?\n\n• Describe your company’s ability and experience in sourcing F-15 PRCA and ARI spare parts from Moog and other aviation suppliers.\n\n• Does your company possess, or have unassisted access to all necessary technical data to perform under this performance-based supply chain management contract?\n\n• Are you qualified to manufacture and/or repair any of the components listed in this announcement?\n\n• Describe your test facilities, warehousing, transportation, manufacturing, and workforce capabilities and capacity and inventory management relating to the scope of this project.\n\n• Describe your current repair/remanufacture capabilities for the F-15 PRCA and ARI assemblies.\n\n• How much transition time would your company require to perform on this contract?\n\n• What quality control measures do you currently have in place (ISO 9000, 9001, AS9100, NADCAP (National Aerospace and Defense Contractors Accreditation Program)?\n\n• Describe your experience with Government Source Inspection, Hardness Critical Items, and other OSHA standards.\n\n• Are you currently registered in the System for Award Management and Wide Area Workflow?\n\n• The current F-15 A-D PRCA DSOR (11-256) workload is approved for a workload split of 87% OO-ALC and 13% contract repair. Does your company have any capacity constraints, and if so, what are your mitigation plans?\n\nThe government is accepting responses to this request for information via email only. Please provide written responses to the Contracting Officer and Program Managers. The responses are due 30 days after the RFI is posted to the following email addresses:\n\nMichelle Mihu\n\nContracting Officer\n\nMichelle.mihu@us.af.mil\n\nAnna Bassett\n\nProgram Manager\n\nAnna.bassett@us.af.mil\n\nCamilla Zampedri\n\nProgram Manager\n\nCamilla.zampedri@us.af.mil","html":"<p>This announcement&nbsp;constitutes&nbsp;an official Request for Industry Comments (RFIC).&nbsp;&nbsp;This is not a Request for Proposal (RFP) or an Invitation for Bid (IFB), nor is it to be construed as a commitment by the government.&nbsp;</p>\n\n<ol>\n\t<li><strong>INTRODUCTION &amp; PURPOSE</strong></li>\n</ol>\n\n<p>The 423rd F-15 Supply Chain Management Squadron (423 SCMS), in conjunction with the Enterprise Hill Commodity Council&nbsp;(EHCC)&nbsp;and Defense Logistics Agency (DLA), is conducting market research to inform the development of a requirements-based Performance-Based Logistics&nbsp;(PBL) contract.&nbsp; The Government anticipates a contract structure consisting of one (1) five (5) year base ordering period and one (1) five (5) year option period.&nbsp; This effort is in support of the Air Force Sustainment Center (AFSC) at Tinker Air Force Base (TAFB), Oklahoma.</p>\n\n<p>Initial market research indicates that Moog Inc. is the Original Equipment Manufacturer (OEM) for the systems contemplated herein, and that the Government does not possess a complete and unrestricted technical data package for these items.</p>\n\n<p><strong>2.0&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; SCOPE</strong></p>\n\n<p>The Government is seeking to establish a strategic and adaptable PBL contracting vehicle. The scope is envisioned in two parts: the Base Requirement, which will form the initial scope of the contract, and the Potential Future Requirements, which may be incorporated at a later date through in-scope contract modifications or as separately priced and exercised options.</p>\n\n<p><strong>2.1 Base Requirement: F-15 Pitch and Roll Channel Assembly (PRCA) and Aileron Rudder Interconnect (ARI)</strong></p>\n\n<p>The primary requirement of this PBL is to ensure the sustained availability of serviceable F-15 PRCA and ARI assets, including selected sub-components. The contractor shall be responsible for the full, integrated lifecycle management necessary to meet warfighter demand. This includes, but is not limited to, the manufacture and remanufacture of all field-requisitionable assets, comprehensive supply management, material support, and sustaining engineering functions.</p>\n\n<p>Performance will be measured against Government-defined Key Performance Indicators (KPIs) to incentivize the achievement of critical availability and support goals. The National Stock Numbers (NSNs) currently under consideration for the Base Requirement are listed in TABLE 1. This list is subject to modification prior to the release of a formal solicitation.</p>\n\n<p><strong><u>TABLE 1:</u></strong></p>\n\n<p><strong><u>Noun</u></strong></p>\n\n<p><strong><u>NSN</u></strong></p>\n\n<p><strong><u>P/N</u></strong></p>\n\n<p>Pitch &amp; Roll Channel Assy (PRCA-E)</p>\n\n<p>1650-01-398-0036</p>\n\n<p>A71500-4</p>\n\n<p>Pitch &amp; Roll Channel Assy (PRCA-E)</p>\n\n<p>1650-01-446-0599</p>\n\n<p>A71500-5</p>\n\n<p>&nbsp;PRCA-E Upgrade</p>\n\n<p>6615-01-702-6785</p>\n\n<p>A71500-007</p>\n\n<p>Pitch &amp; Roll Channel Assy (PRCA-C/D)</p>\n\n<p>1650-01-173-9697</p>\n\n<p>010-63055-22</p>\n\n<p>Pitch &amp; Roll Channel Assy (PRCA-C/D)</p>\n\n<p>1650-01-446-2029</p>\n\n<p>010-63055-24</p>\n\n<p>A-D PRCA Upgrade</p>\n\n<p>1650NCF624975</p>\n\n<p>010-63055-028</p>\n\n<p>Emergency Pressurization Assy (EPA-C/D/E)</p>\n\n<p>1650-00-000-0129</p>\n\n<p>010-65234-1</p>\n\n<p>Mode Select Assy (MSA-C/D)</p>\n\n<p>1650-01-104-9424</p>\n\n<p>010-59751-3</p>\n\n<p>Mode Select Assy (MSA-E)&nbsp;</p>\n\n<p>4810-01-251-8480</p>\n\n<p>A71503-2</p>\n\n<p>Roll Ratio Controller (C/D/E)</p>\n\n<p>1650-01-020-8689</p>\n\n<p>010-63078-7</p>\n\n<p>Roll Ratio Controller (C/D/E)</p>\n\n<p>1650-01-346-6328</p>\n\n<p>010-63078-8</p>\n\n<p>Pitch Ratio Controller (PRC-C/D/E)</p>\n\n<p>1650-00-535-7662</p>\n\n<p>010-63077-7</p>\n\n<p>Pitch Trim Controller (PTC) (F-15C/D)</p>\n\n<p>1650-01-008-7314</p>\n\n<p>010-63089-9</p>\n\n<p>Pitch Trim Controller (PTC) (F-15E)</p>\n\n<p>4810-01-396-3097</p>\n\n<p>A71504-6</p>\n\n<p>Ratio Changer and Booster Assy (F-15E)</p>\n\n<p>1650-01-446-2426</p>\n\n<p>A71502-4</p>\n\n<p>Ratio Changer and Booster Assy (C/D)</p>\n\n<p>1650-01-174-5735</p>\n\n<p>029-69733-3</p>\n\n<p>Ratio Changer and Booster Assy (C/D)</p>\n\n<p>1650-01-446-2030</p>\n\n<p>029-69733-5</p>\n\n<p>Aileron Rudder Interconnect (ARI-C/D/E)</p>\n\n<p>1650-01-050-3491</p>\n\n<p>010-63058-19</p>\n\n<p>Yaw Ratio Controller (F-15C/D/E)</p>\n\n<p>1650-01-015-7858</p>\n\n<p>010-33769-2</p>\n\n<p>Pitch Booster Upgrade</p>\n\n<p>1650-01-702-6827</p>\n\n<p>010-73251-007</p>\n\n<p>Roll Booster Upgrade</p>\n\n<p>1650-01-702-7511</p>\n\n<p>010-70623-003</p>\n\n<p>PRCA Upgrade Kit</p>\n\n<p>1560-01-693-6367</p>\n\n<p>CC12023-001</p>\n\n<p>ARI Upgrade&nbsp;</p>\n\n<p>1650-01-698-8844</p>\n\n<p>010-63058-021</p>\n\n<p>&nbsp; Roll Boost Act Upgrade</p>\n\n<p>1650-01-703-3833</p>\n\n<p>A01791-003</p>\n\n<p>&nbsp; Ratio Changer Upgrade</p>\n\n<p>1650-01-698-9765</p>\n\n<p>010-33778-006</p>\n\n<p>&nbsp; Lock Actuator Upgrade</p>\n\n<p>1650-01-702-3985</p>\n\n<p>029-67722-003</p>\n\n<p>ARI Upgrade kit</p>\n\n<p>1560-01-693-6368</p>\n\n<p>CC12024-001</p>\n\n<p></p>\n\n<p><strong>2.2 Potential Future Requirements: Expanded Workload</strong></p>\n\n<p>The Government is highly interested in structuring this PBL contract to accommodate the on-ramping of additional sole-sourced components for which Moog Inc. is the OEM. This framework is intended to provide a flexible and efficient mechanism to add workload as depot activation strategies are finalized or as other sustainment needs are identified.</p>\n\n<p>These potential future items may be added to the contract vehicle at a later point in time, with distinct performance metrics and pricing structures as appropriate. Items currently in consideration for future inclusion are listed in TABLE 2 and may fall into one of two categories:</p>\n\n<ol>\n\t<li>Items pending Depot-level maintenance activation.</li>\n\t<li>Items currently repaired under separate contract by the OEM.</li>\n</ol>\n\n<p>This list is not exhaustive, and the Government is interested in industry feedback on the most effective contractual methods to incorporate this and other potential future work.</p>\n\n<p><strong><u>TABLE 2:</u></strong></p>\n\n<p><strong><u>Noun</u></strong></p>\n\n<p><strong><u>NSN</u></strong></p>\n\n<p><strong><u>P/N</u></strong></p>\n\n<p><strong><u>Notes</u></strong></p>\n\n<p>F-15EX RUDDER ACTUATOR</p>\n\n<p>1680016289363SA</p>\n\n<p>&nbsp;CB06349-007</p>\n\n<p>Depot Activation processes have begun by the F-15EX System Program Office (SPO)</p>\n\n<p>KC-46 ACTUATOR, ELEVATOR</p>\n\n<p>1650016961146</p>\n\n<p>CB61135-003</p>\n\n<p>424 SCMS activation goal FY31</p>\n\n<p>KC-46 ELEVATOR FEEL COMP</p>\n\n<p>1560016537583</p>\n\n<p>CB23710-001</p>\n\n<p>424 SCMS activation goal FY29</p>\n\n<p>KC-46 TELESCOPE ACTUATOR</p>\n\n<p>1680016856454</p>\n\n<p>CC24576-004</p>\n\n<p>424 SCMS activation goal TBD</p>\n\n<p>KC-46 STAB TRIM CON MOD</p>\n\n<p>1560016541161</p>\n\n<p>160201-103</p>\n\n<p>424 SCMS activation goal FY31</p>\n\n<p>KC-46 RUDDER ACTUATOR</p>\n\n<p>1650016618031</p>\n\n<p>CB61131-001</p>\n\n<p>No current activation goal&nbsp;</p>\n\n<p>KC-46 AUTOPILOT SERVO</p>\n\n<p>1680016535500</p>\n\n<p>A28321-18</p>\n\n<p>424 SCMS activation goal FY31</p>\n\n<p>KC-46 VALVE ASSEMBLY</p>\n\n<p>4820016535507</p>\n\n<p>A28320-15</p>\n\n<p>No current activation goal</p>\n\n<p>KC-46 ACTUATOR,MECHANICAL</p>\n\n<p>1680016536230</p>\n\n<p>A28640-12</p>\n\n<p>424 SCMS activation goal FY28</p>\n\n<p>KC-46 SERVOVALVE,HYDRAULI</p>\n\n<p>1650015892453</p>\n\n<p>A71882-003</p>\n\n<p>No current activation goal</p>\n\n<p>KC-46 VALVE ASSEMBLY</p>\n\n<p>4820016612199</p>\n\n<p>920129-300</p>\n\n<p>No current activation goal</p>\n\n<p>KC-46 VALVE ASSEMBLY</p>\n\n<p>4810016233340</p>\n\n<p>401-09772-03</p>\n\n<p>424 SCMS activation goal FY32</p>\n\n<p>KC-46 BRAKE ASSEMBLY,STAB</p>\n\n<p>1630015210581</p>\n\n<p>160500-101</p>\n\n<p>No current activation goal</p>\n\n<p>F-16 Power Drive Unit, Hydro-Mechanical (PDU)</p>\n\n<p>1650013061268</p>\n\n<p>C36909-001</p>\n\n<p>5-year repair contract with Moog awarded August 2025</p>\n\n<p>F-16 Power Drive Unit, Hydro-Mechanical (PDU)</p>\n\n<p>1650013406328</p>\n\n<p>C36909-002</p>\n\n<p>5-year repair contract with Moog awarded August 2025</p>\n\n<p></p>\n\n<p><strong>3.0&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Background</strong></p>\n\n<p>In its passive state, the PRCA serves as a link between the pilot&rsquo;s control stick and the control surface power servos of the primary flight control system pitch and roll channels. When activated by pilot selection, it provides hydraulic force boost to the unit outputs and modifies the control linkage ratios as a function of a predetermined air data program. In the roll channel, it serves as a function of the pitch channel output. It also introduces a trim displacement. The rate of displacement is proportional to the difference between commanded and measured normal acceleration as determined by stick displacement.</p>\n\n<p>The ARI accepts mechanical roll and yaw commands from the control stick and rudder pedals. The unit adds to the yaw command a series input proportional to the roll command. This input is dependent in size and sign (direction) upon the position of the pitch output from the PRCA. The resulting output is then passed to the rudder servo-actuators via the aircraft mechanical control system.</p>\n\n<p></p>\n\n<p><strong>4.0&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Issues and Constraints</strong></p>\n\n<p>Worldwide PRCA, components and ARI availability are consistently below 448 Supply Chain Management Wing established targets, driving backorders and Mission Capability (MICAPs).&nbsp; Several root causes contribute to low levels of serviceable availability worldwide. &nbsp;It has been determined that the OO-ALC Depot is constrained by material shortages, the absence of engineering services/technical assistance from the OEM, and the obsolescence of test and support equipment.&nbsp; Additionally, the government is requiring kitting support.&nbsp; Improving end item PRCA, ARI, and subcomponent availability is the primary objective of this PBL effort.</p>\n\n<p></p>\n\n<p><strong>5.0 &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Developing Strategy</strong></p>\n\n<p></p>\n\n<p>The Contractor&rsquo;s performance shall include utilizing the Air Force overhaul facility at Hill AFB through a Public Private Partnership (PPP) and Direct Sales Agreement (DSA), through which utilization shall result in maintaining Government core capability IAW Title 10 of the U.S. Code (10 USC 2464) and Department of Defense (DoD)/Air Force Instructions.&nbsp; The touch labor for overhaul/repair of PRCA, ARI, and selected subcomponents shall remain organic to the maximum extent possible.</p>\n\n<p></p>\n\n<p><strong>Intent of RFIC:</strong></p>\n\n<ol>\n\t<li>Identify potential sources that are capable, experienced, and qualified in satisfying the requirement.</li>\n\t<li>Enhance competition by identifying contracting and sub-contracting opportunities.</li>\n\t<li>Request suggestions from Industry regarding the development of this contract.</li>\n</ol>\n\n<p></p>\n\n<p><strong>Responses to this Sources Sought should address the following questions:</strong></p>\n\n<ol>\n\t<li>Please provide the following business information for your company and for any teaming and joint venture programs:\n\t<ol>\n\t\t<li>Company Name</li>\n\t\t<li>Address</li>\n\t\t<li>Point of Contact</li>\n\t\t<li>Cage Code</li>\n\t\t<li>Unique Entity ID</li>\n\t\t<li>Business Unit</li>\n\t\t<li>Phone Number</li>\n\t\t<li>E-mail Address</li>\n\t\t<li>Web Page URL</li>\n\t\t<li>Size of Business and North American Industry Classification (NAICS) Code</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p></p>\n\n<ol>\n\t<li>Describe your experience executing relevant performance-based logistics &amp; supply chain management programs in support of USAF requirements and worldwide aviation customers.</li>\n\t<li>What do you envision as the risks associated with this effort and how would you mitigate them?</li>\n\t<li>Describe your company&rsquo;s ability and experience in sourcing F-15 PRCA and ARI spare parts from Moog and other aviation suppliers.</li>\n\t<li>Does your company possess, or have unassisted access to all necessary technical data to perform under this performance-based supply chain management contract?</li>\n\t<li>Are you qualified to manufacture and/or repair any of the components listed in this announcement?</li>\n\t<li>Describe your test facilities, warehousing, transportation, manufacturing, and workforce capabilities and capacity and inventory management relating to the scope of this project.</li>\n\t<li>Describe your current repair/remanufacture capabilities for the F-15 PRCA and ARI assemblies.</li>\n\t<li>How much transition time would your company require to perform on this contract?</li>\n\t<li>What quality control measures do you currently have in place (ISO 9000, 9001, AS9100, NADCAP (National Aerospace and Defense Contractors Accreditation Program)?</li>\n\t<li>Describe your experience with Government Source Inspection, Hardness Critical Items, and other OSHA standards.</li>\n\t<li>Are you currently registered in the System for Award Management and Wide Area Workflow?</li>\n\t<li>The current F-15 A-D PRCA DSOR (11-256) workload is approved for a workload split of 87% OO-ALC and 13% contract repair.&nbsp; Does your company have any capacity constraints, and if so, what are your mitigation plans?</li>\n</ol>\n\n<p></p>\n\n<p></p>\n\n<p>The government is accepting responses to this request for information via email only.&nbsp; Please provide written responses to the Contracting Officer and Program Managers. The responses are due 30 days after the RFI is posted to the following email addresses:</p>\n\n<p></p>\n\n<p>Michelle Mihu</p>\n\n<p>Contracting Officer</p>\n\n<p>Michelle.mihu@us.af.mil</p>\n\n<p></p>\n\n<p>Anna Bassett</p>\n\n<p>Program Manager</p>\n\n<p>Anna.bassett@us.af.mil</p>\n\n<p></p>\n\n<p>Camilla Zampedri</p>\n\n<p>Program Manager</p>\n\n<p>Camilla.zampedri@us.af.mil</p>\n\n<p></p>","origin":"detail"},"contacts":[{"name":"Michelle Mihu","role":"primary","email":"michelle.mihu@us.af.mil"}],"place_of_performance":null,"office_address":{"zip":"84056-5820","city":"HILL AIR FORCE BASE","state":"UT","country":"USA"},"naics_codes":["336413"],"award":null,"attachments":[{"resource_id":"e334b993ceae4d0e812688f18ac1ff73","name":"PRCA and ARI PBL RFIC.pdf","kind":"file","mime_type":".pdf","size_bytes":240970,"posted_at":"2026-02-23T15:00:48.917Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e334b993ceae4d0e812688f18ac1ff73/download","mirrored":false}],"awards":[],"related":[{"key":"SPRHA127Q0056","latest_notice_id":"5cd4623f25f5409da58eb34ec5213747","title":"KC-135 Directional Sleeve","solicitation_number":"SPRHA1-27-Q-0056","notice_type":"r","first_type":"r","first_posted":"2026-11-10","last_posted":"2026-11-10","notices":1,"due_at":"2026-11-25T19:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRHA1","office_name":"DLA AVIATION AT OGDEN, UT","naics":"336413","psc":"1650","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1650)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"SPRHA127Q0993","latest_notice_id":"6065286d78f04e5ebd07038cb3c41cef","title":"BALLSCREW ASSEMBLY For C-130","solicitation_number":"SPRHA1-27-Q-0993","notice_type":"o","first_type":"o","first_posted":"2026-10-29","last_posted":"2026-10-29","notices":1,"due_at":"2026-11-28T21:00:00Z","due_date":"2026-11-28","closes_at":"2026-11-28T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRHA1","office_name":"DLA AVIATION AT OGDEN, UT","naics":"336413","psc":"1620","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1620)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-30T03:41:17.879115Z"},{"key":"SPRHA127Q0992","latest_notice_id":"a95ebc03dffc49159d4a9332c8f39f93","title":"PLENUM, TURBINE FOR THE POWER SYSTEMS","solicitation_number":"SPRHA127Q0992","notice_type":"o","first_type":"o","first_posted":"2026-10-29","last_posted":"2026-10-29","notices":1,"due_at":"2026-11-29T21:59:00Z","due_date":"2026-11-29","closes_at":"2026-11-29T21:59:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRHA1","office_name":"DLA AVIATION AT OGDEN, UT","naics":"333611","psc":"2835","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 2835)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-30T03:41:17.879115Z"},{"key":"SPRHA127R0050","latest_notice_id":"4d8c181768594c2780ced968d2bcfd02","title":"INSERT,ELECTRICAL,H","solicitation_number":"SPRHA1-27-R-0050","notice_type":"r","first_type":"r","first_posted":"2026-11-12","last_posted":"2026-11-12","notices":1,"due_at":"2026-11-30T17:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRHA1","office_name":"DLA AVIATION AT OGDEN, UT","naics":"336413","psc":"1620","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1620)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"},{"key":"SPRHA427Q0036","latest_notice_id":"fc74f1a38f99400d91a385e82e53f8a0","title":"F-16 Grip Assembly, Contr","solicitation_number":"SPRHA4-27-Q-0036","notice_type":"o","first_type":"o","first_posted":"2026-10-26","last_posted":"2026-10-29","notices":2,"due_at":"2026-12-01T06:59:00Z","due_date":"2026-11-30","closes_at":"2026-12-01T06:59:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRHA1","office_name":"DLA AVIATION AT OGDEN, UT","naics":"336413","psc":"1680","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1680)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-30T03:41:17.879115Z"}],"similar_open":[{"key":"FD2030240080002","latest_notice_id":"2c50e1fbd2764ca3bb184df240aa228a","title":"MOTOR, HYDRAULIC_End_Item_F-16_NSN_1650015681044_PN_FA100009-001","solicitation_number":"FD20302400800-02","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-25T17:59:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T17:59:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRTA1","office_name":"DLA AVIATION AT OKLAHOMA CITY, OK","naics":"336413","psc":"1650","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1650)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"SPRPA127RWA06","latest_notice_id":"62027fdd1ec0472296a914565dd09ba8","title":"16--DRIVE UNIT,HYDRAULI","solicitation_number":"SPRPA127RWA06","notice_type":"o","first_type":"p","first_posted":"2026-10-22","last_posted":"2026-11-10","notices":2,"due_at":"2026-11-25T18:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"336413","psc":"1650","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1650)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"SPE4A727R0021SYNOPSIS","latest_notice_id":"dabd184dc6c844029ee2caeda80339a1","title":"FLUID FILTER ELEMENT / E2A, AH-64E APACHE HELICOPTER","solicitation_number":"SPE4A727R0021-Synopsis","notice_type":"p","first_type":"p","first_posted":"2026-10-09","last_posted":"2026-10-09","notices":1,"due_at":"2026-11-25T19:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPE4A7","office_name":"DLA AVIATION","naics":"336413","psc":"1650","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1650)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-06T04:46:59.158685Z"}],"similar_open_total":568,"indexable":false}