Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,729 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Combined synopsis and solicitation, first published as sources sought

Combined Synopsis / Solicitation for Containment Case B1 Flange Repair Limit Exploration in support of the F108 Engine

SPE4AX-25-R-F108-0002

Defense Logistics Agency, DLA Aviation. Other Aircraft Parts and Auxiliary Equipment Manufacturing.

Response deadline

October 17, 2025 at 5:00 PM EDT

Closed 404 days ago. Posted September 16, 2025, first published September 5, 2025. Scheduled to archive November 1, 2025.

Get the next one like this from Defense Logistics Agency by email, the day it is posted.Find my opportunities

This one closed in 2025

568 like it are open now in other aircraft parts and auxiliary equipment manufacturing

All 568 open in other aircraft parts and auxiliary equipment manufacturing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 336413 (other aircraft parts and auxiliary equipment manufacturing), means no more than 1,250 employees, counted with affiliates. What a set-aside is
Time to respond
Bidders had 31 days from the day the solicitation was posted, September 16, 2025, to the deadline. The deadline moved once: it was first September 12, 2025 and ended as October 17, 2025.
Before the solicitation
The agency published a sources sought on September 5, 2025, 11 days before the solicitation.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

This notice serves as DLA Aviation’s combined synopsis/solicitation as described in FAR 12.603, in accordance with FAR 5.201 and the approved J&A, for addition of providing support to identify acceptable repairability limits for hole numbers 70 and 71 on the Containment Case B1 Flange for the CFM56-7B27 series of engines (USAF F108) in support of the United States Navy (USN) and provide reports documenting the findings.. Addition to sole source Long Term Contract SPE4AX-25-D-9406 to CFM International Inc. (CFM), Contractor and Government Entity (CAGE) code 58828.

This is a FAR part 12 effort being added to the current contract SPE4AX-25-D-9406.

B1 Flange support services for the United States Air Force (USAF) are being solicited to be added to contract SPE4AX-25-D-9406, awarded to CFM International Inc. CAGE 58828. Actual requirements for the additional scope will be negotiated and added to the basic contract. Individual requirements are certified as sole source to CFM and synopsized in accordance with FAR 5.201.

DLA Aviation will issue a letter solicitation (RFP) to the sole source Original Equipment Manufacturer (OEM). If any non-OEM source is interested in any of the NSNs, please notify the Contracting Officer prior to the combined synopsis/solicitation closing date. A copy of the letter of interest should be forwarded to the Contracting Officer identified herein. The Government may alter the acquisition strategy if it is in the best interest of the Government. In order to receive an award, you must be registered in the System for Award Management (SAM). SAM registration is at https://www.sam.gov.

It is anticipated that this requirement will be added as a separate line item to the current sole source CFM COI contract SPE4AX-25-D-9406.  The data required to perform the necessary services is CFM’s proprietary and confidential commercial intellectual data and cannot be shared or provided by the Government. Only sources able to gather the required performance data will be considered as a qualified source.

The scope of work is as follows:

The United States Navy (USN) identified cracking in the Fan Containment Case B1 flange, originating at lug number 71, on two separate occasions. The driving mode for these cracks has preliminarily been identified as low-stress, high-cycle fatigue (HCF) likely caused by vibration of the Integrated Drive Generator (IDG) retention lanyard. This vibration would theoretically drive cyclic torsional and shear stresses at B1 flange lug number 71 via the IDG retention lanyard bracket mounted to the containment case at lugs #70 and #71.

The USN desires to understand the hypothetical limits and repair procedures associated with transverse cracks propagating between the scallops of lugs #70 and #71 on the Fan Containment case B1 flange. This effort is limited to determining the feasibility and dimensional limits of a hypothetical repair on these 2 lugs, inclusive of removal of the entirety of the material of B1 flange lugs #70 and #71 down to or below the flange minimum radial height in the scallops between lugs. The scope of the effort is not to validate the removal of the IDG lanyard, nor to redesign the lanyard brackets and configuration.

The Contractor will be responsible for delivering;

  1. Documentation, including a breakdown and timeline of work tasking, for performance of the repair limit development work as outlined in this document.
  2. A Technical Data Package (TDP) summarizing:
    1. Analyses performed
    2. Underlying modeling or analysis assumptions.
    3. Test and validation data used if any
    4. High level description of modeling or analysis results
  3. A Technical Data Package (TDP) inclusive of:
  1. Hypothetical Repairability Limits
    1. Inclusive of min/max depth, distances, and radii, and their associated dimensional tolerances, relative to reference points and/or planes usable for machining operations and inspection of a hypothetical repaired flange.
    2. Calling out both the maximum/minimum recommended and allowable dimensional limits for the hypothetical repair, if they are different.
  1. Hypothetical Repair Procedure
    1. Inclusive of min/max depth, distances, and radii, and their associated dimensional tolerances, relative to reference points and/or planes usable for machining operations and inspection of a hypothetical repaired flange.
    2. Recommended inspection(s), if any, to ensure conformance to part material specifications and component functionality (e.g. local surface hardness, grain size, surface roughness)

Requirements of this effort are as follows;

1.Work Planning
The Contractor shall provide support and documentation, including a rough order of magnitude (ROM) cost and plan of action and milestones (POAM) for performance of the work as outlined in this document.

2. Technical Analysis
 The Contractor shall perform analysis to support an assessment of the limiting dimensions of the hypothetical flange repair identified in this project inclusive of, but not limited to, the critical elements of the Modeling and Simulation analysis.

3. Hypothetical Repair Documentation
The Contractor shall develop a Technical Data Package (TDP) that defines the methods of implementing and the dimensional constraints of this hypothetical repair.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 5, 2025

    Sources sought

    Sources Sought for a potential Supply Chain Management Contract for F108 Engine Support – B1 Flange

    Due September 12, 2025 at 5:00 PM EDT. SAM.gov, notice 8f0022ce152743efb388f05fc8e400a3

    3 revisions on SAM
    • September 16, 2025: publish, combined synopsis and solicitation
    • September 5, 2025: publish, sources sought
    • September 5, 2025: publish, sources sought
  2. September 5, 2025

    Sources sought

    Sources Sought for a potential Supply Chain Management Contract for F108 Engine Support – B1 Flange

    Due September 12, 2025 at 5:00 PM EDT. SAM.gov, notice e6ece26bc0cb47cd8fc96fe7125e8dd9

    2 revisions on SAM
    • September 5, 2025: publish, sources sought
    • September 5, 2025: publish, sources sought
  3. September 16, 2025

    Combined synopsis and solicitation, originally sources sought

    Due October 17, 2025 at 5:00 PM EDT. SAM.gov, notice 5e1bb87b6d214338a1afbcccac91d477

    2 revisions on SAM
    • September 16, 2025: publish, combined synopsis and solicitation
    • September 5, 2025: publish, sources sought

Points of contact