Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,425 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Solicitation, total small business set-aside

Two (2) Computer Numerically Controlled (CNC) Shot Peen Systems

SPE4A825Q00520002

Defense Logistics Agency, DLA Aviation. Machine Tool Manufacturing.

Response deadline

September 8, 2025 at 4:00 PM EDT

Closed 444 days ago. Posted August 25, 2025. Scheduled to archive September 23, 2025.

Get the next one like this from Defense Logistics Agency by email, the day it is posted.Find my opportunities

This one closed in 2025

9 like it are open now in machine tool manufacturing

  • Horizontal Machining Centers

    Defense Logistics Agency, DLA Aviation

    PresolicitationNAICS 333517Ship to Silverdale, WASPE4A827Q0017
    Due todayNov 26
  • X209 Mazak FUSE System FY27

    Department of Energy, ORNL Ut-Battelle LLC-DOE Contractor

    Combined synopsis and solicitationNAICS 333517Ship to Oak Ridge, TNRFP510922
    Due tomorrowNov 27
  • SHEARING MACHINE,SH

    Defense Logistics Agency, DLA Troop Support

    Combined synopsis and solicitationSmall businessNAICS 333517Ship to the buyerSPE8E627T0663
    Due in 2 daysNov 27

All 9 open in machine tool manufacturing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 333517 (machine tool manufacturing), means no more than 500 employees, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 14 days from the day the solicitation was posted, August 25, 2025, to the deadline.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

The purpose of this amendment is to:

1.The solicitation SPE4A8-25-Q-0052, for Two (2) Automated Shot Peen Booths in accordance with Purchase Description VIBB 23-20-1101, Dated 01 July 2025, close date will be extended until COB 08 September 2025. The purpose of this extension is to provide answers to questions:

Vendor Questions:
1.    How many parts will need to be programmed? 
2.    Will parts (test fixtures) be available to ship to vendor for the factory programming and testing?
3.    Do they intend to keep using both media sizes (CW14 and CW28)?
4.    Does Plan of Action and Milestones have to be submitted in Microsoft Project or will Excel or other software be acceptable?
5.    How many amps are available in the building (need to confirm there is enough power to run the equipment)?
6.    How many parts will be run for the Acceptance Testing?
7.    It is my understanding that there may be a preferred electrician that Tinker already uses and is familiar with installations at Tinker. I believe the previous Hartwig salesman used said electrician, but I can’t locate any past records of the company. Is there a preferred electrician that we can contact for electrical connections? 
8.    Is the point of electrical connection at the bus bar above the machine?
9.    During the walkthrough we were not allowed to take photos. Can you provide photos of the existing machine, the overall space, the current air compressor, and the power and air connection points (For the machine photos, we would like to see both the inside and outside of the blast machine, as well as the recovery system and dust collector)?
10.     What is the CFM capacity and pressure of the existing compressor? 
11.     What is the maximum AMP capacity and voltage of the existing power supply?
12.     The SOW specifies the use of CNC controls. This is antiquated technology. Will you accept a design proposal that utilizes a Fanuc Robot in lieu of the CNC controls?
13.     Can you provide 7 days per week access to the site for our installation crew? 
14.     During the walkthrough the size of the media was discussed with the possibility of only one size media being used. This would simplify the machine design and reduce the overall cost. Is this a possibility? And if so, what size media will be used (The current machine runs both 0.014” & 0.028” abrasive)?
15.     During the walkthrough we were told that you may not have enough power to operate both machines simultaneously. Is this true? And if so, can we control this in our control panel by linking the 2 together via an ethernet connection?
16.     Conversely, could both machine cabinets chambers be combined into one system (with one common recovery system, and one control panel which would control both blast chambers)? 
17.     2.1.2 - Cannot locate attachments A-F. Can these be forwarded? 
18.     3.4, 3.8 - Can you confirm the required Maximum Part Diameter (The table indicates 57”, yet the current machine’s capacity is 48”)? 
19.    3.14.1 – Can you please describe the “disposal” of the current machine in more detail (Is the contractor responsible for transporting old equipment to a DRMO facility on the Naval Air Station Jacksonville for the government to scrap, or will it be moved off the Air Station and disposed of at the contractor’s expense)? 
20.     4.6.1. h. – Refers to the “image below”, yet no image is included. Can you provide the image? 
21.     4.6.2. h. – Refers to the “image below”, yet no image is included. Can you provide the image? 

Answer to Questions:
1.    No parts will need to be programmed by the contractor. The government will be performing part programming after receiving training.
2.    Upon contract award, test fixtures could be shared with the vendor that was awarded the contract.
3.    Production has said we must maintain both sizes of shot, CW14 and CW28.
4.    Microsoft Project, Excel, and Access would all be acceptable software to use for submittal.
5.    150 Amps.
6.    Two parts, one for each booth.
7.    There are no preferred electricians.
8.    Electrical connection is located on the back wall behind the automated booth.
9.    NO.
10.    Maximum working pressure of 125psig with 860 cfm. Kaesar DSD200.
11.    480 volts, 150 amps.
12.    Yes, we will accept other robotic solutions that are able to fulfill the requirements other than CNC.
13.    Yes.
14.    Production has said we must maintain both sizes of shot, CW14 and CW28.
15.    The total power availability is above. If this is not enough power, this is an acceptable solution.
16.    Yes, this would be acceptable.
17.    Please See C Folder for attachments.
18.    The maximum part diameter will need to be 57” in order to account for new workload.
19.    The contractor shall be responsible for disposing of all scrap off of the base.
20.    Statement to be removed from SOW.
21.    Statement to be removed from SOW.

2. All offers will be considered valid for 120 days from the closing date in this amendment.

3. Before award, direct any questions to Christina Petrone at Christina.Petrone@dla.mil.

4. All other terms and conditions remain the same.

List of Attachments:
Attachment A: Purchase Description VIBB 23-20-1101, Dated 01 July 2025, for the Acquisition of Two (2) Automated Shot Peen Booths.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 25, 2025

    Solicitation, originally presolicitation

    Due September 8, 2025 at 4:00 PM EDT. SAM.gov, notice ad2db7c52c534af69a1d7685a915b751

    2 revisions on SAM
    • August 25, 2025: publish, solicitation
    • March 17, 2025: publish, presolicitation

Points of contact