Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,678 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans

Sources sought

SLAC SSRL 10S Alcove Shielding Replacement

SLAC_RFP_362155

Department of Energy, SLAC Natl Accel Lab -DOE Contractor. Foundation, Structure, and Building Exterior Contractors.

Response deadline

February 11, 2026 at 8:00 PM EST

Closed 287 days ago. Posted February 4, 2026. Scheduled to archive February 26, 2026.

Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. What a set-aside is
What comes next
No solicitation was published under this number after the sources sought of February 4, 2026. An agency sometimes issues the solicitation under a new number.

Description

As published on SAM.gov.

THIS POSTING IS FOR "SOURCES SOUGHT ONLY." PLEASE DO NOT SUMBIT BIDS. While the DRAFT RFP package has been included with this post, the RFP has NOT yet been released.

Interested Vendors should express their interest on the Interested Vendors List through this SAM.GOV posting or emailing the procurement specialist.
 

SSRL 10S Alcove Shielding Replacement – Build portion of Design-Bid-Build

The SLAC National Accelerator Laboratory (SLAC) is a U.S. Department of Energy, Office of Science (SC) laboratory that supports a large national and international community of scientific users performing cutting-edge research in support of the Department’s mission. 

Minimum Qualifications

  • The Offeror’s General Contractor’s license has not been revoked within the past five (5) years.
  • The Offeror’s company has not been debarred within the past five (5) years from working on any U.S. government contracts/subcontracts.
  • Neither the Offeror’s firm, nor any of its owners or officers have been convicted of a crime involving the awarding of the contract of a government (U.S. Federal, State, and City) construction project, or the bidding or performance of a government contract.
  • Offeror must have an established local office for a minimum of 2 years in the San Francisco Bay Area. The San Francisco Bay Area is defined as the following 10 counties: Santa Clara, San Mateo, San Francisco, Alameda, Contra Costa, Marin, Napa, Sonoma, Solano, and Santa Cruz Counties
  • The Offeror must list any U.S. projects within the past five (5) years that have been terminated for default. The Offeror’s company cannot have any U.S. projects within the past five (5) years that have been terminated for default.
  • The Offeror must have previous experience working at Department of Energy (DOE) and/or Department of Defense (DOD) Facilities

Scope

The SSRL 10S Alcove Shielding Replacement project consists of demolition and reconstruction of the concrete shielding structure at the 10S straight section of the SPEAR ring to:

  • Accommodate a new insertion device.
  • Enable out-of-alcove beam extraction.
  • Bring shielding structures up to current seismic and DOE 420.1C requirements.
  • Prepare the alcove for future beamline installation.

All construction must occur during the 2026 SSRL summer shutdown (July 2026 – September 2026) to avoid impact to ongoing SPEAR operations.

Project consists of the modification and reconstruction of the existing SSRL 10S Alcove section to support installation of a new insertion device for the SPEAR ring. The project will expand the current alcove footprint using new cast-in-place concrete shielding walls and removable roof blocks and aligning the area with current seismic and structural design standards. Major project elements include: Structural & Shielding Work: Demolition of existing concrete walls, ceiling panels, and roof shielding blocks, followed by construction of new cast-in-place concrete shielding walls and removable roof blocks designed to meet current seismic criteria.

Increased alcove footprint and ceiling height to accommodate the upcoming insertion device and required operational clearances. Integration of new embedded steel and support elements within the shielding walls for future utilities, cable routing, and safety system installations.

Construction and installation of a new concrete rolling block door to maintain radiation shielding and allow equipment access. Waterproofing of roof-block gaps and flashing at modified exterior interfaces.

Electrical Systems: Modification and relocation of existing electrical systems, including power distribution, lighting, and backup generator connections. Temporary generator installation, if required, to maintain operations during the period in which the existing generator must be removed for construction access. Removal of all existing alcove lighting during demolition and reinstallation of new lighting after the expansion is complete. Relocation or temporary storage of utilities to maintain service continuity during construction.

Architectural & Building Modifications: Minor exterior and interior architectural modifications to Building 131 to support access to the shielding enclosure and accommodate changes in shielding wall and roof elevation. Removal of an existing door and infill of the wall with materials matching existing adjacent conditions.

Protection of the experimental floor, SPEAR ring components, and all exposed SSRL equipment during construction activities. Safety & Fire Systems: Removal and relocation of the red manual fire alarm pull station currently located inside the existing alcove door, to be reinstalled per code after reconstruction.

Coordination with SLAC Fire Marshal and SSRL safety groups to ensure all life-safety systems remain compliant during phased construction.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. February 5, 2026

    Sources sought

    Due February 11, 2026 at 8:00 PM EST. SAM.gov, notice f166c0b29c4f45d08f7cc22a10051a8c

    1 revision on SAM
    • February 5, 2026: publish, sources sought

Points of contact