# VAlve

Canonical: https://sealedbidder.com/opportunities/slac357639valve

- Solicitation number: SLAC_357639_Valve
- Notice type: Solicitation
- Status: Closed. Deadline was July 30, 2025 at 8:00 PM EDT
- Department: Department of Energy
- Contracting office: SLAC Natl Accel Lab -DOE Contractor (899040)
- NAICS: 333310 Commercial and Service Industry Machinery Manufacturing
- Product or service code: AJ12 General Science And Technology R&D Services; General Science And Technology; Applied Research
- Small business size standard: 1,000 employees (13 CFR 121.201, NAICS 333310)
- Place of performance: Menlo Park, California
- County: San Mateo County (FIPS 06081). https://sealedbidder.com/counties/san-mateo-county-ca-06081
- City: Menlo Park. https://sealedbidder.com/cities/menlo-park-ca-0646870
- First posted: July 15, 2025
- Last posted: July 16, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/2effa695612d4ec88cc667d141ca6b12/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 333310 (commercial and service industry machinery manufacturing), means no more than 1,000 employees, counted with affiliates.
- Time to respond: Bidders had 15 days from the day the solicitation was posted, July 15, 2025, to the deadline.

## Description

SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions.

The following Addendum is being issued for the subject Request for Quotation: #357639_Valve

	Required item listed Qty revised:

		Item #4:

Flow Safe Spring Op. Relief Valve                               QTY: 1

P/N S846B-15RF2-02RF2-SS-SS-TT

Body & Trim: SS

Inlet: 1 1/2&rdquo; 300# RF-ANSI Flange

Outlet: 2&rdquo; 150# RF-ANSI Flange

Seat: Teflon

Seals: Teflon

Set Point: 320 psig

Process: He gas @ -321

Functional Test Report, C of C

This Addendum modifies the Request for Quotation and must be acknowledged. Failure to acknowledge all addenda could make your proposal non-responsive.  Please confirm that the submitted proposal is not changed because of this addendum. If proposal sent is revised because of this, please submit the revised proposal.

The following changes are hereby made to the appropriate documents contained the above-mentioned Request for Quotation (RFQ). All other terms and conditions of the RFQ remain the same.

---------------------------------------------------------------------------------------------------------------------------------

The follow has been attached for you to complete and review:

	(BAA) Buy American Act Certification

	Representations & Certifications Rider

	Confirm Attached SLAC terms are accepted: FP Commercial Supplies-Services T&Cs (August 2023)

Required item(s) listed below:

	Flow Safe Spring Op. Relief Valve                                  QTY: 1

P/N S84JE-02RF1-03RF1-SS-SS-TT

Body & Trim: SS

Inlet: 2&rdquo; 150# RF-ANSI Flange

Outlet: 3&rdquo; 150# RF-ANSI Flange

Seat: Teflon

Seals: Teflon

Set Point: 70 psig

Process: He gas @ -321

Functional Test Report, C of C

	Flow Safe Spring Op. Relief Valve                                  QTY: 1

P/N S84FD-15RF1-02RF1-SS-SS-TT

Body & Trim: SS

Inlet: 1 1/2&rdquo; 150# RF-ANSI Flange

Outlet: 2&rdquo; 150# RF-ANSI Flange

Seat: Teflon

Seals: Teflon

Set Point: 145 psig

Process: He gas @ -321

Functional Test Report, C of C

	Flow Safe Spring Op. Relief Valve                                  QTY: 1

P/N S841M-05RF2-05RF2-SS-SS-TT

Body & Trim: SS

Inlet: 1/2&rdquo; 300# RF-ANSI Flange

Outlet: 1/2&rdquo; 300# RF-ANSI Flange

Seat: Teflon

Seals: Teflon

Set Point: 320 psig

Process: H2 @131

Functional Test Report, C of C

	Flow Safe Spring Op. Relief Valve                               QTY: 2

P/N S846B-15RF2-02RF2-SS-SS-TT

Body & Trim: SS

Inlet: 1 1/2&rdquo; 300# RF-ANSI Flange

Outlet: 2&rdquo; 150# RF-ANSI Flange

Seat: Teflon

Seals: Teflon

Set Point: 320 psig

Process: He gas @ -321

Functional Test Report, C of C

	Flow Safe Spring Op. Relief Valve                               QTY: 1

P/N S848B-01RF2-01RF2-SS-SS-TT

Body & Trim: SS

Inlet: 1&rdquo; 300# RF-ANSI Flange

Outlet: 1&rdquo; 300# RF-ANSI Flange

Seat: Teflon

Seals: Teflon

Set Point: 320 psig

Process: He gas @ -428

Functional Test Report, C of C

	Flow Safe Spring Op. Relief Valve                               QTY: 2

P/N S846B-15RF1-02RF1-SS-SS-TT

Body & Trim: SS

Inlet: 1 1/2&rdquo; 150# RF-ANSI Flange

Outlet: 2&rdquo; 150# RF-ANSI Flange

Seat: Teflon

Seals: Teflon

Set Point: 145 psig

Process: N2 gas @ -268

Functional Test Report, C of C \

	Flow Safe Spring Op. Relief Valve                               QTY: 1

P/N S842M-34RF1-01RF1-SS-SS-TT

Body & Trim: SS

Inlet: 3/4&rdquo; 150# RF-ANSI Flange

Outlet: 1&rdquo; 150# RF-ANSI Flange

Seat: Teflon

Seals: Teflon

Set Point: 145 psig

Process: N2 gas @ -268

Functional Test Report, C of C

	Flow Safe Spring Op. Relief Valve                                      QTY: 1

P/N S841M-05RF2-05RF1-SS-SS-TT

Body & Trim: SS

Inlet: 1/2&rdquo; 300# RF-ANSI Flange

Outlet: 1/2&rdquo; 150# RF-ANSI Flange

Seat: Teflon

Seals: Teflon

Set Point: 320 psig

Process: He gas @ 131

Functional Test Report, C of C

	Flow Safe Spring Op. Relief Valve                               QTY: 1

P/N S84HE-02RF1-03RF1-SS-SS-TT

Body & Trim: SS

Inlet: 2&rdquo; 150# RF-ANSI Flange

Outlet: 3&rdquo; 150# RF-ANSI Flange

Seat: Teflon

Seals: Teflon

Set Point: 75 psig

Process: He gas @ 80

Functional Test Report, C of C

	Flow Safe Spring Op. Relief Valve                               QTY: 1

P/N S844B-34RF1-01RF1-SS-SS-TT

Body & Trim: SS

Inlet: 3/4&rdquo; 150# RF-ANSI Flange

Outlet: 1&rdquo; 150# RF-ANSI Flange

Seat: Teflon

Seals: Teflon

Set Point: 145 psig

Process: He gas @ -442

Functional Test Report, C of C

	Flow Safe Spring Op. Relief Valve                               QTY: 1

P/N S84FD-15RF1-03RF1-SS-SS-TT

Body & Trim: SS

Inlet: 1 1/2&rdquo; 150# RF-ANSI Flange

Outlet: 3&rdquo; 150# RF-ANSI Flange

Seat: Teflon

Seals: Teflon

Set Point: 145 psig

Process: He gas @ 80

Functional Test Report, C of C

	Flow Safe Spring Op. Relief Valve                               QTY: 1

P/N S84JE-02RF1-03RF1-SS-SS-TT

Body & Trim: SS

Inlet: 2&rdquo; 150# RF-ANSI Flange

Outlet: 3&rdquo; 150# RF-ANSI Flange

Seat: Teflon

Seals: Teflon

Set Point: 145 psig

Process: He gas @ 80

Functional Test Report, C of C

	Flow Safe Spring Op. Relief Valve                               QTY: 1

P/N S843M-05RF2-05RF1-SS-SS-TT

Body & Trim: SS

Inlet: 1/2&rdquo; 300# RF-ANSI Flange

Outlet: 1/2&rdquo; 150# RF-ANSI Flange

Seat: Teflon

Seals: Teflon

Set Point: 320 psig

Process: He gas @ -442

Functional Test Report, C of C

	Flow Safe Spring Op. Relief Valve                               QTY: 1

P/N S84GD-15RF1-03RF1-SS-SS-TT

Body & Trim: SS

Inlet: 1 1/2&rdquo; 150# RF-ANSI Flange

Outlet: 3&rdquo; 150# RF-ANSI Flange

Seat: Teflon

Seals: Teflon

Set Point: 145 psig

Process: He gas @ 80

Functional Test Report, C of C

	Flow Safe Spring Op. Relief Valve                               QTY: 1

P/N S842M-01RF2-01RF2-SS-SS-TT

Body & Trim: SS

Inlet: 1&rdquo; 300# RF-ANSI Flange

Outlet: 1&rdquo; 300# RF-ANSI Flange

Seat: Teflon

Seals: Teflon

Set Point: 320 psig

Process: He gas @ -437

Functional Test Report, C of C

	Flow Safe Spring Op. Relief Valve                               QTY: 1

P/N S854B-01MNO-01FNO-SS-SS-VT

Body & Trim: SS

Inlet: 1&rdquo; MNPT

Outlet: 1&rdquo; FNPT

Seat: Viton

Seals: Teflon

Set Point: 300 psig

Process: He gas @ 250

Functional Test Report, C of C

	Flow Safe Spring Op. Relief Valve                               QTY: 1

P/N S854B-01RF2-01FNO-SS-SS-VT

Body: SS

Trim: SS

Inlet: 1&rdquo; 300# RF-ANSI Flange

Outlet: 1&rdquo; FNPT

Seat: Viton

Seals: Teflon

Set Point: 275 psig

Process: He gas @ 210

Functional Test Report, C of C

	Flow Safe Spring Op. Relief Valve                               QTY: 1

P/N S858B-01RF1-01RF1-SS-SS-VT

Body: SS

Trim: SS

Inlet: 1&rdquo; 150# RF-ANSI Flange

Outlet: 1&rdquo; 150# RF-ANSI Flange

Seat: Viton

Seals: Teflon

Set Point: 150 psig

Process: Air @130

Functional Test Report, C of C

	Flow Safe Spring Op. Relief Valve                               QTY: 2

P/N S846B-01FNO-01FNO-SS-SS-TT

Body & Trim: SS

Inlet: 1&rdquo; FNPT

Outlet: 1&rdquo; FNPT

Seat: Teflon

Seals: Teflon

Set Point: 75 psig

Process: He gas @ -445

Functional Test Report, C of C

	Flow Safe Spring Op. Relief Valve                               QTY: 1

P/N S84GD-15FNO-02FNO-SS-SS-TT

Body & Trim: SS

Inlet: 1 1/2&rdquo; FNPT

Outlet: 2&rdquo; FNPT

Seat: Teflon

Seals: Teflon

Set Point: 45 psig

Process: He gas @ -447

Functional Test Report, C of C

Quote is for product only; no on-site services permitted.

Source selection will be based on Lowest Price and Technically Acceptable Method (LPTA).

Technical evaluation criteria are as follows:

	Meets specified part numbers exactly (P/N)

	Conforms to requested materials (e.g., Stainless Steel body & trim, Teflon/Viton seats and seals).

	Meets ANSI flange or FNPT inlet/outlet connection specifications.

	Valves must precisely match requested pressure set points (e.g., 70 psig, 145 psig, 320 psig).

	Valves must be suitable for the specified gases and extreme temperature ranges (e.g., Helium at -321&deg;F, Hydrogen at 131&deg;F, Nitrogen at -268&deg;F).

	Includes Functional Test Reports.

Please provide a price and lead time quotation by COB 7/30/2025.

Please be advised that the requirement was also posted on SAM.gov.

Send quote to marissat@SLAC.stanford.edu.

The bid closing date for this requirement is 7/30/2025.

Is there any room for additional discount such as for Academic, ICPT, GSA, or Government Institutions?

If possible, please provide a link to your webpage for published price list to substantiate for the prices quoted.

	Buy American Act Certification (BAA) applies to awards that are over $10,000.

	Representations & Certifications Rider is required. Once completed the Reps and Certs is valid for one year until renewal. If you have already completed one within the year please disregard. Otherwise, please complete and return.

	All subcontractors are required to register in the System for Award Management (www.sam.gov).

	The resulting purchase order will be issued on a fixed price basis. SLAC National Accelerator Laboratory Terms and Conditions for Fixed Price Commercial Supplies and Services (Rev. August 2023) will be made a part of the resulting order.

	Payment Terms will be NET-30 (SLAC is unable to do advance payments and or Prepayments).

	Freight terms will be FOB Destination Prepaid and Add

	Foreign Vendors Shipments will be made CIP SLAC, Menlo Park, and Duty Unpaid.

You are requested to mark and identify proprietary/confidential information provided in response to the solicitation.

Contact me directly with any questions.

Kind regards,

Marissa Tanomrat

Procurement Commodities Team

SLAC National Accelerator Laboratory

2575 Sand Hill Road

Menlo Park, CA 94025

Email: marissat@slac.stanford.edu

## Attachments

- [01. BAA_Certification_08.29.2023_(D5) (1).pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3d38980d73b64ae7970b04a4adb4a3a4/download)

## Open now in the same industry

60 open in NAICS 333310.

- Brand Name Southbend Kettle, Electric, Stationary (N0040627Q0037), due November 30, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/n0040627q0037
- Iris aiOne System (Req-369230), due November 30, 2026 at 8:00 PM EST. https://sealedbidder.com/opportunities/req369230
- FEEDER,CHEMICAL SOLUTI (SPE8E827Q0069), due November 25, 2026. https://sealedbidder.com/opportunities/spe8e827q0069

## Publications

- July 15, 2025: Solicitation, due July 30, 2025 at 8:00 PM EDT. Notice e1874829602d4cf7b764a8b13a7339ec. https://sam.gov/workspace/contract/opp/e1874829602d4cf7b764a8b13a7339ec/view
- July 16, 2025: Solicitation, due July 30, 2025 at 8:00 PM EDT. Notice 2effa695612d4ec88cc667d141ca6b12. https://sam.gov/workspace/contract/opp/2effa695612d4ec88cc667d141ca6b12/view

## Points of contact

- Katherine Jill A. Coh, kcoh@slac.stanford.edu, 6509262770

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/slac357639valve.
