{"canonical":"https://sealedbidder.com/opportunities/slac357639valve","key":"SLAC357639VALVE","url":"https://sealedbidder.com/opportunities/slac357639valve","title":"VAlve","solicitation_number":"SLAC_357639_Valve","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-07-31T00:00:00Z","first_posted":"2025-07-15","last_posted":"2025-07-16","department":"ENERGY, DEPARTMENT OF","subagency":"ENERGY, DEPARTMENT OF","office":"SLAC Natl Accel Lab -DOE Contractor","naics":"333310","psc":"AJ12","set_aside":null,"place_state":"CA","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"06081","place_county_name":"San Mateo County","place_city":"0646870","place_city_name":"Menlo Park","winner":null,"award_amount":null,"publications":[{"notice_id":"e1874829602d4cf7b764a8b13a7339ec","title":"VAlve","solicitation_number":"SLAC_357639_Valve","notice_type":"o","base_type":"o","posted":"2025-07-15","posted_at":"2025-07-15T22:26:14.856Z","due_at":"2025-07-31T00:00:00Z","due_date":"2025-07-30","cancelled":false,"archived":true,"archive_date":"2025-08-14","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e1874829602d4cf7b764a8b13a7339ec/view","enriched":true,"history":[{"index":3,"title":"VAlve","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T19:57:43.081Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"2effa695612d4ec88cc667d141ca6b12","solicitation_number":"SLAC_357639_Valve","parent_opportunity_id":"e1874829602d4cf7b764a8b13a7339ec"},{"index":1,"title":"VAlve","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T22:26:14.856Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e1874829602d4cf7b764a8b13a7339ec","solicitation_number":"SLAC_357639_Valve"}]},{"notice_id":"2effa695612d4ec88cc667d141ca6b12","title":"VAlve","solicitation_number":"SLAC_357639_Valve","notice_type":"o","base_type":"o","posted":"2025-07-16","posted_at":"2025-07-16T19:57:43.081Z","due_at":"2025-07-31T00:00:00Z","due_date":"2025-07-30","cancelled":false,"archived":true,"archive_date":"2025-08-14","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2effa695612d4ec88cc667d141ca6b12/view","enriched":true,"history":[{"index":3,"title":"VAlve","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T19:57:43.081Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"2effa695612d4ec88cc667d141ca6b12","solicitation_number":"SLAC_357639_Valve","parent_opportunity_id":"e1874829602d4cf7b764a8b13a7339ec"},{"index":1,"title":"VAlve","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T22:26:14.856Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e1874829602d4cf7b764a8b13a7339ec","solicitation_number":"SLAC_357639_Valve"}]}],"latest_notice_id":"2effa695612d4ec88cc667d141ca6b12","first_type":"o","notices":[{"dates":{"posted":"2025-07-15","posted_at":"2025-07-15T22:26:14.856Z","created_at":"2025-07-15T22:24:04.172Z","modified_at":"2025-08-15T04:02:19.987Z","response_deadline":{"raw":"2025-07-30T17:00:00-07:00","utc":"2025-07-31T00:00:00Z","date":"2025-07-30","time":"17:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e1874829602d4cf7b764a8b13a7339ec/view"},"naics":{"codes":["333310"],"primary":"333310"},"title":"VAlve","agency":{"office":{"code":"899040","name":"SLAC Natl Accel Lab -DOE Contractor"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"94025","city":"Menlo Park","state":"CA","country":"USA"},"organization_id":"500046233","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-14","archive_type":"auto15"},"history":[{"index":3,"title":"VAlve","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T19:57:43.081Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"2effa695612d4ec88cc667d141ca6b12","solicitation_number":"SLAC_357639_Valve","parent_opportunity_id":"e1874829602d4cf7b764a8b13a7339ec"},{"index":1,"title":"VAlve","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T22:26:14.856Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e1874829602d4cf7b764a8b13a7339ec","solicitation_number":"SLAC_357639_Valve"}],"contacts":[{"name":"Katherine Jill A. Coh","role":"primary","email":"kcoh@slac.stanford.edu","phone":"6509262770"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"e1874829602d4cf7b764a8b13a7339ec","lineage_id":"e1874829602d4cf7b764a8b13a7339ec","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-10T02:06:32.393303218Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"5bb43091775ca73cc612025c95f41faedcb01d619c93d40fef878f95bdd65771","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-10T02:06:32.393303218Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions.</p>\n\n<p></p>\n\n<p><strong>The follow has been attached for you to complete and review</strong>:</p>\n\n<ol>\n\t<li>(BAA) Buy American Act Certification</li>\n\t<li>Representations &amp; Certifications Rider</li>\n\t<li>Confirm Attached SLAC terms are accepted: FP Commercial Supplies-Services T&amp;Cs (August 2023)</li>\n</ol>\n\n<p></p>\n\n<p><strong>Required item(s) listed below</strong>:</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84JE-02RF1-03RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 3&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 70 psig</p>\n\n<p>Process: He gas @ -321</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84FD-15RF1-02RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: He gas @ -321</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S841M-05RF2-05RF2-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1/2&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 1/2&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: H2 @131</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 2</li>\n</ol>\n\n<p>P/N S846B-15RF2-02RF2-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: He gas @ -321</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S848B-01RF2-01RF2-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 1&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: He gas @ -428</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 2</li>\n</ol>\n\n<p>P/N S846B-15RF1-02RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: N2 gas @ -268</p>\n\n<p>Functional Test Report, C of C \\</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S842M-34RF1-01RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 3/4&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 1&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: N2 gas @ -268</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S841M-05RF2-05RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1/2&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 1/2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: He gas @ 131</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84HE-02RF1-03RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 3&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 75 psig</p>\n\n<p>Process: He gas @ 80</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S844B-34RF1-01RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 3/4&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 1&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: He gas @ -442</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84FD-15RF1-03RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 3&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: He gas @ 80</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84JE-02RF1-03RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 3&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: He gas @ 80</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S843M-05RF2-05RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1/2&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 1/2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: He gas @ -442</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84GD-15RF1-03RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 3&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: He gas @ 80</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S842M-01RF2-01RF2-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 1&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: He gas @ -437</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S854B-01MNO-01FNO-SS-SS-VT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1&rdquo; MNPT</p>\n\n<p>Outlet: 1&rdquo; FNPT</p>\n\n<p>Seat: Viton</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 300 psig</p>\n\n<p>Process: He gas @ 250</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S854B-01RF2-01FNO-SS-SS-VT</p>\n\n<p>Body: SS</p>\n\n<p>Trim: SS</p>\n\n<p>Inlet: 1&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 1&rdquo; FNPT</p>\n\n<p>Seat: Viton</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 275 psig</p>\n\n<p>Process: He gas @ 210</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S858B-01RF1-01RF1-SS-SS-VT</p>\n\n<p>Body: SS</p>\n\n<p>Trim: SS</p>\n\n<p>Inlet: 1&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 1&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Viton</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 150 psig</p>\n\n<p>Process: Air @130</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 2</li>\n</ol>\n\n<p>P/N S846B-01FNO-01FNO-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1&rdquo; FNPT</p>\n\n<p>Outlet: 1&rdquo; FNPT</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 75 psig</p>\n\n<p>Process: He gas @ -445</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84GD-15FNO-02FNO-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; FNPT</p>\n\n<p>Outlet: 2&rdquo; FNPT</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 45 psig</p>\n\n<p>Process: He gas @ -447</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<p>Quote is for product only; no on-site services permitted.</p>\n\n<p></p>\n\n<p>Source selection will be based on Lowest Price and Technically Acceptable Method (LPTA).</p>\n\n<p></p>\n\n<p><strong><u>Technical evaluation criteria are as follows: </u></strong></p>\n\n<ol>\n\t<li><strong>Meets specified part numbers exactly (P/N)</strong></li>\n\t<li><strong>Conforms to requested materials (e.g., Stainless Steel body &amp; trim, Teflon/Viton seats and seals).</strong></li>\n\t<li><strong>Meets ANSI flange or FNPT inlet/outlet connection specifications.</strong></li>\n\t<li><strong>Valves must precisely match requested pressure set points (e.g., 70 psig, 145 psig, 320 psig).</strong></li>\n\t<li><strong>Valves must be suitable for the specified gases and extreme temperature ranges (e.g., Helium at -321&deg;F, Hydrogen at 131&deg;F, Nitrogen at -268&deg;F).</strong></li>\n\t<li><strong>Includes Functional Test Reports.</strong></li>\n</ol>\n\n<p></p>\n\n<p>Please provide a price and lead time quotation by COB 7/30/2025.</p>\n\n<p><em>Please be advised that the requirement was also posted on SAM.gov.</em></p>\n\n<p><strong>Send quote to </strong><strong>marissat@SLAC.stanford.edu</strong><strong>.</strong></p>\n\n<p></p>\n\n<p>The bid closing date for this requirement is 7/30/2025.</p>\n\n<p></p>\n\n<p>Is there any room for additional discount such as for Academic, ICPT, GSA, or Government Institutions?</p>\n\n<p>If possible, please provide a link to your webpage for published price list to substantiate for the prices quoted.</p>\n\n<p></p>\n\n<ul>\n\t<li><strong>Buy American Act Certification (BAA)</strong> applies to awards that are over $10,000.</li>\n\t<li><strong>Representations &amp; Certifications Rider is required</strong>. Once completed the Reps and Certs is valid for one year until renewal. If you have already completed one within the year please disregard. Otherwise, please complete and return.</li>\n\t<li><strong>All subcontractors are required to register in the System for Award Management (</strong><strong>www.sam.gov</strong><strong>).</strong></li>\n\t<li><strong>The resulting purchase order will be issued on a fixed price basis.</strong> SLAC National Accelerator Laboratory Terms and Conditions for Fixed Price Commercial Supplies and Services (Rev. August 2023) will be made a part of the resulting order.</li>\n\t<li><strong>Payment Terms will be NET-30 (SLAC is unable to do advance payments and or Prepayments).</strong></li>\n\t<li><strong>Freight terms will be FOB Destination Prepaid and Add</strong></li>\n\t<li><strong>Foreign Vendors Shipments will be made CIP SLAC, Menlo Park, and Duty Unpaid.</strong>&nbsp;</li>\n</ul>\n\n<p></p>\n\n<p>You are requested to mark and identify proprietary/confidential information provided in response to the solicitation.</p>\n\n<p></p>\n\n<p>Contact me directly with any questions.</p>\n\n<p></p>\n\n<p>Kind regards,</p>\n\n<p></p>\n\n<p>Marissa Tanomrat</p>\n\n<p>Procurement Commodities Team</p>\n\n<p>SLAC National Accelerator Laboratory</p>\n\n<p>2575 Sand Hill Road</p>\n\n<p>Menlo Park, CA 94025</p>\n\n<p>Email: marissat@slac.stanford.edu</p>\n\n<p></p>\n\n<p></p>\n\n<p></p>","text":"SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions.\n\nThe follow has been attached for you to complete and review:\n\n• (BAA) Buy American Act Certification\n\n• Representations & Certifications Rider\n\n• Confirm Attached SLAC terms are accepted: FP Commercial Supplies-Services T&Cs (August 2023)\n\nRequired item(s) listed below:\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84JE-02RF1-03RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 2” 150# RF-ANSI Flange\n\nOutlet: 3” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 70 psig\n\nProcess: He gas @ -321\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84FD-15RF1-02RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” 150# RF-ANSI Flange\n\nOutlet: 2” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: He gas @ -321\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S841M-05RF2-05RF2-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1/2” 300# RF-ANSI Flange\n\nOutlet: 1/2” 300# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: H2 @131\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 2\n\nP/N S846B-15RF2-02RF2-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” 300# RF-ANSI Flange\n\nOutlet: 2” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: He gas @ -321\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S848B-01RF2-01RF2-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1” 300# RF-ANSI Flange\n\nOutlet: 1” 300# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: He gas @ -428\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 2\n\nP/N S846B-15RF1-02RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” 150# RF-ANSI Flange\n\nOutlet: 2” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: N2 gas @ -268\n\nFunctional Test Report, C of C \\\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S842M-34RF1-01RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 3/4” 150# RF-ANSI Flange\n\nOutlet: 1” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: N2 gas @ -268\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S841M-05RF2-05RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1/2” 300# RF-ANSI Flange\n\nOutlet: 1/2” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: He gas @ 131\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84HE-02RF1-03RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 2” 150# RF-ANSI Flange\n\nOutlet: 3” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 75 psig\n\nProcess: He gas @ 80\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S844B-34RF1-01RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 3/4” 150# RF-ANSI Flange\n\nOutlet: 1” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: He gas @ -442\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84FD-15RF1-03RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” 150# RF-ANSI Flange\n\nOutlet: 3” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: He gas @ 80\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84JE-02RF1-03RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 2” 150# RF-ANSI Flange\n\nOutlet: 3” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: He gas @ 80\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S843M-05RF2-05RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1/2” 300# RF-ANSI Flange\n\nOutlet: 1/2” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: He gas @ -442\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84GD-15RF1-03RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” 150# RF-ANSI Flange\n\nOutlet: 3” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: He gas @ 80\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S842M-01RF2-01RF2-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1” 300# RF-ANSI Flange\n\nOutlet: 1” 300# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: He gas @ -437\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S854B-01MNO-01FNO-SS-SS-VT\n\nBody & Trim: SS\n\nInlet: 1” MNPT\n\nOutlet: 1” FNPT\n\nSeat: Viton\n\nSeals: Teflon\n\nSet Point: 300 psig\n\nProcess: He gas @ 250\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S854B-01RF2-01FNO-SS-SS-VT\n\nBody: SS\n\nTrim: SS\n\nInlet: 1” 300# RF-ANSI Flange\n\nOutlet: 1” FNPT\n\nSeat: Viton\n\nSeals: Teflon\n\nSet Point: 275 psig\n\nProcess: He gas @ 210\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S858B-01RF1-01RF1-SS-SS-VT\n\nBody: SS\n\nTrim: SS\n\nInlet: 1” 150# RF-ANSI Flange\n\nOutlet: 1” 150# RF-ANSI Flange\n\nSeat: Viton\n\nSeals: Teflon\n\nSet Point: 150 psig\n\nProcess: Air @130\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 2\n\nP/N S846B-01FNO-01FNO-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1” FNPT\n\nOutlet: 1” FNPT\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 75 psig\n\nProcess: He gas @ -445\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84GD-15FNO-02FNO-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” FNPT\n\nOutlet: 2” FNPT\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 45 psig\n\nProcess: He gas @ -447\n\nFunctional Test Report, C of C\n\nQuote is for product only; no on-site services permitted.\n\nSource selection will be based on Lowest Price and Technically Acceptable Method (LPTA).\n\nTechnical evaluation criteria are as follows:\n\n• Meets specified part numbers exactly (P/N)\n\n• Conforms to requested materials (e.g., Stainless Steel body & trim, Teflon/Viton seats and seals).\n\n• Meets ANSI flange or FNPT inlet/outlet connection specifications.\n\n• Valves must precisely match requested pressure set points (e.g., 70 psig, 145 psig, 320 psig).\n\n• Valves must be suitable for the specified gases and extreme temperature ranges (e.g., Helium at -321°F, Hydrogen at 131°F, Nitrogen at -268°F).\n\n• Includes Functional Test Reports.\n\nPlease provide a price and lead time quotation by COB 7/30/2025.\n\nPlease be advised that the requirement was also posted on SAM.gov.\n\nSend quote to marissat@SLAC.stanford.edu.\n\nThe bid closing date for this requirement is 7/30/2025.\n\nIs there any room for additional discount such as for Academic, ICPT, GSA, or Government Institutions?\n\nIf possible, please provide a link to your webpage for published price list to substantiate for the prices quoted.\n\n• Buy American Act Certification (BAA) applies to awards that are over $10,000.\n\n• Representations & Certifications Rider is required. Once completed the Reps and Certs is valid for one year until renewal. If you have already completed one within the year please disregard. Otherwise, please complete and return.\n\n• All subcontractors are required to register in the System for Award Management (www.sam.gov).\n\n• The resulting purchase order will be issued on a fixed price basis. SLAC National Accelerator Laboratory Terms and Conditions for Fixed Price Commercial Supplies and Services (Rev. August 2023) will be made a part of the resulting order.\n\n• Payment Terms will be NET-30 (SLAC is unable to do advance payments and or Prepayments).\n\n• Freight terms will be FOB Destination Prepaid and Add\n\n• Foreign Vendors Shipments will be made CIP SLAC, Menlo Park, and Duty Unpaid.\n\nYou are requested to mark and identify proprietary/confidential information provided in response to the solicitation.\n\nContact me directly with any questions.\n\nKind regards,\n\nMarissa Tanomrat\n\nProcurement Commodities Team\n\nSLAC National Accelerator Laboratory\n\n2575 Sand Hill Road\n\nMenlo Park, CA 94025\n\nEmail: marissat@slac.stanford.edu","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"SLAC_357639_Valve","place_of_performance":{"zip":"94025","city":{"code":"46870","name":"Menlo Park"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"AJ12"},{"dates":{"posted":"2025-07-16","posted_at":"2025-07-16T19:57:43.081Z","created_at":"2025-07-16T19:57:16.367Z","modified_at":"2025-08-15T04:02:19.987Z","response_deadline":{"raw":"2025-07-30T17:00:00-07:00","utc":"2025-07-31T00:00:00Z","date":"2025-07-30","time":"17:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2effa695612d4ec88cc667d141ca6b12/view"},"naics":{"codes":["333310"],"primary":"333310"},"title":"VAlve","agency":{"office":{"code":"899040","name":"SLAC Natl Accel Lab -DOE Contractor"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"94025","city":"Menlo Park","state":"CA","country":"USA"},"organization_id":"500046233","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-14","archive_type":"auto15"},"history":[{"index":3,"title":"VAlve","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T19:57:43.081Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"2effa695612d4ec88cc667d141ca6b12","solicitation_number":"SLAC_357639_Valve","parent_opportunity_id":"e1874829602d4cf7b764a8b13a7339ec"},{"index":1,"title":"VAlve","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T22:26:14.856Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e1874829602d4cf7b764a8b13a7339ec","solicitation_number":"SLAC_357639_Valve"}],"contacts":[{"name":"Katherine Jill A. Coh","role":"primary","email":"kcoh@slac.stanford.edu","phone":"6509262770"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"2effa695612d4ec88cc667d141ca6b12","lineage_id":"e1874829602d4cf7b764a8b13a7339ec","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-09T04:03:51.922620899Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"c00976737b561267419545cb9b1af9ea994db1836480ef79cfee8d61a8431296","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-09T04:03:51.922620899Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions.</p>\n\n<p>The following Addendum is being issued for the subject <u>Request for Quotation: #357639_Valve</u></p>\n\n<p></p>\n\n<ul>\n\t<li>Required item listed Qty revised:\n\t<ul>\n\t\t<li><strong>Item #4:</strong>&nbsp;</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</p>\n\n<p>P/N S846B-15RF2-02RF2-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: He gas @ -321</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<p>This Addendum modifies the Request for Quotation and must be acknowledged. Failure to acknowledge all addenda could make your proposal non-responsive. &nbsp;Please confirm that the submitted proposal is not changed because of this addendum. If proposal sent is revised because of this, please submit the revised proposal.</p>\n\n<p></p>\n\n<p>The following changes are hereby made to the appropriate documents contained the above-mentioned Request for Quotation (RFQ). All other terms and conditions of the RFQ remain the same.</p>\n\n<p>---------------------------------------------------------------------------------------------------------------------------------&nbsp;</p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>The follow has been attached for you to complete and review</strong>:</p>\n\n<ol>\n\t<li>(BAA) Buy American Act Certification</li>\n\t<li>Representations &amp; Certifications Rider</li>\n\t<li>Confirm Attached SLAC terms are accepted: FP Commercial Supplies-Services T&amp;Cs (August 2023)</li>\n</ol>\n\n<p></p>\n\n<p><strong>Required item(s) listed below</strong>:</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84JE-02RF1-03RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 3&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 70 psig</p>\n\n<p>Process: He gas @ -321</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84FD-15RF1-02RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: He gas @ -321</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S841M-05RF2-05RF2-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1/2&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 1/2&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: H2 @131</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 2</li>\n</ol>\n\n<p>P/N S846B-15RF2-02RF2-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: He gas @ -321</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S848B-01RF2-01RF2-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 1&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: He gas @ -428</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 2</li>\n</ol>\n\n<p>P/N S846B-15RF1-02RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: N2 gas @ -268</p>\n\n<p>Functional Test Report, C of C \\</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S842M-34RF1-01RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 3/4&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 1&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: N2 gas @ -268</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S841M-05RF2-05RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1/2&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 1/2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: He gas @ 131</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84HE-02RF1-03RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 3&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 75 psig</p>\n\n<p>Process: He gas @ 80</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S844B-34RF1-01RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 3/4&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 1&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: He gas @ -442</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84FD-15RF1-03RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 3&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: He gas @ 80</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84JE-02RF1-03RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 3&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: He gas @ 80</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S843M-05RF2-05RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1/2&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 1/2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: He gas @ -442</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84GD-15RF1-03RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 3&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: He gas @ 80</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S842M-01RF2-01RF2-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 1&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: He gas @ -437</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S854B-01MNO-01FNO-SS-SS-VT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1&rdquo; MNPT</p>\n\n<p>Outlet: 1&rdquo; FNPT</p>\n\n<p>Seat: Viton</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 300 psig</p>\n\n<p>Process: He gas @ 250</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S854B-01RF2-01FNO-SS-SS-VT</p>\n\n<p>Body: SS</p>\n\n<p>Trim: SS</p>\n\n<p>Inlet: 1&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 1&rdquo; FNPT</p>\n\n<p>Seat: Viton</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 275 psig</p>\n\n<p>Process: He gas @ 210</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S858B-01RF1-01RF1-SS-SS-VT</p>\n\n<p>Body: SS</p>\n\n<p>Trim: SS</p>\n\n<p>Inlet: 1&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 1&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Viton</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 150 psig</p>\n\n<p>Process: Air @130</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 2</li>\n</ol>\n\n<p>P/N S846B-01FNO-01FNO-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1&rdquo; FNPT</p>\n\n<p>Outlet: 1&rdquo; FNPT</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 75 psig</p>\n\n<p>Process: He gas @ -445</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84GD-15FNO-02FNO-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; FNPT</p>\n\n<p>Outlet: 2&rdquo; FNPT</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 45 psig</p>\n\n<p>Process: He gas @ -447</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<p>Quote is for product only; no on-site services permitted.</p>\n\n<p></p>\n\n<p>Source selection will be based on Lowest Price and Technically Acceptable Method (LPTA).</p>\n\n<p></p>\n\n<p><strong><u>Technical evaluation criteria are as follows: </u></strong></p>\n\n<ol>\n\t<li><strong>Meets specified part numbers exactly (P/N)</strong></li>\n\t<li><strong>Conforms to requested materials (e.g., Stainless Steel body &amp; trim, Teflon/Viton seats and seals).</strong></li>\n\t<li><strong>Meets ANSI flange or FNPT inlet/outlet connection specifications.</strong></li>\n\t<li><strong>Valves must precisely match requested pressure set points (e.g., 70 psig, 145 psig, 320 psig).</strong></li>\n\t<li><strong>Valves must be suitable for the specified gases and extreme temperature ranges (e.g., Helium at -321&deg;F, Hydrogen at 131&deg;F, Nitrogen at -268&deg;F).</strong></li>\n\t<li><strong>Includes Functional Test Reports.</strong></li>\n</ol>\n\n<p></p>\n\n<p>Please provide a price and lead time quotation by COB 7/30/2025.</p>\n\n<p><em>Please be advised that the requirement was also posted on SAM.gov.</em></p>\n\n<p><strong>Send quote to </strong><strong>marissat@SLAC.stanford.edu</strong><strong>.</strong></p>\n\n<p></p>\n\n<p>The bid closing date for this requirement is 7/30/2025.</p>\n\n<p></p>\n\n<p>Is there any room for additional discount such as for Academic, ICPT, GSA, or Government Institutions?</p>\n\n<p>If possible, please provide a link to your webpage for published price list to substantiate for the prices quoted.</p>\n\n<p></p>\n\n<ul>\n\t<li><strong>Buy American Act Certification (BAA)</strong> applies to awards that are over $10,000.</li>\n\t<li><strong>Representations &amp; Certifications Rider is required</strong>. Once completed the Reps and Certs is valid for one year until renewal. If you have already completed one within the year please disregard. Otherwise, please complete and return.</li>\n\t<li><strong>All subcontractors are required to register in the System for Award Management (</strong><strong>www.sam.gov</strong><strong>).</strong></li>\n\t<li><strong>The resulting purchase order will be issued on a fixed price basis.</strong> SLAC National Accelerator Laboratory Terms and Conditions for Fixed Price Commercial Supplies and Services (Rev. August 2023) will be made a part of the resulting order.</li>\n\t<li><strong>Payment Terms will be NET-30 (SLAC is unable to do advance payments and or Prepayments).</strong></li>\n\t<li><strong>Freight terms will be FOB Destination Prepaid and Add</strong></li>\n\t<li><strong>Foreign Vendors Shipments will be made CIP SLAC, Menlo Park, and Duty Unpaid.</strong>&nbsp;</li>\n</ul>\n\n<p></p>\n\n<p>You are requested to mark and identify proprietary/confidential information provided in response to the solicitation.</p>\n\n<p></p>\n\n<p>Contact me directly with any questions.</p>\n\n<p></p>\n\n<p>Kind regards,</p>\n\n<p></p>\n\n<p>Marissa Tanomrat</p>\n\n<p>Procurement Commodities Team</p>\n\n<p>SLAC National Accelerator Laboratory</p>\n\n<p>2575 Sand Hill Road</p>\n\n<p>Menlo Park, CA 94025</p>\n\n<p>Email: marissat@slac.stanford.edu</p>\n\n<p></p>\n\n<p></p>\n\n<p></p>","text":"SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions.\n\nThe following Addendum is being issued for the subject Request for Quotation: #357639_Valve\n\n• Required item listed Qty revised:\n\n• Item #4:\n\nFlow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S846B-15RF2-02RF2-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” 300# RF-ANSI Flange\n\nOutlet: 2” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: He gas @ -321\n\nFunctional Test Report, C of C\n\nThis Addendum modifies the Request for Quotation and must be acknowledged. Failure to acknowledge all addenda could make your proposal non-responsive. Please confirm that the submitted proposal is not changed because of this addendum. If proposal sent is revised because of this, please submit the revised proposal.\n\nThe following changes are hereby made to the appropriate documents contained the above-mentioned Request for Quotation (RFQ). All other terms and conditions of the RFQ remain the same.\n\n---------------------------------------------------------------------------------------------------------------------------------\n\nThe follow has been attached for you to complete and review:\n\n• (BAA) Buy American Act Certification\n\n• Representations & Certifications Rider\n\n• Confirm Attached SLAC terms are accepted: FP Commercial Supplies-Services T&Cs (August 2023)\n\nRequired item(s) listed below:\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84JE-02RF1-03RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 2” 150# RF-ANSI Flange\n\nOutlet: 3” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 70 psig\n\nProcess: He gas @ -321\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84FD-15RF1-02RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” 150# RF-ANSI Flange\n\nOutlet: 2” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: He gas @ -321\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S841M-05RF2-05RF2-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1/2” 300# RF-ANSI Flange\n\nOutlet: 1/2” 300# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: H2 @131\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 2\n\nP/N S846B-15RF2-02RF2-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” 300# RF-ANSI Flange\n\nOutlet: 2” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: He gas @ -321\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S848B-01RF2-01RF2-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1” 300# RF-ANSI Flange\n\nOutlet: 1” 300# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: He gas @ -428\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 2\n\nP/N S846B-15RF1-02RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” 150# RF-ANSI Flange\n\nOutlet: 2” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: N2 gas @ -268\n\nFunctional Test Report, C of C \\\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S842M-34RF1-01RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 3/4” 150# RF-ANSI Flange\n\nOutlet: 1” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: N2 gas @ -268\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S841M-05RF2-05RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1/2” 300# RF-ANSI Flange\n\nOutlet: 1/2” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: He gas @ 131\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84HE-02RF1-03RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 2” 150# RF-ANSI Flange\n\nOutlet: 3” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 75 psig\n\nProcess: He gas @ 80\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S844B-34RF1-01RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 3/4” 150# RF-ANSI Flange\n\nOutlet: 1” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: He gas @ -442\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84FD-15RF1-03RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” 150# RF-ANSI Flange\n\nOutlet: 3” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: He gas @ 80\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84JE-02RF1-03RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 2” 150# RF-ANSI Flange\n\nOutlet: 3” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: He gas @ 80\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S843M-05RF2-05RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1/2” 300# RF-ANSI Flange\n\nOutlet: 1/2” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: He gas @ -442\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84GD-15RF1-03RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” 150# RF-ANSI Flange\n\nOutlet: 3” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: He gas @ 80\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S842M-01RF2-01RF2-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1” 300# RF-ANSI Flange\n\nOutlet: 1” 300# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: He gas @ -437\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S854B-01MNO-01FNO-SS-SS-VT\n\nBody & Trim: SS\n\nInlet: 1” MNPT\n\nOutlet: 1” FNPT\n\nSeat: Viton\n\nSeals: Teflon\n\nSet Point: 300 psig\n\nProcess: He gas @ 250\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S854B-01RF2-01FNO-SS-SS-VT\n\nBody: SS\n\nTrim: SS\n\nInlet: 1” 300# RF-ANSI Flange\n\nOutlet: 1” FNPT\n\nSeat: Viton\n\nSeals: Teflon\n\nSet Point: 275 psig\n\nProcess: He gas @ 210\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S858B-01RF1-01RF1-SS-SS-VT\n\nBody: SS\n\nTrim: SS\n\nInlet: 1” 150# RF-ANSI Flange\n\nOutlet: 1” 150# RF-ANSI Flange\n\nSeat: Viton\n\nSeals: Teflon\n\nSet Point: 150 psig\n\nProcess: Air @130\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 2\n\nP/N S846B-01FNO-01FNO-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1” FNPT\n\nOutlet: 1” FNPT\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 75 psig\n\nProcess: He gas @ -445\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84GD-15FNO-02FNO-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” FNPT\n\nOutlet: 2” FNPT\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 45 psig\n\nProcess: He gas @ -447\n\nFunctional Test Report, C of C\n\nQuote is for product only; no on-site services permitted.\n\nSource selection will be based on Lowest Price and Technically Acceptable Method (LPTA).\n\nTechnical evaluation criteria are as follows:\n\n• Meets specified part numbers exactly (P/N)\n\n• Conforms to requested materials (e.g., Stainless Steel body & trim, Teflon/Viton seats and seals).\n\n• Meets ANSI flange or FNPT inlet/outlet connection specifications.\n\n• Valves must precisely match requested pressure set points (e.g., 70 psig, 145 psig, 320 psig).\n\n• Valves must be suitable for the specified gases and extreme temperature ranges (e.g., Helium at -321°F, Hydrogen at 131°F, Nitrogen at -268°F).\n\n• Includes Functional Test Reports.\n\nPlease provide a price and lead time quotation by COB 7/30/2025.\n\nPlease be advised that the requirement was also posted on SAM.gov.\n\nSend quote to marissat@SLAC.stanford.edu.\n\nThe bid closing date for this requirement is 7/30/2025.\n\nIs there any room for additional discount such as for Academic, ICPT, GSA, or Government Institutions?\n\nIf possible, please provide a link to your webpage for published price list to substantiate for the prices quoted.\n\n• Buy American Act Certification (BAA) applies to awards that are over $10,000.\n\n• Representations & Certifications Rider is required. Once completed the Reps and Certs is valid for one year until renewal. If you have already completed one within the year please disregard. Otherwise, please complete and return.\n\n• All subcontractors are required to register in the System for Award Management (www.sam.gov).\n\n• The resulting purchase order will be issued on a fixed price basis. SLAC National Accelerator Laboratory Terms and Conditions for Fixed Price Commercial Supplies and Services (Rev. August 2023) will be made a part of the resulting order.\n\n• Payment Terms will be NET-30 (SLAC is unable to do advance payments and or Prepayments).\n\n• Freight terms will be FOB Destination Prepaid and Add\n\n• Foreign Vendors Shipments will be made CIP SLAC, Menlo Park, and Duty Unpaid.\n\nYou are requested to mark and identify proprietary/confidential information provided in response to the solicitation.\n\nContact me directly with any questions.\n\nKind regards,\n\nMarissa Tanomrat\n\nProcurement Commodities Team\n\nSLAC National Accelerator Laboratory\n\n2575 Sand Hill Road\n\nMenlo Park, CA 94025\n\nEmail: marissat@slac.stanford.edu","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"SLAC_357639_Valve","place_of_performance":{"zip":"94025","city":{"code":"46870","name":"Menlo Park"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"AJ12"}],"due_at":"2025-07-31T00:00:00Z","due_date":"2025-07-30","closes_at":"2025-07-31T00:00:00Z","awardable":true,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899040","office_name":"SLAC Natl Accel Lab -DOE Contractor","state":"CA","county":"06081","county_name":"San Mateo County","city":"0646870","city_name":"Menlo Park","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-09T04:28:26.362441Z","principal_notice_id":"2effa695612d4ec88cc667d141ca6b12","description":{"text":"SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions.\n\nThe following Addendum is being issued for the subject Request for Quotation: #357639_Valve\n\n• Required item listed Qty revised:\n\n• Item #4:\n\nFlow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S846B-15RF2-02RF2-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” 300# RF-ANSI Flange\n\nOutlet: 2” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: He gas @ -321\n\nFunctional Test Report, C of C\n\nThis Addendum modifies the Request for Quotation and must be acknowledged. Failure to acknowledge all addenda could make your proposal non-responsive. Please confirm that the submitted proposal is not changed because of this addendum. If proposal sent is revised because of this, please submit the revised proposal.\n\nThe following changes are hereby made to the appropriate documents contained the above-mentioned Request for Quotation (RFQ). All other terms and conditions of the RFQ remain the same.\n\n---------------------------------------------------------------------------------------------------------------------------------\n\nThe follow has been attached for you to complete and review:\n\n• (BAA) Buy American Act Certification\n\n• Representations & Certifications Rider\n\n• Confirm Attached SLAC terms are accepted: FP Commercial Supplies-Services T&Cs (August 2023)\n\nRequired item(s) listed below:\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84JE-02RF1-03RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 2” 150# RF-ANSI Flange\n\nOutlet: 3” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 70 psig\n\nProcess: He gas @ -321\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84FD-15RF1-02RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” 150# RF-ANSI Flange\n\nOutlet: 2” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: He gas @ -321\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S841M-05RF2-05RF2-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1/2” 300# RF-ANSI Flange\n\nOutlet: 1/2” 300# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: H2 @131\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 2\n\nP/N S846B-15RF2-02RF2-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” 300# RF-ANSI Flange\n\nOutlet: 2” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: He gas @ -321\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S848B-01RF2-01RF2-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1” 300# RF-ANSI Flange\n\nOutlet: 1” 300# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: He gas @ -428\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 2\n\nP/N S846B-15RF1-02RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” 150# RF-ANSI Flange\n\nOutlet: 2” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: N2 gas @ -268\n\nFunctional Test Report, C of C \\\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S842M-34RF1-01RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 3/4” 150# RF-ANSI Flange\n\nOutlet: 1” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: N2 gas @ -268\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S841M-05RF2-05RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1/2” 300# RF-ANSI Flange\n\nOutlet: 1/2” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: He gas @ 131\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84HE-02RF1-03RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 2” 150# RF-ANSI Flange\n\nOutlet: 3” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 75 psig\n\nProcess: He gas @ 80\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S844B-34RF1-01RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 3/4” 150# RF-ANSI Flange\n\nOutlet: 1” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: He gas @ -442\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84FD-15RF1-03RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” 150# RF-ANSI Flange\n\nOutlet: 3” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: He gas @ 80\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84JE-02RF1-03RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 2” 150# RF-ANSI Flange\n\nOutlet: 3” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: He gas @ 80\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S843M-05RF2-05RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1/2” 300# RF-ANSI Flange\n\nOutlet: 1/2” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: He gas @ -442\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84GD-15RF1-03RF1-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” 150# RF-ANSI Flange\n\nOutlet: 3” 150# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 145 psig\n\nProcess: He gas @ 80\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S842M-01RF2-01RF2-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1” 300# RF-ANSI Flange\n\nOutlet: 1” 300# RF-ANSI Flange\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 320 psig\n\nProcess: He gas @ -437\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S854B-01MNO-01FNO-SS-SS-VT\n\nBody & Trim: SS\n\nInlet: 1” MNPT\n\nOutlet: 1” FNPT\n\nSeat: Viton\n\nSeals: Teflon\n\nSet Point: 300 psig\n\nProcess: He gas @ 250\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S854B-01RF2-01FNO-SS-SS-VT\n\nBody: SS\n\nTrim: SS\n\nInlet: 1” 300# RF-ANSI Flange\n\nOutlet: 1” FNPT\n\nSeat: Viton\n\nSeals: Teflon\n\nSet Point: 275 psig\n\nProcess: He gas @ 210\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S858B-01RF1-01RF1-SS-SS-VT\n\nBody: SS\n\nTrim: SS\n\nInlet: 1” 150# RF-ANSI Flange\n\nOutlet: 1” 150# RF-ANSI Flange\n\nSeat: Viton\n\nSeals: Teflon\n\nSet Point: 150 psig\n\nProcess: Air @130\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 2\n\nP/N S846B-01FNO-01FNO-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1” FNPT\n\nOutlet: 1” FNPT\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 75 psig\n\nProcess: He gas @ -445\n\nFunctional Test Report, C of C\n\n• Flow Safe Spring Op. Relief Valve QTY: 1\n\nP/N S84GD-15FNO-02FNO-SS-SS-TT\n\nBody & Trim: SS\n\nInlet: 1 1/2” FNPT\n\nOutlet: 2” FNPT\n\nSeat: Teflon\n\nSeals: Teflon\n\nSet Point: 45 psig\n\nProcess: He gas @ -447\n\nFunctional Test Report, C of C\n\nQuote is for product only; no on-site services permitted.\n\nSource selection will be based on Lowest Price and Technically Acceptable Method (LPTA).\n\nTechnical evaluation criteria are as follows:\n\n• Meets specified part numbers exactly (P/N)\n\n• Conforms to requested materials (e.g., Stainless Steel body & trim, Teflon/Viton seats and seals).\n\n• Meets ANSI flange or FNPT inlet/outlet connection specifications.\n\n• Valves must precisely match requested pressure set points (e.g., 70 psig, 145 psig, 320 psig).\n\n• Valves must be suitable for the specified gases and extreme temperature ranges (e.g., Helium at -321°F, Hydrogen at 131°F, Nitrogen at -268°F).\n\n• Includes Functional Test Reports.\n\nPlease provide a price and lead time quotation by COB 7/30/2025.\n\nPlease be advised that the requirement was also posted on SAM.gov.\n\nSend quote to marissat@SLAC.stanford.edu.\n\nThe bid closing date for this requirement is 7/30/2025.\n\nIs there any room for additional discount such as for Academic, ICPT, GSA, or Government Institutions?\n\nIf possible, please provide a link to your webpage for published price list to substantiate for the prices quoted.\n\n• Buy American Act Certification (BAA) applies to awards that are over $10,000.\n\n• Representations & Certifications Rider is required. Once completed the Reps and Certs is valid for one year until renewal. If you have already completed one within the year please disregard. Otherwise, please complete and return.\n\n• All subcontractors are required to register in the System for Award Management (www.sam.gov).\n\n• The resulting purchase order will be issued on a fixed price basis. SLAC National Accelerator Laboratory Terms and Conditions for Fixed Price Commercial Supplies and Services (Rev. August 2023) will be made a part of the resulting order.\n\n• Payment Terms will be NET-30 (SLAC is unable to do advance payments and or Prepayments).\n\n• Freight terms will be FOB Destination Prepaid and Add\n\n• Foreign Vendors Shipments will be made CIP SLAC, Menlo Park, and Duty Unpaid.\n\nYou are requested to mark and identify proprietary/confidential information provided in response to the solicitation.\n\nContact me directly with any questions.\n\nKind regards,\n\nMarissa Tanomrat\n\nProcurement Commodities Team\n\nSLAC National Accelerator Laboratory\n\n2575 Sand Hill Road\n\nMenlo Park, CA 94025\n\nEmail: marissat@slac.stanford.edu","html":"<p>SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions.</p>\n\n<p>The following Addendum is being issued for the subject <u>Request for Quotation: #357639_Valve</u></p>\n\n<p></p>\n\n<ul>\n\t<li>Required item listed Qty revised:\n\t<ul>\n\t\t<li><strong>Item #4:</strong>&nbsp;</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</p>\n\n<p>P/N S846B-15RF2-02RF2-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: He gas @ -321</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<p>This Addendum modifies the Request for Quotation and must be acknowledged. Failure to acknowledge all addenda could make your proposal non-responsive. &nbsp;Please confirm that the submitted proposal is not changed because of this addendum. If proposal sent is revised because of this, please submit the revised proposal.</p>\n\n<p></p>\n\n<p>The following changes are hereby made to the appropriate documents contained the above-mentioned Request for Quotation (RFQ). All other terms and conditions of the RFQ remain the same.</p>\n\n<p>---------------------------------------------------------------------------------------------------------------------------------&nbsp;</p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>The follow has been attached for you to complete and review</strong>:</p>\n\n<ol>\n\t<li>(BAA) Buy American Act Certification</li>\n\t<li>Representations &amp; Certifications Rider</li>\n\t<li>Confirm Attached SLAC terms are accepted: FP Commercial Supplies-Services T&amp;Cs (August 2023)</li>\n</ol>\n\n<p></p>\n\n<p><strong>Required item(s) listed below</strong>:</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84JE-02RF1-03RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 3&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 70 psig</p>\n\n<p>Process: He gas @ -321</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84FD-15RF1-02RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: He gas @ -321</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S841M-05RF2-05RF2-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1/2&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 1/2&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: H2 @131</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 2</li>\n</ol>\n\n<p>P/N S846B-15RF2-02RF2-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: He gas @ -321</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S848B-01RF2-01RF2-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 1&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: He gas @ -428</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 2</li>\n</ol>\n\n<p>P/N S846B-15RF1-02RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: N2 gas @ -268</p>\n\n<p>Functional Test Report, C of C \\</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S842M-34RF1-01RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 3/4&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 1&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: N2 gas @ -268</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S841M-05RF2-05RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1/2&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 1/2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: He gas @ 131</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84HE-02RF1-03RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 3&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 75 psig</p>\n\n<p>Process: He gas @ 80</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S844B-34RF1-01RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 3/4&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 1&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: He gas @ -442</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84FD-15RF1-03RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 3&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: He gas @ 80</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84JE-02RF1-03RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 3&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: He gas @ 80</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S843M-05RF2-05RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1/2&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 1/2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: He gas @ -442</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84GD-15RF1-03RF1-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 3&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 145 psig</p>\n\n<p>Process: He gas @ 80</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S842M-01RF2-01RF2-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 1&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 320 psig</p>\n\n<p>Process: He gas @ -437</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S854B-01MNO-01FNO-SS-SS-VT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1&rdquo; MNPT</p>\n\n<p>Outlet: 1&rdquo; FNPT</p>\n\n<p>Seat: Viton</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 300 psig</p>\n\n<p>Process: He gas @ 250</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S854B-01RF2-01FNO-SS-SS-VT</p>\n\n<p>Body: SS</p>\n\n<p>Trim: SS</p>\n\n<p>Inlet: 1&rdquo; 300# RF-ANSI Flange</p>\n\n<p>Outlet: 1&rdquo; FNPT</p>\n\n<p>Seat: Viton</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 275 psig</p>\n\n<p>Process: He gas @ 210</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S858B-01RF1-01RF1-SS-SS-VT</p>\n\n<p>Body: SS</p>\n\n<p>Trim: SS</p>\n\n<p>Inlet: 1&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Outlet: 1&rdquo; 150# RF-ANSI Flange</p>\n\n<p>Seat: Viton</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 150 psig</p>\n\n<p>Process: Air @130</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 2</li>\n</ol>\n\n<p>P/N S846B-01FNO-01FNO-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1&rdquo; FNPT</p>\n\n<p>Outlet: 1&rdquo; FNPT</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 75 psig</p>\n\n<p>Process: He gas @ -445</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<ol>\n\t<li>Flow Safe Spring Op. Relief Valve&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; QTY: 1</li>\n</ol>\n\n<p>P/N S84GD-15FNO-02FNO-SS-SS-TT</p>\n\n<p>Body &amp; Trim: SS</p>\n\n<p>Inlet: 1 1/2&rdquo; FNPT</p>\n\n<p>Outlet: 2&rdquo; FNPT</p>\n\n<p>Seat: Teflon</p>\n\n<p>Seals: Teflon</p>\n\n<p>Set Point: 45 psig</p>\n\n<p>Process: He gas @ -447</p>\n\n<p>Functional Test Report, C of C</p>\n\n<p></p>\n\n<p>Quote is for product only; no on-site services permitted.</p>\n\n<p></p>\n\n<p>Source selection will be based on Lowest Price and Technically Acceptable Method (LPTA).</p>\n\n<p></p>\n\n<p><strong><u>Technical evaluation criteria are as follows: </u></strong></p>\n\n<ol>\n\t<li><strong>Meets specified part numbers exactly (P/N)</strong></li>\n\t<li><strong>Conforms to requested materials (e.g., Stainless Steel body &amp; trim, Teflon/Viton seats and seals).</strong></li>\n\t<li><strong>Meets ANSI flange or FNPT inlet/outlet connection specifications.</strong></li>\n\t<li><strong>Valves must precisely match requested pressure set points (e.g., 70 psig, 145 psig, 320 psig).</strong></li>\n\t<li><strong>Valves must be suitable for the specified gases and extreme temperature ranges (e.g., Helium at -321&deg;F, Hydrogen at 131&deg;F, Nitrogen at -268&deg;F).</strong></li>\n\t<li><strong>Includes Functional Test Reports.</strong></li>\n</ol>\n\n<p></p>\n\n<p>Please provide a price and lead time quotation by COB 7/30/2025.</p>\n\n<p><em>Please be advised that the requirement was also posted on SAM.gov.</em></p>\n\n<p><strong>Send quote to </strong><strong>marissat@SLAC.stanford.edu</strong><strong>.</strong></p>\n\n<p></p>\n\n<p>The bid closing date for this requirement is 7/30/2025.</p>\n\n<p></p>\n\n<p>Is there any room for additional discount such as for Academic, ICPT, GSA, or Government Institutions?</p>\n\n<p>If possible, please provide a link to your webpage for published price list to substantiate for the prices quoted.</p>\n\n<p></p>\n\n<ul>\n\t<li><strong>Buy American Act Certification (BAA)</strong> applies to awards that are over $10,000.</li>\n\t<li><strong>Representations &amp; Certifications Rider is required</strong>. Once completed the Reps and Certs is valid for one year until renewal. If you have already completed one within the year please disregard. Otherwise, please complete and return.</li>\n\t<li><strong>All subcontractors are required to register in the System for Award Management (</strong><strong>www.sam.gov</strong><strong>).</strong></li>\n\t<li><strong>The resulting purchase order will be issued on a fixed price basis.</strong> SLAC National Accelerator Laboratory Terms and Conditions for Fixed Price Commercial Supplies and Services (Rev. August 2023) will be made a part of the resulting order.</li>\n\t<li><strong>Payment Terms will be NET-30 (SLAC is unable to do advance payments and or Prepayments).</strong></li>\n\t<li><strong>Freight terms will be FOB Destination Prepaid and Add</strong></li>\n\t<li><strong>Foreign Vendors Shipments will be made CIP SLAC, Menlo Park, and Duty Unpaid.</strong>&nbsp;</li>\n</ul>\n\n<p></p>\n\n<p>You are requested to mark and identify proprietary/confidential information provided in response to the solicitation.</p>\n\n<p></p>\n\n<p>Contact me directly with any questions.</p>\n\n<p></p>\n\n<p>Kind regards,</p>\n\n<p></p>\n\n<p>Marissa Tanomrat</p>\n\n<p>Procurement Commodities Team</p>\n\n<p>SLAC National Accelerator Laboratory</p>\n\n<p>2575 Sand Hill Road</p>\n\n<p>Menlo Park, CA 94025</p>\n\n<p>Email: marissat@slac.stanford.edu</p>\n\n<p></p>\n\n<p></p>\n\n<p></p>","origin":"detail"},"contacts":[{"name":"Katherine Jill A. Coh","role":"primary","email":"kcoh@slac.stanford.edu","phone":"6509262770"}],"place_of_performance":{"zip":"94025","city":{"code":"46870","name":"Menlo Park"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"94025","city":"Menlo Park","state":"CA","country":"USA"},"naics_codes":["333310"],"award":null,"attachments":[{"resource_id":"3d38980d73b64ae7970b04a4adb4a3a4","name":"01. BAA_Certification_08.29.2023_(D5) (1).pdf","kind":"file","mime_type":".pdf","size_bytes":583314,"posted_at":"2025-07-15T22:26:14.856Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3d38980d73b64ae7970b04a4adb4a3a4/download","mirrored":false}],"awards":[],"related":[{"key":"SLAC369019DCPOWERSUPPLY","latest_notice_id":"4e4acfada72244b6a547ec75e12df836","title":"DC Power Supply","solicitation_number":"SLAC_369019_DCPowerSupply","notice_type":"o","first_type":"o","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":2,"due_at":"2026-12-01T01:00:00Z","due_date":"2026-11-30","closes_at":"2026-12-01T01:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899040","office_name":"SLAC Natl Accel Lab -DOE Contractor","naics":"3333","psc":"AJ12","set_aside":null,"state":"CA","county":"06081","county_name":"San Mateo County","city":"0646870","city_name":"Menlo Park","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"REQ369230","latest_notice_id":"229f30abcc164940aae9b631b004159c","title":"Iris aiOne System","solicitation_number":"Req-369230","notice_type":"k","first_type":"k","first_posted":"2026-11-20","last_posted":"2026-11-23","notices":3,"due_at":"2026-12-01T01:00:00Z","due_date":"2026-11-30","closes_at":"2026-12-01T01:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899040","office_name":"SLAC Natl Accel Lab -DOE Contractor","naics":"333310","psc":"AJ12","set_aside":null,"state":"CA","county":"06081","county_name":"San Mateo County","city":"0646870","city_name":"Menlo Park","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"SLACRFP369851AT","latest_notice_id":"c34e1b68f0f94733870a9e11ab9b97ef","title":"SPEAR Beam Position Monitors (BPMs)","solicitation_number":"SLAC_RFP369851_(AT)","notice_type":"o","first_type":"o","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-12-05T01:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-05T01:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899040","office_name":"SLAC Natl Accel Lab -DOE Contractor","naics":"334516","psc":"6625","set_aside":null,"state":"CA","county":"06081","county_name":"San Mateo County","city":"0646870","city_name":"Menlo Park","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"SLACNOV2026CHEMICALINVENTORYSYSTEMCIS","latest_notice_id":"ef38bb23d27d497da5149e0735097cf8","title":"SLAC_NOV2026_CHEMICAL_INVENTORY_SYSTEM (CIS)","solicitation_number":"SLAC_NOV2026_CHEMICAL_INVENTORY_SYSTEM_(CIS)","notice_type":"r","first_type":"r","first_posted":"2026-11-17","last_posted":"2026-11-19","notices":3,"due_at":"2027-01-09T01:00:00Z","due_date":"2027-01-08","closes_at":"2027-01-09T01:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899040","office_name":"SLAC Natl Accel Lab -DOE Contractor","naics":"32599","psc":"N068","set_aside":null,"state":"CA","county":"06081","county_name":"San Mateo County","city":"0646870","city_name":"Menlo Park","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"}],"similar_open":[{"key":"N0040627Q0037","latest_notice_id":"9e37c8bf03434e269dd0f05f4e4a4af1","title":"Brand Name Southbend Kettle, Electric, Stationary","solicitation_number":"N0040627Q0037","notice_type":"o","first_type":"o","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-11-30T20:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00406","office_name":"NAVSUP FLT LOG CTR PUGET SOUND","naics":"333310","psc":"7310","set_aside":"WOSB","state":"CA","county":"06073","county_name":"San Diego County","city":"0666000","city_name":"San Diego","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"REQ369230","latest_notice_id":"229f30abcc164940aae9b631b004159c","title":"Iris aiOne System","solicitation_number":"Req-369230","notice_type":"k","first_type":"k","first_posted":"2026-11-20","last_posted":"2026-11-23","notices":3,"due_at":"2026-12-01T01:00:00Z","due_date":"2026-11-30","closes_at":"2026-12-01T01:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899040","office_name":"SLAC Natl Accel Lab -DOE Contractor","naics":"333310","psc":"AJ12","set_aside":null,"state":"CA","county":"06081","county_name":"San Mateo County","city":"0646870","city_name":"Menlo Park","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"SPE8E827Q0069","latest_notice_id":"e57ede98194b432198c49945f413c287","title":"46--FEEDER,CHEMICAL SOLUTI","solicitation_number":"SPE8E827Q0069","notice_type":"k","first_type":"k","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":null,"due_date":"2026-11-25","closes_at":"2026-11-26T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPE8E8","office_name":"DLA TROOP SUPPORT","naics":"333310","psc":"46","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"SOLUTI: LINE 0001 QTY 1 UI EA DELIVER TO: W1A8 DLA DISTRIBUTION BY:","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"}],"similar_open_total":60,"indexable":false}