Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 9,224 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans

Sources sought

SLAC B750 Clean Room Project – Design-Bid-Build

SLAC_352065

Department of Energy, SLAC Natl Accel Lab -DOE Contractor. Commercial and Institutional Building Construction.

Response deadline

November 27, 2024 at 8:00 PM EST

Closed 729 days ago. Posted November 20, 2024. Scheduled to archive December 12, 2024.

Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities

This one closed in 2024

190 like it are open now in commercial and institutional building construction

All 190 open in commercial and institutional building construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
What comes next
No solicitation was published under this number after the sources sought of November 20, 2024. An agency sometimes issues the solicitation under a new number.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

THIS POSTING IS FOR "SOURCES SOUGHT ONLY." PLEASE DO NOT SUMBIT BIDS. While the DRAFT RFP package has been included with this post, the RFP has NOT yet been released. Interested Vendors should express their interest on the Interested Vendors List through this SAM.GOV posting or emailing the procurement specialist identified on this Sources Sought posting.

SLAC B750 Clean Room Project – Design-Bid-Build SLAC is looking to create a clean working environment for the fabrication of critical equipment that will be used in the next phase of LCLS II HE in 2026. For SLAC to build the required materials a space is needed to ensure a stable controlled setting to allow the work to commence. This project consists of building out a 900 square foot class 100K cleanroom (assembly room) module and the installation of a new air handling unit inside B750 at SLAC.

To do this the project requires the installation of a prefabricated equipment assembly room furnished by SLAC. The room will consist of a gowning room, cleanroom and assembly room. All required utilities to meet the standards set forth by the end users as called out on the Room Data Sheet will be installed and connected as part of this project. Minimum Qualifications The Offeror’s General Contractor’s license has not been revoked within the past five (5) years.

The Offeror’s company has not been debarred within the past five (5) years from working on any U.S. government contracts/subcontracts. Neither the Offeror’s firm, nor any of its owners or officers have been convicted of a crime involving the awarding of the contract of a government (U.S. Federal, State, and City) construction project, or the bidding or performance of a government contract. Offeror must have an established local office for a minimum of 2 years in the San Francisco Bay Area.

The San Francisco Bay Area is defined as the following 10 counties: Santa Clara, San Mateo, San Francisco, Alameda, Contra Costa, Marin, Napa, Sonoma, Solano, and Santa Cruz Counties The Offeror must list any U.S. projects within the past five (5) years that have been terminated for default. The Offeror’s company cannot have any U.S. projects within the past five (5) years that have been terminated for default.

The Offeror must have previous experience working at Department of Energy (DOE) and/or Department of Defense (DOD) Facilities Scope All design elements and requirements as laid out on design drawings. Below you will find the key elements further defined in the drawings.

Provide polished concrete flooring (to be installed prior to the cleanroom being assembled) Address all ADA compliance requirements as called out in the design documentation Handicap parking lot spaces and associated signage Bathroom modifications (Remove toilet partition, liquid soap dispenser relocation flip door orientation for 1’-6” clearance on pull side. Repaint door and reinstall signage on exterior of door. Patch and repair all holes from equipment removed/relocated.

Sloped Walkway outside of the southside exit door Install equipment assembly room (SLAC furnished, GC installed) Per the notes on S2.0, the design-build contractor responsible for duct supports on the roof will need to coordinate loading with the clean room designer such that live load and all superimposed dead loads (ceiling, lights, MEP systems, etc.) are within the 25psf combined load allowance.

All submittals/shop drawings as called out on the cover sheet of the design package (Fire alarm, Fire sprinkler mods, and structural support of mechanical ductwork. Clean room Module will be ran, furnished and provided by SLAC.)

Mechanical: Installation of HVAC system for new 100k cleanroom Installation of exhaust system for new 100k Cleanroom All equipment, material and installation to be provided by the contractor (not including the cleanroom shell, which SLAC provides). This is to include all plumbing, ductwork, and controls; tie-ins and startup/commissioning. The Air handler, condenser, and other such material will be the contractor's responsibility to procure and install, once submittal is approved by the engineer of record.

Installation of process piping Electrical: Provide 480V power for the new AC unit Provide power for the prefabricated cleanroom, lighting, HEPA/FAN units Provide power for receptacles and special outlets for lab equipment Provide fire alarm horns strobes, duct smoke detectors for automatic fan shut down, deferred shop drawing submittal for BIO approval by fire alarm sub Bid for new transformer, in event existing transformer fails.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. November 20, 2024

    Sources sought

    Due November 27, 2024 at 8:00 PM EST. SAM.gov, notice 104326ef11144fa49c1207e4449e93e9

Points of contact