Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,680 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Solicitation

Fermilab -Replacement of EOL water-cooled HVAC system

RK-365984-ISD

Department of Energy, Fermilab - DOE Contractor. Plumbing, Heating, and Air-Conditioning Contractors.

Response deadline

April 4, 2025 at 4:00 PM EDT

Closed 600 days ago. Posted February 18, 2025. Scheduled to archive April 19, 2025.

Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities

This one closed in 2025

59 like it are open now in plumbing, heating, and air-conditioning contractors

All 59 open in plumbing, heating, and air-conditioning contractors

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 238220 (plumbing, heating, and air-conditioning contractors), means no more than $19 million in average annual receipts, counted with affiliates. What a set-aside is
Time to respond
Bidders had 45 days from the day the solicitation was posted, February 18, 2025, to the deadline.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

This statement of work (SOW) aims to obtain supervision, expertise, labor, materials, and equipment for the work indicated below.

The work will be completed at Proton West 7 (PW7) at the Fermilab facility in Batavia, Illinois. Fermilab is operated by the Fermi Forward Discovery Group (FFDG). FFDG will provide a Task Manager / Construction Coordinator (TM/CC) to oversee the project. 

The subcontractor will replace the existing water-cooled HVAC unit at PW7. The subcontractor will purchase and provide the replacement unit. This is an end-of-life replacement of the HVAC system.

The subcontractor will be responsible for all installation, labor, supervision, equipment, measurements, programming, and testing needed to complete this project before turning it over to FFDG.

SCOPE OF WORK

Subcontractor shall perform the following:

  1. Mobilize to PW7 FIMS 626
  2. The contractor will remove the existing York E#1922 water-cooled cooling-only unit.
    1. LOTO (lock out tag out) electrical panel PHP-WB-2-1 Circ.7-9-11.
    2. Isolate 2” water lines.
    3. Remove existing electrical wiring.  Ensure line voltage and control wiring are removed and disposed of as required.
    4. Disconnect both supply and return water lines.
    5. Disconnect condensate line.
    6. Once the unit is completely disconnected, TM/CC will work with an in-house overhead crane technician to assist with the removal.
  3. The contractor will provide and install a new 20-ton water-cooled system as indicated below.
    1. TM/CC will install a new unit with an in-house overhead crane technician.
    2. The contractor will provide vibration pads for the new unit to sit on.
    3. The contractor will provide a new 2” Penn refrigeration regulator valve.
      1. The contractor will install a 2” Penn valve with a 1/4-inch refrigeration line from the high side of the regulator valve.
      2. The contractor will install a refrigeration tee for service and pressure testing.
    4. The contractor is to supply all 2” copper and materials necessary to connect the supply and return water lines properly.
    5. The contractor will supply and install new insulation on water lines after the leak is checked.
    6. The contractor will install a new electrical 460VAC-3 phased, fused disconnect.
      1. The contractor must supply appropriately sized fuses to match unit MOCP.
      2. The contractor must supply an appropriately sized wire and conduit for the new unit.
      3. The contractor will make the final connections and check the phasing.
  4. The contractor is to install an FFDG-supplied thermostat.
    1. The contractor will install a new 8-wire thermostat wire from the unit to the thermostat.
    2. The contractor is to land low-voltage wiring.
  5. The contractor must supply proper duct supplies (e.g., a Pair of pants) for adequate amperage and airflow.
    1. The TM/CC will provide an in-house overhead crane technician to lift ductwork for final installation.
  6. The contractor is to start up the equipment.
    1. Provide an amp draw on motors to ensure proper ducting.
    2. Adjust the Pen valve to the proper height to ensure an appropriate flow and pressure.
    3. The contractor is to fill out manufacturer start-up paperwork.
  7. Demobilize, final clean up, and check.

The contractor must provide TM/CC with all manuals and a picture of the manufacturer's nameplate

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. February 18, 2025

    Solicitation

    Due April 4, 2025 at 4:00 PM EDT. SAM.gov, notice 7d19fab4951641d18ce501ba8a5c7446

    1 revision on SAM
    • February 18, 2025: publish, solicitation

Points of contact