Solicitation
Fundamental Aerodynamics for Large Wind Turbine Performance and Reliability
RFX-2025-10021
Department of Energy, Alliance for Energy Innovation, LLC - DOE Contractor. Wind Electric Power Generation.
Response deadline
April 7, 2025 at 7:00 PM EDT
Closed 597 days ago. Posted March 7, 2025, first published January 16, 2025. Scheduled to archive April 8, 2025.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2025
1 like it is open now in wind electric power generation
- Renewable Energy Certificates (RECs) - Basic Ordering Agreement
Defense Logistics Agency, DLA Energy
SolicitationSmall businessNAICS 221115Ship to the buyerSP0604-22-R-0417Closes in 154 daysApr 28, 2027
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 221115 (wind electric power generation), means no more than 1,150 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 81 days from the day the solicitation was posted, January 16, 2025, to the deadline. The deadline moved once: it was first March 17, 2025 and ended as April 7, 2025.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
One of the U.S. Department of Energy’s Wind Energy Technologies Office’s (WETO’s) strategic priorities is to overcome the cost and risk barriers to the commercial liftoff of such large turbines. The National Renewable Energy Laboratory’s (NREL) portfolio of research and development (R&D) efforts in the past has included projects to characterize and model the above-mentioned phenomena so the industry can design effectively. The R&D community in general has hit the knowledge/validation data barrier that the lack of above-mentioned data represents. Consequently, WETO has mobilized funding from the Bipartisan Infrastructure Law (BIL) and Base Appropriations to support a fundamental R&D effort to overcome these barriers. NREL will lead/manage “Aerodynamics of Large Turbines” (ALTius) resulting from this RFP with the following goals:
• Collect and disseminate benchmark airfoil aerodynamic data to validate and improve the tools/models that assure the performance of next-generation wind turbine blades.
• Provide data to validate modeling and simulation tools to predict the behavior of nonoperational wind turbine rotors, e.g., when they are stopped for installation, maintenance, or idling (during the passage of extreme weather).
• Inform the wind industry with physical insights that advance modeling capabilities to minimize the risks and costs of next-generation wind turbines.
The RFP is organized by objectives into two (2) different topic areas of interest.
Amendment 1 posted 3/7/25. See attachments.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Attachment No. 4 - Sample Deliverable Summary Table.xlsx24 KB, January 16, 2025
- Attachment 1.B - NFAC Testing Cost Estimates.pdf123 KB, January 16, 2025
- Attachment 1.A - NFAC Test Planning Additional Information.pdf135 KB, January 16, 2025
- Attachment 3 - Sample Subcontract Schedule.pdf214 KB, January 16, 2025
- Appendix 1.D - Open Source Airfoils Candidates.pdf185 KB, January 16, 2025
- Attachment 2 - Statement of Work (Topic Area 2).pdf289 KB, January 16, 2025
- Request for Proposal RFX-2025-10021.pdf449 KB, January 16, 2025
- Attachment 1 - Statement of Work (Topic Area 1).pdf797 KB, January 16, 2025
- Attachment 1.C - NFAC Test Planning Guide.pdf894 KB, January 16, 2025
- Amendment No. 1 to RFX-2025-10021 - Fundamental Aerodynamics for Large Wind Turbine Performance and Reliability.pdf195 KB, March 8, 2025
- Revised Attachment 1 - Statement of Work (Topic Area 1)-2.pdf1023 KB, March 8, 2025
- Revised Attachment 1.A - NFAC Test Planning Additional Information.pdf177 KB, March 8, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 16, 2025
Solicitation, originally special notice
Due March 17, 2025 at 7:00 PM EDT. SAM.gov, notice 2c14de26190c4fe9a8ee50ee9187029b
3 revisions on SAM
- March 8, 2025: publish, solicitation
- December 13, 2024: publish, special notice
- January 16, 2025: publish, solicitation
March 8, 2025
Solicitation
Due April 7, 2025 at 7:00 PM EDT. SAM.gov, notice 4f293165c67a44a498ff8aa553bcf06c
3 revisions on SAM
- March 8, 2025: publish, solicitation
- December 13, 2024: publish, special notice
- January 16, 2025: publish, solicitation
Points of contact
- Kyndall JacksonKyndall.Jackson@nrel.gov