Solicitation
Central Monorail Hoist Commissioning
RFP-LBNF-368455-BF
Department of Energy, Fermilab - DOE Contractor. Overhead Traveling Crane, Hoist, and Monorail System Manufacturing.
Response deadline
August 8, 2025 at 7:00 PM EDT
Closed 474 days ago. Posted August 4, 2025, first published June 17, 2025. Scheduled to archive August 23, 2025.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2025
22 like it are open now in overhead traveling crane, hoist, and monorail system manufacturing
- HOIST,CHAIN
Defense Logistics Agency, DLA Troop Support
Combined synopsis and solicitationSmall businessNAICS 333923Ship to the buyerSPE8EE27Q0091Due tomorrowNov 25 - FAIRLEAD,ROLLER
Defense Logistics Agency, DLA Troop Support
Combined synopsis and solicitationNAICS 333923Ship to the buyerSPE8EE27Q0093Due in 2 daysNov 26 - Hoist Blocks, Naval Base San Diego
Department of the Navy, NAVSUP FLT Log CTR San Diego
Sources soughtNAICS 333923Ship to San Diego, CAN0024427Q0010Due in 2 daysNov 27
All 22 open in overhead traveling crane, hoist, and monorail system manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 333923 (overhead traveling crane, hoist, and monorail system manufacturing), means no more than 1,250 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 52 days from the day the solicitation was posted, June 17, 2025, to the deadline. The deadline moved once: it was first July 25, 2025 and ended as August 8, 2025.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The excavation of the caverns at LBNF has been completed. A contractor has installed the central monorail beams in both the North and South Caverns. Due to discrepancy in specifications, the beams were not installed in compliance with CMAA guidelines for straightness. Fermi Forward Discovery Group LLC is now requesting proposals from qualified crane and hoist contractors who are interested in performing the modification, installation, and commissioning of the new hoists/trolley assembly on the existing beams in both the North and South caverns.
Two 20-ton CMCO electric monorail hoist and trolley assemblies have been purchased and are currently warehoused in Rapid City, SD. These two hoists will need to be installed on the South Cavern central rail to facilitate movement of materials underground. The existing trolleys will need to be modified to fit onto the installed central rail once a proper rail survey has been performed.
Two more 20-ton electric monorail hoists and trolley assemblies will be purchased through this contract. These two additional hoists will be installed on the North Cavern central rail to facilitate movement of materials underground.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- J-1 Price Sheet including Fully Burdened Hourly Rate.xlsx11 KB, June 17, 2025
- RFP LBNF-368455 Monorail Hoist Commissioning Complete File.pdf7.3 MB, June 17, 2025
- J-7 Davis Bacon Wage Determination SD20250016 Mod2.txt15 KB, June 17, 2025
- Amendment 01--RFP LBNF-368455-BF.pdf120 KB, June 18, 2025
- 13.0-Exhibit I supplier_online_registration_instructions.pdf195 KB, June 18, 2025
- FL-11_Rev1.pdf327 KB, June 18, 2025
- FL-55 (Rev. 6-23) 14.0 - Exhibit III-G.pdf392 KB, June 18, 2025
- Amendment 01--RFP LBNF-368455-BF.RV1.pdf120 KB, June 18, 2025
- Amendment 02--RFP LBNF-368455-BF 7.2.25.pdf294 KB, July 2, 2025
- UG-FD-SS-801.pdf354 KB, July 2, 2025
- UG-FD-SS-802.pdf210 KB, July 2, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 17, 2025
Solicitation, originally sources sought
Due July 25, 2025 at 7:00 PM EDT. SAM.gov, notice bf82194ab53d4d259966d5c7a12ae293
8 revisions on SAM
- August 4, 2025: publish, solicitation
- July 30, 2025: publish, solicitation
- July 8, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 18, 2025: publish, solicitation
- June 18, 2025: publish, solicitation
- June 17, 2025: publish, solicitation
- May 16, 2025: publish, sources sought
June 18, 2025
Solicitation
Due July 25, 2025 at 7:00 PM EDT. SAM.gov, notice 56f516363e254111ae3d08551d576996
8 revisions on SAM
- August 4, 2025: publish, solicitation
- July 30, 2025: publish, solicitation
- July 8, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 18, 2025: publish, solicitation
- June 18, 2025: publish, solicitation
- June 17, 2025: publish, solicitation
- May 16, 2025: publish, sources sought
June 18, 2025
Solicitation
Due July 25, 2025 at 7:00 PM EDT. SAM.gov, notice dbc277fe46904d699546301795ce3ba7
8 revisions on SAM
- August 4, 2025: publish, solicitation
- July 30, 2025: publish, solicitation
- July 8, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 18, 2025: publish, solicitation
- June 18, 2025: publish, solicitation
- June 17, 2025: publish, solicitation
- May 16, 2025: publish, sources sought
July 2, 2025
Solicitation
Due August 8, 2025 at 7:00 PM EDT. SAM.gov, notice a5f22bbc0f6e452a8182a216d205b67f
8 revisions on SAM
- August 4, 2025: publish, solicitation
- July 30, 2025: publish, solicitation
- July 8, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 18, 2025: publish, solicitation
- June 18, 2025: publish, solicitation
- June 17, 2025: publish, solicitation
- May 16, 2025: publish, sources sought
July 8, 2025
Solicitation
Due August 8, 2025 at 7:00 PM EDT. SAM.gov, notice 992814cf820245a8820e9360447eb614
8 revisions on SAM
- August 4, 2025: publish, solicitation
- July 30, 2025: publish, solicitation
- July 8, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 18, 2025: publish, solicitation
- June 18, 2025: publish, solicitation
- June 17, 2025: publish, solicitation
- May 16, 2025: publish, sources sought
July 30, 2025
Solicitation
Due August 8, 2025 at 7:00 PM EDT. SAM.gov, notice 84af6224f4304eaaba7e23713600e0ed
8 revisions on SAM
- August 4, 2025: publish, solicitation
- July 30, 2025: publish, solicitation
- July 8, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 18, 2025: publish, solicitation
- June 18, 2025: publish, solicitation
- June 17, 2025: publish, solicitation
- May 16, 2025: publish, sources sought
August 4, 2025
Solicitation
Due August 8, 2025 at 7:00 PM EDT. SAM.gov, notice a1cbb7af9c9649b2b56fa94e081203ff
8 revisions on SAM
- August 4, 2025: publish, solicitation
- July 30, 2025: publish, solicitation
- July 8, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 18, 2025: publish, solicitation
- June 18, 2025: publish, solicitation
- June 17, 2025: publish, solicitation
- May 16, 2025: publish, sources sought
Points of contact
- Bridget Fugettbridget@fnal.gov8152459847
- Jeremy Duncanjeremyd@fnal.gov865-300-0443