Solicitation
4 1/16" Coaxial Dual Directional Coupler
RFP_375295RLP
Department of Energy, Fermilab - DOE Contractor. Other Electronic Component Manufacturing.
Response deadline
November 7, 2025 at 6:00 PM EST
Closed 383 days ago. Posted October 31, 2025, first published October 23, 2025. Scheduled to archive November 8, 2025.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2025
216 like it are open now in other electronic component manufacturing
- CABLE ASSEMBLY,SPECIAL
Defense Logistics Agency, DLA Aviation
Combined synopsis and solicitationSmall businessNAICS 334419Ship to the buyerSPE4A627T108CDue tomorrowNov 25 - CABLE ASSEMBLY,SPECIAL
Defense Logistics Agency, DLA Aviation
Combined synopsis and solicitationSmall businessNAICS 334419Ship to the buyerSPE4A627T104HDue tomorrowNov 25 - WIRING HARNESS
Defense Logistics Agency, DLA Aviation
Combined synopsis and solicitationNAICS 334419Ship to the buyerSPE4A527T3448Due tomorrowNov 25
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 334419 (other electronic component manufacturing), means no more than 750 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 15 days from the day the solicitation was posted, October 23, 2025, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Please provide a proposal that meets specification requirements outlined in document RFP 375295RLP and include completed accompany documents: SARC and PUR-466.
UPDATE 10/31/2025:
Fermilab needs couplers to sustain small differential air pressure. This will ensure that there are acceptable levels of non-ionizing radiation around the RF distribution lines after constructed or modified.
Fermilab expects the RF distribution to run fully reflected from the cavity. Cross talk between ports during operation must be limited for diagnostic purposes.
The procurement of the fixed transmission line has not begun, no commitment to brand at this time.
Fermilab has found that the termination is the most delicate part of the directional coupler. Previous replacements have occurred in the past. Having an external termination makes repair process easier. An acceptable option would be an internal termination that could be replaced in house, in the event of failure.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- FFDG General Terms and Conditions for Commercial Products and Commercial Services (08.2025).pdf387 KB, October 23, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 23, 2025
Solicitation
Due November 7, 2025 at 6:00 PM EST. SAM.gov, notice be4971e2ab574b35b8b2b022cdc08d54
2 revisions on SAM
- October 31, 2025: publish, solicitation
- October 23, 2025: publish, solicitation
October 31, 2025
Solicitation
Due November 7, 2025 at 6:00 PM EST. SAM.gov, notice e4a28b3e500b49de8cc981c5b8793e41
2 revisions on SAM
- October 31, 2025: publish, solicitation
- October 23, 2025: publish, solicitation
Points of contact
- Rhiannon Pattersonrhiannon@fnal.gov6054312905