Special notice
Request for Information (RFI) for Launch Equipment Test Facility (LETF)
RFI-KSC-LETF-2025
National Aeronautics and Space Administration, NASA Kennedy Space Center. Engineering Services.
Response deadline
July 25, 2025 at 5:00 PM EDT
Closed 490 days ago. Posted July 17, 2025, first published June 3, 2025. Scheduled to archive August 9, 2025.
Get the next one like this from National Aeronautics and Space Administration by email, the day it is posted.Find my opportunities
This one closed in 2025
98 like it are open now in engineering services
- Diving, Biomedical, Information Technology (IT), Logistics and Program Management Support for the Navy Experimental Diving Unit (NEDU).
Department of the Navy, Naval Surface Warfare Center
PresolicitationNAICS 541330FloridaN6133126SNQ34Due in 5 daysDec 2 - Sources Sought Title II Inspection Services
Department of the Air Force, FA2521 45 Cons PK
Sources sought8(a)NAICS 541330Patrick AFB, FLTitle-IIInspectionServices2027Due in 6 daysDec 3 - Sonic Boom Launch Noise Analysis RFI _NAICS 541330, 541715
Department of the Air Force, FA2521 45 Cons PK
Sources soughtNAICS 541330Cape Canaveral, FLRFISonicBoom1Due in 6 daysDec 3
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
Description
As published on SAM.gov.
Amendment 03: DUE DATE FOR RFI RESPONSES IS EXTENDED TO JULY 25, 2025, and Q&A provided.
This amendment changes the due date from July 18, 2025, to July 25, 2025.
NASA Responses to Industry Questions are attached.
Amendment 02: THE DUE DATE FOR RFI RESPONSES IS EXTENDED TO JULY 18, 2025.
This amendment changes the due date from July 11, 2025, to July 18, 2025.
NASA Responses to Industry Questions will be posted this week.
Amendment 01: AN ADDITIONAL INDUSTRY DAY OPPORTUNITY IS SET FOR TUESDAY, JULY 1, 2025
Interested parties are required to provide written requests NLT June 27, 2025, to Christina.L.Williams@nasa.gov.
Reference “Industry Day, RFI-KSC-LETF-2025” in the subject line and include the names and e-mail addresses for all participants.
A confirmation e-mail will be sent to participants with details regarding Industry Day upon receipt of written requests.
**SEE ATTACHMENTS FOR FULL OPPORTUNITY INFORMATION**
NASA’s John F. Kennedy Space Center (KSC) is the world’s premier spaceport. The KSC Master Plan (https://masterplan.ksc.nasa.gov/) addresses both U.S. Government and commercial launch activities at KSC. Periodically, the Spaceport Development Division conducts market research to seek industry interest on specific aspects of the KSC Master Plan.
This Request for Information (RFI) is soliciting interest for potential utilization of services at KSC by entities interested in using the Launch Equipment Test Facility (LETF). NASA is interested in potential operational concepts for partial areas of the facility or the entire facility operations.
The LETF has the capability to test full scale launch hardware, Ground to Flight Umbilical Interface Testing (pneumatic, electrical, instrumentation, cryogenic systems), Vehicle Motion Simulators (VMS) 4-axis, 600 Ton proof-loading test fixture, simulated launch towers, Facility Cryogenic System (liquid nitrogen or liquid hydrogen capability), Water Flow Test Loop, Vehicle Simulation 2-Axis Motion Fixture, Vehicle Support Post 2-Axis load test fixture, Data Acquisition System, Mobile Instrumentation and Data Acquisition System, Control Room, High Speed / Low Speed Video Systems, Hazardous Gas Detection System, Instrumentation and Data Acquisition System Laboratory, Ground Support Equipment Integration Testbed (GSEITB), Electrical / Instrumentation Cable Fabrication and Mold Shop, Pneumatics Shop, Machine and Weld Shop, and the High Bay area for assembly, integration and localized testing.
**SEE ATTACHMENTS FOR FULL OPPORTUNITY INFORMATION**
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- RFI-KCS-LETF-2025 Attachment A_LETF Capabilities.pdf6.1 MB, June 3, 2025
- RFI-KSC-LETF-2025 Announcement.pdf853 KB, June 3, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 3, 2025
Special notice
Due July 11, 2025 at 5:00 PM EDT. SAM.gov, notice e6e38a80c5564917a295f92f267de42b
5 revisions on SAM
- July 18, 2025: publish, special notice
- July 7, 2025: publish, special notice
- June 24, 2025: publish, special notice
- June 24, 2025: publish, special notice
- June 3, 2025: publish, special notice
June 24, 2025
Special notice
Due July 11, 2025 at 5:00 PM EDT. SAM.gov, notice 4dadb5be10594dfc869d23c36decb9cd
5 revisions on SAM
- July 18, 2025: publish, special notice
- July 7, 2025: publish, special notice
- June 24, 2025: publish, special notice
- June 24, 2025: publish, special notice
- June 3, 2025: publish, special notice
June 24, 2025
Special notice
Due July 11, 2025 at 5:00 PM EDT. SAM.gov, notice cb4b6d4168d048beb29fdc75ba44e7aa
5 revisions on SAM
- July 18, 2025: publish, special notice
- July 7, 2025: publish, special notice
- June 24, 2025: publish, special notice
- June 24, 2025: publish, special notice
- June 3, 2025: publish, special notice
July 7, 2025
Special notice
Due July 18, 2025 at 5:00 PM EDT. SAM.gov, notice e5819e450c0944f09a80cf7bc0f70dcb
5 revisions on SAM
- July 18, 2025: publish, special notice
- July 7, 2025: publish, special notice
- June 24, 2025: publish, special notice
- June 24, 2025: publish, special notice
- June 3, 2025: publish, special notice
July 18, 2025
Special notice
Due July 25, 2025 at 5:00 PM EDT. SAM.gov, notice bd22f4fa10c9421eba150847f6515208
5 revisions on SAM
- July 18, 2025: publish, special notice
- July 7, 2025: publish, special notice
- June 24, 2025: publish, special notice
- June 24, 2025: publish, special notice
- June 3, 2025: publish, special notice
Points of contact
- Christina L. Williamschristina.l.williams@nasa.gov3218673912