Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 9,283 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans

Sources sought

Repair for Bldg 2025 Cooling Tower - Peterson, SFB

RFI2517X

Department of the Air Force, FA2517 21 Cons BLDG 350. Plumbing, Heating, and Air-Conditioning Contractors.

Response deadline

July 22, 2024 at 12:00 PM EDT

Closed 858 days ago. Posted July 15, 2024. Scheduled to archive August 6, 2024.

Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities

This one closed in 2024

59 like it are open now in plumbing, heating, and air-conditioning contractors

All 59 open in plumbing, heating, and air-conditioning contractors

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 238220 (plumbing, heating, and air-conditioning contractors), means no more than $19 million in average annual receipts, counted with affiliates. What a set-aside is
What comes next
No solicitation was published under this number after the sources sought of July 15, 2024. An agency sometimes issues the solicitation under a new number.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

Peterson Space Force Base, Colorado is seeking information for seeking potential sources to provide the Civil Engineering Squadron (CES) with repair for the Bldg 2025 Cooling Towers to address leaks and operation of the towers.

Description: Make repairs to three cooling towers at Building 2025 at Peterson SFB. There are three existing Evapco cooling towers with model number ESWA 336-45N and with serial numbers 12-517182, 12-517183, 12-51784 rated at 2050 gallons per minute. The basin is stainless steel and upper sections are galvanized. These Cooling towers have various degrees of scaling, and currently have leaks in basin. All work should be done in accordance with the PWS, all local, federal and USAF applicable codes. The Contractor shall follow all Green Procurement mandates and submittal requirements.

Project Specifications: Must meet or exceed the following specifications: Contractor shall prep surface with combination of cleaning, descaling and hand grinding basin to create a 3 mil profile. Basin areas under piping with limiting clearances to grind shall be surface treated with Rydlyme or equivalent biodegradable descaler to get down to bare metal. Contractor shall replace inlet louvers with original or equivalent to original manufacturers materials on all three cooling towers.

Contractor shall clean, descale and unplug nozzles to ensure good flow. Contractor shall clean and descale drift eliminators and sidewalls of cooling towers. Contractor shall inspect and adjust float/fill for cooling tower operation. Contractor shall provide a bonding agent prior to applying CIM 1000 or equivalent urethane to cooling towers. Contractor shall provide 60 mil thickness of CIM (Chase Industrial Membrane) 1000 or equivalent urethane.

This coating is to form an elastomeric liner to form a chemical, waterproof and abrasion resistant barrier. CIM can handle a pH range of 2 to 12. CIM can handle stretch of 300% and return to its original shape. After work is complete including cure time, contractor shall restart cooling tower system ensuring proper operation including makeup water and chemical water treatment. Contractor may work on one cooling tower at a time to ensure uptime of condenser water. As one tower is complete and inspected, contractor can start work on next cooling tower.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 15, 2024

    Sources sought

    Due July 22, 2024 at 12:00 PM EDT. SAM.gov, notice c5edb9d56ab84ebc8bead45db03ee988

Points of contact