Justification, first published as sources sought
NEFSC JJH Marine Sciences Laboratory Seawater Intake Line Repair
REQUIREMENTS-26-3483
National Oceanic and Atmospheric Administration, Department of Commerce NOAA. Water and Sewer Line and Related Structures Construction.
Awarded
Caldwell Marine International LLC
$52,000.00 obligated so far on USAspending, September 20, 2026, contract 1305M326P0404
Get the next one like this from National Oceanic and Atmospheric Administration by email, the day it is posted.Find my opportunities
This one was awarded in 2026
25 like it are open now in water and sewer line and related structures construction
- HAVO 326181 Rehabilitate Rainshed&Water Treatment
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237110Hawaii140P2026R0091Due in 3 daysNov 28 - New Meadows Range Barn
Forest Service, Payette National Forest
Combined synopsis and solicitationSmall businessNAICS 237110Idaho1240LT27Q0027Due in 4 daysNov 29 - Kelly Pierson OSS
Indian Health Service, Div of Engineering SVCS - Seattle
Combined synopsis and solicitationSmall businessNAICS 237110Shelton, WA75H70127Q00001Due in 5 daysNov 30
All 25 open in water and sewer line and related structures construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Justification. Why an agency limited competition or awarded without it, citing the FAR authority. Glossary
- How it ended
- Awarded to Caldwell Marine International LLC on September 20, 2026, 27 days after offers were due. The contracting office reported 1 offer (not competed under simplified acquisition procedures).
Description
As published on SAM.gov.
The National Marine Fisheries Service (NMFS) James J. Howard Marine Sciences Laboratory, located at Highlands, NJ, relies on continuous, uninterrupted seawater delivery to support critical marine research, aquaculture, and experimental habitats. The existing 6-inch Schedule 80 PVC seawater intake lines have experienced operational constraints, requiring immediate targeted intervention on line #2. The objective of this contract is to safely mobilize, inspect, and perform specialized jetting operations in an effort to clear obstructions and restore functionality within seawater intake line #2.
The Contractor shall provide all labor, supervision, materials, equipment, tools, logistical support, and marine vessels necessary to complete the inspection and targeted obstruction clearance of seawater intake line #2.
The scope is divided into the following primary tasks:
Task 1: Mobilization, Logistics, and Site Preparation:
- Marine & Land Mobilization: Mobilize all necessary workboats, dive support vessels, jetting equipment, and support tools to the James J. Howard Marine Lab waterfront.
- Safety & Environmental Controls: Implement appropriate safety barriers and environmental controls to protect the local marine environment and conform to Sandy Hook's strict environmental regulations.
Task 2: Inspection and Assessment:
- Line Inspection: Conduct a thorough initial inspection of seawater intake line #2 to locate, identify, and assess the nature of the internal obstructions.
- Reporting: Document findings and coordinate with the onsite technical representative prior to or during jetting operations.
Task 3: Jetting and Obstruction Clearance Operations:
- Jetting Operations: Deploy specialized marine jetting equipment into seawater intake line #2.
- Obstruction Clearance: Execute targeted jetting operations in a safe manner in an effort to dislodge, clear, and flush out the identified obstructions to restore line flow.
Task 4: Post-Jetting Testing and Verification:
- Flow Verification: Perform functional flow or vacuum testing on line #2 following jetting operations to evaluate the success of the clearance efforts and verify restored operational capacity.
Task 5: Demobilization and Site Restoration:
- Demobilization: Remove all boats, equipment, unused materials, and temporary safety barriers from the facility and surrounding waters.
- Site Restoration: Restore any disturbed land, dock, or staging areas to their pre-work conditions.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Single Source Determination - Sandy Hook Seawater Intake Line Repair_Redacted.pdf377 KB, October 5, 2026
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Caldwell Marine International LLC
- UEI
- J9LPP2V9M1K7
- CAGE
- 3GR52
- Vendor location
- Wall Township, NJ
- Contract
- 1305M326P0404, purchase order
- Obligated
- $52,000.00
- Actions
- 1 between September 20, 2026 and September 20, 2026
- Competition
- Not Competed Under SAP, 1 offer received
- Set-aside reported
- No Set Aside Used.
- Described as
- Seawater Intake Line #2 Inspection and Jetting Operations at the Northeast Fisheries Science Center (Nefsc) James J. Howard Marine Sciences Laboratory
- Match
- award number 1305M326P0404 equals the contract number; same awarding office 1305M3 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 19, 2026
Sources sought
Due August 24, 2026 at 7:00 PM EDT. SAM.gov, notice fb0625b24e9d439ea4c61d30b0949290
1 revision on SAM
- August 19, 2026: publish, sources sought
October 5, 2026
Justification
SAM.gov, notice 29a1ed60e5994673b91c6b315eba2770
1 revision on SAM
- October 5, 2026: publish, justification
Points of contact
- Hannah Montoyahannah.montoya@noaa.gov