Sources sought
Trimax Controls System Integration & Automation Upgrade
PZZG0713
Department of the Air Force, FA9302 Aftc PZZ. Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables.
Response deadline
July 16, 2026 at 12:00 PM EDT
Closed 132 days ago. Posted July 13, 2026. Scheduled to archive July 31, 2026.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2026
30 like it are open now in instruments and related products manufacturing for measuring, displaying, and controlling industrial process variables
- Peel 3 3D Scanners and Software BPA
Department of the Navy, NSWC Carderock
Combined synopsis and solicitationSmall businessNAICS 334513Ship to the buyerN0016727Q1010Due todayNov 25 - SPE4A527R0007; 6685014552559; Indicator, Pressure
Defense Logistics Agency, DLA Aviation
PresolicitationNAICS 334513Ship to VASPE4A527R0007Due todayNov 25 - RFI Process control system plumbing and programming
Department of the Army, W6QK ACC-APG Natick
Sources soughtNAICS 334513Natick, MARFIProcessControlSystemPlumbingAndProgrammingDue tomorrowNov 26
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 334513 (instruments and related products manufacturing for measuring, displaying, and controlling industrial process variables), means no more than 750 employees, counted with affiliates. What a set-aside is
- What comes next
- No solicitation has been published under this number yet. The sources sought of July 13, 2026 is the earliest notice of the purchase.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Description(s): EDWARDS AFB SOURCES SOUGHT FOR TRIMAX CONTROLS SYSTEM INTEGRATION & AUTOMATION UPGRADE
THIS IS A MARKET SURVEY FOR INFORMATION ONLY. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPISIS. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SYNOPSIS OR ANY FOLLOW-UP INFORMATION REQUESTS. THE PURPOSE OF THIS SYNOPSIS IS TO GAIN KNOWLEDGE OF POTENTIALLY QUALIFIED SOURCES AND THEIR SIZE CLASSIFICATIONS (SMALL BUSINESS, LARGE BUSINESS, ETC.). PLEASE DO NOT REQUEST A COPY OF A SOLICITATION, AS ONE DOES NOT EXIST.
1. Purpose.
The United States Air Force is conducting market research to identify capable sources for the turnkey installation, programming, and commissioning of the EGW control system at Building 1030, Edwards Air Force Base (EAFB), California. The selected contractor will be required to provide all management, labor, equipment, and materials necessary to successfully execute the scope of work described herein.
2. Requirement.
SCOPE OF WORK:
- System Engineering and Programming
- PLC Logic Development: The contractor shall engineer and program the Programmable Logic Controllers (PLCs) to accurately control the designated facility equipment (e.g., pumps, valves, and generators) in accordance with the approved sequence of operations.
- HMI/SCADA Configuration: The contractor shall develop and deploy the Human- Machine Interface (HMI) screens. The graphical interface must provide operators with real-time equipment status, historical data trending, and immediate visual/audible alarming for critical system faults.
- Cybersecurity & Compliance: All software configurations and network integration shall adhere to current Risk Management Framework (RMF) guidelines. The contractor must ensure that default passwords are changed, unnecessary ports are disabled, and role-based access controls are implemented.
- Installation and Hardware Integration
- Panel Assembly: The contractor shall assemble, wire, and label all internal components of the control panels prior to site delivery. All wiring must be clearly labeled and correspond directly to the provided schematic drawings.
- On-Site Implementation: The contractor shall physically install the upgraded components, terminate field wiring, and establish network connectivity without causing uncoordinated disruptions to ongoing facility operations.
- Testing and Commissioning
- Site Acceptance Testing (SAT): Following installation, the contractor shall conduct a comprehensive SAT alongside government representatives. This includes point-to-point loop checks, verification of all automated sequences, and simulated fault testing to ensure alarms trigger correctly.
- System Cut-Over: The contractor shall manage the transition from the legacy system to the new system, ensuring continuous utility support during the cut-over phase
3. Information requested.
The Government requests interested offerors furnish the following information if they can FULLY support this requirement:
a. Company name, SAM Unique Entity ID (UEI) and Cage Code, address, points of contact, phone numbers and e-mail addresses.
b. Information should include a brief description of experience in providing the items and services specified above. The information package must be clear, concise, and complete. The Air Force is under no obligation to provide feedback to the company, or to contact the company for clarification of any information submitted in response to this request.
c. Identification of business size (small or large) and identify the socioeconomic disadvantaged category, as defined in RFO 19 and currently listed in the System for Award Management (SAM). Small business size standards are published by the U.S. Small Business Administration (SBA) and may be found at www.sba.gov/size/sizetable2002.html. The potential North American Industry Classification System (NAICS) codes assigned to this procurement is 334513 “Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables”. The Small Business Size Standard is 750 employees.
d. Any other information deemed useful to the Air Force. Information packages should be limited to no more than 3 pages.
4. Inquiries.
Qualified and interested offerors responding to this announcement must be able to support all areas. NO partial support responses from industry will be accepted.
The due date and time for responses to this Sources Sought is 9:00 AM Pacific Daylight Time on Thursday 16 July 2026.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 13, 2026
Sources sought
Due July 16, 2026 at 12:00 PM EDT. SAM.gov, notice 44b881fcef5e44188e343e1b560339d2
1 revision on SAM
- July 13, 2026: publish, sources sought
Points of contact
- Carmen Barahonacarmen.barahona@us.af.mil
- Karla Vazquezkarla_lizette.vazquez_montes@us.af.mil