Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,734 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Solicitation

Plasma Arc Melting System

PR396924

Department of Energy, ORNL Ut-Battelle LLC-DOE Contractor. Welding and Soldering Equipment Manufacturing.

Response deadline

August 13, 2025 at 3:00 PM EDT

Closed 469 days ago. Posted August 1, 2025, first published July 22, 2025. Scheduled to archive August 13, 2025.

Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities

This one closed in 2025

9 like it are open now in welding and soldering equipment manufacturing

  • 3439 ELECTRODE

    Department of the Navy, NAVSUP FLT Log CTR Puget Sound

    SolicitationSmall businessNAICS 333992Ship to the buyerN0040627Q0047
    Due in 5 daysNov 30
  • Level 1 Silver Brazing Rings

    Defense Logistics Agency, DLA Maritime - Portsmouth

    Combined synopsis and solicitationNAICS 333992Ship to Kittery, MESPMYM327Q5004
    Due in 6 daysDec 1
  • INSERT,WELDING

    Department of the Navy, NAVSUP Weapon Systems Support Mech

    SolicitationNAICS 333992Ship to the buyerN0010424QFD78
    Due in 6 daysDec 1

All 9 open in welding and soldering equipment manufacturing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 333992 (welding and soldering equipment manufacturing), means no more than 1,250 employees, counted with affiliates. What a set-aside is
Time to respond
Bidders had 22 days from the day the solicitation was posted, July 22, 2025, to the deadline. The deadline moved once: it was first August 6, 2025 and ended as August 13, 2025.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

Plasma Arc Melting System

Oak Ridge National Laboratory (ORNL) is requesting proposals for a pilot-scale plasma arc melting system to support research on refractory metal alloys. The system must be adaptable for various feedstock types and melting conditions, with precise control over heat input, melt rate, and gas environment. Key specifications include:
 
Melter Characteristics:
 
Plasma Torch System: Programmable motion control with multiple plasma torches and controlled gas delivery.
Cooling System: Closed-loop water cooling for heat-sensitive components, with integrated manifold and valves.
Material Feeding: Capability to handle compacted powder, turnings, and scrap, with optional bar feeders.
Ingot Forming: Vertical ingot formation in induction-heated molds, producing solid ingots (max: 100 mm x 100 mm x 1000 mm; min: 50 mm diameter x 1000 mm).
Melting Rate: Minimum of 1000 cc/hour for refractory metals.
Operational Safety & Integration:
 
Must include necessary framing, enclosures, and controls for safe lab operation, complying with safety codes.
Proposals should cover installation, commissioning, training, and a list of recommended spare parts and consumables.
Utility Requirements:
 
Power: 480 V, 3-phase, 60 Hz, ≤1200 KVA total demand.
Gases: Helium and argon at 120 psi.
Cooling Water: 350 gallons per minute from a tower loop and 80 gallons for emergency use.
Facility Constraints:
 
Max footprint: 35 ft (L) x 28 ft (W) x 25 ft (H), supported by an 11-inch thick concrete slab, with no below-grade installation required.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 22, 2025

    Solicitation

    Due August 6, 2025 at 3:00 PM EDT. SAM.gov, notice 084c731961ce414c8ac09541156b2963

    4 revisions on SAM
    • August 1, 2025: publish, solicitation
    • August 1, 2025: publish, solicitation
    • July 28, 2025: publish, solicitation
    • July 22, 2025: publish, solicitation
  2. July 28, 2025

    Solicitation

    Due August 13, 2025 at 3:00 PM EDT. SAM.gov, notice 47fc659a0f4e4d909d5d5a5a4d522cab

    4 revisions on SAM
    • August 1, 2025: publish, solicitation
    • August 1, 2025: publish, solicitation
    • July 28, 2025: publish, solicitation
    • July 22, 2025: publish, solicitation
  3. August 1, 2025

    Solicitation

    Due August 13, 2025 at 3:00 PM EDT. SAM.gov, notice e13f3a51cf2a4d8ca81dd639afa2e6f8

    4 revisions on SAM
    • August 1, 2025: publish, solicitation
    • August 1, 2025: publish, solicitation
    • July 28, 2025: publish, solicitation
    • July 22, 2025: publish, solicitation
  4. August 1, 2025

    Solicitation

    Due August 13, 2025 at 3:00 PM EDT. SAM.gov, notice e514135bcf6e4f54a21864a7dcb3c2a8

    4 revisions on SAM
    • August 1, 2025: publish, solicitation
    • August 1, 2025: publish, solicitation
    • July 28, 2025: publish, solicitation
    • July 22, 2025: publish, solicitation

Points of contact