Solicitation
Vacuum Gate Valves
PR389124
Department of Energy, ORNL Ut-Battelle LLC-DOE Contractor. Industrial Valve Manufacturing.
Response deadline
September 15, 2025 at 5:00 PM EDT
Closed 436 days ago. Posted August 27, 2025, first published August 26, 2025. Scheduled to archive September 15, 2025.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2025
237 like it are open now in industrial valve manufacturing
- VALVE,SAFETY RELIEF
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 332911Ship to the buyerSPE7MC27Q0067Due tomorrowNov 25 - VALVE,GATE
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 332911Ship to the buyerSPE7MC27Q0055Due tomorrowNov 25 - VALVE,REGULATING,FLUID
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 332911Ship to the buyerSPE7M227U0061Due in 3 daysNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 332911 (industrial valve manufacturing), means no more than 750 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 20 days from the day the solicitation was posted, August 26, 2025, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Vacuum Gate Valves
The Material-Plasma Exposure eXperiment (MPEX), a superconducting magnet, steady-state device, is being built at Oak Ridge National Laboratory (ORNL), herein referred to as “the Company”, to address the harsh conditions inside a fusion reactor. This device, as designed, will have the unique feature of being able to conduct accelerated lifetime tests of plasma-facing components, including those that have experienced neutron damage.
The primary role of the water-cooled gate valve is to provide a leak tight vacuum chamber barrier when plasma is not present and the mating vacuum chambers are separated, remove heat that is gate valve when the plasma is present and the gate valve is open, and provide inlet and outlet ports for cooling water.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- MPEX-12-PLAN-001- Quality Assurance Plan for MPEX.pdf1.7 MB, August 26, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 26, 2025
Solicitation
Due September 15, 2025 at 5:00 PM EDT. SAM.gov, notice 1bbc78e9d9f54c79bb70824142a4162c
2 revisions on SAM
- August 27, 2025: publish, solicitation
- August 26, 2025: publish, solicitation
August 27, 2025
Solicitation
Due September 15, 2025 at 5:00 PM EDT. SAM.gov, notice 895d3b3b81104aab9360b206ba415ba4
2 revisions on SAM
- August 27, 2025: publish, solicitation
- August 26, 2025: publish, solicitation
Points of contact
- Genna Pencepencegl@ornl.gov8653414644
- Misty Magillmagillm@ornl.gov8653411872