Solicitation
MPEX Insulating and Heating Blankets
PR348918
Department of Energy, ORNL Ut-Battelle LLC-DOE Contractor. Heating Equipment (except Warm Air Furnaces) Manufacturing.
Response deadline
April 14, 2025 at 5:00 PM EDT
Closed 590 days ago. Posted April 1, 2025, first published April 1, 2025. Scheduled to archive April 3, 2025.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2025
8 like it are open now in heating equipment (except warm air furnaces) manufacturing
- FLOODLIGHT,ELECTRIC
Defense Logistics Agency, DLA Troop Support
Combined synopsis and solicitationNAICS 333414Ship to the buyerSPE8E727T0536Due in 3 daysNov 27 - PARTS KIT,AIR FLOW REG
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 333414Ship to the buyerSPE7M427T3316Due in 3 daysNov 27 - T-AH Class HOT START CONTROL BOXES
Department of the Navy, MSCHQ Norfolk
Combined synopsis and solicitationNAICS 333414Ship to Norfolk, VAN3220527Q7015Due in 7 daysDec 2
All 8 open in heating equipment (except warm air furnaces) manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 333414 (heating equipment (except warm air furnaces) manufacturing), means no more than 500 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 13 days from the day the solicitation was posted, April 1, 2025, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The Material Plasma Exposure eXperiment (MPEX), a superconducting magnet, steady-state device, is being built at Oak Ridge National Laboratory (ORNL) to address the harsh conditions inside a fusion reactor. This device, as designed, will have the unique feature of being able to conduct accelerated lifetime tests of plasma-facing components, including those that have experienced neutron damage. The vacuum vessels create the vacuum barrier to generate and contain the plasma. The vacuum vessels require to be baked out. To bake out the vacuum vessels, insulating and heating blankets are required.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Attachment C - MPEX-04-SOW-102 R0 Statement of Work.pdf602 KB, April 1, 2025
- Attachment E - MPEX-00-ENG-002.pdf1.2 MB, April 1, 2025
- Attachment F - MPEX-00-ENG-002-A1.pdf753 KB, April 1, 2025
- Attachment G - MPEX-00-ENG-002-A2.pdf397 KB, April 1, 2025
- Attachment H - MPEX-00-ENG-002-A3.pdf715 KB, April 1, 2025
- Attachment I - MPEX-04-SPC-102 R1.pdf2.1 MB, April 1, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 1, 2025
Solicitation
Due April 14, 2025 at 5:00 PM EDT. SAM.gov, notice 32d3c184e5d74523ad860a08ed9c46f7
2 revisions on SAM
- April 1, 2025: publish, solicitation
- April 1, 2025: publish, solicitation
April 1, 2025
Solicitation
Due April 14, 2025 at 5:00 PM EDT. SAM.gov, notice 974f49d994984589b1c663abe8ec6b7f
2 revisions on SAM
- April 1, 2025: publish, solicitation
- April 1, 2025: publish, solicitation
Points of contact
- Genna Pencepencegl@ornl.gov865-341-4644
- Misty Magillmagillm@ornl.gov865-341-1872