Presolicitation
Dust Filter Design/Fab
PR313130
Department of Energy, ORNL Ut-Battelle LLC-DOE Contractor. Other Metal Valve and Pipe Fitting Manufacturing.
Response deadline
January 27, 2025 at 5:00 PM EST
Closed 667 days ago. Posted January 13, 2025. Scheduled to archive February 11, 2025.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2025
196 like it are open now in other metal valve and pipe fitting manufacturing
- USS ARLINGTON (LPD-24) Expansion Joint Parts
Department of the Navy, Mid Atlantic Reg Maint CTR
Combined synopsis and solicitationSmall businessNAICS 332919Ship to the buyerN5005427Q0020Due todayNov 25 - VALVE,DIAPHRAGM CON
Defense Logistics Agency, Sprmm1 DLA Mechanicsburg
SolicitationNAICS 332919Ship to the buyerSPRMM126QMJ18Due todayNov 25 - VALVE, GLOBE W/ ACT
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 332919Ship to Mechanicsburg, PAN0010426QEB89Due todayNov 25
All 196 open in other metal valve and pipe fitting manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 332919 (other metal valve and pipe fitting manufacturing), means no more than 750 employees, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the presolicitation of January 13, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The ITER Tokamak Dust Filter System (TDFS) contains six (6) dust filters that stops dust particulates, mainly the activated dust (mainly tungsten and beryllium), from reaching the roughing pumps during Tokamak pump down or vacuum vessel maintenance or detritiation. The TDFS consists of primary dust filters (x4) and secondary dust filters (x2) with associated filter elements, process pipework and pipe supports for primary dust filter systems and secondary dust filter system, dust proof and all-metal pneumatic actuated gate valves, as well as manual valves for test ports, double-walled bellows with some being remote handling compatible, ITER-style flanges with some having remote handling features, remote handling platform, lifting feature, support rails, and remote handling multiport connector for primary dust filters, temporary trolly support and adapter frame for primary dust filters, support frame and integrated valve box for secondary dust filters, and instrumentation (e.g. temperature sensors, gamma monitors, absolute pressure sensors, differential pressure sensors, switches, electrical feedthroughs) with mechanical supports and container for double containment of the pressure sensors. The successful vendor will demonstrate that they can meet the design requirements of this technical specification. The successful vendor’s proposal must also demonstrate they are capable of generating the design and calculation documentation as well as performing the validation and quality activities. Requirements are defined in the Technical Specification (803f11ca) and the design Statement of Work (807014e1). The successful vendor will bid on the total contract which will be split into two phases. Phase one encompasses the design of the TDFS according to SOW 807014e1. Phase two encompasses the fabrication, testing, and shipment of the TDFS according to SOW 807015f4. Given the successful completion of phase one, US ITER will award phase two to the same vendor that performed phase one. Phase two will result in the delivery of the TDFS and associated equipment described by the technical specification (803f11ca), along with any special tools needed for installation or maintenance of the equipment.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Design Statement of Work - 807014e1 - 1.1.pdf314 KB, January 13, 2025
- Fabrication Statement of Work - 807015f4 - 1.1.pdf354 KB, January 13, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 13, 2025
Presolicitation
Due January 27, 2025 at 5:00 PM EST. SAM.gov, notice 31f4e2d52d3d4298a4276157c84f7052
1 revision on SAM
- January 13, 2025: publish, presolicitation
Points of contact
- Pete Vancevancepj@ornl.gov8653412744
- Travis Olingerolingertj@ornl.gov865-341-3795