Sources sought
Large Carbonization-Graphitization Combination Furnace
PR310469
Department of Energy, ORNL Ut-Battelle LLC-DOE Contractor. Industrial Process Furnace and Oven Manufacturing.
Response deadline
September 25, 2024 at 12:00 PM EDT
Closed 791 days ago. Posted September 16, 2024. Scheduled to archive September 26, 2024.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2024
9 like it are open now in industrial process furnace and oven manufacturing
- Vacuum Relief Furnace
Department of the Air Force, FA9101 Aedc PKP Procrmnt BR
SolicitationNAICS 333994Ship to TNFA910127QB008Due in 5 daysNov 30 - Deep Pit Furnace
Department of the Army, W6QK ACC-RI
Combined synopsis and solicitationSmall businessNAICS 333994Ship to Rock Island, ILW519TC-27-Q-A019Due in 3 daysNov 28 - Dehumidifier Large Buy
Defense Logistics Agency, DLA Troop Support
Combined synopsis and solicitationNAICS 333994Ship to Philadelphia, PA4440-01-699-4396Due in 5 daysNov 30
All 9 open in industrial process furnace and oven manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 333994 (industrial process furnace and oven manufacturing), means no more than 500 employees, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of September 16, 2024. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Company’s Extreme Environment Processing group is seeking sources for the purchase of a large furnace capable of both carbonization of polymer matrix composites and then subsequent graphitization in the same furnace. This furnace is needed to fulfill project milestones for the immediate future and beyond. This Statement of Work will outline requirements for the furnace along with milestones through the design and procurement.
Requirements: A complete furnace shall be designed, built, and delivered within 60 weeks from contract being awarded. • System must be capable of performing carbonization of polymer matrix composites and the associated effluent off-gassing at 1000° C. • Inert gas capability Argon, Nitrogen, & Helium. • Interior dimensions of retort: 60-inch diameter, 96-inch height. • Maximum weight handling requirement for retort, 800 lbs of product. • Must be able to accommodate 200 lbs. of resin binder removal during processing. • Desired cool down from max temperature less than 24 hrs. • Desired Maximum ramp rate from ambient to max temp less than 24 hrs. • Required continuous operation temperature 2500 C in positive pressure of inert gas at minimum. • System must have base vacuum pressure in the 10-3 Torr range. • Gas Safety System required. • Inert gas flow must be strong enough to remove effluent off-gassing. • Exhaust port for effluent off-gassing. • System will be bottom loading. • Maximum assembled height of 24ft. • Seller must provide all recommended utility requirements. • Seller will provide hoisting and rigging support.
Seller will provide supervision support during the movement of the furnace. • Company will make the final electrical tie-in. • System must not have wireless communication capability I.E. Bluetooth or Wifi. • If system is controlled by a separate standalone computer wireless communication must be removed from computer by the computer supplier and a receipt of verification must be provided. • Must provide user Manuals including setup, calibration, operations, maintenance procedures, steps, and requirements.
Maintenance will be provided per the manufacturer’s recommendations. • Provide a recommended spare parts list and consumables. • Must provide controllers for temperature and timing with over-temperature protection. • The system must be approved by Nationally Recognized Testing Laboratory or equivalent electrical certification. • System must include supervised field service startup including at least one service technician for required installation time-frame. • System must come with a 1-year warranty after start-up. • System must be manufactured under a quality assurance (QA) program such as ISO 9001 or similar. • System must conform to the following standards: NFPA 55, NFPA 68, NFPA 70, NFPA 79, NFPA 86. • Seller must provide monthly status updates in the form of meetings or virtual communication. • Seller must provide a check-out run on-site prior to delivery and installation of the system.
Milestones: Milestones to be performed concurrently. Time requirements can be negotiated, however total time of 60 weeks is non-negotiable.
1. Initial design of system.
2. Final design of system.
3. Procurement of materials for manufacturing.
4. Completion of manufacturing the system.
5. System Testing at Seller’s site.
6. Delivery, installation, and acceptance of system at ORNL.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 16, 2024
Sources sought
Due September 25, 2024 at 12:00 PM EDT. SAM.gov, notice 8a137ec4be364b35a94f2c82d3dbcbfd
Points of contact
- Scott Scarbroughscarbroughws@ornl.gov8652353750
- Mckenzi Bazbazmk@ornl.gov8652353750