{"canonical":"https://sealedbidder.com/opportunities/pr16062817","key":"PR16062817","url":"https://sealedbidder.com/opportunities/pr16062817","title":"F-FAC SVC Replacement of emergency exit Signs @ COB","solicitation_number":"PR16062817","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-08-09T22:00:00Z","first_posted":"2026-07-07","last_posted":"2026-07-07","department":"STATE, DEPARTMENT OF","subagency":"STATE, DEPARTMENT OF","office":"US CONSULATE FRANKFURT","naics":"33995","psc":"9905","set_aside":null,"place_state":null,"place_scope":"overseas","site":null,"place_state_source":null,"place_evidence":"Product purchase (PSC 9905)","place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"7efc8a4aaa4a49309f338923dce1ea9c","title":"F-FAC SVC Replacement of emergency exit Signs @ COB","solicitation_number":"PR16062817","notice_type":"o","base_type":"o","posted":"2026-07-07","posted_at":"2026-07-07T13:56:25.841Z","due_at":"2026-08-09T22:00:00Z","due_date":"2026-08-10","cancelled":false,"archived":true,"archive_date":"2026-08-25","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/7efc8a4aaa4a49309f338923dce1ea9c/view","enriched":true,"history":[{"index":3,"title":"F-FAC SVC Replacement of emergency exit Signs @ COB","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-07T13:56:25.841Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"7efc8a4aaa4a49309f338923dce1ea9c","solicitation_number":"PR16062817"}]}],"latest_notice_id":"7efc8a4aaa4a49309f338923dce1ea9c","first_type":"o","notices":[{"dates":{"posted":"2026-07-07","posted_at":"2026-07-07T13:56:25.841Z","created_at":"2026-06-25T07:40:21.919Z","modified_at":"2026-08-25T05:06:54.835Z","response_deadline":{"raw":"2026-08-10T00:00:00+02:00","utc":"2026-08-09T22:00:00Z","date":"2026-08-10","time":"00:00:00","timezone":"Europe/Berlin","utc_offset_seconds":7200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/7efc8a4aaa4a49309f338923dce1ea9c/view"},"naics":{"codes":["33995"],"primary":"33995"},"title":"F-FAC SVC Replacement of emergency exit Signs @ COB","agency":{"office":{"code":"19K405","name":"US CONSULATE FRANKFURT"},"subtier":{"code":"1900","name":"STATE, DEPARTMENT OF"},"department":{"code":"019","name":"STATE, DEPARTMENT OF"},"office_address":{"city":"60435 Frankfurt","country":"DEU"},"organization_id":"100173459","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-08-25","archive_type":"auto15"},"history":[{"index":3,"title":"F-FAC SVC Replacement of emergency exit Signs @ COB","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-07-07T13:56:25.841Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"7efc8a4aaa4a49309f338923dce1ea9c","solicitation_number":"PR16062817"}],"contacts":[{"name":"GSO Procurement","role":"primary","email":"einkauf@state.gov","phone":"496975353544"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"7efc8a4aaa4a49309f338923dce1ea9c","lineage_id":"7efc8a4aaa4a49309f338923dce1ea9c","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-30T09:29:20.903865226Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T00:55:27.040971Z","row_sha256":"7f3091815a9cd6d22d49a4c5d46d53db3398bc4ce26cb757d4679040b2ffda1e","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-30T09:29:20.903865226Z","first_seen_at":"2026-09-16T00:55:27.040971Z"},"description":{"html":"<p>The U.S. Consulate General Frankfurt has a requirement to Replacement and Installation of Exit Signs<br />\nand Emergency Egress Lighting<br />\nA. located at the Joachim-Becher-Stra&szlig;e 19 and AmConGen Frankfurt, Gie&szlig;ener Stra&szlig;e 30.<br />\nThe Contractor shall furnish all materials, equipment, and labor required to complete the<br />\nwork. The proposed scope of work includes, but is not limited to, the following:<br />\n1. Replacement and Installation of Exit Signs and Emergency Egress Lighting<br />\nThe project consists of the replacement, installation, testing, commissioning, and documentation<br />\nof emergency exit signs and emergency egress lighting systems throughout multiple Consulate<br />\nfacilities. The Contractor shall provide all labor, materials, equipment, supervision,<br />\ntransportation, and services necessary to deliver a complete, fully operational, and codecompliant<br />\ninstallation.<br />\nThe scope includes a detailed site survey, assessment and documentation of existing conditions,<br />\nremoval and disposal of existing fixtures, installation of new LED exit signs and emergency<br />\nluminaires, electrical modifications, firestopping of penetrations, system testing, commissioning,<br />\nlabeling, and final cleanup. All work shall comply with applicable U.S. codes and standards,<br />\nincluding NEC (NFPA 70), NFPA 101, NFPA 72, OSHA requirements, UL 924, the<br />\nInternational Building Code (IBC), and local Authority Having Jurisdiction (AHJ) requirements.<br />\nAs the project is located in Germany, the Contractor shall also ensure compliance with all<br />\napplicable German and European regulations and standards, including, where applicable, DIN<br />\nEN 1838 (Emergency Lighting), DIN EN 50172 / VDE 0108-100 (Emergency Escape Lighting<br />\nSystems), DIN VDE electrical installation standards, the German Workplace Ordinance<br />\n(ArbSt&auml;ttV), Technical Rules for Workplaces (ASR A2.3 Escape Routes and Emergency<br />\nExits), local building regulations, and fire protection requirements.<br />\nThe Contractor shall perform functional testing, emergency operation verification, illumination<br />\nmeasurements, and compliance checks to ensure that all installed systems meet life-safety and<br />\nemergency egress requirements. Upon completion, comprehensive closeout documentation shall<br />\nbe provided, including as-built drawings, test reports, circuit schedules, product data sheets,<br />\nwarranties, maintenance manuals, and an updated asset inventory.<br />\nDue to the work being performed within an active Consulate facility, strict security and access<br />\nprocedures shall apply. The Contractor must demonstrate relevant experience in government,<br />\ndiplomatic, institutional, or high-security facilities, employ qualified and licensed personnel, and<br />\ncoordinate all activities with facility management and security representatives. Final acceptance<br />\nwill be subject to successful completion of all work, testing, documentation, correction of<br />\ndeficiencies, and written approval by the Contracting Officer or Owner Representative.</p>","text":"The U.S. Consulate General Frankfurt has a requirement to Replacement and Installation of Exit Signs\n\nand Emergency Egress Lighting\n\nA. located at the Joachim-Becher-Straße 19 and AmConGen Frankfurt, Gießener Straße 30.\n\nThe Contractor shall furnish all materials, equipment, and labor required to complete the\n\nwork. The proposed scope of work includes, but is not limited to, the following:\n\n1. Replacement and Installation of Exit Signs and Emergency Egress Lighting\n\nThe project consists of the replacement, installation, testing, commissioning, and documentation\n\nof emergency exit signs and emergency egress lighting systems throughout multiple Consulate\n\nfacilities. The Contractor shall provide all labor, materials, equipment, supervision,\n\ntransportation, and services necessary to deliver a complete, fully operational, and codecompliant\n\ninstallation.\n\nThe scope includes a detailed site survey, assessment and documentation of existing conditions,\n\nremoval and disposal of existing fixtures, installation of new LED exit signs and emergency\n\nluminaires, electrical modifications, firestopping of penetrations, system testing, commissioning,\n\nlabeling, and final cleanup. All work shall comply with applicable U.S. codes and standards,\n\nincluding NEC (NFPA 70), NFPA 101, NFPA 72, OSHA requirements, UL 924, the\n\nInternational Building Code (IBC), and local Authority Having Jurisdiction (AHJ) requirements.\n\nAs the project is located in Germany, the Contractor shall also ensure compliance with all\n\napplicable German and European regulations and standards, including, where applicable, DIN\n\nEN 1838 (Emergency Lighting), DIN EN 50172 / VDE 0108-100 (Emergency Escape Lighting\n\nSystems), DIN VDE electrical installation standards, the German Workplace Ordinance\n\n(ArbStättV), Technical Rules for Workplaces (ASR A2.3 Escape Routes and Emergency\n\nExits), local building regulations, and fire protection requirements.\n\nThe Contractor shall perform functional testing, emergency operation verification, illumination\n\nmeasurements, and compliance checks to ensure that all installed systems meet life-safety and\n\nemergency egress requirements. Upon completion, comprehensive closeout documentation shall\n\nbe provided, including as-built drawings, test reports, circuit schedules, product data sheets,\n\nwarranties, maintenance manuals, and an updated asset inventory.\n\nDue to the work being performed within an active Consulate facility, strict security and access\n\nprocedures shall apply. The Contractor must demonstrate relevant experience in government,\n\ndiplomatic, institutional, or high-security facilities, employ qualified and licensed personnel, and\n\ncoordinate all activities with facility management and security representatives. Final acceptance\n\nwill be subject to successful completion of all work, testing, documentation, correction of\n\ndeficiencies, and written approval by the Contracting Officer or Owner Representative.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"PR16062817","place_of_performance":{"zip":"60435","city":{"code":"Frankfurt","name":"Frankfurt"},"country":{"code":"DEU","name":"GERMANY"}},"product_service_code":"9905"}],"due_at":"2026-08-09T22:00:00Z","due_date":"2026-08-10","closes_at":"2026-08-09T22:00:00Z","awardable":true,"dept_key":"d-019","dept_name":"STATE, DEPARTMENT OF","sub_key":"s-1900","sub_name":"STATE, DEPARTMENT OF","office_key":"o-19K405","office_name":"US CONSULATE FRANKFURT","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"DEU","state_source":null,"state_evidence":"Product purchase (PSC 9905)","site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-09-30T10:13:25.558890Z","principal_notice_id":"7efc8a4aaa4a49309f338923dce1ea9c","description":{"text":"The U.S. Consulate General Frankfurt has a requirement to Replacement and Installation of Exit Signs\n\nand Emergency Egress Lighting\n\nA. located at the Joachim-Becher-Straße 19 and AmConGen Frankfurt, Gießener Straße 30.\n\nThe Contractor shall furnish all materials, equipment, and labor required to complete the\n\nwork. The proposed scope of work includes, but is not limited to, the following:\n\n1. Replacement and Installation of Exit Signs and Emergency Egress Lighting\n\nThe project consists of the replacement, installation, testing, commissioning, and documentation\n\nof emergency exit signs and emergency egress lighting systems throughout multiple Consulate\n\nfacilities. The Contractor shall provide all labor, materials, equipment, supervision,\n\ntransportation, and services necessary to deliver a complete, fully operational, and codecompliant\n\ninstallation.\n\nThe scope includes a detailed site survey, assessment and documentation of existing conditions,\n\nremoval and disposal of existing fixtures, installation of new LED exit signs and emergency\n\nluminaires, electrical modifications, firestopping of penetrations, system testing, commissioning,\n\nlabeling, and final cleanup. All work shall comply with applicable U.S. codes and standards,\n\nincluding NEC (NFPA 70), NFPA 101, NFPA 72, OSHA requirements, UL 924, the\n\nInternational Building Code (IBC), and local Authority Having Jurisdiction (AHJ) requirements.\n\nAs the project is located in Germany, the Contractor shall also ensure compliance with all\n\napplicable German and European regulations and standards, including, where applicable, DIN\n\nEN 1838 (Emergency Lighting), DIN EN 50172 / VDE 0108-100 (Emergency Escape Lighting\n\nSystems), DIN VDE electrical installation standards, the German Workplace Ordinance\n\n(ArbStättV), Technical Rules for Workplaces (ASR A2.3 Escape Routes and Emergency\n\nExits), local building regulations, and fire protection requirements.\n\nThe Contractor shall perform functional testing, emergency operation verification, illumination\n\nmeasurements, and compliance checks to ensure that all installed systems meet life-safety and\n\nemergency egress requirements. Upon completion, comprehensive closeout documentation shall\n\nbe provided, including as-built drawings, test reports, circuit schedules, product data sheets,\n\nwarranties, maintenance manuals, and an updated asset inventory.\n\nDue to the work being performed within an active Consulate facility, strict security and access\n\nprocedures shall apply. The Contractor must demonstrate relevant experience in government,\n\ndiplomatic, institutional, or high-security facilities, employ qualified and licensed personnel, and\n\ncoordinate all activities with facility management and security representatives. Final acceptance\n\nwill be subject to successful completion of all work, testing, documentation, correction of\n\ndeficiencies, and written approval by the Contracting Officer or Owner Representative.","html":"<p>The U.S. Consulate General Frankfurt has a requirement to Replacement and Installation of Exit Signs<br />\nand Emergency Egress Lighting<br />\nA. located at the Joachim-Becher-Stra&szlig;e 19 and AmConGen Frankfurt, Gie&szlig;ener Stra&szlig;e 30.<br />\nThe Contractor shall furnish all materials, equipment, and labor required to complete the<br />\nwork. The proposed scope of work includes, but is not limited to, the following:<br />\n1. Replacement and Installation of Exit Signs and Emergency Egress Lighting<br />\nThe project consists of the replacement, installation, testing, commissioning, and documentation<br />\nof emergency exit signs and emergency egress lighting systems throughout multiple Consulate<br />\nfacilities. The Contractor shall provide all labor, materials, equipment, supervision,<br />\ntransportation, and services necessary to deliver a complete, fully operational, and codecompliant<br />\ninstallation.<br />\nThe scope includes a detailed site survey, assessment and documentation of existing conditions,<br />\nremoval and disposal of existing fixtures, installation of new LED exit signs and emergency<br />\nluminaires, electrical modifications, firestopping of penetrations, system testing, commissioning,<br />\nlabeling, and final cleanup. All work shall comply with applicable U.S. codes and standards,<br />\nincluding NEC (NFPA 70), NFPA 101, NFPA 72, OSHA requirements, UL 924, the<br />\nInternational Building Code (IBC), and local Authority Having Jurisdiction (AHJ) requirements.<br />\nAs the project is located in Germany, the Contractor shall also ensure compliance with all<br />\napplicable German and European regulations and standards, including, where applicable, DIN<br />\nEN 1838 (Emergency Lighting), DIN EN 50172 / VDE 0108-100 (Emergency Escape Lighting<br />\nSystems), DIN VDE electrical installation standards, the German Workplace Ordinance<br />\n(ArbSt&auml;ttV), Technical Rules for Workplaces (ASR A2.3 Escape Routes and Emergency<br />\nExits), local building regulations, and fire protection requirements.<br />\nThe Contractor shall perform functional testing, emergency operation verification, illumination<br />\nmeasurements, and compliance checks to ensure that all installed systems meet life-safety and<br />\nemergency egress requirements. Upon completion, comprehensive closeout documentation shall<br />\nbe provided, including as-built drawings, test reports, circuit schedules, product data sheets,<br />\nwarranties, maintenance manuals, and an updated asset inventory.<br />\nDue to the work being performed within an active Consulate facility, strict security and access<br />\nprocedures shall apply. The Contractor must demonstrate relevant experience in government,<br />\ndiplomatic, institutional, or high-security facilities, employ qualified and licensed personnel, and<br />\ncoordinate all activities with facility management and security representatives. Final acceptance<br />\nwill be subject to successful completion of all work, testing, documentation, correction of<br />\ndeficiencies, and written approval by the Contracting Officer or Owner Representative.</p>","origin":"detail"},"contacts":[{"name":"GSO Procurement","role":"primary","email":"einkauf@state.gov","phone":"496975353544"}],"place_of_performance":{"zip":"60435","city":{"code":"Frankfurt","name":"Frankfurt"},"country":{"code":"DEU","name":"GERMANY"}},"office_address":{"city":"60435 Frankfurt","country":"DEU"},"naics_codes":["33995"],"award":null,"attachments":[{"resource_id":"164f5d9608e9437f80097da9a60b2596","name":"SOW PR16062817 - F-FAC SVC Replacement of emergency exit Signs.pdf","kind":"file","mime_type":".pdf","size_bytes":871301,"posted_at":"2026-07-07T13:56:25.841Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/164f5d9608e9437f80097da9a60b2596/download","mirrored":false}],"awards":[],"related":[],"similar_open":[],"similar_open_total":0,"indexable":false}