Solicitation
Construction Materials to be delivered in Manta – Ecuador
PR15472096
Department of State, U.S. Embassy Quito. Construction.
Response deadline
August 18, 2025 at 6:00 PM EDT
Closed 464 days ago. Posted August 8, 2025, first published July 31, 2025. Scheduled to archive September 2, 2025.
Get the next one like this from Department of State by email, the day it is posted.Find my opportunities
This one closed in 2025
3 like it are open now in construction
- Non-Complex Construction and Design Build Construction, Basic Ordering Agreement RAF Lakenheath, Suffolk
Department of the Air Force, FA5587 48 Cons (Admin Only No Req)
Sources soughtNAICS 23Outside the USFA558723GXXXXCloses in 805 daysFeb 7, 2029 - Schofield Barracks, HI - Care Care Center w/Gas Express Image Update (SB80)
Army Air Force Exchange Service, PZ - K Ofc of DIR-PROCU 1018572
SolicitationNAICS 23Schofield Barracks, HIGNFR-FC-SCH-26-27662Closes in 8 daysDec 3 - Craft Labor and Corrosion Control Services
National Aeronautics and Space Administration, NASA Kennedy Space Center
Sources soughtNAICS 23Titusville, FL80KSC027R0008Closes in 22 daysDec 17
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. What a set-aside is
- Time to respond
- Bidders had 18 days from the day the solicitation was posted, July 31, 2025, to the deadline.
Description
As published on SAM.gov.
ADVERTISEMENT
RFP Number: PR15472096
The U.S. Embassy in Quito, Ecuador, through the Bureau of International Narcotics and Law Enforcement Affairs (INL), intends to award a Firm Fixed-Price Purchase Order for the acquisition and delivery of construction materials to support the construction of a perimeter wall in Manta, Ecuador.
1. Task/Scope
1.1 The vendor shall coordinate with the INL-designated point of contact to plan the delivery of the construction materials.
1.2 The vendor shall provide all construction materials as detailed in Appendix A of this document.
1.3 The vendor shall transport, unload and deliver all materials to the designated location at the GEMA base in the city of Manta, Ecuador.
1.4 The vendor shall unload and verify the materials on-site together with the INL-designated point of contact.
1.5 The vendor shall properly stack and secure all delivered materials at the designated area within the GEMA base.
1.6 The vendor shall provide all required delivery documentation, including the commercial invoice, delivery note, and a signed receipt of delivery.
1.7 The vendor shall provide all required delivery documentation, including the commercial invoice, delivery note, and a signed receipt confirming delivery.
1.8 The vendor shall replace, at no additional cost, any items delivered in error or found to be damaged or defective.
1.9 The vendor shall complete the delivery within a maximum of fifteen (15) calendar days from the date of purchase order approval.
2. Deliverables
2.1 All construction materials listed in Appendix A shall be delivered to the GEMA base in Manta. In the case of imported materials, delivery shall be under Incoterm DDP (Delivered Duty Paid), inclusive of all applicable taxes, duties, and customs clearance.
3. Requirements
3.1 All materials must be new, unused, and in good condition, with proper packaging to prevent damage during transport.
3.2 The vendor must provide a designated point of contact to coordinate with INL throughout the process.
3.3 The vendor must replace any defective or incorrect materials within five (5) business days of notification, at no additional cost.
4. Place of performance
4.1 The place of performance for all tasks and deliveries under this contract shall be in the city of Manta, Manabí Province, Ecuador.
5. Schedule
5.1 Kickoff: Project will begin immediately after the purchase order is approved.
5.2 Delivery: All materials must be delivered within fifteen (15) calendar days from the date of purchase order approval.
5.3 Completion: The project will be considered complete once all materials have been delivered, inspected, and verified by the INL-designated point of contact.
6. Special Terms and Conditions
6.1 INL may inspect materials during the delivery process.
6.2 All delivery details and logistics must remain confidential until the delivery is completed.
6.3 Security Requirements
6.3.1 The vendor must comply with standard safety procedures during transport, unloading, and handover.
6.3.2 The vendor shall not disclose any project-related or delivery information to third parties.
6.4 Industry standards.
6.4.1 All materials must comply with applicable construction quality standards in Ecuador.
6.4.2 All items must be factory new; used, reconditioned, or expired materials are not permitted.
6.4.3 No hazardous materials shall be included in this procurement.
7. Warranty
7.1 Warranty must match original manufacturer’s terms and be valid in Ecuador.
8. Goods and prices
8.1 The Contractor shall provide and deliver to the U.S. Government the construction materials described in the specifications for the stated firm-fixed price. The firm-fixed price shall include delivery to the location set forth under Section 2.
8.2 The price shall include all direct and indirect costs. The price will not be subject to adjustment after the award of the contract.
8.3 Offerors shall include specific details and delivery dates in their responses to this Synopsis. All prices shall be listed in USD.
8.4 Value Added Tax (VAT) is not included in the CLIN rates. Instead, it will be priced as a separate Line Item in the contract and on Invoices. Local law dictates the portion of the contract price that is subject to VAT; this percentage is multiplied only against that portion.
8.5 The payment method used by the Embassy of the United States of America is: 100% payment in 30 days once the goods are received and the invoice is submitted. No advance payment is considered, no payments will be made for any unauthorized supplies or services or for any unauthorized changes to the work specified herein. This includes any services performed by the awardee of its own volition or at the request of an individual other than a duly appointed Contracting Officer (CO). Only the duly appointed CO is authorized to change the specifications, terms, and/or conditions of the contract.
9. Nonpayment for unauthorized work
9.1 No payments will be made for any unauthorized supplies or services or for any unauthorized changes to the work specified herein. This includes any services performed by the awardee of its own volition or at the request of an individual other than a duly appointed Contracting Officer (CO). Only the duly appointed CO is authorized to change the specifications, terms, and/or conditions of the contract.
10. Evaluation Criteria
Best price offered
FAR 15.101-2
Lowest price technically acceptable (LPTA) Source Selection Process
To be deemed technically acceptable, all offers must include a proposal fully aligned with Appendix A, clearly indicating the brand, description, quantity, and unit of measure for each item, as well as specifying the warranty and delivery time. Foreign vendors must explicitly state DDP delivery terms.
Offers failing to meet technical acceptability will be rejected without clarification or opportunity to revise.
Reference: FAR 15.305(a)(3)
11. Process Schedule
We will evaluate offers based on the best value to the US Government, please see below the following schedule:
- Questions regarding this bid will be received by August 07,2025.
- Responses to all the questions will be provided by August 13, 2025.
- Final offers will be received by August 18, 2025.
12. Point of contact
- Direct any questions regarding this project to Valeria Rueda Procurement Agent, at telephone number +593 99-202-8803, Email: ruedavj@state.gov, in writing to same e-mail addresses.
13. SAM requirement
- Pursuant to FAR 4.1102, bidders are required to be registered in SAM (System for Award Management) at the time a quotation is submitted. In order to register to SAM, please follow the instructions detailed in the following link: https://sam.gov/content/home
APPENDIX A – Technical Specifications (attached)
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 2025.08.01_PR15472096_Advertisement.pdf351 KB, July 31, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 31, 2025
Solicitation
Due August 18, 2025 at 6:00 PM EDT. SAM.gov, notice 2238fad78093455a82cb22bdba76bfdc
2 revisions on SAM
- August 8, 2025: publish, solicitation
- July 31, 2025: publish, solicitation
August 8, 2025
Solicitation
Due August 18, 2025 at 6:00 PM EDT. SAM.gov, notice 67a13dc1180b4d67948dc0e2255a4e27
2 revisions on SAM
- August 8, 2025: publish, solicitation
- July 31, 2025: publish, solicitation
Points of contact
- Valeria Ruedaruedavj@state.gov593992028803
- Matthew MaddenQuito-INL-Procurement@state.gov59323985231