Sources sought
Liquid Flow Calibrators
PANRSA-25-P-0000-014828
Department of the Army, W6QK ACC-RSA. Totalizing Fluid Meter and Counting Device Manufacturing.
Response deadline
July 3, 2025 at 1:00 PM EDT
Closed 512 days ago. Posted June 18, 2025. Scheduled to archive July 18, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
17 like it are open now in totalizing fluid meter and counting device manufacturing
- Receiver, Indicator [WSDC: JDN] End Item: Arleigh Burke Class DDG PR: 7016785396; NSN: 6680-013169400 IAW P/N: 73700-0100
Defense Logistics Agency, DLA Aviation
PresolicitationNAICS 334514Ship to VASPE4A627R0021Due todayNov 27 - STAND,VEHICLE SUPPORT
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 334514Ship to the buyerSPE7LX27U0975Due tomorrowNov 27 - ADAPTIVE DIAGNOSTIC EL
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 334514Ship to the buyerSPE7M127T2736Due tomorrowNov 27
All 17 open in totalizing fluid meter and counting device manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 334514 (totalizing fluid meter and counting device manufacturing), means no more than 850 employees, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of June 18, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The US Army Contracting Command-Redstone Services & IT Solution Branch, plans to obtain information to serve as market research to help identify potential sources that can provide two
(2) Primary Standard Liquid Flow Calibrators or equivalent for a life-cycle replacement for an older similar calibrator that is becoming inoperable due to repair parts being unavailable. The equipment shall be delivered to APSL, located at Building 5435, Fowler Road Redstone Arsenal. The Liquid Flow Calibrators module shall include the following specifications or equivalent (if not brand name):
• Maximum measurement capability of 60 GPM
• Utilize CFlow+ software
• Provide temperature control of fluids (heating and cooling)
• Manual and automatic operation
• Access to temperature probes and other components to provide for easy calibration
• Fluid draw plumbing attachment
• Flow calibrators must have an uncertainty of 0.05% or better at k=2
• Flow meter calibrators must be compatible with all turbine meters and flowmeters (rotameters, frequency output, analog output)
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Purchase Description (W80RA6-34-25C).pdf103 KB, June 18, 2025
- Request for Information (W80RA6-34-25C).pdf139 KB, June 18, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 18, 2025
Sources sought
Due July 3, 2025 at 1:00 PM EDT. SAM.gov, notice c81c775f1f7045df92ef65c015a49840
1 revision on SAM
- June 18, 2025: publish, sources sought
Points of contact
- Taylor Siskofftaylor.c.siskoff.civ@army.mil
- Shalanda McMurryshalanda.r.mcmurry.civ@army.mil